NANT Site - ASSIST / Processed Data
This dataset contains processed summary data from the ASSIST operated by NOAA Physical Science Laboratory on Nantucket Island for WFIP3.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This dataset contains processed summary data from the ASSIST operated by NOAA Physical Science Laboratory on Nantucket Island for WFIP3.
The Visible Infrared Imaging Radiometer Suite (VIIRS) is a multi-spectral Earth-observing instrument on board the Suomi-NPP (SNPP) and NOAA-20 (N20) spacecraft, with spectral bands ranging in wavelength from 0.41 to 12.2 μm. For the reflective solar bands (RSB), the bands are calibrated on orbit using both solar diffuser (SD) and lunar observations. The lunar observations use near-monthly scheduled spacecraft maneuvers in order to view the Moon within a desired phase angle range. While the primary purpose of the maneuvers is for radiometric calibration, these observations can also be used to characterize the spatial performance of the instrument, including the band-to-band and detector-to-detector registration (BBR/DDR). The Moon can also be observed without spacecraft maneuvers. However, these observations are over a larger phase angle range. While the geometry of these unscheduled observations is more varied, they can still be used to assess the sensor performance. In this work, we will use unscheduled Moon data to analyze the BBR and DDR of the SNPP and N20 VIIRS RSB. For the BBR, we implemented an image cross-correlation approach, which removes the residual oscillations in the trending data when compared to previous methodologies. For the DDR, we developed an edge fitting approach that accounts for the lunar motion across the VIIRS focal plane array on a scan-by-scan basis using lunar and satellite ephemeris data. In our analysis, we find that the BBR and DDR for both VIIRS RSB are stable on orbit.
The 2000 and 2006 Texas Air Quality Study (TexAQS 2000 and 2006) field campaigns took place in eastern Texas in August-October of 2000 and 2006. Several flights of the National Oceanic and Atmospheric Administration (NOAA) and National Center for Atmospheric Research (NCAR) research aircraft were dedicated to characterizing anthropogenic emissions over Houston. Houston is known for having serious problems with non-attainment of air quality standards. We present a method that uses three models and aircraft observations to assess and improve existing emission inventories using an inverse modeling technique. We used 3-dimensional and 4-dimensional variational (3D-VAR and 4D-VAR) inverse modeling techniques based on a least-squares method to improve the spatial and temporal distribution of CO, NOy (sum of all reactive nitrogen compounds), and SO2 emissions predicted by the 4-km-resolution U.S. Environmental Protection Agency (EPA) National Emission Inventory (NEI) for 2005. Differences between the prior and posterior inventories are discussed in detail. We found that in 2006 the prior daytime emissions in the urban area of Houston have to be reduced by 40% {+-} 12% for CO and 7% {+-} 13% for NOy. Over the Houston Ship Channel, where industrial emissions are predominant, the prior emissions have to be reduced by 41% {+-} 15% for CO and 51% {+-} 9% for NOy. Major ports around Houston have their NOy emissions reduced as well, probably due to uncertainties in near-shore ship emissions in the EPA NEI inventory. Using the measurements from the two field campaigns, we assessed the interannual emission variability between 2000 and 2006. Daytime CO emissions from the Houston urban area have been reduced by 8% {+-} 20%, while the NOy emissions have increased by 20% {+-} 12% from 2000 to 2006. In the Houston Ship Channel, the daytime NOy emissions have increased by 13% {+-} 17%. Our results show qualitative consistencies with known changes in Houston emissions sources.
To support marine ecological resource management and emergency response and to enhance scientific understanding of physical and biogeochemical processes in Puget Sound, a real-time Puget Sound Operational Forecast System (PS-OFS) was developed by the Coastal Ocean Dynamics & Ecosystem Modeling group (CODEM) of Pacific Northwest National Laboratory (PNNL). PS-OFS employs the state-of-the-art three-dimensional coastal ocean model and closely follows the standards and procedures established by National Oceanic and Atmospheric Administration (NOAA) National Ocean Service (NOS). PS-OFS consists of four key components supporting the Puget Sound Circulation and Transport Model (PS-CTM): data acquisition, model execution and product archive, model skill assessment, and model results dissemination. This paper provides an overview of PS-OFS and its ability to provide vital real-time oceanographic information to the Puget Sound community. PS-OFS supports pacific northwest region’s growing need for a predictive tool to assist water quality management, fish stock recovery efforts, maritime emergency response, nearshore land-use planning, and the challenge of climate change and sea level rise impacts. The structure of PS-OFS and examples of the system inputs and outputs, forecast results are presented in details.
