Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 5: Technical summary

Engineering and operational facets associated with the implementation of the first two AMPS flights are covered. The payload is described including all systems and subsystems and the mission planning and flight operations are described too. Payload integration, ground operations, and logistics are included along with key supporting analyses and mass properties.

Source record↗

SSME component assembly and life management expert system

The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

Ali, M.↗

Modeling Air Traffic Management Technologies with a Queuing Network Model of the National Airspace System

This report describes an integrated model of air traffic management (ATM) tools under development in two National Aeronautics and Space Administration (NASA) programs -Terminal Area Productivity (TAP) and Advanced Air Transport Technologies (AATT). The model is made by adjusting parameters of LMINET, a queuing network model of the National Airspace System (NAS), which the Logistics Management Institute (LMI) developed for NASA. Operating LMINET with models of various combinations of TAP and AATT will give quantitative information about the effects of the tools on operations of the NAS. The costs of delays under different scenarios are calculated. An extension of Air Carrier Investment Model (ACIM) under ASAC developed by the Institute for NASA maps the technologies' impacts on NASA operations into cross-comparable benefits estimates for technologies and sets of technologies.

Long, Dou↗

Demonstration of an Ultra-Short Channel Metal Monolith Catalytic Reactor for Trace Contaminant Control Applications

The International Space Station (ISS) Trace Contaminant Control Subassembly (TCCS) design is based upon proven, highly reliable technology. However, because its core unit operations rely upon expendable activated charcoal and an indirectly heated high temperature catalyst, annual logistics mass, crew time, and power consumption requirements are significant. To address this situation, a unique catalytic reactor design has been developed which is suitable for retrofit into the TCCS's high temperature catalytic oxidizer (HTCO) assembly. The unique design, which employs a metallic, ultra-short channel length monolith (USCM) catalyst substrate, was tested in a flight-like TCCS HTCO assembly to investigate its performance characteristics. Test results indicate that retrofitting the TCCS with a USCM-based catalytic reactor is feasible and that it may provide significant reductions in logistics mass, crew time, and power consumption. Savings indicated by test results are up to 81% for annual logistics, 56% for crew time, and 77% for startup transient duration. In addition, its demonstrated ability to operate in a power saving mode provides up to a 43% savings in average power consumption. A summary of the USCM demonstration test objectives, approach, results, and specific benefits to the TCCS's process economics are presented,

Perry, J. L↗

Screening for Psychopathology Versus Selecting for Suitability: Ethical and Legal Considerations

The current system for psychological selection of U.S. astronauts is divided into two phases: The select-out phase and the select-in phase. The select-out phase screens candidates for psychopathology; candidates who do not meet the baseline psychiatric requirements are immediately disqualified. The select-in phase assesses candidates for suitability to fly short- and long-duration missions. Suitability ratings are given for ten factors found to be critical for short and long-duration space missions. There are qualitative differences in the purpose of the two phases (select-in vs. select-out) and in the nature of the information collected in each phase. Furthermore, there are different logistic, ethical, and legal issues related to a medical or psychiatric (select-out) screening versus a suitability (select-in) psychological screening process . The purpose of this presentation is to contrast the ethical and legal environment surrounding the select-out and select-in phases of the psychological selection system. Issues such as data collection, data storage and management, the federal statutory environment, and personnel training will be discussed. Further, a summary of the new standards for psychological testing is presented, along with their implications for astronaut selection.

Holland, Albert W.↗

STS-106 Crew Activity Report/Flight Day 8 Highlights

On this eighth day of the STS-106 Atlantis mission, the flight crew, Commander Terrence W. Wilcutt, Pilot Scott T. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov move into the second half of preparing the International Space Station (ISS) for its first resident crew. Lu and Malenchenko are seen installing the power converters in the Zvezda module and components of the primary oxygen generation system. Mastracchio and Wilcutt moves supplies and logistics from the payload of Atlantis to the ISS. Wilcutt and Altman participate in several interviews and the crew wishes the Olympiads in Sydney good luck in their endeavors. Scenes also include external views of the ISS and images of Earth, including Sydney, Australia.

