Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Performance of the Components of the XJ34-WE-32 Turbojet Engine over a Range of Engine and Flight Conditions

Performance of the compressor, combustor, and turbine operating as integral parts of the XJ34-WE-32 turbojet engine was determined in the Lewis altitude wind tunnel over a range of altitudes from 5000 to 55,000 feet and flight Mach numbers from 0.28 to 1.05. Data were obtained for each of four exhaust-nozzle areas and are presented in graphical and tabular form.

ENGINES, TURBO-JET↗

Implementation of a low-cost, commercial orbit determination system

Traditional satellite and launch control systems have consisted of custom solutions requiring significant development and maintenance costs. These systems have typically been designed to support specific program requirements and are expensive to modify and augment after delivery. The expanding role of space in today's marketplace combined with the increased sophistication and capabilities of modern satellites has created a need for more efficient, lower cost solutions to complete command and control systems. Recent technical advances have resulted in commercial-off-the-shelf products which greatly reduce the complete life-cycle costs associated with satellite launch and control system procurements. System integrators and spacecraft operators have, however, been slow to integrate these commercial based solutions into a comprehensive command and control system. This is due, in part, to a resistance to change and the fact that many available products are unable to effectively communicate with other commercial products. The United States Air Force, responsible for the health and safety of over 84 satellites via its Air Force Satellite Control Network (AFSCN), has embarked on an initiative to prove that commercial products can be used effectively to form a comprehensive command and control system. The initial version of this system is being installed at the Air Force's Center for Research Support (CERES) located at the National Test Facility in Colorado Springs, Colorado. The first stage of this initiative involved the identification of commercial products capable of satisfying each functional element of a command and control system. A significant requirement in this product selection criteria was flexibility and ability to integrate with other available commercial products. This paper discusses the functions and capabilities of the product selected to provide orbit determination functions for this comprehensive command and control system.

Corrigan, Jim↗

Scheduling with genetic algorithms

In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

Fennel, Theron R.↗

Nuclear Thermal Rocket/Vehicle Design Options for Future NASA Missions to the Moon and Mars

The nuclear thermal rocket (NTR) provides a unique propulsion capability to planners/designers of future human exploration missions to the Moon and Mars. In addition to its high specific impulse (approximately 850-1000 s) and engine thrust-to-weight ratio (approximately 3-10), the NTR can also be configured as a 'dual mode' system capable of generating electrical power for spacecraft environmental systems, communications, and enhanced stage operations (e.g., refrigeration for long-term liquid hydrogen storage). At present the Nuclear Propulsion Office (NPO) is examining a variety of mission applications for the NTR ranging from an expendable, single-burn, trans-lunar injection (TLI) stage for NASA's First Lunar Outpost (FLO) mission to all propulsive, multiburn, NTR-powered spacecraft supporting a 'split cargo-piloted sprint' Mars mission architecture. Each application results in a particular set of requirements in areas such as the number of engines and their respective thrust levels, restart capability, fuel operating temperature and lifetime, cryofluid storage, and stage size. Two solid core NTR concepts are examined -- one based on NERVA (Nuclear Engine for Rocket Vehicle Application) derivative reactor (NDR) technology, and a second concept which utilizes a ternary carbide 'twisted ribbon' fuel form developed by the Commonwealth of Independent States (CIS). The NDR and CIS concepts have an established technology database involving significant nuclear testing at or near representative operating conditions. Integrated systems and mission studies indicate that clusters of two to four 15 to 25 klbf NDR or CIS engines are sufficient for most of the lunar and Mars mission scenarios currently under consideration. This paper provides descriptions and performance characteristics for the NDR and CIS concepts, summarizes NASA's First Lunar Outpost and Mars mission scenarios, and describes characteristics for representative cargo and piloted vehicles compatible with a reference 240 t-class heavy lift launch vehicle (HLLV) and smaller 120 t HLLV option. Attractive performance characteristics and high-leverage technologies associated with both the engine and stage are identified, and supporting parametric sensitivity data is provided. The potential for commonality of engine and stage components to satisfy a broad range of lunar and Mars missions is also discussed.

