Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Prototype”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Measurement of isotopic separation of argon with the prototype of the cryogenic distillation plant Aria for dark matter searches

The Aria cryogenic distillation plant, located in Sardinia, Italy, is a key component of the DarkSide-20k experimental program for WIMP dark matter searches at the INFN Laboratori Nazionali del Gran Sasso, Italy. Aria is designed to purify the argon, extracted from underground wells in Colorado, USA, and used as the DarkSide-20k target material, to detector-grade quality. In this paper, we report the first measurement of argon isotopic separation by distillation with the 26 m tall Aria prototype. We discuss the measurement of the operating parameters of the column and the observation of the simultaneous separation of the three stable argon isotopes: ${}^{36}\hbox {Ar}$, ${}^{38}\textrm{Ar}$, and ${}^{40}\textrm{Ar}$. We also provide a detailed comparison of the experimental results with commercial process simulation software. This measurement of isotopic separation of argon is a significant achievement for the project, building on the success of the initial demonstration of isotopic separation of nitrogen using the same equipment in 2019.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CORAL Prototype Implementation (CORAL) v0.1

This is prototype code that implements many of the concepts in our invention, "The CORAL Framework for FAIR Data Management and Analysis" (ROI 2019-123, attached). The code includes a back end module that interfaces with third party open source software (ArangoDB), and a front end user interface (UI) that allows user interaction with the software through a web interface.

Chandonia, John-Marc↗

CORAL Prototype Implementation (CORAL) v0.1

This is prototype code that implements many of the concepts in our invention, "The CORAL Framework for FAIR Data Management and Analysis" (ROI 2019-123, attached). The code includes a back end module that interfaces with third party open source software (ArangoDB), and a front end user interface (UI) that allows user interaction with the software through a web interface.

Chandonia, John-Marc↗

Bench Testing Data and Report for an Early Prototype Pitch Resonator WEC

This dataset encompasses data and documentation from bench tests conducted on an early prototype of a "pitch resonator" wave energy converter (WEC). The testing aimed to validate numerical models and reduce risks associated with the pitch resonator concept, which is designed to convert the pitching and rolling motions of a buoy into electrical power. The project's goal is to provide supplementary power, in the range of 10-100 watts, to the National Science Foundation's Ocean Observatories Initiative Pioneer Array. Two distinct testing phases are documented: one using a single degree of freedom (1DOF) test rig, and another employing a six degree of freedom (6DOF) Stewart platform, known as the Large Amplitude Motion Platform (LAMP). These tests assessed various factors, such as system performance in different motion scenarios, the torque exerted by wave forces, and the impact of mounting configurations. The dataset includes raw test data in MATLAB (.mat) format, detailed metadata, and a report describing the experimental procedures and preliminary findings.

16 TIDAL AND WAVE POWER↗

Commissioning of the prototype C75 cavities in a CEBAF cryomodule

Prototype cavities have been built at Jefferson Lab to increase the energy of future refurbished CEBAF cryomodules to 75 MeV in the most cost efficient way. Three such cavities, named "C75", have been built from ingot Nb material of different purity and have been processed and tested. The two better performing cavities have been assembled into a "cavity pair" and installed in the latest refurbished original CEBAF cryomodule. The cryomodule was installed and commissioned in CEBAF. The results from the commissioning of the C75 cavities, compared with the original CEBAF cavities, are presented in this article. The vertical test performance of the C75 cavities was preserved in the cryomodule with one of the cavities achieving the performance specification of an accelerating gradient of 19 MV/m with a quality factor of ~8×109 at 2.07 K. The performance in terms of microphonics and tuner operation was similar to that of original CEBAF cavities, as expected, and the high-order modes are properly damped. The quality factor of the two C75 cavities was the highest achieved in a CEBAF cryomodule, possibly due to the better magnetic flux expulsion of ingot Nb than standard fine-grain Nb.

Drury, Michael A.↗

Test Results of the Prototype SSR1 Cryomodule for PIP-II at Fermilab

A prototype cryomodule containing eight Single Spoke Resonators type-1 (SSR1) operating at 325 MHz and four superconducting focusing lenses has been successfully assembled and cold tested in the framework of PIP-II project at Fermilab. The performance of cavities and focusing lenses along with test results of other cryomodule’s key parameters are presented in this contribution.

43 PARTICLE ACCELERATORS↗

Computer Vision Techniques Used to Monitor the Alignment of Cavities and Solenoids in the PIP-II Prototype SSR1 Cryomodule

The alignment of the SRF PIP-II string components is studied as the acceptable beam deflection, offset and defocusing, which may otherwise cause beam loss. Simulations and measurements established that the maximum deviation of the beam pipe from the reference orbit should not exceed a small fraction of the beam aperture. To observe the translations and rotations of each single component within the cryomodule, optical instruments (H-BCAM) surveying highly reflective targets, installed in the internal assembly of the module were used. The alignment monitoring concept for the PIP II SSR1 prototype cryomodule, along with relevant measurements of the components’ position monitoring during coldmass cooldown is presented in this contribution. This development paves the way to new computer vision applications in the field of cryomodule assemblies in cleanroom environment, in which robotically-assisted operations have the potential to dramatically reduce the risk of chemical and particulate contamination.

