Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEWS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

STS-114: Discovery Mission Status/Post MMT Briefing

Bob Castle, Mission Operations Representative, and Wayne Hale, Space Shuttle Deputy Program Manager are seen during a post Mission Management Team (MMT) briefing. Bob Castle talks about the Multi-Purpose Logistics Module (MPLM) payload and its readiness for unberthing. Wayne Hale presents pictures of the Space Shuttle Thermal Blanket, Wind Tunnel Tests, and Space Shuttle Blanket Pre and Post Tests. Questions from the news media about the Thermal Protection System after undocking and re-entry of the Space Shuttle Discovery, and lessons learned are addressed.

Source record↗

STS-114: Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative; Mark Ferring, Lead ISS Flight Director; Cindy Begley, Lead Spacewalk Officer for the Mission were present. Phil reported that the vehicle continues to operate very cleanly, no system anomalies or issues, crew keeping up with the timelines, and small minor and major EVA activities went extremely well. He recapped previous day's activities such as: nitrogen transfer to the Station, and storing water and transferring it to the Space Station. Mark noted Mission Specialists Steven Robinson and Souichi Noguchi's superb job doing EVA. Cindy gave a technical detail of the CMG1 remove and replace activities with supporting video clips. News media focused their questions on technical details of flight activities and safety.

Source record↗

STS-114: Discovery Impromptu Briefing

Dr. Griffin, NASA Administrator, is accompanied by members of The U.S. House of Representatives in this STS-114 Discovery Impromptu briefing. The U.S. House of Representatives present include: Sherwood Boehlert, House Science Committee Chairman, Senator Hutchinson, Sheila Jackson, 18th Congressional District Texas, Al Green, 9th Congressional District, Representative Jim Davis, Florida, and Gene Green, 29th District, Texas. Griffin talks about the problem that occurred with the external fuel tank sensor of the Space Shuttle Discovery and the effort NASA is pursuing to track the problem, and identify the root cause. He answers questions from the news media about the next steps for the Space Shuttle Discovery, time frame for the launch, and activities for the astronauts for the next few days.

Source record↗

STS-114: Discovery Mission Status Briefing Tape 3

Paul Hill, STS-114 Lead Shuttle Flight Director is seen during this mission status briefing. He answers questions from the news media about the progress of the analysis of the gap fillers on the Space Shuttle Discovery. He is asked about the EVA's the astronauts may or may not perform to reach and repair the gap fillers.

Source record↗

STS-114: Discovery Day 6 Post MMT Meeting

Wayne Hale, Space Shuttle Deputy Program Manager and Steve Poulos, Orbiter Program Manager, discuss the damage assessment from the tiles that came off the Space Shuttle Discovery during launch. Poulos presents charts and discusses in detail the following topics: 1) Composite Tile Damage/Gap Filler Sites Evaluation; 2) Protruding Ceramic Shim Aft of the Nose Landing Gear Door (NLGD); 3) Protruding Chine Gap Filler; 4) RH NLGD Tile Damage; 5) RH NLGD Damage Analysis; 6) Left Wing Tile Damage; 7) Comparison of Ground Test Results vs. FD5 Focused Inspection; 8) Current Status: Focused Inspection 721L07-01 ITVC FD5 Image of Panel 7L Apex 9) Current Status: Focused Inspection Lower Panel 7L721L07-02; 10) Current Status Focused Inspection 721L10-02 Lower Panel 10L Close-up view; and 11) Window 1 Blanket. The presentation ends with a question and answer period from the news media.

Source record↗

STS-114: Discovery Post Landing Press Briefing

A post landing discussion of the STS-114 Space Shuttle Discovery is shown. Dean Acosta, Deputy Assistant Administrator of Public Affairs introduces the panel. The panel consists of: Michael Griffin, NASA Administrator, Bill Parsons, Space Shuttle Program Manager, Mike Leinbach, NASA Launch Director, and Bill Readdy, Associate Administrator for Space Operations. Mike Griffin answers questions from the news media about the amount of damage to the Space Shuttle and the possibility of returning to space, Mike Leinbach addresses the question about the process of bringing Discovery back to Kennedy Space Center and Bill Parsons talks about milestones reached during this mission.

