Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

JISEA Annual Meeting: Clean Energy for Oil and Gas Topic Table

Presentation on clean energy for oil and gas topic discussion table at the 2022 JISEA annual meeting. Many refineries may have wind and solar resources and clean energy technology costs are declining. JISEA created an oil and gas consortium including Baker Hughes, Conoco Phillips, Extraction Oil & Gas, INGAA Foundation, and Kinder Morgan to explore potential pathways for integrating clean energy into oil and gas operations. This presentation goes over JISEA case studies that demonstrate reliable and affordable clean power for oil and gas operations. JISEA used the REopt Energy Planning Platform and evaluated several potential future scenarios.

clean energy↗

Cyber-Resilient Distributed Autonomous Energy Grid

The aim of Cyber-Resilient Distributed Autonomous Grid research initiative is to advance fundamental science and engineering approaches for cyber-resilient design, control, and operation of a distributed, highly interconnected, and autonomous energy grid of the future. From increasing penetration of DERs, smart homes and building with highly controllable loads at the distribution layer, to the interconnection of bulk renewables at the transmission layer the fundamental nature of the energy grid is changing, and these changes are enabled by rapid increase in dependence on the communication infrastructure and independent third parties for control and operation of the grid. NREL's Integrated Energy Pathways critical objective correctly identifies that there are fundamental cyber-resilience challenges inherent in the grid's evolution, and this effort is establishing strong and novel integrated cyber-resilience framework and approaches to address these new and fundamental challenges.

controls↗

Developing an Energy Service Interface Specification

Developing an Energy Service Interface (ESI) specification requires engaging a community of stakeholders including grid operators, Information and Communication Technology implementors, integrators, and finally standards bodies who will define an interface that respects and boundaries of ownership and roles of responsibility in order to activate millions of Distributed Energy Resource for the provision of grid services. By applying Interoperability Maturity Model Criteria and ESI principles to common grid-DER service use cases, the Grid Modernization Lab Consortium team will engage subject matter experts to develop a specification, with an eventual goal of informing development of ESI compliant profiles or standards. The ESI Specification is intended to specify the characteristics, attributes, or qualities that need to be addressed in ESI compliant standards or profiles. This includes addressing interoperability criteria and the service-performance style of the interface.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Data Sensitivity/Uncertainty Studies of Tantalum-Reflected Systems

Tantalum (Ta) is a refractory metal with high melting point and high corrosion resistance. This makes it useful as a mold material for plutonium casting operations. Unfortunately, there are few criticality benchmarks with high nuclear data sensitivities. Given that, it is desirable to design new experiments to provide additional validation data for nuclear criticality safety, which is the objective of the Thales project. Multiple application models were used to represent process conditions (either normal conditions or credible upset conditions) both at Los Alamos National Laboratory (LANL) and Savannah River Site (SRS). A total of 40 application models were obtained. Given this, it was useful to down-select the number of needed application models. This work documents the down-selection based on several nuclear data sensitivity/uncertainty metrics. In addition to showing the result of the specific down-selection used for the Thales project, this work discusses potential ways to represent a large number of application models with a smaller number of proposed experiment designs.

42 ENGINEERING↗

Key Insights: Interconnecting Behind-the-Meter Microgrids

This technical brief explores the interconnection challenges and evolving standards associated with behind-the-meter (BTM), facility-scale microgrids. It clarifies key functions related to customer microgrids and backup systems while addressing critical questions regarding certification coverage, operational impacts, customer relationships, and testing requirements for BTM microgrid systems. The document emphasizes the need for updated standards and additional witness testing to ensure safe and effective microgrid operation as well as improved grid integration and compliance with power quality standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