This data bundle contains raw GPS data files and resulting data using Trimble Business Center and NOAA OPUS to process the GPS data in spreadsheets with station coordinates and elevations. A map of station locations is included along with the final processing report which includes pre-processing, pre-stack time migration, and pre-stack depth migration. It also contains a readme.text file goes into further explanation.
Through a partnership between the U.S. National Aeronautics and Space Administration (NASA) and the National Oceanic and Atmospheric Administration (NOAA), this field campaign demonstrated first-of-its-kind hyperspectral microwave airborne measurements (Conical Scanning Millimeter-wave Imaging Radiometer [CoSMIR-H]). It was complemented by other passive (infrared, visible) and active (lidar) sensors onboard the NASA ER-2 aircraft. Serving as a future NASA planetary boundary-layer (PBL) mission prototype, the Westcoast and Heartland Hyperspectral Microwave Intensive Experiment (WH 2 yMSIE, formerly WHyMSIE) aimed to capture a wide variety of thermodynamic, moisture, and PBL regimes across a variety of surface types. The intensive operating period of the campaign spanned from October 22, 2024, through November 15, 2024, and included a large network of collaborators.
An interagency collaboration initiated between Navy, Air Force and NOAA and expanded to DOE, NASA, and NSF in 2012, for coordination of research to operations of a National earth system analysis and prediction capability. The goal of ESPC is to meet broad but specific agency requirements for an earth system analysis and prediction framework to support one-day to decadal global prediction at appropriate horizontal and vertical resolution; including the atmosphere, ocean, land, cryosphere, and space.
In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list Snake River sockeye salmon (Oncorhynchus nerka) as endangered. Snake River sockeye salmon were officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Project was implemented. This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of Snake River sockeye salmon. The Shoshone-Bannock Tribal goal for this project is two tiered: the immediate goal is to increase the population of Snake River sockeye salmon while preserving the unique genetic characteristics of the evolutionarily significant unit (ESU). The Tribes long term goal is to maintain a viable population that warrants delisting and provides Tribal harvest opportunities. The Bonneville Power Administration (BPA) provides funding for this interagency Recovery effort. Collaborators in the recovery effort include the National Oceanic and Atmospheric Administration (NOAA), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), and the Shoshone-Bannock Tribes (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2008 calendar year. Project tasks include: (1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; (2) conduct lake fertilization in Pettit and Alturas lakes; (3) reduce the number of mature kokanee salmon spawning in Alturas Lake Creek; (4) monitor, enumerate, and evaluate sockeye salmon smolt migration from Pettit and Alturas lakes; (5) monitor spawning kokanee salmon escapement and estimate fry recruitment in Fishhook and Alturas Lake creeks; (6) conduct sockeye and kokanee salmon population surveys; (7) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Redfish, Pettit, and Alturas lakes; and (8) assist IDFG with captive broodstock production activities.
Long-term changes and fluctuations in river flow, water properties, tides, and sediment transport in the Columbia River and its estuary have had a profound effect on Columbia River salmonids and their habitat. Understanding the river-flow, temperature, tidal, and sediment-supply regimes of the Lower Columbia River (LCR) and how they interact with habitat is, therefore, critical to development of system management and restoration strategies. It is also useful to separate management and climate impacts on hydrologic properties and habitat. This contract, part of a larger project led by the National Oceanic and Atmospheric Administration (NOAA), consists of three work elements, one with five tasks. The first work element relates to reconstruction of historic conditions in a broad sense. The second and third elements consist, respectively, of participation in project-wide integration efforts, and reporting. This report focuses on the five tasks within the historic reconstruction work element. It in part satisfies the reporting requirement, and it forms the basis for our participation in the project integration effort. The first task consists of several topics related to historic changes in river stage and tide. Within this task, the chart datum levels of 14 historic bathymetric surveys completed before definition of Columbia River Datum (CRD) were related to CRD, to enable analysis of these surveys by other project scientists. We have also modeled tidal datums and properties (lower low water or LLW, higher high water or HHW, mean water level or MWL, and greater diurnal tidal range or GDTR) as a function of river flow and tidal range at Astoria. These calculations have been carried for 10 year intervals (1940-date) for 21 stations, though most stations have data for only a few time intervals. Longer-term analyses involve the records at Astoria (1925-date) and Vancouver (1902-date). Water levels for any given river flow have decreased substantially (0.3-1.8 m, depending on river flow and tidal range), and tidal ranges have increased considerably (by a factor of 1.5 to 4 for most river-flow levels) since the 1900-1940 period at most stations, with the largest percentage changes occurring at upriver stations. These changes have been caused by a combination of changes in channel roughness, shape and alignment, changes in coastal tides, and (possibly) bed degradation. Tides are growing throughout the Northeast Pacific, and Astoria (Tongue Pt) has one of the most rapid