Source record↗

Advanced Spacecraft Designs in Support of Human Missions to Earth's Neighborhood

NASA's strategic planning for technology investment draws on engineering studies of potential future missions. A number of hypothetical mission architectures have been studied. A recent study completed by The NASA/JSC Advanced Design Team addresses one such possible architecture strategy for missions to the moon. This conceptual study presents an overview of each of the spacecraft elements that would enable such missions. These elements include an orbiting lunar outpost at lunar L1 called the Gateway, a lunar transfer vehicle (LTV) which ferries a crew of four from the ISS to the Gateway, a lunar lander which ferries the crew from the Gateway to the lunar surface, and a one-way lunar habitat lander capable of supporting the crew for 30 days. Other supporting elements of this architecture discussed below include the LTV kickstage, a solar-electric propulsion (SEP) stage, and a logistics lander capable of re-supplying the 30-day habitat lander and bringing other payloads totaling 10.3 mt in support of surface mission activities. Launch vehicle infrastructure to low-earth orbit includes the Space Shuttle, which brings up the LTV and crew, and the Delta-IV Heavy expendable launch vehicle which launches the landers, kickstage, and SEP.

Fletcher, David↗

Lessons Learned from the Development and Implementation of the Atmosphere Resource Recovery and Environmental Monitoring Project

The Advanced Exploration Systems (AES) Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) Project have been developing atmosphere revitalization and environmental monitoring subsystem architectures suitable for enabling sustained crewed exploration missions beyond low Earth orbit (LEO). Using the International Space Station state-of-the-art (SOA) as the technical basis, the ARREM Project has contributed to technical advances that improve affordability, reliability, and functional efficiency while reducing dependence on a ground-based logistics resupply model. Functional demonstrations have merged new process technologies and concepts with existing ISS developmental hardware and operate them in a controlled environment simulating various crew metabolic loads. The ARREM Project's strengths include access to a full complement of existing developmental hardware that perform all the core atmosphere revitalization functions, unique testing facilities to evaluate subsystem performance, and a coordinated partnering effort among six NASA field centers and industry partners to provide the innovative expertise necessary to succeed. A project overview is provided and the project management strategies that have enabled a multidiscipinary engineering team to work efficiently across project, NASA field center, and industry boundaries to achieve the project's technical goals are discussed. Lessons learned and best practices relating to the project are presented and discussed.

Roman, Monsi C.↗

Space Resources and Mining: Current Objectives, Plans, and Missions

Why are Space Resources and Their Use Important? There are many reasons why people and nations want to explore space, and there are many different ways in which space can be explored. A critical interface linking both the ‘why’ and the ‘how’ of space exploration is the identification, extraction, and use of resources in space. In both NASA’s Journey to Mars: Pioneering Next Steps in Space Exploration released in October of 2015 and the Global Exploration Roadmap released in August 2013, the ability to find, quantify, extract, process, and use space resources was identified as a critical objective by NASA and over 14 other space agencies for achieving affordable and sustainable human exploration beyond Earth’s orbit, encouraging and creating new commercial entities and markets based on space activities, and increasing the terrestrial economy and quality-of-life benefits for all humankind. Robotic and especially human space exploration up to this point in time can be considered to be ‘Earth reliant’ in that everything needed to support and enable the mission is launched from Earth. The past Apollo missions to the Moon and the International Space Station currently in orbit above the Earth all rely on hardware, habitats, power, transportation, and life support consumables sent from Earth to keep the crew alive and working. As the distance from Earth increases, the cost of transportation and the risks due to failures and logistics disruptions also increases. By using resources found at the site of exploration to make mission critical consumables (such as propellants, fuel cell reactants and life support commodities), spare parts, and infrastructure needed to support surface activities (such as landing pads, roads, habitats/shelters, and power/thermal systems) commonly referred to as In Situ Resource Utilization, a significant amount of launch mass and cost can be saved and risk reduced. The ability to do these things also changes how exploration is performed from Earth Reliant to NASA’s goal of ‘Earth Independent’ exploration. After the US Apollo program was over, people began to recognize that it had been an inspiration for a generation of young students to go into Science, Technology, Engineering and Math (STEM) fields, and that the US industry and economy had significantly grown and lived off these students and the technological advances made to achieve these missions for decades. Space exploration should no longer be focused solely on scientific advancement or national pride, but for economic growth and population standard of living advancement. Considering the economic value of human exploration and how it could expand the economy of the US was brought to full light in a speech by John Marburger, the director of US Office of Science and Technology Policy under George W Bush at the Goddard Symposium in 2006. In his speech he highlighted that the ultimate goal was not to just Explore space but to Use space for the benefit of mankind. He further stated that the use of off-planet resources, in this case from the Moon, should be a critical architectural consideration for human space exploration to make it more affordable and sustainable. This could be achieved in two ways. The first is to start by encouraging and commercializing the extraction and production of transportation and life support related products from space resources, which could than lead to other resource uses once an affordable transportation architecture is established. The second is to encourage the spin-in of terrestrial technologies into space applications and spin-off of space technologies into terrestrial applications to increase the efficiency and profitability of terrestrial industries.

