Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Materials and Fuels Complex Operations Management Improvement Strategy for FY2022

The Materials and Fuels Complex (MFC) has experienced substantial growth in terms of staff, research, and production in recent years. MFC operational performance has effectively kept pace with this growth. However, to capture the continuous improvement actions needed to improve effectiveness and increase the efficiency of our management systems, a broad operations management strategy is necessary. The MFC Operations Management Improvement (OMI) Strategy is complementary to the MFC Five-Year Mission and Investment Strategies and the MFC Management Plan. The OMI strategy is structured to address the management systems outlined in the Nuclear Facility Management Standard Operations Model. Selected management systems are evaluated independently in chapters that describe the prior 5 years of performance improvement, a description of improvement actions for the MFC staff that directly perform within or contribute to the management system, process improvements, and any needed equipment improvements. Chapter selection is based on a management system’s need for improvement. In some cases, management systems may be combined in a single chapter. Additional chapters are added to address subject areas not formally described in the standard operations model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2020

This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are failure-to-open/close (FTOC), failure to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following trends were identified for the most recent 10-year period: o Extremely statistically significant increasing trend for the frequency of FTOC demands (demands per reactor year) for low-demand (= 20 demands per year) AOVs o Extremely statistically significant increasing trend for the frequency of FTOC demands for high-demand (> 20 demands per year) AOVs o Highly statistically significant decreasing trend for the failure rate of FTOP for low-demand AOVs o Highly statistically significant decreasing trend for the frequency of FTOP events (failures per reactor year) for low-demand AOVs o Statistically significant decreasing trend for the failure rate of SO for low-demand AOVs o Statistically significant decreasing trend for the frequency of SO events (failures per reactor year) for low-demand AOVs.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2020

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following increasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Materials and Fuels Complex Operations Management Improvement Strategy for Fiscal Year 2023

The Materials and Fuels Complex (MFC) has experienced substantial growth in terms of staff, research, and production in recent years. MFC operational performance has effectively kept pace with this growth. However, to capture the continuous improvement actions needed to improve effectiveness and increase the efficiency of our management systems, a broad operations management strategy is necessary. The MFC Operations Management Improvement (OMI) Strategy is complementary to the MFC Five-Year Mission and Investment Strategies and the MFC Management Plan. The OMI strategy is structured to address the management systems outlined in the Nuclear Facility Management Standard Operations Model. Selected management systems are evaluated independently in chapters that describe the prior 5 years of performance improvement, a description of improvement actions for the MFC staff that directly perform within or contribute to the management system, process improvements, and any needed equipment improvements. Chapter selection is based on a management system’s need for improvement. In some cases, management systems may be combined in a single chapter. Additional chapters are added to address subject areas not formally described in the standard operations model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Operational Parameter Database for Molten Salt Thermal Energy Storage Tank Modeling

The second generation of concentrated solar power (CSP) plants is characterized by the use of a central receiver (either cavity or external), two molten nitrate salt tanks (60 wt.% NaNO 3 and 40 wt.% KNO 3 ), and a steam Rankine power-generation cycle connected through a primary heat exchanger. Molten salt thermal energy storage (TES) tanks have been widely deployed in commercial CSP plants worldwide and have been essential for increasing plant dispatchability and capacity factor, while also reducing the levelized cost of electricity (LCOE). These systems enable energy storage at the gigawatt-hour scale, typically providing 6 to 17 hours of storage duration. Despite being a commercial technology, the multiple failures observed after only a few months or years of operation in plants around the world demonstrate the technology's relative infancy and highlight the need for further research to improve its reliability. The National Laboratory of the Rockies (NLR), in collaboration with industry partners and academic and research institutions, has been leading multiple projects funded by the U.S. Department of Energy (DOE). These projects focus on addressing molten salt tank failures by improving tank design and welding fabrication practices, evaluating new alloys and weld fillers, and providing guidelines for tank commissioning and safe operation. In particular, this report presents modeling results on the effect of key tank operation parameters during 60 minutes of operation, including the mass flow rate and temperature of the salt inflow, tank salt inventory temperature, and inventory level for a representative molten salt tank design. These results form a database of tank operation behaviors that captures the effects of each specific parameter during charging, charging/discharging, and discharging processes.

