Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lighting Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

850 records · Page 48

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Procurement of 100 kg of Enriched Xenon for the EXO Prototype and for its Installation at WIPP

This grant supported the enriched xenon procurement, detector construction and initial operation of the EXO-200 double beta decay experiment at the Waste Isolation Pilot Plant (WIPP). The period of performance was Aug 15, 2002 to Dec 31, 2014. The primary goal of the experiment is to search for the very rare (and to date not observed) neutrino-less double beta decay. Such decay, if observed, would shed the light of the quantum-mechanical structure of neutrinos, and the origins of elementary particle masses. Another goal of the detector is to serve as prototype of a larger neutrino-less double beta decay experiment, currently being considered by DOE-OS. EXO-200 has already been extremely successful in both areas and is, in fact, leading the way world-wide in this area of fundamental physics. In the initial part of the grant the EXO-200 collaboration acquired 200kg of xenon enriched to 80% in the isotope 136 that is a candidate for double beta decay. At the time this was the largest isotope separation program carried out for fundamental science. The enrichment was done in Russia, providing a rare and valuable opportunity for US scientists to work alongside Russian colleagues, in some cases from the former closed cities of their military complex. By now the EXO-200 collaboration include institutions from the US, Canada, South Korea, China, Germany, Switzerland and Russia. Many collaborating scientists from these countries have taken shifts at WIPP or at the various remote monitoring sites world-wide. EXO-200 detector construction was completed in early 2010, with the time projection chamber (TPC) installation in the cleanrooms already placed in NeXA. Detector commissioning at WIPP followed, with the last phase, the filling of the TPC with liquid Xenon, occurring in the spring 2011. EXO-200 is described in [1]. Low background data taking started on Jun 1, 2011 and within the first month of data the 2-neutrino double beta decay of 136Xe was discovered, as reported in [2]. More data provided the best half-life measurement of any 2-neutrino double-beta decay modes [3]. Until Feb 2014 the detector ran continuously producing some of the world leading results in the field and, in particular, two of the most sensitive searches for neutrinoless double beta decay [4,5]. These measurements show that the half life of this decay is longer than 1015 times the age of the universe. This is one of the leading results in this field world-wide and succeeded to put the DOE-funded research on the world stage in a very cost-effective way. Other results from EXO-200 include a search for exotic double-beta decay modes [6], a detailed report on the state of the art background levels achieved in the detector [7], the study of rare ion and neutral atom motion and neutralization rates in liquid Xenon [8], a study of the cosmogenic backgrounds in the detector at WIPP’s depth [9], a search for Lorentz and CPT symmetries violation [10] and a search for double-beta decay to excited states [11]. In Feb 2014 the EXO-200 detector was severely disrupted by the accidents in the WIPP underground (unrelated to EXO-200). The EXO-200 operations team was able to recover the unique stockpile of enriched Xenon to high pressure cylinders and warm-up the detector to room temperature without damaging the very delicate equipment. This was a very impressive achievement as no plan had been made to complete these operations entirely from remote. This validates the robustness of well-designed liquid xenon detectors for this and other measurements in particle and nuclear astrophysics. The operations team re-gained almost regular access to the WIPP underground and the EXO-200 detector in Jan 2015 and spent calendar 2015 cleaning up the soot from the WIPP fire, assessing the damage to the EXO-200 infrastructure, correcting such damage and restarting the detector. This process was successfully carried out and culminated in the re-filling of the detector with liquid xenon, in Jan 2016. As of late Jan 2016 EXO-200 is taking data again. The collaboration is in the process of upgrading the readout electronics and restarting a radon abatement system that had been commissioned just before the Feb 2014 events. The upgraded electronics will provide lower readout noise and, in turn, better signal to background discrimination. The radon abatement system will further reduce the radon in a small air-gap between the EXO-200 cryostat and the lead shielding. In a review in Jun 2015 DOE-OS approved EXO-200 for 2.5 more years of running at the end of which we expect to improve the sensitivity to the neutrino-less double-beta decay by a factor two or three. For the last 5 years the EXO-200 detector, located in the WIPP underground, has been at the center of the hunt for new physics beyond the Standard Model of particle physics!

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Public-Private-Academic Partnership to Advance Solar Power Forecasting

