Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Progress on the Development of the Nb 3 Sn 11T Dipole for the High Luminosity Upgrade of LHC

The high-luminosity large hadron collider (LHC) project at CERN entered into the production phase in October 2015 after the completion of the design study phase. In the meantime, the development of the 11 T dipole needed for the upgrade of the collimation system of the machine made significant progress with very good performance of the first two-in-one magnet model of 2-m length made at CERN. The 11 T dipole, which is more powerful than the current main dipoles of LHC, can be made shorter with an equivalent integrated field. This will allow creating space for the installation of additional collimators in specific locations of the dispersion suppressor regions. Following tests carried out during heavy ions runs of LHC in the end of 2015, and a more recent review of the project budget, the installation plan for the 11 T dipole was revised. Consequently, one 11 T dipole full assembly containing two 11 T dipoles of 5.5-m length will be installed on either side of interaction point 7. These two units shall be installed during the long shutdown 2 in years 2019-2020. After a brief reminder on the design features of the magnet, this paper describes the current status of the development activities, in particular the short model programme and the construction of the first full scale prototype at CERN. Finally, critical operations such as the reaction treatment and the coil impregnation are discussed, the quench performance tests results of the two-in-one model are reviewed and finally, the plan toward the production for the long shut down 2 is described.

43 PARTICLE ACCELERATORS↗

Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system together with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Fabrication and Assembly Performance of the First 4.2 m MQXFA Magnet and Mechanical Model for the Hi-Lumi LHC Upgrade

Here, the LHC accelerator research program (LARP), in collaboration with CERN and under the scope of the high luminosity upgrade of the Large Hadron Collider, is in the prototyping stage in the development of a 150 mm aperture high-field Nb 3 Sn quadrupole magnet called MQXF. This magnet is mechanically supported using a shell-based support structure, which has been extensively demonstrated on several R&D models within LARP, as well as in the more recent short (1.2 m magnetic length) MQXF model program. The MQXFA magnets are each 4.2 m magnetic length, and the first mechanical long model, MQXFA1M (using aluminum surrogate coils), and MQXFAP1 prototype magnet (the first prototype with Nb 3 Sn coils) have been assembled at the LBNL. In this paper, we summarize the tooling and the assembly processes, and discuss the mechanical performance of these first two assemblies, comparing strain gauge data with finite element model analysis, as well as the near-term plans for the long MQXF magnet program.

43 PARTICLE ACCELERATORS↗

Assembly of a Mechanical Model of MQXFB, the 7.2-m-Long Low-$\beta$ Quadrupole for the High-Luminosity LHC Upgrade

The ${\rm Nb_{3}Sn}$low-$\beta$quadrupole MQXF is being developed as a part of the High-Luminosity large hadron collider (LHC) upgrade project. The magnet will be produced in two different configurations, sharing the same cross section but with different lengths. A 7.2-m mechanical model of MQXFB was recently assembled at european organization for nuclear research (CERN) with one copper coil, two low-grade coils, and one rejected coil. Coil dimensions were measured with a portable coordinate measurement machine. The coil pack shimming was designed in order to optimize the field quality and the contacts between the coils and the collars. The azimuthal preload target was defined using the short models experience. The mechanical behavior during loading was monitored by means of strain gauges. The results demonstrated that the structure can provide the required prestress to the coils.

43 PARTICLE ACCELERATORS↗

Mechanical Performance of the First Two Prototype 4.5 m Long Nb$_3$Sn Low-$β$ Quadrupole Magnets for the Hi-Lumi LHC Upgrade

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) team is collaborating with CERN in the design and fabrication of the first 4.5 m long MQXFA magnets, a 150 mm aperture high-field Nb$_3$Sn quadrupole magnet that uses the aluminum shell-based bladder-and-key technology. The first two prototype magnets, MQXFAP1 and MQXFAP2, were assem-bled and tested while the first pre-series structure (MQXFA03) was in fabrication. This paper summarizes the mechanical perfor-mance of these prototype structures based on the comparison of measured strain gauge data with finite element model analyses from all load steps to powering. The MQXFAP1 magnet almost reached ultimate current before a short to ground was detected and the test was stopped. The MQXFAP2 magnet experienced a low training performance due to a fractured aluminum shell. MQXFAP1b was rebuilt with a new replacement coil, but an old coil limited the magnet from achieving the ultimate current. The mitigations and analyses of these prototype magnets are discussed in the context of the transition to pre-series production.