rates of increase in tidal range in the entire Eastern Pacific, about 0.3m per century. More than half of this change appears to result from changes within the system, the rest from larger scale changes in coastal tides. Regression models of HHW have been used to estimate daily shallow water habitat (SWHA) available in a {approx}25 mile long reach of the system from Eagle Cliff to Kalama for 1925-2004 under four different scenarios (the four possible combinations of diked/undiked and observed flow/ virgin flow). More than 70% of the habitat in this reach has been lost (modern conditions vs. virgin flow with not dikes). In contrast, however, to the reach between Skamokawa and Beaver, selective dike removal (instead of a combination of dike removal and flow restoration) would suffice to increase spring SWHA. The second task consists of reconstruction of the hydrologic cycle before 1878, based on historic documents and inversion of tidal data collected before the onset of the historic flow record in 1878. We have a complete list of freshet times and peak flows for 1858-1877, and scattered freshet information for 1841-1857. Based on tidal data, we have reconstructed the annual flow cycles for 1870 and 1871; other time periods between 1854 and 1867 are under analysis. The three remaining tasks relate to post-1878 hydrologic conditions (flows, sediment supply and water temperature), and separation of the human and climate influences thereon. Estimated ob-served (sometimes routed), adjusted (corrected for reservoir manipulation) and virgin (corrected also for irrigation diversion) flows for 1878-2004 have been compiled for the Columbia River at The Dalles and Beaver, and for the Willamette River at Portland. Sediment transports for the ob-served, adjusted and virgin flows have been calculated for 1878-2004 for the Columbia River at Vancouver and Beaver, for the Willamette River at Portland, and for other west-side tributaries seaward of Vancouver. For Vancouver and Portland, it has been possible to estimate sand trans-port (including gravel), fine sediment transport and total load. Only total load can be estimated at Beaver, and only fine sediment transport can be determined for the west-side tributaries, except for the post-1980 period influenced by the 1980 eruption of Mt St. Helens. Changes in flows and sediment transport due to flow regulation, irrigation diversion, and climate have been estimated.
The study reported herein was funded as part of the Anadromous Fish Evaluation Program, which is managed by the U.S. Army Corps of Engineers (USACE). The Anadromous Fish Evaluation Program study code is EST P 02 01: A Study of Salmonid Survival and Behavior through the Columbia River Estuary Using Acoustic Tags. The study was conducted by the Pacific Northwest National Laboratory (PNNL) and National Oceanic and Atmospheric Administration (NOAA) Fisheries for the USACE Portland District. Estimated survival of acoustic-tagged juvenile Chinook salmon and steelhead through the lower Columbia River and estuary in 2009 was lowest in the final 50 km of the estuary. Probability of survival was relatively high (>0.90) for yearling and subyearling Chinook salmon from the Bonneville Dam forebay (rkm 236) to Three-tree Point (rkm 49.6). Survival of juvenile Chinook salmon declined sharply through the lower 50 km of the estuary. Acoustic-tagged steelhead smolts did not survive as well as juvenile Chinook salmon between Bonneville Dam and the mouth of the Columbia River. Steelhead survival began to decline farther upstream (at rkm 86) relative to that of the Chinook salmon stocks. Subyearling Chinook salmon survival decreased markedly as the season progressed. It remains to be determined whether later migrating subyearling Chinook salmon are suffering increasing mortality as the season progresses or whether some portion of the apparent loss is due to fish extending their freshwater residence. This study provided the first glimpse into what promises to be a very informative way to learn more about how juvenile salmonid passage experiences through the FCRPS may influence their subsequent survival after passing Bonneville Dam. New information regarding the influence of migration pathway through the lower 50 km of the Columbia River estuary on probability of survival of juvenile salmonids, combined with increased understanding regarding the foraging distances and time periods of avian predators should prove useful in developing or assessing management actions to reduce losses of juvenile salmonid smolts that attempt to pass through the estuary on their seaward migration.
This dataset contains raw data (lv1) from the microwave radiometer (MWR) operated by NOAA Physical Science Laboratory on Block Island for WFIP3.
The Alaska MET (Meteorology, Energy, and Transmission) Toolkit is the National Laboratory of the Rockies' (NLR) new flagship atmospheric dataset, designed to support comprehensive long-term planning and operations across the entire power sector. Serving as the regional counterpart to CONUS-wide HRRR MET Toolkit, this dataset provides a comprehensive, high-fidelity meteorological record covering Alaska.The Alaska MET Toolkit is delivered at an hourly resolution on a standardized 2-km horizontal grid. This dataset is repackaged from the National Oceanic and Atmospheric Administration's (NOAA) operational High-Resolution Rapid Refresh for Alaska (HRRR-AK) forecasts. Spanning from 2019 to 2025, it overcomes the technical barriers of native weather models by providing spatial regridding from the native 3-km HRRR-AK horizontal resolution to a 2-km grid, temporal gap-filling, and vertical interpolation at key energy-relevant heights. By delivering highly accurate, validation-backed data across a comprehensive suite of atmospheric variables - including temperature, pressure, humidity, and wind characteristics - the Alaska MET Toolkit provides a highly accessible and strictly standardized foundation for modern power system modeling.