Executive Summary NOAA is making major contributions to the solar forecasting project in three areas. First, it is improving its forecasts of solar irradiance, clouds, and aerosols in its numerical weather prediction models. Second, it is providing advanced satellite products for DOE's FOA awardees to use in their forecast systems. Third, it is using high-quality ground-based measurements from SURFRAD and ISIS stations to verify and validate forecast model output. This reports covers results from all three areas for the period May 1, 2014 - April 30, 2015. Modeling In its modeling effort, NOAA continues work to improve the skill of solar forecasts from the Earth System Research Lab (ESRL) research versions of the 13-km Rapid Refresh (RAP) and the 3-km High-Resolution Rapid Refresh (HRRR) models, which are in turn transitioned into operations at the National Centers for Environmental Prediction (NCEP). A major milestone was achieved in September 2014 with the initial operational implementation of the HRRR at NCEP. In the ESRL research versions of the models, testing and development, in both real-time runs and retrospective experiments, is guided by an extensive in-house verification system. Early in the SFIP project, we developed the capability to verify our model forecasts against the high-quality surface radiation measurements from the SURFRAD and ISIS networks. This highlighted some shortcomings with the RAP and HRRR forecasts of incoming shortwave radiation. Most of our effort during Phase 1 of SFIP was focused on addressing these problems with a variety of model system improvements. The RAP and HRRR models during the warm season of 2014 had a noticeable warm and dry bias in near-surface conditions over most of the central and eastern United States, and our new SURFRAD/ISIS verification revealed that there was also a large excess of incoming global horizontal irradiance in the models. We hypothesized that a lack of cloud cover (particularly low-level cloud cover) in the models was resulting in too much heating of the land surface. This, in turn, caused unrealistically strong surface heat fluxes and turbulent mixing in the planetary boundary layer (PBL), which further reduced the already deficient cloud cover. We addressed these issues with a combination of data assimilation system modifications and model physics improvements. Many of our data assimilation changes were made with a view towards improving the near-term representation of clouds and precipitation. One of these changes involved better accounting for regions of weak reflectivity in the RAP cloud / hydrometeor assimilation system, in order to improve the representation of light precipitation in the RAP initial conditions and provide more realistic initial cloud cover. Additional modifications more accurately accounted for radar beam blockage and data gaps (particularly in the western United States), which improves shorter lead times forecasts of clouds and precipitation. We have also tested the assimilation of new data sources within the RAP and the HRRR, including radar radial velocity data and surface mesonet observations. Within the HRRR, we have tested the cycling of the 3-km land surface fields to allow a higher-resolution treatment of land surface processes. In terms of model physics development for SFIP, we have implemented a shallow cumulus scheme within the RAP, and have made numerous improvements to the Mellor-Yamada-Nakanishi-Niino (MYNN) PBL scheme to address insufficient low-level cloud cover in the models. We have conducted tests incorporating the radiation effects of (parameterized) boundary-layer clouds within the modified MYNN PBL scheme (independent of the convective schemes). The Grell-Freitas-Olson shallow cumulus scheme has also been tested within the 3-km HRRR. Finally, we have also modified the RUC land surface model (LSM) treatment of the vegetation wilting point, reducing it to increase evapotranspiration and increase cloud cover in the boundary layer. All of these changes work in tandem to significantly improve the model forecasts of cloud cover, incoming shortwave radiation, and near-surface temperature and moisture. Satellite The role of NOAA/NESDIS in the Solar Forecasting Improvement Project is to provide Advanced Satellite Products (ASPs) for the two forecasting teams at NCAR and IBM. The ASPs are cloud, surface, and atmosphere products derived from geostationary satellite imagery at the highest possible spatial and temporal resolution - such quantities as cloud mask, cloud probability, cloud transmission, cloud top height, cloud top temperature, cloud effective particle size, etc. Ancillary data, such as elevation and numerical weather prediction fields are provided in the files at the same resolution as well. There are at this time 147 different variables in the ASP output, including quality flags and processing information. The main goals for Year 1 of the project were to implement an Advanced Satellite Products system for the use of the IBM and NCAR teams, begin validation, and make any needed changes based on feedback from the teams. ASP files are being produced every GOES Imager acquisition, which occur on a 15-30 minute schedule. Processing is done on a dedicated computer, with a turn-around time of 8-21 minutes from image acquisition to results available on ftp. Several helpful visualizations of the data are also created for users on web pages. Users have been provided with a document titled "User's Guide for 1km Cloud Products Derived from GOES Imager Data using CLAVR-x", which discusses the basics of the source imagery, the process by which it is turned into Advanced Satellite Products, and considerations users should make when using the data. Validation of selected variables from the older 4km version of the products was also included. Future work will concentrate on validation of the 1km products and improving the turn-around time, product variety, and product quality as needed. Ground Observations In the ground-based measurement effort, NOAA's main objectives are to provide high quality radiation products for validation and verification of short-term to day-ahead solar forecasts. More specifically for the three year project, our goals include (1) Maintaining and providing data from our 7 SURFRAD and 7 ISIS; (2) Update ISIS radiation measurements from 3 min to 1 min data: (3) Purchase and install new pyrheliometers for direct solar irradiance measurements at the 7 SURFRAD sites; (4) Building, testing, and deploying two mobile SURFRAD stations at two utility plants in collaboration with DOE sponsored partners, and includes ongoing maintenance and processing of the data at the mobile sites; (5) Upgrading the data acquisition and communications at 7 SURFRAD sites and 7 ISIS sites; (6) Providing radiation data at the 7 SURFRAD sites in near real-time; (7) Develop and provide aerosol optical depth and cloud images and cloud fraction at our two mobile sites; (8) Provide data recovery rates each year; (9) Provide temporally and spatially averaged radiation products for comparison to HRRR and RAP solar forecasts and advanced satellite products; (10) Provide a data-set for analysis of conversion of direct and diffuse to sloped surfaces; (11) and as time permits develop and provide spectral solar irradiance, cloud optical depth and spectral albedo from the mobile sites. Milestones this year include working with the DOE sponsored teams to find locations to deploy two mobile SURFRAD stations. One existing unit was deployed at a 30MW PV facility in the San Luis Valley in collaboration with Xcel and the NCAR team in August, 2014. The second unit was built and tested at our facilities in Boulder, CO and deployed near Green Mountain Power's Education Center in Rutland, VT in collaboration with Green Mountain Power and the IBM Team in October, 2014. Data processing was implemented and the radiation data from these two mobile sites have been made available on our ftp server in near real-time. We also are providing images and cloud fraction from the TSI cameras for these two mobile sites on our ftp site. Another milestone was upgrading our data acquisition and communication systems at 7 SURFRAD and 7 ISIS sites. We accelerated our schedule for these upgrades to provide timely radiation products. These upgrades allow more reliable and near-real time radiation data delivery to the DOE sponsored teams to meet their goals. Lastly, we changed the data rate at the ISIS sites from 3 min to 1 min.

14 SOLAR ENERGY↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