Source record↗

STS-114: Discovery L-3 Countdown Status Briefing

Bruce Buckingham of NASA Public Affair hosted this briefing. Jeff Spaulding, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Jeff specifically noted that the mission represents NASA's first step towards fulfilling the President's visions of returning to the Moon and then on to Mars and beyond. Scott reports that the 28,000 pounds of ISS hardware that is in the payload bay of the Discovery is ready to go, and completed final close outs. Cathy mentioned that Hurricane Dennis is not a threat, however, main threat of inland thunderstorms would result to 30% weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast and with 24 hours and 48 hours turn around plan. Final inspections, ice formation, ice inspection, effect of weather conditions to the external tank, delays and contingencies were some of the topics covered with the News Media.

Source record↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

STS-114: Discovery Day 8 Mission Status Briefing

Paul Hill, STS 114 Lead Shuttle Flight Director, David Wolf, Extravehicular Activity (EVA) Branch Chief, JSC from the Astronaut Office, and Kelly Beck, STS-114 Team 4 Flight Director are seen on the 8th day of the Space Shuttle Discovery Mission. Paul Hill presents and explains charts of the Gap Fillers that Steve Robinson will be pulling off during his EVA. The charts include: 1) Protruding Gap Fillers; 2) Starboard Worksite Access; 3) Protruding Chine Gap Filler; 4) Port Gap Filler Space Shuttle Remote Manipulator System (SSRMS) Position; and 5) Port Gap Filler Close-up View. Kelly Beck talks about how the plan for the gap fillers were arranged, and presents the tools and techniques that Steve Robinson will be using during the EVA. David Wolf demonstrates how the EVA will be performed using forceps and a hacksaw to remove the gap fillers. The presentation ends with a question and answer period from the news media.

Source record↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is shown during this 9th day of the Space Shuttle Mission to the International Space Station. Paul Hill talks about the status of the transfers of critical items to the International Space Station and transfers back from the International Space Station into the Multi-Purpose Logistics Module (MPLM). Hill also presents footage of the crew cabin blanket survey procedure. Mark Ferring talks in detail about the primary International Space Station task on the External Stowage Platform (ESP). The status of the external stowage platform installation, removal of grapple fixture, gap filler removal task, and Materials International Space Station Experiment (MISSE) 5 payload installation is discussed by Cindy Begley. She also presents footage of Steve Robinson's spacewalk before the gap filler task and during the removal of the gap filler. The Capture of ESP-2 is also presented. The presentation ends with a question and answer period from the news media

Source record↗

STS-114: Discovery Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director, talks about the imagery that was captured during the first twenty four hours in orbit. He expresses that new data was captured during ascent of the Space Shuttle Discovery through imagery and in-orbit handheld photographs of the Orbital Maneuvering system (OMS) pods were taken. Laser surveys were also taken of both the wing leading edges and nose caps using the Orbiter Boom and Sensor System (OBSS) instrument package. He presents raw footage from the Laser Dynamic Range Imager (LDRI) at the end of the OBSS showing RCC panels and tiles. He also answers questions from the news media about the possible damage to the Orbiter and debris during lift-off.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, discusses the topics covered at the Mission Management Team (MMT) meeting. The topics include: 1) Wing leading edge reinforced carbon-carbon clearance; 2) Protruding blanket on the side of the Space Shuttle Discovery Orbiter; 3) Control Moment Gyroscope (CMG) replacement; 4) Transfer items; and 5) EVA procedures. Questions from the news media about the possibility of a CMG failure, Space Shuttle re-entry, gap fillers, and dangers during the EVA to repair the Space Shuttle Discovery are answered.

Source record↗

STS-114: Discovery Post MMT Briefing

On flight day 13, Leroy Cain, STS-114 Ascent/Entry Flight Director, discusses the condition of the Space Shuttle Discovery, and the weather outlook for landing. He answers questions from the news media about his feelings about re-entry since the Columbia tragedy, possible new information during re-entry, critical moments in the Mission Control Room during landing, and differences between night landing and day landing. Footage of the Mission Control Room and a talk with Soichi Noguchi in orbit is shown. Also, footage of the truss structure of the International Space Station, Destiny Laboratory, crew cabin of Discovery, and the Orbiter Docking System linked up to forward docking port on Discovery is shown. Eileen Collins and Wendy Lawrence are shown in the flight deck of Discovery. Charles Camarda is also shown in the mid-deck. Downlink television from Discovery shows spacewalk choreographer Andy Thomas with Stephen Robinson and Soichi Noguchi preparing for depressurization and pre-breathing activities that will lead to the opening of the hatch. The installation of a replacement GPS antenna, images of the port wing of Discovery and Canadarm moving with the Orbital Boom Sensor System (OBSS) extension is shown.

