Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

The Early Career Research Program Annual Progress Report: Using ARM Data and Multiscale Models to Advance the Understanding of Liquid-Phase Cloud Response to Aerosol Perturbation over Ocean and Land

This report is for the first fiscal year of this ECRP project. This ECRP project aims to study the response of liquid-phase clouds to aerosol perturbation and reduce the related uncertainty in the DOE Earth system model. During this fiscal year, this project mainly made progress on the tasks about observational analyses for Objective 1; and successfully set up two Large-Eddy Simulation (LES) models for Objective 2. A postdoctoral researcher and a graduate student summer intern are on board and fully dedicated to this project. In addition to internal collaboration within LLNL, this project has routinely maintained external collaboration with scientists from universities, NASA Langley Research Center, and other DOE national laboratories. For the next reporting period, we plan to complete the tasks scheduled for the second year. Furthermore, we will promote the findings to communities of interest and proactively seek new collaborations to increase the impact of this project.

54 ENVIRONMENTAL SCIENCES↗

Joint US/Soviet docking mission.

The purpose and objectives of the joint Apollo/Soyuz experimental test flight, the technical requirements and anticipated solutions necessary to meet the objectives, the mission plan, the flight vehicles, the schedule, and the expected results of successfully completing such a project are discussed. The androgynous feature of the docking system is provided by a symmetrical distribution of all elements which are directly connected during docking, relative to the axis of reverse symmetry. Both the American and Russian systems are designed to serve as either the active or passive system for docking and undocking.

Scott, D. R.↗

Large Space Telescope Program status

This paper provides an overview of the current status of the LST Program. The history of the program is treated briefly, with emphasis placed on the recent Phase B definition activity. The background and rationale leading to the decision of the aperture size of the LST primary mirror are discussed. The current technical definition status of the LST Optical Telescope Assembly and Support Systems Module is treated in a summary fashion. Key milestone events during the balance of the Phase B definition effort and schedule and over-all planning for the development phase of the program are described.

Downey, J. A., III↗

Space processing in early Shuttle missions

The paper first reviews potential scientific and commercial benefits of space processing, and discusses roles of ground laboratory, sounding rocket, and Shuttle/Spacelab experimentation in carrying out space processing programs. Benefits which have been identified in such processes as containerless melting/solidification, electrophoresis, crystal growing, etc., and using such specific materials as tungsten, isoenzymes, single crystal silicon ribbon are utilized as specific examples in the above discussion. As a result, the paper identifies spectrum of specific objectives and implementation approaches for Shuttle/Spacelab experimentation. The paper then reviews currently planned Shuttle/Spacelab payload accommodations and traffic model. Finally, the paper matches experimentation approaches with Shuttle/Spacelab plans, and derives a possible schedule of missions in the 1979-1982 time frame using configurations with a high degree of automation where crew time for experiment involvement is limited.

Bloom, H. L.↗

Orbital construction demonstration study. Executive summary

The supported construction base concept (no permanent habitation quarters) was explored. The studies concentrated on: (1) representative large structures that can only be tested in space, (2) definition of initial construction base (add-on to cover applications of facility), and (3) programmatic issues of schedule and cost, and mission plans.

Source record↗

Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 1B: Concise review

Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.

Miller, R. E., Jr.↗

An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter: Executive Summary - Volume 1

Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

Hays, D.↗

Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

Cable, D. A.↗

A unique approach to space thermal simulation

The Space Systems Lab of McDonnell Douglas developed several innovative techniques to perform the DELTA Star System thermal vacuum test. Test design constraints included an accelerated test schedule and an ambitious test plan focusing on cyclic absorbed orbital flux simulation. Test design and fabrication was completed in only 4 months, producing a 21 zone computer modeled refectorless lamp array system. Array zone control was based on discreet absorbed flux measurements, provided by adiabatic coupons conceived to eliminate the need for conventional radiometers. Test requirements, methodology, and test thermal model flight data correlation are presented.

Durant, D. Q.↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

The 1994 research and technology report at the Goddard Space Flight Center

The breadth of subject material in this 1994 edition of the Research and Technology Report illustrates the broad scope of activities at the Goddard Space Flight Center. The numerous entries dealing with data processing and visualization show the strong emphasis on data and its interpretation. Reports are presented in the following sections: data processing and visualization; space sciences - high energy astronomy, solar system, and new techniques; earth system science - atmospheres, oceans and ice, solid earth, and soils and vegetation; networks, planning, and information systems - mission scheduling and operations, spacecraft operation and status, software engineering, and infrastructure support; engineering and materials - spacecraft subsystems, launch vehicles, thermal control, new mechanisms, and testing and evaluation; and flight projects.