The impetus for this special theme grew out of discussions that began several years ago in the NOAA Restoration Center (a division within the Office of Habitat Conservation, U.S. National Oceanic and Atmospheric Administration) and resulted in a panel session titled "Protection and Restoration: Are We Having an Effect?" at the 2007 meeting of the Estuarine Research Federation (November 4-8, 2007, in Providence RI). The session was developed with the intent to publish a special journal issue with the same theme. The all-day session was divided into three parts: reflections on estuarine restoration by veteran practitioners; regional perspectives from those actively engaged in habitat restoration on different U.S. coasts; and new kinds of technologies and tools. Twenty invited speakers addressed the question "Are we having an effect?" with our habitat restoration efforts in coastal and riverine areas. A subsequent call for papers for the special volume resulted in over a dozen manuscript submissions, most of which were selected for peer review by experts on the various topics covered.
Two sources of H1/3 estimates were available at Platform harvest; a NOAA buoy and CU depth sensor highrate data.
The NASA Engineering & Safety Center (NESC) was established in 2003 to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.). Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s Earth science missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA (or NOAA) Earth science missions have been for: Soil Moisture Active Passive (SMAP), Deep Space Climate Observatory (DSCOVR), Cyclone Global Navigation Satellite System (CYGNSS), Ice, Cloud, and Land Elevation Satellite (ICESat-II), Joint Polar Satellite System (JPSS), and the soon to be launched collaboration mission with India, NASA-ISRO Synthetic Aperture Radar (NISAR). In this paper, we outline some of the technical challenges faced by these Earth science missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space lidars, radars, electronics, attitude control systems, as well as Micrometeoroid Orbital Debris (MMOD) risk assessment impact to NASA missions. The efforts include strategies for risk mitigation, technical resolution of challenging problems, and failure root cause investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.
Validation results from a reflectance-based field campaign at the Salar de Uyuni in Bolivia (September 2018) are presented for GOES-17 and GOES-16 Advanced Baseline Imagers (ABI) reflective channels. The in situ measurements were used to characterize the surface reflectance and the atmosphere in order to constrain a radiative transfer model and predict the reflectance at the top of the atmosphere (TOA), which was then compared to the ABI measurements. The field campaign provides TOA reflectance estimates over several days, allowing assessment of the calibration accuracy and stability of channels 1, 2, 3, 5 and 6 for GOES-17 andGOES-16 ABI. Channel 1 of GOES-17 ABI shows -5.5% bias in comparison to the ground-based predicted TOA. Over 6% bias in GOES-17 B2 was confirmed. A comparison to NOAA-20 VIIRS was also carried on during a near nadir overpass.
Terra and Aqua Moderate Resolution Imaging Spectroradiometer (MODIS) have successfully operated since their launches in 1999 and 2002, respectively, and generated various data products to support the Earth remote sensing disciplines and users worldwide for their research activities and applications, including studies of the Earth system, and its changes over time and geographic regions. The MODIS data have also significantly contributed to the continuity of multi-decadal satellite data records and led to major advances in the Earth remote sensing field. The long-term data records from MODIS observations have been and will continue to be extended by the Visible Infrared Imaging Radiometer Suite (VIIRS) instruments, currently operated aboard the Suomi-National Polar-Orbiting Partnership (NPP) and NOAA-20 satellites. The data quality of satellite instruments strongly depends on their calibration accuracy and stability. In order to help scientists and users gain a better understanding of MODIS and VIIRS data quality, this paper provides an overview of their on-orbit calibration methodologies, approaches, and results derived from instrument on-board calibrators and lunar observations, as well as select Earth view targets. What is also discussed is the calibration consistency between MODIS and VIIRS and its potential impact on producing multi-sensor long-term data records. As illustrated, the overall performance of both MODIS and VIIRS continues to meet their design requirements.
Hurricane Emily, formed in the Atlantic Ocean on July 10, 2005, was the strongest hurricane ever to form before August. By checking computer models against the actual path of the storm, researchers can improve hurricane prediction. In 2010, NOAA researchers were awarded 25 million processor-hours on Argonne's BlueGene/P supercomputer for the project. Read more at http://go.usa.gov/OLh