Sanders, Gerald B.↗

Determination of On-Orbit Cabin Air Loss from the International Space Station (ISS)

The International Space Station (ISS) loses cabin atmosphere mass at some rate. Due to oxygen partial pressures fluctuations from metabolic usage, the total pressure is not a good data source for tracking total pressure loss. Using the nitrogen partial pressure is a good data source to determine the total on-orbit cabin atmosphere loss from the ISS, due to no nitrogen addition or losses. There are several important reasons to know the daily average cabin air loss of the ISS including logistics planning for nitrogen and oxygen. The total average daily cabin atmosphere loss was estimated from January 14 to April 9 of 2003. The total average daily cabin atmosphere loss includes structural leakages, Vozdukh losses, Carbon Dioxide Removal Assembly (CDRA) losses, and other component losses. The total average daily cabin atmosphere loss does not include mass lost during Extra-Vehicular Activities (EVAs), Progress dockings, Space Shuttle dockings, calibrations, or other specific one-time events.

Williams, David E.↗

STS-72 Flight Day 2

On this second day of the STS-72 mission, the flight crew, Cmdr. Brian Duffy, Pilot Brent W. Jett, and Mission Specialists Leroy Chiao, Daniel T. Barry, Winston E. Scott, and Koichi Wakata (NASDA), awakened to music from the motion picture 'Star Wars.' The crew performed a systems checkout, prepared for the retrieval of the Japanese Space Flyer Unit (SFU), tested the spacesuits for the EVA, and activated some of the secondary experiments. An in-orbit news interview was conducted with the crew via satellite downlinking. Questions asked ranged from the logistics of the mission to the avoidance procedures the Endeavour Orbiter performed to miss hitting the inactive Air Force satellite, nicknamed 'Misty' (MSTI). Earth views included cloud cover, several storm systems, and various land masses with several views of the shuttle's open cargo bay in the foreground.

Source record↗

Predictions of adult Anopheles albimanus densities in villages based on distances to remotely sensed larval habitats

Remote sensing is particularly helpful for assessing the location and extent of vegetation formations, such as herbaceous wetlands, that are difficult to examine on the ground. Marshes that are sparsely populated with emergent macrophytes and dense cyanobacterial mats have previously been identified as very productive Anopheles albimanus larval habitats. This type of habitat was detectable on a classified multispectral System Probatoire d'Observation de la Terre image of northern Belize as a mixture of two isoclasses. A similar spectral signature is characteristic for vegetation of river margins consisting of aquatic grasses and water hyacinth, which constitutes another productive larval habitat. Based on the distance between human settlements (sites) of various sizes and the nearest marsh/river exhibiting this particular class combination, we selected two groups of sites: those located closer than 500 m and those located more than 1,500 m from such habitats. Based on previous adult collections near larval habitats, we defined a landing rate of 0.5 mosquitoes/human/min from 6:30 PM to 8:00 PM as the threshold for high (> or = 0.5 mosquitoes/human/min) versus low (< 0.5 mosquitoes/human/min) densities of An. albimanus. Sites located less than 500 m from the habitat were predicted as having values higher than this threshold, while lower values were predicted for sites located greater than 1,500 m from the habitat. Predictions were verified by collections of mosquitoes landing on humans. The predictions were 100% accurate for sites in the > 1,500-m category and 89% accurate for sites in the < 500-m category.

