Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INSTALLATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Simple, Secure, Internet Delivery of MOOSE-based Applications

Application packaging and distribution are the final steps for delivering software to end-users; both are frequently neglected when creating scientific software. Commercial businesses rely on electronic distribution systems that have rendered disk drives obsolete. Still, national laboratories continue to rely heavily on removable media to distribute and limit access to controlled applications. With increasing concerns of unauthorized copying of sensitive applications, a modern distribution system that utilizes cryptographically secure communication and authentication protocols has been developed. This new distribution system will secure the chain of custody for nuclear software while simultaneously simplifying access to these tools. This report summarizes four primary advancements made toward the secure distribution of Nuclear Energy Advanced Modeling and Simulation (NEAMS)-developed, Multiphysics Object Oriented Simulation Environment (MOOSE)-based applications: application installation, package distribution, automated package building, and distribution of documentation. NEAMS is currently developing more than ten separate applications based on the open-source MOOSE Framework. Distribution of these applications has primarily been accomplished by distributing source code, with end-users compiling the applications themselves. This work created a mechanism where MOOSE applications can be installed in a similar way to any other software. This allows both administrators and end-users simplified access to runnable executables. With this new installation capability, it was then possible to rethink distribution. A new, secure capability for delivering MOOSE-based applications over the internet has been created. This system requires unique cryptographic tokens for authentication, greatly securing the custody chain for software. Once granted access, installation of any NEAMS code can be accomplished with these terminal commands: "conda install ncrc" "ncrc install ncrc-bison." After these two commands (and authenticating) the BISON application will be securely down- loaded from Idaho National Laboratory (INL)’s servers, installed, and ready to use. To enable this new distribution capability to be successful, the open-source Continuous Integration, Verification, Enhancement, and Testing (CIVET) Continuous Integration (CI) capability was augmented to add Continuous Delivery (CD). CD enables the automated building and packaging of MOOSE-based applications as they are modified by development teams, ensuring that our customers can obtain up-to-date versions of the software at any time. The need for instruction on how to use these applications was addressed through modifications to the MOOSE documentation system. The MooseDocs capability, which enables robust documentation of MOOSE-based applications, has been extended to allow both for the installation of documentation and the packaging of documentation with installed applications. Together, these enhancements form the core of a new, secure distribution mechanism for nuclear simulation tools. In concert with the Nuclear Computational Resource Center (NCRC), NEAMS- developed applications will now be straightforward to obtain securely.

97 MATHEMATICS AND COMPUTING↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Packaged Combined Heat and Power Technology Overview and Market Profile

Combined heat and power (CHP), sometimes referred to as cogeneration, is an efficient and clean approach to generating electric power and useful thermal energy onsite from a single fuel source, offering reliable and affordable energy services to businesses and institutions. Furthermore, CHP provides a cost effective opportunity to improve the environmental footprint and resilience of industrial and commercial facilities across the United States. CHP equipment can be custom-engineered or installed as a predesigned and assembled package. A packaged CHP system is a standardized, pre-engineered system that includes all equipment, piping, wiring, and ancillary components to deliver electricity and thermal energy to a host facility with minimal onsite engineering and design time. Packaged CHP systems can be shipped as single or multiple modules with standard interconnections (e.g., fuel; electrical; thermal—hot water, steam, and/or chilled water), which simplifies installation and reduces the costs associated with the project. Most containerized or single packaged CHP system offerings range from 10 kW to 3 MW in capacity. Packaged CHP systems are extending the operating, efficiency, and emissions benefits of CHP to nontraditional markets in commercial, institutional, multifamily, light manufacturing, government, and military applications. These markets tend to be served by smaller systems (less than 5 MW) that are conducive to pre-engineered packaging and/or modularization. Many of these sectors have limited CHP experience and technical resources to adequately evaluate, install, and maintain onsite CHP systems. The introduction of packaged CHP offerings from experienced CHP Packagers and Solution Providers has accelerated CHP adoption, lowered energy costs, reduced emissions, and strengthened energy resilience in these sectors. In 2019, the US Department of Energy (DOE) launched the Packaged CHP eCatalog to promote increased acceptance of efficient, cost-effective CHP in these applications. The Packaged CHP eCatalog is a web-based, searchable platform that hosts DOE-recognized packaged CHP systems with features designed to reduce economic and performance risks for designers, developers, owners, and facility operators interested in installing CHP. DOE established the Packaged CHP Accelerator at the same time to help launch and publicize the eCatalog, and to validate project performance, cost, and installation time of CHP packages across a variety of applications. Accelerator efforts documented installed cost reductions and installation time reductions of more than 20% for packaged CHP systems over 100 kW compared with custom-engineered systems. The Packaged CHP Accelerator and eCatalog established a peer-to-peer network connecting public and private sector partners including utilities, state energy offices, and energy efficiency program administrators interested in promoting cost-effective, efficient CHP systems, Packagers, and Solution Providers. Feedback from these partners, along with input from DOE’s CHP Technical Assistance Partnerships (CHP TAPs), was critical in understanding the current market for packaged CHP technologies, stimulating investment in these technologies, and guiding future directions for packaged CHP systems and their applications. This report provides background on packaged CHP systems, an overview of their benefits, a profile of current packaged CHP installations, and a summary of future market trends; this report is intended for facility owners, project developers, engineers, policymakers, and other stakeholders looking to increase the adoption of efficient, flexible, and resilient packaged CHP systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Knowledge Spillovers and Cost Reductions in Solar Soft Costs