Source record↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director; Mark Ferring, Lead ISS Flight Director; Cindy Begley, STS-114 Lead EVA Officer were present. Paul reported on the general accomplishments of the mission for the day: the transfer to two stations are complete, transfers back from station into logistics module into the mid-deck are about 75 % complete and definitely in schedule to finish the next day, everything with the external video cam and the RGMC return are complete. He noted that all crews are doing great by all means. Paul also gave a detailed explanation with supporting video clips regarding concern for Eileen's side of window. Mark and Cindy both gave technical details on Mission Specialists Steven Robinson and Souichi Noguchi's extravehicular activities (EVA). News media focused most of their questions on extravehicular activities.

Source record↗

STS-114: Discovery L-1 Countdown Status Briefing STS-114/Discovery L-2 Countdown Status Briefing

Bruce Buckingham from NASA Public Affairs introduces Jeff Spaulding, NASA Test Director and Kathy Winters, Shuttle Weather Officer in this L-2 countdown status briefing. Spaulding gives the Space Shuttle launch countdown status before lift-off on July 26th. He expresses that vehicle launch and ground systems are performing well and that there are no significant issues in preparation for the launch. The crew arrival time to the launching pad and the launch window for Discovery is also discussed. He ends his countdown status by expressing that the Discovery Orbiter is the safest Shuttle to date. Kathy Winters gives her weather forecast for the launch day. She presents a satellite picture of tropical storm Franklin and charts showing the STS-114 Tanking Forecast, Launch Forecast, Solid Rocket Booster (SRB) recovery, Continental United States (CONUS) launch, Transoceanic Abort Landing (TAL) launch, 24 and 48 Hour Delay, CONUS 24 and 48 hour delay, and TAL 24 and 48 hr delay. Questions from the news media about the mood of the test engineers as launch day is approached are answered. Jessica Rye from NASA Public Affairs introduces Pete Nikolento, NASA Test Director; Scott Higgenbotham, STS-114 Payload Mission Manager; and Kathy Winters, Space Shuttle Weather Officer in this L-1 Countdown Status Briefing. Nikolento expresses that the completion of the main engine system check-outs and servicing of on-board fuel-cell reactants have been completed. He also talks about pad closeouts and external cryogenic loads prior to launch. Scott Higgenbotham gives the payload status and Kathy Winters talks about her weather forecast for launch. Questions about the ecosensors, TAL sites, weather forecast and thoughts about return to flight are addressed.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager and Terri Murphy, Space Shuttle Imagery Integration Manager are seen in this post Mission Management Team (MMT) briefing. Hale begins with showing a video that was recovered from the Solid Rocket Booster (SRB) looking at the external tank during ascent. Pictures of the RH Nose Landing Gear Damage (NLGD), Protruding gap filler near chine and protruding gap fillers are shown. Terri Murphy talks about the imagery from debris, integrated simulations and radar data collected from the launch. Hale answers questions from the news media about the location of the gap fillers, possible EVA to remove the gap fillers and the thermal protection system.

Source record↗

STS-114: Discovery Day 13 Mission Status Briefing

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He reports that the vehicle is in good shape, consumable status is excellent, and the shuttle crew is in high spirits and preparing for de-orbit and landing. LeRoy and his team have completed the entry system check up, flight control check up, reactor control system check up, and noted that all are at nominal performance; weather forecast is very good, the Entry team is ready and looking forward to de-orbit and landing at the Kennedy Space Center on Monday, August 8th. Re-entry, personal feelings, Columbia accident, data gathering, consumable situation, back up sites, weather, communication block out, night and day landing, and Commander Collin's piloting skills during night flight are some of the topics covered with the News media.

Source record↗

STS-114: Discovery Post Landing Press Briefing from JSC

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He noted that the successful flight and return of Discovery is another important milestone, a fresh start, and a new beginning as part of NASA's commitment to the President's vision of man's return to the Moon, Mars and beyond. From this successful test flight, NASA will have a lot of learning and hard work to do in preparation for the next flight. Weather factors, safe landing, touch down, communications, re-entry, the Columbia, were some topics covered with the News media.

Source record↗