Performance of the electrically-heated 2 to 15 kWe Brayton power system
Comparison of performance test results of Brayton power conversion system to performance predictions
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Comparison of performance test results of Brayton power conversion system to performance predictions
A Data Bus Evaluation Laboratory (DBEL) facility has been established to test and evaluate space shuttle data bus hardware. Performance testing conducted on an in-house developed multiplex interface adapter for the purpose of evaluating DBEL test procedures, test hardware, and test software in a realistic test environment is described. Results are presented.
Improved designs of swirl-can combustor modules were tested using seven-module arrays in a combustor. The combustor was operated over a pressure range of 69 to 207 N/sq cm, a fuel-air ratio range of 0.015 to 0.046, at a constant inlet air temperature of 733 K, and at reference velocities of 23.9 and 30.6 m/sec. The three designs tested performed with high combustion efficiency at all conditions tested and exhibited oxides of nitrogen emissions substantially lower than that of conventional gas turbine combustors. A correlating parameter used to extrapolate oxides of nitrogen emissions to full power or takeoff conditions for large commercial turbofan engines predicts oxides of nitrogen emissions somewhat higher than those specified in the 1979 government emissions standards.
Embryonic kidney cells were studied as a follow-up to the MA-011 Electrophoresis Technology Experiment which was conducted during the Apollo Soyuz Test Project (ASTP). The postflight analysis of the performance of the ASTP zone electrophoresis experiment involving embryonic kidney cells is reported. The feasibility of producing standard particles for electrophoresis was also studied. This work was undertaken in response to a need for standardization of methods for producing, calibrating, and storing electrophoretic particle standards which could be employed in performance tests of various types of electrophoresis equipment. Promising procedures were tested for their suitability in the production of standard test particles from red blood cells.
An automatic test was developed to test the ability of the deep space station (DSS) command subsystem and exciter to generate and radiate, from the exciter, the correct idle bit sequence for a given flight project or to store and radiate received command data elements and files without alteration. This test, called the command system output bit verification test, is an extension of the command system performance test (SPT) and can be selected as an SPT option. The test compares the bit stream radiated from the DSS exciter with reference sequences generated by the SPT software program. The command subsystem and exciter are verified when the bit stream and reference sequences are identical. It is a key element of the acceptance testing conducted on the command processor assembly (CPA) operational program (DMC-0584-OP-G) prior to its transfer from development to operations.
Satellite Supervisory Control and Data Acquisition (SCADA) of a Photovoltaic (PV)/diesel hybrid system was tested using NASA's Advanced Communication Technology Satellite (ACTS) and Ultra Small Aperture Terminal (USAT) ground stations. The setup consisted of a custom-designed PV/diesel hybrid system, located at the Florida Solar Energy Center (FSEC), which was controlled and monitored at a "remote" hub via Ka-band satellite link connecting two 1/4 Watt USATs in a SCADA arrangement. The robustness of the communications link was tested for remote monitoring of the health and performance of a PV/diesel hybrid system, and for investigating load control and battery charging strategies to maximize battery capacity and lifetime, and minimize loss of critical load probability. Baseline hardware performance test results demonstrated that continuous two-second data transfers can be accomplished under clear sky conditions with an error rate of less than 1%. The delay introduced by the satellite (1/4 sec) was transparent to synchronization of satellite modem as well as to the PV/diesel-hybrid computer. End-to-end communications link recovery times were less than 36 seconds for loss of power and less than one second for loss of link. The system recovered by resuming operation without any manual intervention, which is important since the 4 dB margin is not sufficient to prevent loss of the satellite link during moderate to heavy rain. Hybrid operations during loss of communications link continued seamlessly but real-time monitoring was interrupted. For this sub-tropical region, the estimated amount of time that the signal fade will exceed the 4 dB margin is about 10%. These results suggest that data rates of 4800 bps and a link margin of 4 dB with a 1/4 Watt transmitter are sufficient for end-to-end operation in this SCADA application.