Despite the commonly acknowledged importance of knowledge spillovers in reducing solar soft costs, we are only beginning to answer a fundamental question: who learns what (knowledge acquisition), from whom (knowledge production), and how (spillover mechanisms)? Until recently, this important topic has been largely unexplored in the case of solar soft costs. Thus, this project set out to identify how knowledge spillovers affect soft costs in the U.S. photovoltaic (PV) installation industry, specifically how important spillovers are, what types of knowledge are most likely to spillover, and how networks of actors affect spillovers. Our findings offer insights for designing solutions that address problems associated with knowledge spillovers and that leverage spillovers to reduce solar soft costs. Recognizing the ambiguity in the definition of soft costs, i.e., “non-hardware costs,” and variability in soft cost categories, we developed the Solar Soft Cost Ontology (SSCO) to systematically identify key concepts related to soft costs, network actors, learning processes, and the relationships between them. This ontology served as a foundational organizational structure for the methodology of the remaining tasks: case studies, surveys, pricing analysis, patent analysis, network analysis, and project integration across tasks. While there is substantial learning among installers that is reducing the soft costs for PV installations, most of that learning is retained by firms rather than spread across the industry. The positive relationship between experience accumulation and cost reductions is typically explained as learning by doing (LBD), but we find that LBD effects are mediated by other learning mechanisms, including learning by searching and learning by interacting. Knowledge spillovers have significant potential to reduce solar PV soft costs, but successful knowledge spillover pathways are complex and non-trivial. There are a wide variety of ways to construct an installation business, thus categories of firms that can effectively cross-learn directly are small and what knowledge is relevant to whom is challenging and costly for firms to assess. This fragmentation limits the critical mass needed for spillover related soft cost reductions. Knowledge does not flow directly between installers. Indirect knowledge transfer pathways are critical: distributors, software providers, collaboratives, and hiring. Furthermore, diverse, more integrated knowledge networks tend to promote successful learning by organizations and across the system as a whole. Accordingly, we find the need to supporting the whole ecosystem using an integrated policy and programmatic approach to support installers, distributors, complementary sector, and facilitators. Overall, a deliberate policy-mix design is needed to reduce the solar PV deployment barrier in terms of installation cost reductions, because deployment policies could potentially interact with policies that facilitate network-building and technological innovation. A combination of deployment policies, innovation-support policies, and network-facilitating policies could potentially lead to a more desired market outcome through achieving higher joint learning rates from firms’ cumulative experiences developed in a more integrated production and deployment ecosystem.

14 SOLAR ENERGY↗

Potential reductions in fine particulate matter and premature mortality following implementation of air pollution controls on coal-fired power plants in India