14 SOLAR ENERGY↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2024

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • High-demand MOV SO failure rate • Low-demand MOV frequency of FTOC events (failures per reactor year) • High-demand MOV frequency of SO events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal Operator Training Reference Models for Human-in-the-loop Systems

The human operator is an integral part of a stable and safe power system. While there is increasing attention paid to automation improvements, the importance of understanding and training human operators may be understated. This paper discusses a project to enhance operator training programs by evaluating human performance relative to a reference operator model identified using optimal control theory. Along with establishing a simple computer-based operator workstation for future training purpose, this paper describes the optimal control response design methodology for a human-in-the-loop power system experiment. The overall system model is presented. An optimal controller synthesis methodology is applied to the model system and the optimal controller is designed. The performance of the optimal controller is then compared to human subject performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Value of Faster Computation for Power Grid Operation

As a result of the grid evolution meeting the information revolution, the power grid is becoming far more complex than it used to be. How to feed data in, perform analysis, and extract information in a real-time manner is a fundamental challenge in today’s power grid operation, not to mention the significantly increased complexity in the smart grid environment. Therefore, high performance computing (HPC) becomes one of the advanced technologies used to meet the requirement of real-time operation. This paper presents benefit case studies to show the value of fast computation for operation. Two fundamental operation functions, state estimation (SE) and contingency analysis (CA), are used as examples. In contrast with today’s tools, fast SE can estimate system status in a few seconds—comparable to measurement cycles. Fast CA can solve more contingencies in a shorter period, reducing the possibility of missing critical contingencies. The benefit case study results clearly show the value of faster computation for increasing the reliability and efficiency of power system operation.

high performance computing↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Advanced energy plant operation and training of the future

NETL presented its vision of future plant operations and training for advanced energy systems at the 14th Annual ARC World Industry Forum. Plant operations can be improved through increased use of innovative computational tools, immersive virtual simulation, advanced real-time optimization and model predictive control solutions, wireless sensor networks, and enhanced self-diagnosis and decision-making tools. This presentation emphasized real-time dynamic simulators with operator training system (OTS) capabilities, along with immersive training systems (ITS) that provide three-dimensional virtual plant walk-through environments for training field operators and engineers. It also highlighted NETL's Dynamic Simulator Research and Training (DSR&T) Center, which is scheduled to be launched in late 2010 with the deployment of a combined OTS/ITS solution for an IGCC reference plant with carbon capture. The plant-wide IGCC training system will make use of the Invensys Operations Management DynsimTM software for the OTS and EYESimTM software for the ITS. EYESimTM was recently selected as a Breakthrough Product of 2009 by Processing magazine and was featured, along with NETL's DSR&T Center, in a recent ARC Insights article.

97 MATHEMATICS AND COMPUTING↗

Remotely Operated Equipment for Post Irradiation Examination of the SNS Target Vessel

The Spallation Neutron Source produces neutrons by accelerating protons into flowing mercury contained inside a stainless steel target vessel. During facility operation the target vessel is degraded by a combination of high-energy neutrons, the proton beam, and cavitation-induced corrosion. The degradation is primarily concentrated at the nose of the target vessel, where the proton beam passes through. Currently, the Spallation Neutron Source has replaced three target vessels and is operating the fourth. To minimize the operational costs of manufacturing and disposing of target vessels, efforts are underway to increase the operational lifetimes of the target vessels by conducting post irradiation examinations of spent vessels. This examination involves remotely removing multiple coupons from the nose of the target vessel using a single piece of equipment, called the Nose Sampling Cutter, installed inside the Spallation Neutron Source s hot cell. The Cutter produces circular coupons approximately 2 inches in diameter using a carbide-tipped hole saw. The nose of the target vessel consists of four layers of material, and the Nose Sampling Cutter is capable of cutting through the layers in a single stroke. This remote operation has been successfully completed twice. In addition to the Nose Sampling Cutter, a large reciprocation saw capable of removing a sizable section of the nose of the target vessel has been constructed and tested, but never implemented. To support this large reciprocation saw other equipment has also been designed. The details of the Nose Sampling Cutter, reciprocation saw, and associated equipment are discussed.

36 MATERIALS SCIENCE↗

AVESTAR Center for clean energy plant operators of the future

Clean energy plants in the modern grid era will increasingly exploit carbon capture, utilization, and storage (CCUS), fuel/product flexibility, and load following. Integrated power/process plants will require next generation of well-trained engineering and operations professionals. High-fidelity dynamic simulators are well suited for training, education, and R&D on clean energy plant operations. Combining Operator Training System (OTS) with 3D virtual Immersive Training System (ITS) enables simultaneous training of control room and plant field operators of the future. Strong collaboration between industry, academia, and government is required to address advanced R&D challenges. AVESTAR Center brings together simulation technology and world-class expertise focused on accelerating development of clean energy plants and operators of the future.