Borowski, Stanley K.↗

Ka-band MMIC array system for ACTS aeronautical terminal experiment (Aero-X)

During the summer of 1994, the Advanced Communication Technology Satellite (ACTS) Aeronautical Terminal Experiment (Aero-X) was successfully completed by the NASA Lewis Research Center (LeRC) and the Jet Propulsion Laboratory (JPL). 4.8 and 9.6 Kbps duplex voice links were established between the LeRC Learjet and the ACTS Link Evaluation Terminal (LET) in Cleveland, Ohio, via the ACTS. The antenna system used in this demonstration was developed by LeRC and featured LeRC and US Air Force experimental arrays using GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The antenna system consisted of three arrays mounted inside the LeRC Learjet, pointing out through the windows. An open loop tracking controller developed by LeRC used information from the aircraft position and attitude sensors to automatically steer the arrays toward ACTS during flight JPL ACTS Mobile Terminal (AMT) system hardware was used as transceivers both on the aircraft and at the LET. The single 32 element MMIC transmit array developed by NASA/LeRC and Texas Instruments has an EIRP of 23.4 dBW at boresight. The two 20 GHz MMIC receive arrays were developed in a cooperative effort with the USAF Rome Laboratory/Electronic System Center, taking advantage of existing USAF array development contracts with Boeing and Martin Marietta. The Boeing array has 23 elements and a G/T of 16/6 db/degK at boresight. The Martin Marietta array has 16 elements and a G/T of 16.1 db/degK at boresight. The three proof-of-concept arrays, the array control system and their integration and operation in the Learjet for Aero-X are described.

Raquet, Charles A.↗

Experimental Investigation of an Integrated Strut-Rocket/Scramjet Operating at Mach 4.0 and 6.5 Conditions

A series of tests were conducted to investigate RBCC performance at ramjet and scramjet conditions. The hardware consisted of a linear strut-rocket manufactured by Aerojet and a dual-mods scramjet combustor. The hardware was tested at NASA Langley Research Center in the Direct Connect Supersonic Combustion Test Facility at Mach 4.0 and 6.5 simulated flight conditions.

Hawk, Clark↗

Life Sciences Division Spaceflight Hardware

The Ames Research Center (ARC) is responsible for the development, integration, and operation of non-human life sciences payloads in support of NASA's Gravitational Biology and Ecology (GB&E) program. To help stimulate discussion and interest in the development and application of novel technologies for incorporation within non-human life sciences experiment systems, three hardware system models will be displayed with associated graphics/text explanations. First, an Animal Enclosure Model (AEM) will be shown to communicate the nature and types of constraints physiological researchers must deal with during manned space flight experiments using rodent specimens. Second, a model of the Modular Cultivation System (MCS) under development by ESA will be presented to highlight technologies that may benefit cell-based research, including advanced imaging technologies. Finally, subsystems of the Cell Culture Unit (CCU) in development by ARC will also be shown. A discussion will be provided on candidate technology requirements in the areas of specimen environmental control, biotelemetry, telescience and telerobotics, and in situ analytical techniques and imaging. In addition, an overview of the Center for Gravitational Biology Research facilities will be provided.

Yost, B.↗

Demonstration of a Large-Scale Tank Assembly via Circumferential Friction Stir Welds

A collaborative effort between NASA/Marshall Space Flight Center and the Michoud Unit of Lockheed Martin Space Systems Company was undertaken to demonstrate assembly of a large-scale aluminum tank using circumferential friction stir welds. The hardware used to complete this demonstration was fabricated as a study of near-net- shape technologies. The tooling used to complete this demonstration was originally designed for assembly of a tank using fusion weld processes. This presentation describes the modifications and additions that were made to the existing fusion welding tools required to accommodate circumferential friction stir welding, as well as the process used to assemble the tank. The tooling modifications include design, fabrication and installation of several components. The most significant components include a friction stir weld unit with adjustable pin length capabilities, a continuous internal anvil for 'open' circumferential welds, a continuous closeout anvil, clamping systems, an external reaction system and the control system required to conduct the friction stir welds and integrate the operation of the tool. The demonstration was intended as a development task. The experience gained during each circumferential weld was applied to improve subsequent welds. Both constant and tapered thickness 14-foot diameter circumferential welds were successfully demonstrated.

Jones, Clyde S.↗

Novel Planar and Integrated Microwave Antennas

This project dealt with design, analysis, and testing of new types of planar and integrated antennas operating in the microwave frequency range. The following was accomplished during this project period:

Saed, Mohammad A.↗

Testing the Preliminary X-33 Navigation System

The X-33 Reusable Launch Vehicle (RLV) must meet the demanding requirements of landing autonomously on a narrow landing strip following a flight that reaches an altitude of up to 200,000 feet and a speed in excess of Mach 9 with significant in-flight energy bleed-off maneuvers. To execute this flight regimen a highly reliable avionics system has been designed that includes three LN-100G Inertial Navigation System/Global Positioning System (INS/GPS) units as the primary navigation system for the X-33. NASA's Marshall Space Flight Center (MSFC) tested an INS/GPS system in real-time simulations to determine the ability of this navigation suite to meet the in flight and autonomous landing requirements of the X-33 RLV. A total of sixty-one open loop tests were performed to characterize the navigation accuracy of the LN-100G. Twenty-seven closed-loop tests were also performed to evaluate the performance of the X-33 Guidance, Navigation and Control (GN&C) algorithms with the real navigation hardware. These closed-loop tests were also designed to expose any integration or operational issues with the real-time X-33 vehicle simulation. Dynamic road tests of the INS/GPS were conducted by Litton to assess the performance of differential and nondifferential INS/GPS hybrid navigation solutions. The results of the simulations and road testing demonstrate that this novel solution is capable of meeting the demanding requirements of take-off, in-flight navigation, and autonomous landing of the X-33 RLV. This paper describes the test environment developed to stimulate the LN-100G and discusses the results of this test effort. This paper also presents recommendations for a navigation system suitable to an operational RLV system.