Coal-fired power plants (CFPPs) account for > 70% of electricity generation in India, but < 5% of facilities have installed technologies for sulfur dioxide (SO 2 ) and nitrogen oxide (NO X ) removal. Emissions of these pollutants lead to the formation of fine particulate matter (PM 2.5 ) and an increased risk of premature mortality for exposed populations. Here, we use a nested version of the GEOS-Chem global chemical transport model (0.5° × 0.625° resolution) for India to estimate reductions in PM 2.5 concentrations that could have been achieved by implementing existing emission control technologies like flue-gas desulfurization (FGD) and/or selective catalytic reduction (SCR). We quantify the associated burden of disease using the integrated exposure response (IER) and global exposure mortality model (GEMM) functions and compare the costs of premature mortality to those for FGD installation. Model simulations for 2010 suggest installation of FGD would have reduced mean annual PM 2.5 concentrations across India by 8%, compared to 3% with SCR installation, and 11% with both FGD and SCR. A 7–28% reduction in PM 2.5 was simulated for local communities closest to CFPPs (same model grid cell), leading to up to 17% reduction in annual premature mortality. Overall, more than 0.21–0.48 million premature deaths would have been avoided over a 10-year period if FGD had been implemented on all CFPPs, compared to 0.09–0.21 million with SCR and 0.22–0.72 million with both FGD and SCR. Benefits associated with such actions are approximately $\$18.1$–$\$604$ billion USD per year, which is equivalent to ~ 0.44 to 10% of India’s GDP. These results suggest that monetary benefits from avoided premature mortality far outweigh the capital and operational costs of FGD and/or SCR installation of $\$19.5$ billion and/or $\$32.8$ billion per year, respectively. This information is essential because the high costs of installation and operation are often given as reasons for delaying installation and commissioning. Finally, we conclude that policy actions to control air pollution from CFPPs are economically justifiable.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Weatherization Assistant NEAT/MHEA

The software provides a measure selection technique indicating cost effective retrofit activities that can be applied to a home using a standard Savings to Investment Ratio (SIR). Users must provide an input file describing the characteristics of the home to be evaluated. The software takes the input data provided and calculates energy savings and cost savings predicted for a standard set of measures given the input parameters. The Weatherization Assistant computes estimates of pre-retrofit whole building space heating and cooling energy consumptions based on the house description data supplied by the user. The consumptions are computed using a monthly heating and cooling variable base degree-day method by algorithms similar to those developed for the CIRA program [LBL, 1982]. The building consumptions are needed in computing the energy savings from measures affecting the efficiencies of the heating and cooling equipment. Weatherization Assistant then computes the energy savings and costs for each individual measure applicable to the building described as if it were the only measure installed in the house. From these energy savings, a discounted dollar savings over the life of each measure is computed. The ratio of this dollar savings to the cost of installing the measure, the "savings-to-investment ratio" (SIR), is used in an initial ranking of the measures' effectiveness. The "interacted" savings and SIR of measures are then determined assuming the measures are added to the house collectively, in order of their ranking, e.g., the second ranked measure is installed in the house initially described by the user after having been modified by the first ranked measure. If this second-ranked measure's updated SIR is greater than a user-defined limit, the measure is left implemented, else it is removed so that the next measure's effectiveness is not dependent on it. The choice between two mutually exclusive measures (such as different levels of insulation) is made on the basis of their "net present value" (NPV), the difference of life-time savings and installation cost, rather than their SIR. This has been shown to be the more correct criterion on which to base the selection between two measures, both of which cannot be installed. The audit computes and reports to the user the energy savings, discounted dollar savings, installation cost, and SIR for each measure considered cost-effective. For those with SIR greater than the user-designated cutoff, a materials list gives the material name, type, and quantity required for installation of the measure. Weatherization Assistant permits entry of pre-retrofit billing data for gas or electrically heated homes or homes with electric air-conditioning. The user may then make the decision to have the savings of the measures adjusted to reflect the difference in billed consumption and that predicted by the program.

Gettings, Michael↗

Montana Community-Scale Solar Strategy Project (Final Technical Report)

