Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Texas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Particle Flux Measurements during TRACER (TRACER PFM) (Field Campaign Report)

The purpose of this campaign was to deploy an instrument payload collocated with a suite of in situ and remote-sensing aerosol instruments at the urban site at the La Porte, Texas Municipal Airport during the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Tracking Aerosol Convection Interactions Experiment (TRACER) in Houston, Texas. The payload was designed to characterize the physicochemical properties, mixing state, and size-resolved vertical fluxes of aerosols. Deployed aerosol instruments associated with the flux measurements included three condensation particle counters (CPCs) with different lower cutoff diameters ( D > 2.5 nm, D > 10 nm, and D > 40 nm), a single-particle soot photometer (SP2) measuring refractory black carbon, and a portable optical particle spectrometer (POPS) measuring the optical size distribution (~180 nm < D < ~5000 nm). A 10-m flux tower hosted a sonic anemometer (SONIC) for vertical velocity measurements. In addition, a humidified tandem differential mobility analyzer (HTDMA) was deployed to measure the growth factors and hygroscopicity parameter of 15-50 nm-sized particles in order to constrain the composition of compounds responsible for modal aerosol growth during new particle formation/growth events. Finally, a radial differential mobility analyzer (RDMA) was deployed to extend the size distribution measurement to 5 nm.

54 ENVIRONMENTAL SCIENCES↗

Studies of Reactive Amorphous Compounds and Surfaces: Their Pathways to Crystallinity and Surface Functionality

This project was originally headed by Dr. Abraham Clearfield (Texas A&M University, ret.) and focused on developing structural models of zirconium phosphate (ZrP) based materials at different stages of crystalline order using PDF techniques developed by co-PI Dr. Simon Billinge (Columbia University). When Dr. Clearfield retired, the project was taken over by Dr. Hong-Cai Zhou (Texas A&M University). The project proposed looking at defective metal-organic frameworks (MOFs) supported on the surface of the ZrP materials. During the project, the personnel conducted studies of the dispersion of different phosphate ligands in mixed organic phosphonates, and how they could be utilized to incorporate different metals within the ZrP interlayer spacing.

36 MATERIALS SCIENCE↗

HFTS-1 (Final Report)

Despite the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells can be a complex subject. In addition to the increased expense of multistage fracturing in horizontal wells, increasing the number of fracturing stages does not always correlate with a commensurate increase in production. The problem is the application of a uniform fracture stimulation design to all stages with no consideration for geological variations along the wellbore. The result is an inefficient use and costly waste of energy and water. Optimization of the fracturing process requires an understanding of the cause-and-effect relationship between fracturing parameters and local geological properties at a given location along the wellbore. Realizing that the generalized rock mechanics theories and hypotheses are not truly applicable to fractured and laminated shales, quantifiable impacts of a shale’s geomechanical and depositional features are a prerequisite for design and implementation of optimized hydraulic fractures. The overarching goal of this project is to understand and define the relationships of shale geology and fracture dynamics using detailed field data that includes coring of the fracture domain. Finally, resource recovery from shale formations is estimated to be less than fifteen percent. Research proposed in this project will establish the foundations for investigating enhanced recovery techniques for increased resource recovery in existing fracture treated wells. Natural gas as an EOR fluid is in the initial stages of being used broadly in the oil and gas industry and as such, many aspects of the process need to be researched and addressed prior to widespread acceptance. In addition, re-fracturing techniques, particularly using cemented liners also need to be further investigated. This project explores several of these EOR techniques in greater detail, not just at the theoretical level, but through actual field test sites. This report delves into the research program, identified tasks, several studies, observations, results, and conclusions under the Hydraulic Fracturing Test Site (HFTS) project. This test project is subdivided into three distinct phases and each phase is discussed in detail under separate sections. The original test site for Phase 1 as well as the Phase 2 site are in Midland Basin in Texas and operated by Laredo Petroleum. In the first two phases, the program targeted the Wolfcamp formation in Midland Basin. Phase 3 of the study targeted the EagleFord play in South Texas with Devon Energy as the operator. Significant conclusions from this study include: 1) lateral and vertical fracture growth mapping as well as proppant transport behavior, 2) Use of field gas and its applicability for huff n puff EOR injection in the Midland Basin, 3) Development and validation of proppant log, both at core scale as well as in-fill well implementation by analyzing drilling mud return samples, 4) Applicability of liner refracturing including best practices for enhanced unit level productivity. This report will detail all these studies as well as technical results and conclusions from said studies. These include general subsurface characterization work, completion designs as implemented, studies looking at fracture geometry, high resolution microseismic study, advanced crosswell strain mapping studies including drainage characterization, core characterization results, proppant analysis (core and observation wells), geochemistry, etc. to name a few.