43 PARTICLE ACCELERATORS↗

Test Results of the First Two Full-Length Quadrupole Magnets for the LHC Hi Lumi Upgrade

The future high luminosity (Hi-Lumi) upgrade of the Large Hadron Collider (LHC) at CERN will include eight (plus two spares) 8.4 m-long cryostatted cold masses which will be components of the triplets for two LHC insertion regions. Each cold mass will consist of two 4.2 m long Nb 3 Sn high gradient quadrupole magnets, designated MQXFA, with aperture 150 mm and operating gradient 132.6 T/m, for a total of twenty magnets. Before assembling and testing the final cold masses at Fermilab, the twenty component quadrupoles will be tested first at the ver-tical superconducting magnet test facility of the Superconducting Magnet Division at Brookhaven National Laboratory (BNL), in superfluid He at 1.9 K and to 18.0 kA, to meet LHC operational requirements. The first two full-length prototype quadrupole magnets, MQXFAP1 and MQXFAP2, have been tested at BNL. This paper reports on the quench test and training results of these magnets, and also the retest of the first prototype, rebuilt and designated as MQXFAP1b. We note the test results of these magnets will be important for validating the MQXFA design.

43 PARTICLE ACCELERATORS↗

Test Results of the First Pre-Series Quadrupole Magnets for the LHC Hi-Lumi Upgrade

The future high luminosity (Hi-Lumi) upgrade of the Large Hadron Collider (LHC) at CERN will include eight (plus two spares) 10.2 m-long Cryo-assemblies which will be components of the triplets for two LHC insertion regions. Each cold mass in the Cryo-assemblies will consist of two 4.2 m-long Nb 3 Sn high gradient quadrupole magnets, designated MQXFA, with aperture 150 mm and operating gradient 132.2 T/m, for a total of twenty magnets. Before assembling and testing the final cold masses at Fermilab, the component quadrupoles are being tested first at the vertical superconducting magnet test facility of the Superconducting Magnet Division (SMD) at Brookhaven National Laboratory (BNL), in superfluid He at 1.9 K and up to 18.0 kA, in accordance with operational requirements of the LHC. The tests of the first two full-length prototype quadrupole magnets MQXFAP1 and MQXFAP2 at BNL have been reported previously. The first two pre-series magnets, the first two that will be used in the LHC, have also now been tested. This paper reports on the quench test and training results of these two magnets. The test results of these magnets will be important for validating the final MQXFA design for operational magnets.

43 PARTICLE ACCELERATORS↗

Design of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Here as part of the U.S. contribution to the HL-LHC Accelerator Upgrade Project (AUP), Fermilab is designing and building cold masses suitable for use in the LHC interaction regions. The cold mass provides a vacuum-tight helium enclosure for the magnets. Two magnets are aligned both axially and in cross section at Fermilab based on survey and warm magnetic measurements. Bus work and instrumentation is added. A welded stainless steel vacuum-tight shell surrounds the two magnets, and the structure is prepared for insertion into the cryostat. This paper summarizes the design of the cold mass including alignment, bus work, weld details, and instrumentation.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Design, Fabrication, and Testing of a 1.9 m Long, 16.5 mm Period NbTi Superconducting Undulator for the Advanced Photon Source Upgrade

Superconducting undulator (SCU) technology has been in use at the Advanced Photon Source since 2013. Due to the successful and reliable operation of the existing SCUs, the Advanced Photon Source upgrade project has decided to expand the use of NbTi-based SCUs. The first new magnets to be designed and fabricated are 1.9 m long with a period length of 16.5 mm. NbTi superconductor is used for coil winding and there are four separate coils wound on the mandrel to produce the main undulator field along with end compensation and distributed dipole compensation. The magnetic design, fabrication details, assembly, and testing are described in detail.

