Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space Operations Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

SSC OCIO, IT SUMMIT 2011

The Stennis Space Center (SSC) Records Retention Facility is a centralized location for all SSC records, Records Management staff, and the SSC History Office. The building is a storm resistant facility and provides a secure environment for records housing. The Records Retention Facility was constructed in accordance with The National Archives and Records Administration (NARA) requirements for records storage, making it the first NARA compliant facility in the agency. Stennis Space Center's Records Retention Facility became operational in May 2010. The SSC Records Retention Facility ensures that the required federal records are preserved, managed and accessible to all interested personnel. The facility provides 20,000 cubic feet of records storage capacity for the purpose of managing the centers consolidated records within a central, protected environment. Records housed in the facility are in the form of paper, optical, film and magnetic media. Located within the SSC Records Retention Facility, the Records Management Office provides comprehensive records management services in the form of: a) Storage and life-cycle management of inactive records of all media types; b) Digitizing/scanning of records and documents; c) Non-textual/digital electronic records media storage, migration and transfer; d) Records Remediation.

Cottrell, Dinna L.↗

Long Term Missions at the Sun-Earth Libration Point L1: ACE, SOHO, and WIND

Three heliophysics missions - the Solar Heliospheric Observatory (SOHO), the Advanced Composition Explorer (ACE), and the Global Geoscience WIND - have been orbiting the Sun-Earth interior libration point L1 continuously since 1996, 1997, and 2004, respectively. ACE and WIND (both NASA missions) and SOHO (an ESA-NASA joint mission) are all operated from the NASA Goddard Space Flight Center Flight Dynamics Facility. While ACE and SOHO have been dedicated libration point orbiters since their launches, WIND prior to 2004 flew a remarkable 10-year deep-space trajectory that featured 38 targeted lunar flybys. The L1 orbits and the mission histories of the three spacecraft are briefly reviewed, and the station-keeping techniques and orbit maneuver experience are discussed.

Roberts, Craig E.↗

Study of the Dependency on Magnetic Field and Bias Voltage of an AC-Biased TES Microcalorimeter

At SRON we are studying the performance of a Goddard Space Flight Center single pixel TES microcalorimeter operated in an AC bias configuration. For x-ray photons at 6 keV the pixel shows an x-ray energy resolution Delta E(sub FWHM) = 3.7 eV, which is about a factor 2 worse than the energy resolution observed in an identical DC-biased pixel. In order to better understand the reasons for this discrepancy we characterized the detector as a function of temperature, bias working point and applied perpendicular magnetic field. A strong periodic dependency of the detector noise on the TES AC bias voltage is measured. We discuss the results in the framework of the recently observed weak-link behaviour of a TES microcalorimeter.

Gottardi, L.↗

Use of VIIRS DNB Data to Monitor Power Outages and Restoration for Significant Weather Events

NASA fs Short-term Prediction Research and Transition (SPoRT) project operates from NASA's Marshall Space Flight Center in Huntsville, Alabama. The team provides unique satellite data to the National Weather Service (NWS) and other agencies and organizations for weather analysis. While much of its work is focused on improving short-term weather forecasting, the SPoRT team supported damage assessment and response to Hurricane Superstorm Sandy by providing imagery that highlighted regions without power. The team used data from the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (Suomi NPP) satellite. The VIIRS low-light sensor, known as the day-night-band (DNB), can detect nighttime light from wildfires, urban and rural communities, and other human activity which emits light. It can also detect moonlight reflected from clouds and surface features. Using real time VIIRS data collected by our collaborative partner at the Space Science and Engineering Center of the University of Wisconsin, the SPoRT team created composite imagery to help detect power outages and restoration. This blackout imagery allowed emergency response teams from a variety of agencies to better plan and marshal resources for recovery efforts. The blackout product identified large-scale outages, offering a comprehensive perspective beyond a patchwork GIS mapping of outages that utility companies provide based on customer complaints. To support the relief efforts, the team provided its imagery to the USGS data portal, which the Federal Emergency Management Agency (FEMA) and other agencies used in their relief efforts. The team fs product helped FEMA, the U.S. Army Corps of Engineers, and U.S. Army monitor regions without power as part of their disaster response activities. Disaster responders used the images to identify possible outages and effectively distribute relief resources. An enhanced product is being developed and integrated into a web mapping service (WMS) for dissemination and use by a broader end user community.