The Lunar Surface Power Distribution Network Study team worked to define, breadboard, build and test an electrical power distribution system consistent with NASA's goal of providing electrical power to sustain life and power equipment used to explore the lunar surface. A testbed was set up to simulate the connection of different power sources and loads together to form a mini-grid and gain an understanding of how the power systems would interact. Within the power distribution scheme, each power source contributes to the grid in an independent manner without communication among the power sources and without a master-slave scenario. The grid consisted of four separate power sources and the accompanying power conditioning equipment. Overall system design and testing was performed. The tests were performed to observe the output and interaction of the different power sources as some sources are added and others are removed from the grid connection. The loads on the system were also varied from no load to maximum load to observe the power source interactions.
Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.
The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot tall rocket assembly—consisting primarily of two fuel tanks, an engine section, and four RS-25 rocket engines—capable of sending crew and large payloads to the moon and beyond with 1.6 million pounds of thrust. Currently, the Core Stage is in the B2 Test Stand at Stennis Space Center, undergoing a series of structural and functional tests, designated the Green Run test series. The ultimate goal of Green Run is to verify analytical models and confirm proper subsystem operation of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center modal test team. The desired free boundary condition of the Core Stage was achieved by suspending the massive spacecraft from the B2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound impact hammer for impact testing. Modal response was measured with 550 accelerometers channels distributed on both the Core Stage and the B2 Test Stand crane. Following one very long night of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 2.5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully extracted. The case-study presented in this paper will discuss the SLS Core Stage, the modal test setup and procedure, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.
The active Heat Rejection System designed for Mars Pathfinder was modified for the Mars Exploration Rover mission and will be used to remove excess heat from the Rover electronics during the cruise part of the mission. This paper addresses the lessons learned from the performance testing, and potential changes to improve the HRS performance.
The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.
The Multi-Purpose Crew Vehicle (MPCV) Program Orion vehicle finite element model (FEM) was updated based on a modal test performed by Lockheed Martin. Due to nonlinearity observed in the test results, linear low force level (LL) and high force level (HL) FEMs were developed for use during various Space Launch System (SLS) flight regimes depending on expected forcing levels. Uncertainty models were derived for the combined MPCV and MPCV Stage Adaptor LL and HL Hurty/Craig-Bampton (HCB) components based on the MPCV structural test article Configuration 4 modal test-analysis correlation results. Subsequently, system-level uncertainty quantification analyses were performed using both models for various SLS flight configurations to determine the impact of the nonlinearity on important system metrics. The system metrics included both transfer functions associated with attitude control and dynamic loads associated with aerodynamic buffeting during ascent. In each case, an independent Monte Carlo (MC) analysis was performed, and no attempt was made to combine the results. The Hybrid Parametric Variation (HPV) method was used to develop the LL and HL MPCV HCB uncertainty models. The HPV method provides both parametric and non-parametric components of uncertainty. The non-parametric uncertainty accounts for the difference in model-form between the linearized analytical model and the corresponding linearized component test results in the form of mode shapes and frequencies at that force level. This linear model-form uncertainty is implemented in the HPV method using random matrix theory. However, the HPV uncertainty models developed for the linear LL and HL MPCV components do not account for the nonlinearity in the MPCV. With respect to the linearized models, this nonlinearity is also an uncertainty in model form, but in this case, it must be treated independently as an epistemic uncertainty. It represents a lack of knowledge, in contrast to an aleatory uncertainty due to the randomness of a variable. In the case of an epistemic variable, the true value is unknown, only the interval within which it lies is known. Epistemic uncertainty can be reduced with increased knowledge, while in general, aleatory uncertainty cannot. This work combines the epistemic uncertainty due to the MPCV nonlinearity with the parametric and non-parametric uncertainty within the HPV method using a second order propagation approach. The LL and HL test data is augmented with surrogate test data derived from a nonlinear MPCV representation. The impact of the MPCV nonlinearity on system response statistics is determined using a series of cumulative distribution functions in the form of a horsetail plot, or p-box. This results in an interval of probabilities for a specific response value, or an interval of response values at a specific probability.