97 MATHEMATICS AND COMPUTING↗

High-Performance Computing for Real-Time Grid Analysis and Operation

Power grids worldwide are undergoing an unprecedented transition as a result of grid evolution meeting information revolution. The grid evolution is largely driven by the desire for green energy. Emerging grid technologies such as renewable generation, smart loads, plug-in hybrid vehicles, and distributed generation provide opportunities to generate energy from green sources and to manage energy use for better system efficiency. With utility companies actively deploying these technologies, a high level of penetration of these new technologies is expected in the next 5-10 years, bringing in a level of intermittency, uncertainties, and complexity that the grid did not see nor design for. On the other hand, the information infrastructure in the power grid is being revolutionized with large-scale deployment of sensors and meters in both the transmission and distribution networks. The future grid will have two-way flows of both electrons and information. The challenge is how to take advantage of the information revolution: pull the large amount of data in, process it in real time, and put information out to manage grid evolution. Without addressing this challenge, the opportunities in grid evolution will remain unfulfilled. This transition poses grand challenges in grid modeling, simulation, and information presentation. The computational complexity of underlying power grid modeling and simulation will significantly increase in the next decade due to an increased model size and a decreased time window allowed to compute model solutions. High-performance computing is essential to enable this transition. The essential technical barrier is to vastly increase the computational speed so operation response time can be reduced from minutes to seconds and sub-seconds. The speed at which key functions such as state estimation and contingency analysis are conducted (typically every 3-5 minutes) needs to be dramatically increased so that the analysis of contingencies is both comprehensive and real time. An even bigger challenge is how to incorporate dynamic information into real-time grid operation. Today’s online grid operation is based on a static grid model and can only provide a static snapshot of current system operation status, while dynamic analysis is conducted offline because of low computational efficiency. The offline analysis uses a worst-case scenario to determine transmission limits, resulting in under-utilization of grid assets. This conservative approach does not necessarily lead to reliability. Many times, actual power grid scenarios are not studied, and they will push the grid over the edge and resulting in outages and blackouts. This chapter addresses the HPC needs in power grid analysis and operations. Example applications such as state estimation and contingency analysis are given to demonstrate the value of HPC in power grid applications. Future research directions are suggested for high performance computing applications in power grids to improve the transparency, efficiency, and reliability of power grids.

Contingency Analysis↗

Potential of Wind Power to Provide Flexible Ramping Products and Operating Reserve: Preprint

With increasing penetration levels of variable renewable energy sources, such as wind and solar, electric power systems need flexible resources that can provide fast-response ramping capabilities to counter the variability and uncertainty of renewable generation. Although the California Independent System Operator and Midcontinent System Operator have lauched ramp products, determining how wind power can participate using their flexible ramping models is still largely unclear. This paper proposes a security-constrained unit commitment (SCUC) model considering a flexible ramping constraint representing the system's flexible ramping requirements that account for the net load probabilistic forecast uncertainty. Through this explicit modeling of the uncertainty, the true cost of the flexible ramp service can be determined after solving the SCUC problem. In addition, the potential of wind power to provide operating reserves is analyzed. Numerical case studies demonstrate that with wind power providing both flexible ramping products and operating reserve, the system operating costs and ramp shortages will be reduced significantly.

17 WIND ENERGY↗

How Wrong Can the Operational AEP Uncertainty Estimate Be When We Ignore the Correlations Between the Uncertainty Components?

Calculations of wind farm annual energy production (AEP) on operational data are essential for a variety of financial transactions during the life of wind plants. The AEP estimate is associated with an uncertainty value, which is calculated by combining contributions connected to on-site measurements, long-term reference measurements, losses, regression, windiness adjustment, and wind resource interannual variability. Although very limited documentation on the topic exists, the conventional approach currently used by the wind energy community to assess the uncertainty connected to the operational AEP estimate assume that the different uncertainty components are uncorrelated and therefore calculates the overall uncertainty with a sum of squares approach. In this analysis, we contrast the traditional technique to estimate the overall AEP uncertainty by ignoring the correlation between its different components with a novel Monte Carlo based approach, which can instead take into account the correlation between different uncertainty categories. We consider monthly operational data from 472 wind farms from the Energy Information Administration (EIA) 923 database to assess the difference between the two approaches. Long-term wind speed data needed for the AEP assessment are taken from three reanalysis products: the Modern-Era Retrospective analysis for Research and Applications v2 (MERRA-2), the European Reanalysis Interim (ERA-interim), and the National Centers for Environmental Prediction v2 (NCEP-2). The results of the Monte Carlo approach show that three pairs of AEP uncertainty components do show a statistically significant correlation: the uncertainty connected with wind resource inter-annual variability is positively correlated with the one related to the windiness correction and negatively correlated with the one due to the regression, and the wind measurement uncertainty is positively correlated with the regression uncertainty. All these correlations, which are found between uncertainty components which are not only part of an operational analysis, but also of a wind resource assessment, are currently ignored in the conventional techniques used as industry standard. We further investigate the causes of these correlations, in terms of common dependencies of different uncertainty components on wind resource variability, number of data points, and quality of the regression between wind speed and energy production data. Next, we quantify the error in the current industry standard technique, in terms of the percentage difference in total uncertainty calculated with the two considered approaches, for all the analyzed wind farms. We find a mean absolute percentage difference of about 6%, with the largest differences being greater than 20%. The data clearly confirm that ignoring the actual correlation between the uncertainty components can lead to large errors in the assessment of the operational AEP uncertainty, and the proposed Monte Carlo approach should be preferred.

Monte Carlo↗