02 PETROLEUM↗

China-US Theory Institute for Physics of Exotic Nuclei

The China-US Theory Institute for Physics of Exotic Nuclei (CUSTIPEN) was funded by DOE during May 1, 2013-April 30, 2023. The grant was managed by Texas A&M University-Commerce under the guidance of the CUSTIPEN Governing Board consists of physicists from Michigan State University, Florida State University, and Texas A&M University-Commerce. Its main goal was to support US-based physicists to visit their collaborators in China to work on projects supporting the science goals of DOE's national Facility for Rare Isotope Beams (FRIB) built on the campus of Michigan State University. The project has achieved successfully its scientific goals and mission.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Novel subnanosecond rise, flattop, 100 kV high voltage pulse generator (ASAP-LDRD-22-0122)

We looked to build a new type of 100 kV pulse generator that we hope will avoid many of the problems seen with other commercially available pulse generators. We looked to exploit recent improvements in both lasers and solid-state pulse charge units along with an alternative triggering layout to build something new. For the pulse charging unit, we collaborated with Texas Tech to leverage their knowledge and expertise in pulse transformers and solid-state switching. The final result of the LDRD looks promising. Texas Tech was able to build a pulse charge unit that meets our specifications regarding output, and we were able to integrate it with a switch and a laser to create a device that meets the goals of the LDRD. There is still much work to do to advance the design further and improve reliability, but the proto-type design satisfies the goals we set for this LDRD.

42 ENGINEERING↗

Project PARETO—DOE’s Produced Water Optimization Initiative

The Texas Produced Water Consortium invited Project PARETO to contribute a write-up about the project to an update report they are preparing for the Texas legislature. The article we have prepared presents a high-level overview of the PARETO produced water management framework, and includes sections dedicated to going into more detail about PARETO’s strategic model and water sharing portals (AquaShare and AquaTrade).

97 MATHEMATICS AND COMPUTING↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

Reduction of Methane Leaks through Corrosion Mitigation Pre-treatments for Pipelines with Field Applied Coatings

Corrosion of buried, coated steel pipelines transporting natural gas is a significant source of methane emissions, from pipeline venting required for maintenance and repairs and from pipeline leaks and incidents. Corrosion of steel under field applied coatings is an important safety concern for the pipeline industry. This project investigates the application of a field applied alloy over girth welds to mitigate external corrosion of buried coated steel pipelines. Various metallic coating options were considered, which were required to meet several criteria: (1) it must resist corrosion under open-circuit or mild cathodic protection conditions, (2) it must protect the substrate steel, and (3) it must not negatively affect the adhesion of the field coating. Finite element models and lab testing were performed of alloy coating compositions to identify promising alloy types underneath disbonded coatings. Polarization curves of coating alloys were generated to provide the boundary conditions for the COMSOL model to compute potential and current distributions around coated areas. Sacrificial and corrosion-resistant metal alloy coatings were evaluated and optimized using corrosion modeling and laboratory electrochemical testing, where aluminum alloy 5356 (5% Mg) and steel alloy B9 (9% Cr) were selected. Corrosion test coupons were designed and fabricated using thermal spray aluminum 5356 and welded B9 steel overlays on API 5L grade X42 line pipe steel. The corrosion test coupons, with simulated pipe coating damage, were tested in a laboratory soil box and a field pipeline site in Texas for 3-months. Corrosion test coupons were then tested for 6-months at field pipeline sites in Texas and Tennessee to quantify corrosion rates and performance of the aluminum and steel alloys under polyethylene tape and 2-part epoxy coatings, various coating holidays, and with and without cathodic protection.