NbTi.↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

Field Harmonic Measurement of High-Gradient Permanent Magnet Quadrupoles for NSLS- II Upgrade

The National Synchrotron Light Source II (NSLS-II) is preparing for a major upgrade based on a new lattice concept, known as “Complex Bend,” to replace its existing double bend achromat (DBA) lattice. Here, this novel lattice will use high-gradient permanent magnet quadrupoles (PMQs) with small apertures in the range of 16–22 mm. A prototype complex bend branch with PMQs has been installed in the NSLS-II linac to evaluate the lattice's performance. An accurate and precise magnetic measurement system is required for field harmonic characterization and magnetic tuning of these PMQs. As part of this project a Rotating-Coil bench, based on a Printed Circuit Board (PCB) coil with a 12 mm diameter, has been configured to measure nine PMQs with bore diameter of 12.7 mm. This PCB coil has an active length of 270 mm, and is able to measure fields up to the 15th harmonic of the main field at a reference radius of 5 mm, while maintaining field quality levels within 10 ppm of the main field. This article presents the PCB coil setup, the harmonic measurement results and their temperature dependencies and repeatability. Simulation results on compensation of undesired multipoles using “IDBuilder”, a genetic algorithm-based optimizer code for magnetic tuning is included for field harmonic corrections.

36 MATERIALS SCIENCE↗

FemtoDAQ: A Low-Cost Digitizer for SiPM-Based Detector Studies and Its Application to the HAWC Detector Upgrade

The FemtoDAQ is a low-cost two channel data acquisition system which we have used to investigate the signal characteristics of silicon photomultipliers (SiPMs) coupled to fast scintilators. The FemtoDAQ system can also be used to instrument low cost moderate performance passive detectors, and is suitable for use in harsh environments (e.g., high altitude). The FemtoDAQ is being used as a SiPM test bench for the High Altitude Water Cherenkov (HAWC) Observatory, a TeV gamma ray detector located 4100 m above sea level. Planned upgrades to the HAWC array can benefit greatly from SiPMs, a robust, low-voltage, low-cost alternative to traditional vacuum photomultipliers. The FemtoDAQ is used to power the SiPM detector front end, bias the SiPM, and digitize the photosensor output in a single compact unit.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational Experience With the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade

The CMS Collaboration has been creating large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we report on how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Testing of the Address in Real-Time Data Driver Card for the Micromegas Detector of the ATLAS New Small Wheel Upgrade

The Address in Real Time Data Driver Card (ADDC) is designed to transmit the trigger data in the Micro-Mesh Gaseous Structure (Micromegas) detector of the ATLAS New Small Wheel (NSW) upgrade. The Address in Real Time (ART) signals are generated by the front-end ASIC, named VMM chip, to indicate the address of the first above-threshold event. A custom ASIC (ART ASIC) is designed to receive the ART signals from the VMM chip and implement the hit-selection. The processed data from the ART ASIC will be transmitted out of the NSW through the GBTx serializer, the unidirectional Versatile Twin Transmitter (VTTx) and fiber optical links. The ART signal is critical for the ATLAS experiment trigger selection thus the performance and stability of the ADDC is very important. To ensure extensive testing of the ADDC, an FPGA Mezzanine Card (FMC) based testing platform and a special designed firmware/software are developed. We find that this test platform works with the commercial Xilinx VC707 FPGA development kit, independent of the other electronics of the NSW it can test all the functions of the ADDC and its long-term stability. This paper will introduce the design, testing procedure and results of the ADDC and the FMC testing platform.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Prototype Design of Global Common Module for ATLAS Experiment’s Phase-II Upgrade

A new Global Trigger subsystem will be installed in the Level-0 Trigger as part of HL-LHC Upgrade of ATLAS during the upcoming Long-Shutdown 3. It will feature new and improved trigger hardware and algorithms, and an increased maximum output rate of 1 MHz. The Global Trigger will run offline-like trigger algorithms on full-granularity data, gathered from several sub-detectors and trigger-processing subsystems. A single Global Common Module (GCM) hardware is implemented across the Global Trigger system to be used as Multiplexer Processor, Global Event Processor and CTP Interface (gCTPi). This common hardware platform method will minimize the complexity of the firmware and simplify the system design and long-term maintenance. The GCM prototype is an ATCA front form factor board with two Xilinx Virtex UltraScale+ FPGA VU13P and one ZYNQ UltraScale+ FPGA ZU19EG and seventeen 25.78125 Gb/s FireFly duplex optical modules on it. The total power consumption of this board must be less than 350 W, and the temperature of the optical modules should be less than 70 °C in the worst case. The VU13Ps serve as algorithms processor nodes such as MUX, GEP and gCTPi, and the ZU19EG with Peta Linux OS running on it, is used as Command/Control/Readout Unit to configure and monitor the board and communicate with the ATLAS Detector Control System (DCS). The development of an ATCA blade with three large FPGAs and about 200 optical links running at 25Gb/s is a very challenging task, and the successful test results have demonstrated this GCM prototype as an advancement of state-of-the-art electronics module design in HEP experiments. This paper presents the hardware design considerations, functionalities, and performance test results of this GCM prototype.