Lomas, James J.↗

Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

Patterson-Hine, Ann↗

The Implementation of Payload Safety in an Operational Environment

The objective of this paper is to define the safety life-cycle process for a payload beginning with the output of the Payload Safety Review Panel and continuing through the life of the payload on-orbit. It focuses on the processes and products of the operations safety implementation through the increment preparations and real-time operations processes. In addition, the paper addresses the role of the Payload Operations and Integration Center and the interfaces to the International Partner Payload Control Centers.

Cissom, R. D.↗

Sabatier Engineering Development Unit

To facilitate life support system loop closure on board the International Space Station (ISS), the Node 3 Oxygen Generation System (OGS) rack contains a functional scar to accommodate a carbon dioxide reduction assembly (CRA). As part of the effort to better understand and define the functional scar, significant risk mitigation activities have been performed. To address integration risks, a CRA Engineering Development Unit (EDU) has been developed that is functionally equivalent to a flight CRA and is suitable for integrating with ground based carbon dioxide removal and oxygen generation systems. The CRA EDU has been designed to be functionally equivalent to the Sabatier Reactor Subsystem (SRS) portion of the CRA. The design of the CRA EDU and testing results in a stand alone configuration with simulated OGA and CDRA interfaces are reported. Carbon dioxide flow control is a major area requiring development since the size of the CO2 accumulator may result in periods of CRA starvation. The capability of the CO2 flow control algorithm to effectively manage integrated CRA operations is discussed.

Perry, Jay↗

Research progress and accomplishments on International Space Station

The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

long duration↗

MIMOS II on MER One Year of Mossbauer Spectroscopy on the Surface of Mars: From Jarosite at Meridiani Planum to Goethite at Gusev Crater

The miniaturized Mossbauer (MB) spectrometer MIMOS II [1] is part of the Athena payload of NASA s twin Mars Exploration Rovers "Spirit" (MER-A) and "Opportunity" (MER-B). It determines the Fe-bearing mineralogy of Martian soils and rocks at the Rovers respective landing sites, Gusev crater and Meridiani Planum. Both spectrometers performed successfully during first year of operation. Total integration time is about 49 days for MERA (79 samples) and 34 days for MER-B (85 samples). For curiosity it might be interesting to mention that the total odometry of the oscillating part of the MB drive exceeds 35 km for both rovers.

Klingelhoefer, G.↗

STS-114: Discovery Day 3/Mission Status Briefing

Paul Hill, STS-114 Lead Flight Director, and John Shannon, Flight Operations and Integrations Manager for the Space Shuttle Program were present. Paul gave a detailed description of the Orbiter's performance upon its arrival on the International Space Station, orbital rendezvous and docking was completed, performance was nominal by all measures, and crew is already inside the ISS. He also briefly mentioned the next day crew activities, robotics work and first space walk. John emphasized on ground technical engineering tasks, data gathering and inspection of data, imagery and damage assessment, assessing the performance of the external tank, engineering analysis, and the increase of understanding of the overall condition of the vehicle. Safety of the vehicle, battery lifetime, foam loss, tile damage, post launch analysis were some of the topics discussed with the News Media.

Source record↗

STS-114: Discovery Mission Status Briefing

This STS-114 Discovery Mission Status Briefing begins with Eileen Collins, Commander of the STS-114 Discovery, and crewmembers in orbit talking with mission control after launch of the Space Shuttle Discovery. Collins gives tribute to the crewmembers of the Space Shuttle Columbia and their families. Phil Engelauf, STS-114 Mission Operations Representative presents his mission status briefing and John Shannon, Space Shuttle Flight Operations and Integration Manager talks about the processing of radar data taken of the Space Shuttle Discovery during ascent. A video presentation from the Solid Rocket Booster Camera is shown by John Shannon. The video includes: 1) Piece of orbiter tile and origins of debris; 2) Pictures of debris after SRB separation; 3) TYVEK covers; and 4) Bird impacts external tank nose cone. Questions from the news media about tile shearing, vehicle damage and debris from the external tank are answered.

Source record↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