03 NATURAL GAS↗

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING↗

PUFFIn Software Modeling for Quality Management

PUFFIn (PENELOPE User Friendly Fast Interface) was designed as a fast and simple Monte Carlo simulation tool for the transport of photons and electrons, with a primary purpose as a learning and education tool for a broad range of static configurations in the radiation processing industry. Development of the PUFFIn software is funded by the Office of Radiological Security (ORS) within the United States National Nuclear Security Administration (NNSA). PUFFIn helps fill the education and knowledge gaps in the industry, as identified in reports by Fermilab (2017) and the IAEA (2020). PUFFIn uses the PENELOPE (NEA-2023) physics engine to perform simulations on static configurations. PUFFIn has support for multiple geometry types from simple, single material simulations to full 3D configurations created from CAD input files or images from X-Ray Tomography scans. PUFFin was designed to be easy for the novice user, it will generate the input and geometry files required by PENLOPE and will display the output plots within the PUFFIn interface. PUFFin is distributed for free but requires a free workshop so users can be adequately trained in its use. Workshops have been presented in the past at Texas A&M university, the Aerial-CRT facility in Strasbourg France and Jakarta Indonesia. PUFFIn simulations have been validated by 10 MeV ebeam experiments done at Aerial-CRT in France (Radiation Physics and Chemistry 222 (2024) 111774). Further user experimental comparisons were made at the medical product hands on workshop at Texas A&M in October 2024.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

NSUF RTE completion report for 23-4780: Microstructural Defect Induced Thermal Conductivity Reduction in Uranium Nitride and Thorium Nitride

Uranium nitride (UN) is known to have a higher thermal conductivity than traditional oxide fuels, which could lead to a more efficient energy transport and lower local temperature during its lifetime. But the thermal transport performance of UN in extreme environments has not been systematic studied. This study investigated the irradiation induced microstructural defects in UN and the impacts on thermal conductivity. The samples were produced by spark plasma sintering at University of Texas-San Antonio (UTSA), Los Alamos National Laboratory (LANL), and Idaho National Laboratory (INL). Thermal conductivity of UN before and after 2MeV proton irradiation were measured by using laser metrology at INL in a temperature range of 77-295K. Thermal conductivity measurements in this wide, cryogenic temperature range is critical to understand the phonon scattering mechanisms between the thermal energy carrier, phonons, and different types of irradiation-induced defects. In order to ensure the measurements were conducted in the same grains and minimize the impact of the local heterogeneities, the measurement locations were highlighted by fiducial marks using the focused ion beam (FIB) with grain orientation identified using the electron backscatter diffraction (EBSD) at the Center of Advanced Energy Studies (CAES). Irradiation experiment was conducted at the Ion Beam Laboratory at Texas A&M University (TAMU). A total of 6 samples were irradiated with different irradiation doses and temperatures. After irradiation, the microstructure was characterized by using Transmission Electron Microscope (TEM) at CAES (also in the FIB marks).

36 - MATERIALS SCIENCE↗

Data-Driven Modeling and Control of Systems with Plasma-Surface Interactions (Final Technical Report)

This final technical report summarizes the activities and accomplishments in the period from February 2023 thru January 2026. The objective of the proposed research is to investigate the physical mechanisms and processes underlying the formation of structures and patterns in systems with plasma-surface interactions. In the past decades, there have been extensive studies on the interaction of glow discharges, dielectric barrier discharges, and arc discharges with confining or intervening surfaces. The advancement of the understanding of these phenomena is not only of fundamental scientific interest and relevance to the knowledge of the plasma state, but also with profound implications in various technological applications. The research will integrate theoretical, computational, and experimental work within an innovative framework of data assimilation, i.e., optimally combining model predictions with measurements. The scientific merit of this research has three aspects. Firstly, it extends the studies of plasma-surface interactions to systems with insulator surfaces and multi-layer systems, while existing studies are predominantly on electrode surfaces. Secondly, it expects to develop a novel data-driven modeling approach based on data assimilation to enhance the predictive and control capabilities, which could make transformative contributions to basic plasma research. Thirdly, it will shed new light on outstanding problems related to formation of patterns interfacing plasmas. This project also aims to launch an education and outreach initiative at Texas A&M University-Kingsville, a non-R1, minority-serving institution in South Texas. The initiative is structured as a four-tier pyramid. Tier one will be a webinar series for culture and capacity building to inform broader audience in the region about the research fields of plasma science and engineering. Tier two will be the creation and offering of an upper-level undergraduate course on introductory plasma physics, which will help with the recruitment for the upper tiers. On tier three, we will engage and mentor senior design students to conduct work toward the research goal of this project. There will also be a certificate program on general plasma science for undergrad and graduate students, part of which will be lab training at Princeton University. Tier four will be the supervision and mentoring of Ph.D. students. Therefore, this project will systematically expand the talent pipeline, broaden participation from communities historically and geographically underrepresented in DOE SC research portfolio, significantly improve the research and education capacity at the PI’s institution, and contribute to developing a diverse workforce in plasma science and engineering.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