NASA Discipline General Space Life Sciences↗

Green Propellant Landing Demonstration at U.S. Range

The Green Propellant Loading Demonstration (GPLD) was conducted December 2015 at Wallops Flight Facility (WFF), leveraging work performed over recent years to bring lower toxicity hydrazine replacement green propellants to flight missions. The objective of this collaboration between NASA Goddard Space Flight Center (GSFC), WFF, the Swedish National Space Board (SNSB), and Ecological Advanced Propulsion Systems (ECAPS) was to successfully accept LMP-103S propellant at a U.S. Range, store the propellant, and perform a simulated flight vehicle propellant loading. NASA GSFC Propulsion (Code 597) managed all aspects of the operation, handling logistics, preparing the procedures, and implementing the demonstration. In addition to the partnership described above, Moog Inc. developed an LMP-103S propellant-compatible titanium rolling diaphragm flight development tank and loaned it to GSFC to act as the GPLD flight vessel. The flight development tank offered the GPLD an additional level of flight-like propellant handling process and procedures. Moog Inc. also provided a compatible latching isolation valve for remote propellant expulsion. The GPLD operation, in concert with Moog Inc. executed a flight development tank expulsion efficiency performance test using LMP-103S propellant. As part of the demonstration work, GSFC and WFF documented Range safety analyses and practices including all elements of shipping, storage, handling, operations, decontamination, and disposal. LMP-103S has not been previously handled at a U.S. Launch Range. Requisite for this activity was an LMP-103S Risk Analysis Report and Ground Safety Plan. GSFC and WFF safety offices jointly developed safety documentation for application into the GPLD operation. The GPLD along with the GSFC Propulsion historical hydrazine loading experiences offer direct comparison between handling green propellant versus safety intensive, highly toxic hydrazine propellant. These described motives initiated the GPLD operation in order to investigate the handling and process safety variances in project resources between LMP-103S and typical in-space propellants. The GPLD risk reduction operation proved successful for many reasons including handling the green propellant at a U.S. Range, loading and pressurizing a flight-like tank, expelling the propellant, measuring the tank expulsion efficiency, and most significantly, GSFC propulsion personnel's new insight into the LMP-103S propellant handling details.

Propellant↗

Green Propellant Loading Demonstration at U.S. Range

The Green Propellant Loading Demonstration (GPLD) was conducted December 2015 at Wallops Flight Facility (WFF), leveraging work performed over recent years to bring lower toxicity hydrazine replacement green propellants to flight missions. The objective of this collaboration between NASA Goddard Space Flight Center (GSFC), WFF, the Swedish National Space Board (SNSB), and Ecological Advanced Propulsion Systems (ECAPS) was to successfully accept LMP-103S propellant at a U.S. Range, store the propellant, and perform a simulated flight vehicle propellant loading. NASA GSFC Propulsion (Code 597) managed all aspects of the operation, handling logistics, preparing the procedures, and implementing the demonstration. In addition to the partnership described above, Moog Inc. developed an LMP-103S propellant-compatible titanium rolling diaphragm flight development tank and loaned it to GSFC to act as the GPLD flight vessel. The flight development tank offered the GPLD an additional level of flight-like propellant handling process and procedures. Moog Inc. also provided a compatible latching isolation valve for remote propellant expulsion. The GPLD operation, in concert with Moog Inc. executed a flight development tank expulsion efficiency performance test using LMP-103S propellant. As part of the demonstration work, GSFC and WFF documented Range safety analyses and practices including all elements of shipping, storage, handling, operations, decontamination, and disposal. LMP-103S has not been previously handled at a U.S. Launch Range. Requisite for this activity was an LMP-103S Risk Analysis Report and Ground Safety Plan. GSFC and WFF safety offices jointly developed safety documentation for application into the GPLD operation. The GPLD along with the GSFC Propulsion historical hydrazine loading experiences offer direct comparison between handling green propellant versus safety intensive, highly toxic hydrazine propellant. These described motives initiated the GPLD operation in order to investigate the handling and process safety variances in project resources between LMP-103S and typical in-space propellants. The GPLD risk reduction operation proved successful for many reasons including handling the green propellant at a U.S. Range, loading and pressurizing a flight-like tank, expelling the propellant, measuring the tank expulsion efficiency, and most significantly, GSFC propulsion personnel's new insight into the LMP-103S propellant handling details.