Soffen, Gerald↗

Planning Complex Projects Automatically

Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

Henke, Andrea L.↗

XML: James Webb Space Telescope Database Issues, Lessons, and Status

This paper will present the current concept using extensible Markup Language (XML) as the underlying structure for the James Webb Space Telescope (JWST) database. The purpose of using XML is to provide a JWST database, independent of any portion of the ground system, yet still compatible with the various systems using a variety of different structures. The testing of the JWST Flight Software (FSW) started in 2002, yet the launch is scheduled for 2011 with a planned 5-year mission and a 5-year follow on option. The initial database and ground system elements, including the commands, telemetry, and ground system tools will be used for 19 years, plus post mission activities. During the Integration and Test (I&T) phases of the JWST development, 24 distinct laboratories, each geographically dispersed, will have local database tools with an XML database. Each of these laboratories database tools will be used for the exporting and importing of data both locally and to a central database system, inputting data to the database certification process, and providing various reports. A centralized certified database repository will be maintained by the Space Telescope Science Institute (STScI), in Baltimore, Maryland, USA. One of the challenges for the database is to be flexible enough to allow for the upgrade, addition or changing of individual items without effecting the entire ground system. Also, using XML should allow for the altering of the import and export formats needed by the various elements, tracking the verification/validation of each database item, allow many organizations to provide database inputs, and the merging of the many existing database processes into one central database structure throughout the JWST program. Many National Aeronautics and Space Administration (NASA) projects have attempted to take advantage of open source and commercial technology. Often this causes a greater reliance on the use of Commercial-Off-The-Shelf (COTS), which is often limiting. In our review of the database requirements and the COTS software available, only very expensive COTS software will meet 90% of requirements. Even with the high projected initial cost of COTS, the development and support for custom code over the 19-year mission period was forecasted to be higher than the total licensing costs. A group did look at reusing existing database tools and formats. If the JWST database was already in a mature state, the reuse made sense, but with the database still needing to handing the addition of different types of command and telemetry structures, defining new spacecraft systems, accept input and export to systems which has not been defined yet, XML provided the flexibility desired. It remains to be determined whether the XML database will reduce the over all cost for the JWST mission.

Detter, Ryan↗

Tracking the Short Term Planning (STP) Development Process

Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

Price, Melanie↗

OSIRIS-REx Orbit Trim Strategy

One of the more challenging aspects of the trajectory design for the OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer) mission at asteroid Bennu was maneuvering while in orbit. The orbital dynamics were highly perturbed by various sources, most notably solar radiation pressure, which degraded accuracy of long term predictions of the spacecraft’s location in orbit. Generally, the Navigation team had to solve three separate issues: correcting a perturbed orbit, changing to a different orbit, or phasing the or bitto place the spacecraft at a specific location at a specific time. The team composed a common framework using up to two maneuvers that could solve all of these problems using an identical schedule that allowed for consistent planning long before the final trajectory could be designed. This orbit trim strategy was successfully used for the first time in the Orbital B phase of the mission to maximize the duration of usable observing geometry in a time-variable orbit with strict operational limits. It was used an additional 3 times throughout the mission to adjust and/or change the orbit, most notably altering the orbit in the weeks prior to the successful Touch-And-Go (TAG)sample collection attempt. This same strategy was used to phase the orbit a total 10 times in preparation for each of the science sorties over potential sample sites, the TAG Rehearsals, and TAG. The trim strategy was demonstrated to be robust and performed exceptionally well in all aspects, which proved critical to a successful sample collection.

Daniel R. Wibben↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Forward Physics Facility

High-energy collisions at the High-Luminosity Large Hadron Collider will produce a large number of particles along the beam collision axis, outside of the acceptance of existing LHC experiments. The proposed Forward Physics Facility (FPF), to be located 617--682 meters from the ATLAS interaction point along the beam collision axis and shielded by concrete and rock, will host a suite of experiments to probe Standard Model processes and search for physics beyond the Standard Model. The FPF is supported by a rapidly growing user community of 400 physicists, and four pathfinder detectors that are currently operating at the LHC have already yielded promising results, including the first direct detection of collider neutrinos. Here we provide an Executive Summary, and then briefly summarize the status of the FPF, including its rich science case, the facility itself, the proposed FPF experiments and their technical readiness, the preliminary schedule and budget profile, and plans for international participation. Submitted to the DOE/NSF HEPAP Particle Physics Projects Prioritization Panel~(P5)

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