User Access to Scientific Facilities via 5G: A Cyber Security Thought Experiment

5G is more than an over-the-air radio technology upgrade. It is a strategy to extend Mobile Network Operator service offerings beyond traditional voice, instant messaging and Internet access. 5G Mobile Network Operators will offer new telecommunication services that include enhanced guarantees of confidentiality, integrity and availability. How could such services change the way Science collaborations connect scientists to supercomputers and other scientific facilities? Current scientific collaborations implicitly trust cloud service providers to securely store and process data. The perceived risks of outsourcing Science data security are counterbalanced by assurances that cloud providers operate at a scale that allows them to implement security measures impractical for Science collaborations (e.g. continuous system administrator behavioral monitoring and strict individual separation of duties). If that is true for a cloud service provider like Amazon Web Services (2018 revenue: $25.7 billion), could it also be true for Mobile Network Operators like Verizon Wireless (2018 revenue: $91.7 billion) or AT&T Mobility (2018 revenue: $71.3 billion)? DOE Leadership Class supercomputer facility users currently access them from the public Internet via Secure Shell. The sponsors and operators of the supercomputer facilities have determined that the public Internet path between the Scientist’s Device and the Login Node does not natively provide enough confidentiality or integrity to protect those communications. Therefore, the facilities achieve additional confidentiality and integrity by requiring Secure Shell encryption across those untrusted network paths. Using 5G Network Slice technology, a Mobile Network Operator may offer communication services between supercomputer users and facilities that natively provide confidentiality and integrity guarantees. Sponsors and operators of supercomputer facilities may determine that these guarantees provide enough confidentiality and integrity to protect those communications. If so, a 5G Network Slice could replace an SSH session running over the public Internet. Finally, this use case could be extended to other Office of Science user facility access requirements. Consider microscopy instruments at (e.g.) the Center for Nanoscale Materials or the Environmental Molecular Sciences Laboratory. The embedded systems controlling such instruments may not always support encrypted network access technologies like SSH. 5G Network Slices may offer an alternative to current VPN or SSH tunneling techniques, with additional benefits like guaranteed minimum bandwidth.

5G↗

WEST L-mode record long pulses guided by predictions using Integrated Modeling

A new record was set on the WEST Tokamak, designed to operate long duration plasmas in a tungsten (W) environment, with an injected energy of 1.15 GJ and a plasma duration 364s. Scenario development was supported by integrated modeling using the High Fidelity Plasma Simulator (HFPS), the European IMAS-coupled version of JETTO/JINTRAC, which integrates physics-driven modules into a unified framework. In particular, a reduced model for Lower-Hybrid heating and Current-Drive (LHCD) and the quasi-linear turbulent transport model TGLF are crucial for long pulses predictions up to the Last Closed Flux Surface (LCFS). Using this workflow, a 100 s reference discharge was modeled and plasma kinetic profiles and loop voltage were quantitatively well matched. In preparation for the recent long duration experiments, non-inductive current-drive actuators (I P , n e , P LHCD ) were varied to determine the operational domain going towards fully non-inductive discharges. In particular, decreasing the plasma current is shown to ease the access to such conditions, with a careful monitoring of (n e , P LHCD ) to avoid machine limitations. In addition, post-prediction experiments conducted within the investigated parameter range validated the predicted dependencies and were shown to be in quantitative agreement. Exploratory work on the use of ECCD for MHD stability purpose is also introduced.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrate FARM with PID controllers: IES Simulation Ecosystem Control System Development

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM was designed to support the HERON software module in the solution of the optimal dispatch problem for IES units. As the result of HERON-FARM dispatch simulation, the set-point trajectories are optimized to meet constraints on both the production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and the process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.) at a coarse time resolution (every 10 or 100 seconds) over long time horizons (several days or weeks). In case the operational constraints need to be met at finer time resolution, the computational burden of HERON-FARM would linearly increase with the sampling rate, and sub-optimal solutions might be obtained. System responses characterized by overshoots and damped oscillations temporarily violating the imposed constraints might occur during abrupt power transients. In this report, a hierarchical control system architecture for the operation of the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility constructed at INL was proposed. First, the preliminary studies on the proposed control strategy for operating the facility and the designed PI controllers were reviewed. In particular, the current approach for generating the set-point trajectories was studied, and its limits were identified. To this aim, the inclusion of a Supervisory Control layer embedding a modified version of the FARM algorithm for preserving the system safe operation over both long and real-time horizons was proposed. In this way, FARM would be applied twice, i.e., the original version (“FARM Validator”) aiding the solution of the power dispatch problem, and the modified version (“FARM Supervisory” coordinating the PI controllers to address the real-time control tasks. Despite the kernel of the two modules is the same algorithm, their roles, tasks, and capabilities are quite different. A detailed description of the role of FARM at addressing low-level control tasks is provided, along with tentative operational procedures for training the models embedded into the algorithm by using the collected experimental data.