Green Propellant↗

Getting ready to go

The reevaluation of the Space Station that has occurred over the past two and a half years is reviewed, and the system development that has been recently initiated is discussed. Upcoming developments with regard to laboratory outfitting, extended duration Orbiter, and logistics operations are summarized. The goals of the first launches are discussed, and the aims of the succeeding manned flights are examined.

Moser, Thomas L.↗

RACE pulls for shared control

Maintaining and supporting an aircraft fleet, in a climate of reduced manpower and financial resources, dictates effective utilization of robotics and automation technologies. To help develop a winning robotics and automation program the Air Force Logistics Command created the Robotics and Automation Center of Excellence (RACE). RACE is a command wide focal point. Race is an organic source of expertise to assist the Air Logistic Center (ALC) product directorates in improving process productivity through the judicious insertion of robotics and automation technologies. RACE is a champion for pulling emerging technologies into the aircraft logistic centers. One of those technology pulls is shared control. Small batch sizes, feature uncertainty, and varying work load conspire to make classic industrial robotic solutions impractical. One can view ALC process problems in the context of space robotics without the time delay. The ALC's will benefit greatly from the implementation of a common architecture that supports a range of control actions from fully autonomous to teleoperated. Working with national laboratories and private industry, we hope to transition shared control technology to the depot floor. This paper provides an overview of the RACE internal initiatives and customer support, with particular emphasis on production processes that will benefit from shared control technology.

Leahy, M. B., Jr.↗

An Evolvable Approach to Launch Vehicles for Exploration

This paper presents ideas that may be used individually or in combination to mitigate high costs for separate developments of new crew and heavy-lift cargo launch vehicles, while providing the foundation for a highly reliable and evolvable approach to exploration. Consideration is given to reclassification of cargo for launch purposes into high value versus low value categories, rather than the presently-defined crew versus cargo categories. Objectives for the reclassification are to reduce the gap between payload mass requirements for crew and cargo payloads to better allow closure on a single moderately-sized common core vehicle to reduce development cost, achieve an economical balance between launch frequency and payload mass, and to improve total mission reliability and safety, as compared a light-weight crew vehicle and heavy cargo lift approach. Concepts to reduce design and flight qualification costs for a common core vehicle with derivatives are presented. Appropriate types and mass of cargo for each class of vehicle are identified. Utilization of existing infrastructure and flight hardware is considered to reduce costs and build on proven capabilities. The approach enables low-risk incorporation of international and commercial launch of relatively low-cost, easily replaceable assets as a means to evolve toward longer-duration and more distant missions. Benefits are identified for ground idrastructure, personnel, training, logistics, spares, and system evolution. Technology needs are compared with needs for other aspects of exploration. Technology development phasing, demonstration, and reliability growth opportunities are considered. Flexibility to adapt to future technologies such as advanced in-space propulsion is contrasted with an approach of sizing the cargo launch vehicle based on today's in-space propellants.

Cheuvront, David L.↗

An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

Garcia, Christopher↗