Grid-tied solar photovoltaic (PV) development began gradually in Montana, initially taking root in the early 2000s, largely in the form of small residential systems, rarely larger than two kilowatts. Utility support for solar technology through public benefit funding triggered the installation of the state’s first solar PV installations on community-owned facilities including schools, libraries, fire stations and local government buildings in the mid-2000s. By 2016, solar PV installations totaled approximately 28 megawatts of installed capacity, generating less than 0.05% of electricity sold in Montana. Montana’s solar fleet in 2016 included 17 megawatts of utility-scale solar farms, and three shared solar projects developed by rural electric cooperatives that ranged from 25 to 50 kilowatts in size. However, with only 3,000 households utilizing solar PV, either through an on-site installation or participation in a shared solar project, the potential benefits and reach of solar technology was limited. The Montana Solar Community Project (MSCP) was developed by the Montana Energy Office (MEO) at the Department of Environmental Quality in order to implement a “community-scale” solar energy strategy for the state that would cost-effectively expand Montanans’ access to solar PV. This project defines three types of community-scale solar projects: shared solar, community-sited solar, and group purchasing programs. The MSCP project conducted research and stakeholder engagement that helped to inform and develop model community-scale initiatives and an overarching community-scale solar strategy for Montana. Specifically, the project included a solar market assessment, stakeholder meetings across Montana, development of a menu of community-scale solar options, a study of solar potential on schools, community solar market research, and community-scale project implementation support. MSCP activities were successful in implementing solar projects and supporting solar development in communities across Montana. Project activities realized 280 kW of newly installed solar from two solarize programs, a shared solar array at a rural electric cooperative, and a solar array atop a Bozeman high school. The community-scale project implementation support and Solar on Schools components of the project resulted directly in the analysis and design of nearly 2 MW of distributed solar systems across the state. The Solar on Schools analysis alone produced solar designs for 25 schools, representing 920.8 kW of solar potential. Many of the deliverables from this project provide guidance on future development of community-scale solar in Montana, and resulted in a number of important conclusions about community-scale solar in Montana. There is strong interest in community-scale solar in Montana, as noted during stakeholder meetings, in response to solar market research surveys, and as seen by applications for implementation support grants provided by MEO. Project activities also suggest that Montanans demonstrated a desire and need for more information about solar energy technology, solar financing options, and the state’s policy and regulatory framework. Additionally, the project found that schools will be key partners for future community-scale solar programs. In addition to being excellent hosts for solar arrays, schools have the opportunity to use the installation of a solar array to develop educational materials and curricula to educate Montana’s future leaders about these technologies, which can be shared and replicated across the state. Project activities laid a clear path forward for solar energy in Montana. Certain activities have concrete next steps. For example, numerous solar arrays were designed for schools and other public buildings around the state. Many of those designs will be used as soon as funding becomes available. Other activities have less developed next steps, though lay the foundation for future work. The solar market assessment, solar market research, and community stakeholder meetings are good examples. These documents can be used as stepping stones to increase renewable energy education, increase stakeholder outreach, and support communities as they seek to develop community-scale solar projects.

14 SOLAR ENERGY↗

Solar PV on U.S. Houses of Worship: Overview of Market Activity and Trends [Slides]

Rooftop solar photovoltaic systems on houses of worship can provide unique community benefits and can raise local awareness and acceptance of solar energy. Recognizing that potential, a stakeholder team selected under DOE’s Solar Energy Innovation Network is working to develop a scalable model for recruiting and installing solar PV on houses of worship in underserved communities. Berkeley Lab is providing analytical support to this stakeholder team through several work products, including this report, which provides a data-oriented overview of market activity and trends related to solar PV installations on U.S. houses of worship (HoW). Drawing on Berkeley Lab’s project-level dataset of U.S. solar PV installations, the report describes: -market size and growth trends for PV on HoW -demographic characteristics of the communities in which HoW with PV are located, including income, race and ethnicity, and educational levels -key characteristics of the PV systems installed on HoW, including system size, installed costs, prevalence of third-party ownership, and pairing with storage -characteristics of the installer network servicing PV installations on HoW The purpose of the market overview is to inform business development and policy-making efforts aimed at supporting solar adoption by HoW.

14 SOLAR ENERGY↗

Expanding the Solar Workforce through the Illinois Community College System

The Illinois Green Economy Network (IGEN) is a consortium of all 39 Illinois community college districts working to grow the green economy in the state. The network aims to build capacity in sustainability and transform education by connecting business/industry and educators to resources, curating information and tools, cultivating partnerships, and advocating for change. Led by IGEN, the goal of the “Expanding the Solar Workforce through the Illinois Community College System” project was to create and sustain a comprehensive, statewide strategy that equips education and training providers, workers, businesses, and communities with resources and tools to prepare a solar workforce. A cohort of five Illinois community colleges participated in the program based on their capacity and interest, as well as their potential for and proximity to industry growth in the state: City Colleges of Chicago, John A. Logan College, Kankakee Community College, Lewis and Clark Community College, and Lincoln Land Community College. The project had three Objectives, 1) Address an unmet need by increasing the pool of skilled solar workers, 2) Keep pace with evolving needs of the solar workforce by improving programs to be more accessible and industry-driven, 3) Strengthen IGEN’s capacity as a statewide resource for solar education, training, and workforce initiatives. Overall, over 400 students were trained in solar installation practices, with over 40 businesses engaged. Additionally. the project spurred a number of innovations and the development of effective practices related to establishing and maintaining a solar installation program at a community college. This project sought to identify effective and scalable practices for developing a solar installation program which included the following components: enrolling students into aligned programs; developing curriculum and courses which meet industry needs; placing students in solar installation or related employment; and sustaining programming past grant funding. Through this project- IGEN was able to identify critical components of a solar installation program. Detailed further in this report these components describe 1) Necessary conditions for establishing a solar installation program, 2) Program structures use cases for different contexts, 3) Effective practices related to student pipeline development and program throughout. As a result of this project- all five participating community colleges have expressed support for continuing to offer solar installation training to their students. Additionally, three nonparticipating colleges in IGEN have expressed interest in adopting practice, courses, or curriculum developed through this program. IGEN has also committed to making the curriculum, course structure and other materials available on their website for accelerated adoption of effective practices both state and nationwide.