The U.S. liquid petroleum pipeline industry is large, diverse, and vital to the nation's economy. Comprised of approximately 200,000 miles of pipe in all fifty states, liquid petroleum pipelines carried more than 40 million barrels per day, or 4 trillion barrel-miles, of crude oil and refined products during 2001. That represents about 17% of all freight transported in the United States, yet the cost of doing so amounted to only 2% of the nation's freight bill. Approximately 66% of domestic petroleum transport (by ton-mile) occurs by pipeline, with marine movements accounting for 28% and rail and truck transport making up the balance. In 2004, the movement of crude petroleum by domestic federally regulated pipelines amounted to 599.6 billion tonmiles, while that of petroleum products amounted to 315.9 billion ton-miles (AOPL 2006). As an illustration of the low cost of pipeline transportation, the cost to move a barrel of gasoline from Houston, Texas, to New York Harbor is only 3 cents per gallon, which is a small fraction of the cost of gasoline to consumers. Pipelines may be small or large, up to 48 inches in diameter. Nearly all of the mainline pipe is buried, but other pipeline components such as pump stations are above ground. Some lines are as short as a mile, while others may extend 1,000 miles or more. Some are very simple, connecting a single source to a single destination, while others are very complex, having many sources, destinations, and interconnections. Many pipelines cross one or more state boundaries (interstate), while some are located within a single state (intrastate), and still others operate on the Outer Continental Shelf and may or may not extend into one or more states. U.S. pipelines are located in coastal plains, deserts, Arctic tundra, mountains, and more than a mile beneath the water's surface of the Gulf of Mexico (Rabinow 2004; AOPL 2006). The network of crude oil pipelines in the United States is extensive. There are approximately 55,000 miles of crude oil trunk lines (usually 8 to 24 inches in diameter) in the United States that connect regional markets. The United States also has an estimated 30,000 to 40,000 miles of small gathering lines (usually 2 to 6 inches in diameter) located primarily in Texas, Oklahoma, Louisiana, and Wyoming, with small systems in a number of other oil producing states. These small lines gather the oil from many wells, both onshore and offshore, and connect to larger trunk lines measuring 8 to 24 inches in diameter. There are approximately 95,000 miles of refined products pipelines nationwide. Refined products pipelines are found in almost every state in the United States, with the exception of some New England states. These refined product pipelines vary in size from relatively small, 8- to 12-inch-diameter lines, to up to 42 inches in diameter. The overview of pipeline design, installation, and operation provided in the following sections is only a cursory treatment. Readers interested in more detailed discussions are invited to consult the myriad engineering publications available that provide such details. The two primary publications on which the following discussions are based are: Oil and Gas Pipeline Fundamentals (Kennedy 1993) and the Pipeline Rules of Thumb Handbook (McAllister 2002). Both are recommended references for additional reading for those requiring additional details. Websites maintained by various pipeline operators also can provide much useful information, as well as links to other sources of information. In particular, the website maintained by the U.S. Department of Energy's Energy Information Administration (EIA) (http://www.eia.doe.gov) is recommended. An excellent bibliography on pipeline standards and practices, including special considerations for pipelines in Arctic climates, has been published jointly by librarians for the Alyeska Pipeline Service Company (operators of the Trans-Alaska Pipeline System [TAPS]) and the Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).

02 PETROLEUM↗

Natural gas pipeline technology overview.

The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000). The natural gas system is generally described in terms of production, processing and purification, transmission and storage, and distribution (NaturalGas.org 2004b). Figure 1.1-2 shows a schematic of the system through transmission. This report focuses on the transmission pipeline, compressor stations, and city gates.

03 NATURAL GAS↗

Industrial Assessment Center Program

The work described in this report was performed under the direction of the Industrial Assessment Center (IAC) at University of Texas at Arlington. The IAC at The University of Texas at Arlington is managed by Rutgers University under agreement with the United States Department of Energy Office of Industrial Technology, which financially supports the program. The objective of the IAC is to identify, evaluate, and recommend, through analysis of an industrial plant’s operations, opportunities to conserve energy and prevent pollution, thereby reducing the associated costs. IAC team members visit and survey the plant. Based upon observations made in the plant, preventive/corrective actions are recommended. At all times we try to offer specific and quantitative recommendations of cost savings, energy conservation, and pollution prevention to the plants we serve.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