This report describes the qualification test of an Engineering-Model 5-mN-thrust 8-cm-diameter mercury ion thruster which is representative of the Ion Auxiliary Propulsion System (IAPS) thrusters. Two of these thrusters are scheduled for future flight test. The cyclic endurance test described herein was a ground-based test performed in a vacuum facility with a liquid-nitrogen-cooled cryo-surface and a frozen mercury target. The Power Electronics Unit, Beam Shield, Gimal, and Propellant Tank that were used with the thruster in the endurance test are also similar to those of the IAPS. The IAPS thruster that will undergo the longest beam-on-time during the actual space test will be subjected to 7,055 hours of beam-on-time and 2,557 cycles during the flight test. The endurance test was successfully concluded when the mercury in the IAPS Propellant Tank was consumed. At that time, 8,471 hours of beam-on-time and 599 cycles had been accumulated. Subsequent post-test-evaluation operations were performed (without breaking vacuum) which extended the test values to 652 cycles and 9,489 hours of beam-on-time. The Power Electronic Unit (PEU) and thruster were in the same vacuum chamber throughout the test. The PEU accumulated 10,268 hr of test time with high voltage applied to the operating thruster or dummy load.
The purpose of this project was to use NASA technology to assist the US Army in the assessment of motion sickness and performance of soldiers in the Command and Control Vehicle (C2V). Three different vehicle configurations were tested: oblique, (3 seats at a 20-degree angle from the direction of travel); perpendicular, (3 seats at a 90 degree angle); and 4-forward, (all seats faced forward). In all vehicles, the front seat faced forward. Sixteen men and eight women participated for 15 days: 2 days of classroom instruction; 12 days of field tests in the C2V, and 15 minutes of post-field test performance measures. Conditions for field tests were: an initial Park; four Moves (i.e., travel over a mixed terrain); and four Short-halts following movement. NASA task batteries, mood and symptom scales, and physiological data were collected during field tests. Motion sickness symptoms ranging from slight to severe were reported for all subjects. Conclusions were: (1) there was no difference between vehicle configurations; (2) there was a negative impact on crew performance and health when subjects attended to visual screens during vehicle movement; and (3) symptoms and performance degradation were not mitigated by intermittent short-halts.
A facility was designed, constructed and equipped for the production of prismatic alkaline rechargeable battery cells using inorganic (ceramic) separators. This unique facility is environmentally controlled and contains separate areas for electrode fabrication, separator processing, cell assembly, cell finishing and testing. An initial production run of 125 sealed silver zinc cells, using inorganic separators, was made in the facility in order to provide samples for baseline performance tests. Ten of these cells were given performance characterization and life cycle tests.
GRC is supporting JSC by developing LIDS main interface seals Seal development and testing is occurring at both sub-scale and full-scale levels: a) Small-scale tests performed to define seal materials and evaluate exposure to space environments. b) Medium-scale testing: 1) Permits evaluation of candidate seal designs at faster pace than for full-scale seals. 2) Leak rates and loads can be scaled up to full-scale for indication of seal performance. c) Full-scale test rigs used for seal development and flight qualification tests and to assess on-orbit anomalies if needed. GRC responsible for delivering flight hardware seals to JSC approx.2013 for integration into LIDS flight units.
The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. Lockheed Martin designed and fabricated an engineering unit (EU), the ASRG EU, under contract to the Department of Energy. This unit is currently undergoing extended operation testing at the NASA Glenn Research Center to generate performance data and validate life and reliability predictions for the generator and the Stirling convertors. It has also undergone performance tests to characterize generator operation while varying control parameters and system inputs. This paper summarizes and explains test results in the context of designing operating strategies for the generator during a space mission and notes expected differences between the EU performance and future generators.
A summary of recent plants and experiences on current large wind turbine (WT) tests being conducted by electric utilities is provided. The test programs discussed do not include federal research and development (R&D) programs, many of which are also being conducted in conjunction with electric utilities. The information presented is being assembled in a project, funded by the Electric Power Research Institute (EPRI), the objective of which is to provide electric utilities with timely summaries of test performance on key large wind turbines. A summary of key tests, test instrumentation, and recent results and plans is given. During the past year, many of the utility test programs initiated have encountered test difficulties that required specific WT design changes. However, test results to date continue to indicate that long-term machine performance and cost-effectiveness are achievable.