14 SOLAR ENERGY↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

The CMS Magnetic Field Measuring and Monitoring Systems

This review article describes the performance of the magnetic field measuring and monitoring systems for the Compact Muon Solenoid (CMS) detector. To cross-check the magnetic flux distribution obtained with the CMS magnet model, four systems for measuring the magnetic flux density in the detector volume were used. The magnetic induction inside the 6 m diameter superconducting solenoid was measured and is currently monitored by four nuclear magnetic resonance (NMR) probes installed using special tubes outside the barrel hadron calorimeter. Two more NRM probes were installed at the faces of the tracking system. The field inside the superconducting solenoid was precisely measured in 2006 in a cylindrical volume of 3.448 m in diameter and 7 m in length using 10 three-dimensional (3D) B-sensors based on the Hall effect. These B-sensors were installed on each of the two propeller arms of an automated field-mapping machine. In addition to these measurement systems, a system for monitoring the magnetic field during the CMS detector operation has been developed. Inside the solenoid in the horizontal plane, 4 3D B-sensors were installed at the faces of the tracking detector. Twelve 3D B-sensors were installed on the surfaces of the flux-return yoke nose disks. Seventy 3D B-sensors were installed in the air gaps of the CMS magnet yoke. A specially developed flux loop technique was used for the most complex measurements of the magnetic flux density inside the steel blocks of the CMS magnet yoke. The flux loops are installed in 22 sections of the flux-return yoke blocks. The areas enclosed by these coils varied from 0.3 to 1.59 m$^{2}$ in the blocks of the barrel wheels and from 0.5 to 1.12 m$^{2}$ in the blocks of the yoke endcap disks. The development of these systems and the results of the magnetic flux density measurements across the CMS magnet are presented and discussed in this review article.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when necessary. Finally, a new health-monitoring system was installed to measure shaft speed, shaft movement, and machine vibration on all of the rotating equipment. The system also provides automatic alarms and shutdown of the equipment when required. An integrated systems test for checkout of the facility was completed on June 17, 2003. Research testing resumed on June 30 with data obtained in support of the Ultra-Efficient Engine Technology Project's Compressor Casing Treatment Project.

Brokopp, Richard A.↗

Design Evolution and Verification of the A-3 Chemical Steam Generator

Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

Kirchner, Casey K.↗

Close Range Photogrammetry in Space - Measuring the On-Orbit Clearance between Hardware on the International Space Station

When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.

Liddle, Donn↗

Space Suit Portable Life Support System Fastener and Insert Summary, Issues, and Testing Results

Fasteners are included in every assembly on the Exploration External Mobility Unity Portable Life Support System (xEMU PLSS). However, fasteners and inserts have been the cause of many issues seen on the PLSS during development; furthermore, inserts with thermoplastics are not very well understood. The materials used in the PLSS are sometimes softer and lighter weight metals or thermoplastics which require the installation of inserts to improve the interface strength. In addition, space flight requirements call out the need for an additional running/locking torque, so they do not detach in case of failure of the final torque. The xEMU PLSS has experienced various issues with fasteners and inserts, from the bolt binding in an insert or the running torque failing prematurely. A study has been completed to address the running torque life problem. This study compares the insert and locking feature combinations to determine the combination which maximizes life. The study found that using a locking patch with an insert fails after the first installation. Therefore, it is no longer recommended to use a locking patch fastener with an insert for future installments. For the bolt binding issue, inserts have been installed too deep and have caused the bolt to bind near the final threads of the inserts where the hole is not tapped deep enough. Thermoplastics, on the other end, can either use standard helical inserts or heat set inserts. Another study was performed using tangless inserts and heat inserts installed in thermoplastics to quantify the expected pull-out strength for various insert installation parameters (insert type, temperature, and pressure). This paper will review the issues and lessons learned with fasteners on the xEMU PLSS, provide results of a locking feature study, and provide results and recommended installation settings from a heat insert study.

Ryan Ogilvie↗