Jedlovec, Gary↗

Towards a Decision Support System for Space Flight Operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

Meshkat, Leila↗

Co-op Essay - Tour 1

The Mission Operations Directorate (MOD) is responsible for the training, planning and performance of all U.S. manned operations in space. Within this directorate all responsibilities are divided up into divisions. The EVA, Robotics & Crew Systems Operations Division performs ground operations and trains astronauts to carry out some of the more "high action" procedures in space. For example they orchestrate procedures like EVAs, or ExtraVehicular Activities (spacewalks), and robotics operations external to the International Space Station (ISS). The robotics branch of this division is responsible for the use of the Mobile Servicing System (MSS). This system is a combination of two robotic mechanisms and a series of equipment used to transport them on the ISS. The MSS is used to capture and position visiting vehicles, transport astronauts during EVAs, and perform external maintenance tasks on the ISS. This branch consists of two groups which are responsible for crew training and flight controlling, respectively. My first co-op tour took place Fall 2013. During this time I was given the opportunity to work in the robotics operations branch of the Mission Operations Directorate at NASA's Johnson Space Center. I was given a variety of tasks that encompassed, at a base level, all the aspects of the branch.

Porter, Derrick↗

Internship Tasks Associated With CIF Icy Regolith Excavation and Volatile Capture Under Vacuum Conditions

Understanding the surface and atmosphere of Mars is critical to current and future development of exploration systems. Dealing with the Martian regolith-the top layer of soil-remains a significant challenge, and much research is still needed. Addressing this need, the Cryogenics Test Lab and Granular Mechanics and Regolith Operations Lab at NASA's Kennedy Space Center are partnering to develop an apparatus that utilizes simulated Martian regolith in an analogous atmospheric environment to gather data about how the material behaves when exposed to water vapor. Martian surface temperatures range from 128 K (-145 C) to 308 K (35 C), and the average pressure is approximately 4.5 Torr; which presents an environment where water can potentially exist in vapor, solid or liquid form. And based on prior Mars missions such as the Phoenix Lander, it is known that water-ice exists just below the surface. This test apparatus will attempt to recreate the conditions that contributed to the Martian ice deposits by exposing a sample to water vapor at low pressure and temperature; thereby forming ice inside the simulant via diffusion. From this, we can better understand the properties and behavior of the regolith, and have more knowledge concerning its ability to store water-and subsequently, how to dig up and extract that water-which will be crucial to sample gathering when the first manned Mars mission takes place.

Thermal-Vacuum Testing↗

Software Development: 3D Animations and Creating User Interfaces for Realistic Simulations