42 ENGINEERING↗

Architecture of the personnel protection systems for Spallation Neutron Source Second Target Station

The Oak Ridge National Laboratory (ORNL) is implementing a major upgrade to the Spallation Neutron Source (SNS) facility, encompassing the addition of the Second Target Station (STS). Preliminary design reviews have been conducted on several STS Personnel Protection Systems (PPS). The reviews focused primarily on the integration with the existing SNS PPS, the new proton transport tunnel, and the target areas. Development of the PPS is ongoing, to ensure a coherent safety system with the mission of protecting users and workers from prompt radiation hazards while providing high beam availability to operations. The STS PPS element in the Integrated Control System (ICS) is a facility-wide system composed of multiple safety subsystems, including the Ring to Second Target (RTST) beam transport tunnel, Target, Bunker and Instruments. Personnel working in all these geographic areas are protected by modular reliable PPS solutions. The safety system enforces access controls, radiation monitoring, beam destination control, and application of critical device inhibit upon detection of abnormal condition. It uses well-documented processes, Common Industrial Protocol (CIP) safety, pulsed test, and redundancy to achieve the desired Safety Integrity Level (SIL). This paper gives an architectural overview of the STS PPS and a detailed safety plan for the SNS facility, addressing safety solutions and human factors.

Michaelides, Tommy [ORNL] (ORCID:0000000190499869)↗

Mission Operations Center for Lawrence Livermore National Laboratory Space Science & Security Program

Space mission operations has grown in line with the development of new space and ground technology. Originally, the philosophy for a space mission was to keep the spacecraft as simple as possible and have as much of the mission complexity on the ground where engineers can fix, control and access things. This was mostly due to immature space technologies and associated risk, as well as cost to develop complex and capable ground stations was relatively cheaper than complex space missions. This led to large room withs multiple computers and an army of engineers and operators sitting at computers and monitoring specific spacecraft information during operations. With development of new space technologies, a lot of functions that were kept and constantly monitored on the ground have been automated and completely integrated into the spacecraft, reducing the number of operators and engineers needed to operate a mission. With the paradigm shift in increasing spacecraft technologies, improved computer technologies, and scaling down space mission size; the mission operations centers have also adapted to changes. More organizations are becoming space-faring institutions and have developed mission operations centers for their unique missions.

42 ENGINEERING↗

Full-core high-burnup BWR LOCA fuel performance analysis and FFRD susceptibility

The susceptibility of the boiling water reactor (BWR) Limerick Unit 1 to fuel fragmentation, relocation, and dispersal during a postulated large-break loss-of-coolant accident (LBLOCA) was calculated using a multiphysics framework. The simulations include full-core, rod-resolved neutronic, thermal hydraulic, and fuel performance models using the VERA, TRACE, and BISON codes. This work focused on the transient BISON simulations, which include both the normal operation and LBLOCA periods in the same simulations. Cladding integrity was assessed using two correlations that are included with BISON. make page break Several new BWR-specific features were recently added to BISON. This work represents the first time these features have been included in a core-scale set of simulations. This study hence evaluates the performance of these new models for an operating reactor with realistic operating conditions. Simulation results showed that cladding integrity was maintained (i.e., no rods burst). Finally, future work to improve BWR and PWR predictions using this framework is suggested.

BISON↗

Heat Integration Optimization and Dynamic Modeling Investigation for Advancing the Coal-Direct Chemical Looping Process

The purpose of the project is to address the optimization and startup operation of a modular coal direct chemical looping (CDCL) combustion system integrated with a steam cycle for power generation to reduce the risks involved in further scale-up of the technology. The modular reactor design of the CDCL process provides flexibility in the fabrication of the reactor and in its operating capacity (i.e. turndown ratio) at the cost of a more complex heat exchange network (HEN) design and integration. To address the technology gaps and advance the efficiency and economic feasibility of the CDCL technology, the project will perform a detailed and comprehensive analysis of the integration of a modular CDCL reactor system and a steam cycle system under both static and transient conditions via HEN process performance simulations and system dynamic modeling, respectively. The scope of work consists of 1) Experimental and computational studies of the CDCL combustor reactor 2) Comprehensive static (i.e. steady-state) system HEN design analysis in CDCL 550 MWe commercial unit for power generation and 3) Dynamic modeling of site specific design of 10MWe CDCL large pilot plant. The project team has successfully developed and validated a kinetic model for the oxidation of oxygen carriers in the combustor using the unreacted shrinking core model (UCSM). The model is capable of capturing the oxidation kinetics of fully or partially reduced oxygen carrier particles. A computational fluid dynamics (CFD) model is developed to simulate the hydrodynamics, heat transfer, and chemical reaction occurring in the CDCL combustor. The model is developed in MFIX and ANSYS Fluent. Key aspects of CDCL combustor operation, including heat transfer, oxygen carrier oxidation, and the transport of oxygen carrier particles, are simulated using this CFD model. The HEN for a commercial scale 550 MWe CDCL power plant is simulated and optimized using ASPEN Plus. Practical design considerations are incorporated based on industrial experiences. The performance and cost for the commercial CDCL plant is updated based on these analyses. A dynamic model for the 10 MWe CDCL pilot plant is developed in ProTRAX simulation software. The model is based on the pilot plant design developed in project DE-FE0027654 “10 MWe CDCL Large Pilot Plang – Pre-FEED Study” and the steam cycle data obtained from Dover Light & Power plant. The transient behaviors during pilot plant load variation are simulated using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗

Mild hybridisation of turboprop engine with high-power-density integrated electric drives

Here this paper shares with the aerospace community a case study of turboprop mild hybridisation using a recently developed integrated drive system in the University of Nottingham, UK, within the ACHIEVE project under EU H2020 CleanSky 2 program (project No. 737814). The developed drive system enables green taxiing of a turboprop aircraft while on the ground with its engine off, and as an electrical generator when the turboprop is in the air. The entire system is designed to be able to integrate within the power auxiliary gear box (PAGB) of a turboprop aircraft. Some of the key features of the developed system include a high-speed permanent magnet machine (up to 14,200rpm) with dual three-phase design, SiC-based high power density (11.8kW/L for the power converter, 35.3kW/L and 7.2kW/kg for the machine active parts), integrated cooling design for high-temperature operation (>130°C ambient temperature), fault tolerance consideration with dual channel operation capabilities and sensorless control for entire operational conditions. This paper is giving an overview of the design process of the electrical machine, power converters, and its cooling of the entire drive. Numerical analysis (FEM and CFD) and some experimental results are presented to demonstrate the effectiveness and the desired performance of the developed integrated drive system.

42 ENGINEERING↗

2023 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

DOE maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns at the U.S. Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR’s ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. This report covers impacts on drawdown availability due to SPR operations during Calendar Year 2022. A cavern has an available drawdown if, after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a pillar-to-diameter ratio of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for oil sales, purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern’s drawdown capacity may be continued. A methodology for assessing and tracking the available drawdowns for each cavern is reiterated. This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditures. A total of 222 million barrels of oil were released in calendar-year 2022. A nearly-equal amount of raw water was injected, resulting in an estimated 34 million barrels of cavern leaching. Twenty caverns have now expended a full drawdown. Cavern BC 18 has expended all its baseline available drawdowns, and has no drawdowns remaining. Cavern BM 103 has expended one of its two baseline drawdowns, and is now a single-drawdown cavern. All other caverns with an expenditure went from at-least-5 to at-least-4 remaining drawdowns.

02 PETROLEUM↗

Use of Convolutional Neural Network Image Classification and High-Speed Ion Probe Data Toward Real-Time Detonation Characterization in a Water-Cooled Rotating Detonation Engine

As rotating detonation engines (RDEs) progress in maturity, the importance of monitoring advancements toward development of active control becomes more critical. Experimental RDE data processing at time scales which satisfy real-time diagnostics will likely require the use of machine learning. This study aims to develop and deploy a novel real-time monitoring technique capable of determining detonation wave number, direction, frequency, and individual wave speeds throughout experimental RDE operational windows. To do so, the diagnostic integrates image classification by a convolutional neural network (CNN) and ionization current signal analysis. Wave mode identification through single-image CNN classification bypasses the need to evaluate sequential images and offers instantaneous identification of the wave mode present in the RDE annulus. Here, real-time processing speeds are achieved due to low data volumes required by the methodology, namely one short-exposure image and a short window of sensor data to generate each diagnostic output. The diagnostic acquires live data using a modified experimental setup alongside Pylon and PyDAQmx libraries within a python data acquisition environment. Lab-deployed diagnostic results are presented across varying wave modes, operating conditions, and data quality, currently executed at 3–4 Hz with a variety of iteration speed optimization options to be considered as future work. These speeds exceed that of conventional techniques and offer a proven structure for real-time RDE monitoring. The demonstrated ability to analyze detonation wave presence and behavior during RDE operation will certainly play a vital role in the development of RDE active control, necessary for RDE technology maturation toward industrial integration.

42 ENGINEERING↗

Novel Algae Technology to Utilize CO 2 for Value Added Products

The Helios-NRG technology for converting coal-based flue CO 2 into valuable products has been successfully validated through a series of rigorous test programs. The key component, the MSC (Multi Stage Continuous System), played a pivotal role in this process. The MSC's various stages were seamlessly integrated and controlled by a second-generation automated system, surpassing project goals in terms of both algal productivity and capture efficiency. Notably, the MSC's operational duration improved while maintaining healthy cultures. The integrated system was rigorously tested under real outdoor conditions with varying sunlight levels and template flue gas. The final MSC test, conducted at the NCCC, successfully met project objectives.

01 COAL, LIGNITE, AND PEAT↗