47 OTHER INSTRUMENTATION↗

Diagnostic and Power Feed Upgrades to the MAIZE Facility

The Michigan Accelerator for Inductive Z-pinch experiments (MAIZE) is a one stage, 1 MA, Linear Transformer Driver (LTD) at the University of Michigan. The MAIZE facility has been the site of various experimental studies, including wire array z-pinches for x-ray source development and cylindrical foil loads for implosion stability analysis. Here, in order to better understand and investigate these and other experiments, a 4- frame extreme ultraviolet (EUV) camera was implemented, the optical stability of a 12-frame laser shadowgraphy system was improved, B-dot probes were upgraded, and a Rogowski coil was constructed. New conical load hardware was also developed to reduce the inductance of the transmission line and thus improve the current delivered to the loads.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Initial Results From the Newly Upgraded LTX- β

LTX-β, the upgraded Lithium Tokamak Experiment, recently began its first campaign with a goal to study the transport properties of gradient-free electron temperature profile equilibria with increased toroidal field and neutral beam injection. The temperature-gradient-free equilibria in LTX were enabled by the lithium plasma-facing surface. To make the lithium surface conditions more consistent for LTX-β, a new, faster lithium evaporator system has been developed. The toroidal magnetic field has been nearly doubled to ≥0.3 T. Auxiliary heating and fueling with a high flux (35 A, 20 kV) neutral beam has begun. The beam provides core fueling without cold edge neutrals, to test whether flat temperature profiles can be sustained, and makes possible core ion temperature measurements via charge exchange recombination spectroscopy. Neutral beam fueling has been demonstrated with increases in line-integrated density. The coupling of the beam matches well with NUBEAM predictions for shine through. Improved performance has been observed following lithium evaporative coatings and an increase in field strength.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and Analysis of High Heat Flux Plasma-Facing Components for NSTX Upgrade

The National Spherical Tokamak Experiment (NSTX) upgrade (NSTX-U) requirements lead to enhanced heat loads on plasma-facing components (PFCs) especially in the divertor regions, where normal heat flux density can reach up to 8 MW/m 2 . For these high heat flux (HHF) regions, the PFCs were redesigned, to use castellations which relieved the thermal stresses associated with high incident heat flux. Another design feature of HHF PFCs is the absence of front face mounting holes which create localized areas of high temperature and thermal stress concentrations. Optimized shaping of the front face of the HHF PFCs eliminates regions where the front face is perpendicular to the heat flux direction during normal helicity operation and spreads the heat load. A unique mechanism was designed to connect PFC tiles to the NSTX-U center stack casing using locking features accessible from the low heat flux regions. Isotropic graphite was selected as the HHF PFC tile material. Initial tile design parameters were accessed using analytical expressions for pulsed heat flux loading. A working prototype of the locking mechanism was created during the initial stages of the design to prove the concept performance. This article presents an overview of the divertor HHF PFC design and the results of the thermal and structural analyses performed using ANSYS software. The results of the analyses cover normal operating conditions and disruptions which impose electromagnetic (EM) loads from eddy and halo currents. The 3-D, transient, nonlinear analyses took into account the temperature-dependent properties of the materials, friction interfaces between the parts, and variable electric properties of the parts and interfaces. The results confirm that the HHF PFC tiles remain within the allowable limits for the loads defined by the NSTX-U Recovery Project. In addition, tolerance stack up analyses were performed to ensure tile performance in the worst possible assembly configuration. Finally, the design process was completed successfully, and the NSTX HHF PFC tiles are currently in the production phase.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