My fall 2015 semester was spent at the Lyndon B. Johnson Space Center working in the Integrated Graphics, Operations, and Analysis Laboratory (IGOAL). My first project was to create a video animation that could tell the story of OMICS. OMICS is a term being used in the field of biomedical science to describe the collective technologies that study biological systems, such as what makes up a cell and how it functions with other systems. In the IGOAL I used a large 23 inch Wacom monitor to draw storyboards, graphics, and line art animations. I used Blender as the 3D environment to sculpt, shape, cut or modify the several scenes and models for the video. A challenge creating this video was to take a term used in biomedical science and describe it in such a way that an 8th grade student can understand. I used a line art style because it would visually set the tone for what we thought was an educational style. In order to get a handle on the perspective and overall feel for the animation without overloading my workspace, I split up the 2 minute animation into several scenes. I used Blender's python scripting capabilities which allowed for the addition of plugins to add or modify tools. The scripts can also directly interact with the objects to create naturalistic patterns or movements. After collecting the rendered scenes, I used Blender's built-in video editing workspace to output the animation. My second project was to write software that emulates a physical system's interface. The interface was to simulate a boat, ROV, and winch system. Simulations are a time and cost effective way to test complicated data and provide training for operators without having to use expensive hardware. We created the virtual controls with 3-D Blender models and 2-D graphics, and then add functionality in C# using the Unity game engine. The Unity engine provides several essential behaviors of a simulator, such as the start and update functions. A framework for Unity, which was developed in the lab, provided a way to place the different widgets on the virtual console dock and have them resize correctly based on the window dimensions.. My task in this project was to create the controls and visualizations for the data coming in from the simulator for the boat portion of the project. I wrote a class for each control window to handle the functionality of that widget. I implemented 11 widgets that make up the ship portion of the simulator. The members of the lab were each masters of their craft and I'm glad I had the opportunity to learn from them. I learned to plan strategically so I could finish this project on time. I allotted time for storyboarding, development, and refinement. In regards to animating I learned to use modifiers like lattice, boolean and build deformers. I also learned how to animate with drivers, how to use the dope sheet, and how to use the graph editor. In coding I learned to limit the chances for bugs by privatizing functions that should be exclusive to their class. I learned how to use the GIT repository to commit, stash and pull the latest build. I learned a bit of everything because I had the chance to see the entire application development process from the artwork, to the implementation.

Gordillo, Orlando Enrique↗

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Phase 1 Development Testing of the Advanced Manufacturing Demonstrator Engine

The Additive Manufacturing Development Breadboard Engine (BBE) is a pressure-fed liquid oxygen/pump-fed liquid hydrogen (LOX/LH2) expander cycle engine that was built and operated by NASA at Marshall Space Flight Center's East Test Area. The breadboard engine was conceived as a technology demonstrator for the additive manufacturing technologies for an advanced upper stage prototype engine. The components tested on the breadboard engine included an ablative chamber, injector, main fuel valve, turbine bypass valve, a main oxidizer valve, a mixer and the fuel turbopump. All parts minus the ablative chamber were additively manufactured. The BBE was successfully hot fire tested seven times. Data collected from the test series will be used for follow on demonstration tests with a liquid oxygen turbopump and a regeneratively cooled chamber and nozzle.

Case, Nicholas L.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Marrying Social Media Approaches and Space Flight Control - Eight Years at SpaceOps

This paper shows how Marshall Space Flight Center's (MSFC) ISS Payload Operations Integration Center (POIC) is realizing the above goals via a) enhancements to the Console Log Tool (CoLT) first deployed in 2012 and b) the Communications Dashboard (CommDash) software suite deployed in 2017. In addition to technical discussion, the paper chronicles CommDash's role in emergence of an Agile development process and a Human Factors community of practice within MSFC's Payload Mission Operations Division (PMOD).

Scott, D. W.↗

Marrying Social Media Approaches and Space Flight Control: Eight Years at SpaceOps

Three previous SpaceOps papers [1-3] - published in 2010, 2012 (honored by the Conference as a "Best Paper"), and 2014 - have discussed paths to using social media concepts and techniques to enhance space flight controller effectiveness by a) reducing clutter of nonverbal communications (e.g., visual flow with minimal headers and shared content instead of multiple copies), b) moving some voice communication to non-verbal transmission (virtually eliminating "say again" requests because non-verbal comm can be re-read), thus making remaining voice comm easier to focus on, and c) reducing short-term and long-term flight stress on flight control personnel. This paper shows how Marshall Space Flight Center's (MSFC) ISS Payload Operations Integration Center (POIC) is realizing the above goals via the Communications Dashboard (CommDash) software suite deployed in 2017 (including enhancements to the Console Log Tool (CoLT) discussed in earlier papers). Two larger-scope benefits spawned by CommDash evolution are also chronicled: a) emergence of an Agile Software Development (ASD) process adapted to the not-always-nimble environment of government projects, and b) the sprouting of a Human Factors Engineering (HF or HFE) community of practice within MSFC's Payload and Mission Operations Division (PMOD).

Scott, David W.↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Satellite↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