43 PARTICLE ACCELERATORS↗

A High Power Prototype of a Harmonic Kicker Cavity

A harmonic kicker, a beam exchange device that can deflect the beam at an ultra-fast time scale (a few ns), has been developed in Jefferson Lab *, **. The high power prototype that can deliver more than a 100 kV kick at 7 kW was fabricated. The RF performance of cavity such as the harmonic resonant frequencies, kick profiles, it’s stability, and electric center is tested at bench. The cavity will eventually be tested with a beam at Upgraded Injector Test Facility (UITF) in Jefferson Lab. In this paper, we report some features of fabrication and bench test results. We also briefly describe our beam test plan in the future.

Park, Gunn↗

An engineering prototype of a late stage ionization cooling cell for a muon collider

Achieving the low emittances necessary for a muon collider requires ionization cooling. Much of that cooling occurs in compact cooling cells where superconducting coils and conventional RF cavities are closely interleaved [1]. The real challenges for these cooling cells reside in their engineering challenges: high field solenoids, RF cavities, and absorbers, often designed near technological limits, placed in close proximity to each other. We thus propose to build a prototype ionization cooling cell to demonstrate the capability of constructing an ionization cooling channel reaching the lowest emittances and to provide engineering input for the design of such beamlines. The magnets and cavities will be powered at their design values, and an absorber will be included along with a mechanism for heating the absorber similarly to how a beam would.

43 PARTICLE ACCELERATORS↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring 591 MHz Elliptical SRF Cavity

The Electron Ion Collider (EIC) is a new nuclear phys-ics research facility to be constructed at Brookhaven Lab (BNL). It consists a few accelerator complexes, each re-quires some different SRF and RF systems. Among them, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. This 17 cavi-ties system will handle a variable beam current of up to 2.5 A, and replenish up to 10 MW of beam power losses from both synchrotron radiation (SR) and high-order modes (HOM). In this paper, we will report the progress and findings of the ongoing design and prototyping of this cavity.

Guo, J.↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Optimization of static heat loads of the PIP-II cryomodules based on prototype HB650 cryomodule test results

During the first cool down of the prototype HB650 cryomodule (pHB650 CM), high static heat loads have been measured compared to the estimation. Several analysis and calculations have been performed to explain this difference which led to cool down this cryomodule two additional times. Before each cool down, repairs and upgrades have been done, and instrumentations were added to identify the issues and quantify their impact on the heat loads. Based on these findings, the production cryomodule design and assembly process have been updated to align the future heat loads measurements with the estimations.

43 PARTICLE ACCELERATORS↗

Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule

For the first prototype PIP-II SSR1 cryomodule, an alignment monitor system based on HBCAM will be used. The main focus will be changes in alignment due to shipping and handling or during cool down and operation process. The SSR1 cryomodule contains eight 325 MHz superconducting single spoke cavities and four solenoid’based focusing lenses, and an alignment error better than 0.5 mm RMS for the transverse solenoid, based on function requirement specification. The alignment monitor system has been configured to the objectives of SSR1 cryomodule: low space for integration; presence of magnetic fields; exposure to non-standard environmental conditions such as high vacuum and cryogenic temperatures. The mechanical design and first results of system performance will be presented.

43 PARTICLE ACCELERATORS↗

Toward Qualifications of HB and LB 650 MHz Cavities for the Prototype Cryomodules for the PIP-II Project

High-beta (HB) and low-beta (LB) 650 MHz cryomodules are key components of the Proton Improvement Plan II (PIP-II) project. In this contribution we present the results of several 5-cell HB650 cavities that have been processed and tested with the purpose of qualifying them for the prototype cryomodule assembly, which will take place later this year. We also present the first results obtained in LB650 single-cell cavities process optimization. Taking advantage of their very similar geometry, we are also analyzing the effect of different surface treatments in FRIB’s 5-cell medium-beta 644MHz cavities. Cavities processed with N-doping and mid-T baking showed very promising results in term of both Q-factors and accelerating gradient for these low-beta structures.

43 PARTICLE ACCELERATORS↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring SRF cavity

Among the EIC?s numerous RF subsystems, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. Each cavity in the system will handle up to 2.5 A of beam current and supply up to 600 kW beam power under a wide range of voltage. The EIC R&D plan includes the design, fabrication and testing of such a cavity. In this paper, we will report the latest status and findings of the ongoing design and prototyping of this cavity, including the RF and mechanical/thermal design, fabrication design, and the progress of fabrication.

Guo, Jiquan↗

Fabrication and Testing of a Prototype RF-Dipole Crabbing Cavity

Crabbing cavities are essential in particle colliders to compensate the luminosity degradation due to beam collision at a crossing angle. The 952.6 MHz 2-cell rf-dipole crabbing cavity system was proposed for the Jef-ferson Lab Electron-Ion Collider to restore the head-on collisions of electron and proton bunches at the interac-tion point. A prototype cavity was designed and devel-oped to demonstrate the performance of multi-cell rf-dipole structures. This paper presents the fabrication pro-cess and cold test results of the first 2-cell rf-dipole proto-type cavity.

43 PARTICLE ACCELERATORS↗