Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Design Readiness And Maturity Assessment (DRAMA) Tool for Advanced Reactors

Abstract – This research is developing a formal, repeatable method to assess the readiness and maturity of an advanced nuclear reactor design for licensing and deployment. This design readiness and maturity assessment (DRAMA) tool will be capable of determining the readiness of the design and of all parties needed to bring a particular advanced reactor design to fruition. Beneficiaries and stakeholders include the design team, research organizations (required to collect needed data and develop design tools), standards organizations, research facilities to support gathering of needed data, supply chain and construction organizations, and everyone responsible for legal and regulatory infrastructure (including defining import-export requirements). Recent experience has shown that even the most experienced engineering and construction organizations, with decades of experience in the nuclear power business, have had significant challenges in bringing designs to completion, licensing the designs, and constructing new plants. For new entries into the field, simply understanding the unique environmental and regulatory requirements have been daunting. A significant part of the challenge is that new entries into the market do not know what they don't know. This tool will provide design teams a better understanding of their readiness to proceed to licensing (and other steps in the process), while at the same time providing a valuable metric for other interested organizations, such as funding agencies, national regulators, and international markets. The DRAMA tool will provide an assessment of the likelihood of successfully completing licensing and deployment and will also create the capability to assess the ability of regulatory infrastructure and the supply chain to support the deployment of any design or class of designs. It will also help prioritize research and policy efforts to improve the likelihood of deployment of the next generation of advanced reactors.

Arndt, Steven↗

Identifying Opportunities and Recommendations for the Integration of Advanced Reactors for Industrial Heat and Electricity Users

Nuclear power in the United States has been used traditionally to provide baseload electric power to the grid. Advancements in nuclear power to create smaller and safer reactors have renewed interest in nuclear as a source of both heat and electricity for a variety of applications. There is great interest in coupling nuclear reactors with industrial applications because nuclear power is a low carbon energy source that can be utilized for process heating, hydrogen generation, on-site electricity demand, and more. Idaho National Laboratory is developing guidelines to identify and assist industrial heat and electricity decarbonization by integrating with nuclear power plants (NPPs) to provide clean, abundant, and dispatchable energy. Considerations include specific industrial hazards which impact NPP siting, heat transport requirements and associated technologies, and implementation feasibility based on site-specific demand profiles. To assess integration feasibility, facility process models are developed based on real data obtained from a survey of baseline requirements and process information from industrial facilities in the United States. An assessment of safety and siting requirements is also performed to determine how nuclear industrial pairings could meet licensing requirements for NPPs. In addition, site characterization of an industrial plant is essential to determining the feasibility and suitable integration methods for each industry. Characterization includes facility distance from the nearest population center, site size, rail or water transport availability, and proximity to undeveloped land. These characteristics are important to determine reactor- or industry-side design requirements for safe, efficient operation. The siting and technical data assessment will reveal opportunities for single-use nuclear integration and co-location opportunities for industries to share benefits from a single reactor. In addition to existing facilities, this “energy-park” style cooperation could include new construction like data centers which can cost-share energy investments or provide a stable demand-and-revenue stream to the investor. Deliverables will contain a library of documents and models to guide various industries toward understanding nuclear technologies based on their users’ needs. This paper is a summary of the current project status, and provides insights on suitable pairings for specific industries and reactor technologies

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental Impact Assessment of Lithium Recovery from Geothermal Brines in the SS-KGRA: An Overview

There is increasing interest in securing a reliable, domestic source of lithium in the United States to support an electrified grid and energy secure future. The Salton Sea Known Geothermal Resource Area (SS-KGRA) has garnered attention for this purpose due to the abundance of lithium in brines brought to the surface for geothermal energy production in this region. Geothermal production from this field is already expected to grow from the current 400 MWe to 920 MWe in the next 3-4 years with a potential total geothermal capacity in the region estimated at nearly 2,950 MWe. With this growth, there is potential for construction and operation of new direct lithium recovery and processing facilities to meet domestic demands for lithium. In this work, we estimate the potential impact of geothermal expansion and lithium extraction in the SS-KGRA on water use, direct air emissions from facilities, and solid waste production and management.

Busse, MM↗

Updated Conceptual Cost Estimating

16-page report discusses development and use of NASA TR-1508, the Kennedy Space Center Aerospace Construction Price Book for preparing conceptual, budget, funding, cost-estimating, and preliminary cost-engineering reports. Updated annually from 1974 through 1985 with actual bid prices and government estimates. Includes labor and material quantities and prices with contractor and subcontractor markups for buildings, facilities, and systems at Kennedy Space Center. While data pertains to aerospace facilities, format and cost-estimating techniques guide estimation of costs in other construction applications.

Brown, J. A.↗

The Present and Future of QCD: QCD Town Meeting White Paper – An Input to the 2023 NSAC Long Range Plan

It is currently understood that there are four fundamental forces in nature: gravitational, electromagnetic, weak and strong forces. The strong force governs the interactions between quarks and gluons, elementary particles whose interactions give rise to the vast majority of visible mass in the universe. The mathematical description of the strong force is provided by the non-Abelian gauge theory Quantum Chromodynamics (QCD). While QCD is an exquisite theory, constructing the nucleons and nuclei from quarks, and furthermore explaining the behavior of quarks and gluons at all energies, remain to be complex and challenging problems. Such challenges, along with the desire to understand all visible matter at the most fundamental level, position the study of QCD as a central thrust of research in nuclear science. Experimental insight into the strong force can be gained using large particle accelerator facilities, which are necessary to probe the very short distance scales over which quarks and gluons interact. The Long Range Plans (LRPs) exercise of 1989 and 1996 led directly to the construction of two world-class facilities: the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab (JLab) that is focused on studying how the structure of hadrons emerges from QCD (cold QCD research), and the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Lab (BNL) that aims at the discovery and study of a new state of matter, the quark-gluon plasma (QGP), at extremely high temperatures (hot QCD research). These past investments have produced major advances. Nucleons and nuclei are being studied with increasing precision with a unified description of the partonic structure utilizing multi-dimensional imaging. Significant progress has been made, paving the way towards a complete picture of how quarks and gluons give rise to the mass, spin, and momentum of the nucleon. In hot QCD, the QGP is created in the collisions of nuclei at RHIC and the Large Hadron Collider (LHC) and is observed to behave like a fluid with very low specific shear viscosity; the current goals are to understand how the fluid behavior emerges from QCD and to characterize the temperature (and chemical potential) dependence of the properties of the QGP. As this White Paper is written, current experimental programs at CEBAF, RHIC and the LHC continue to provide exciting near term opportunities to capitalize on the investments in experimental equipment and accelerator operations. Most importantly, the QCD community looks forward to the construction of the Electron Ion Collider (EIC) as a major new facility to push forward QCD research in the next decades, with significant focus on exploring the properties of gluons, the mediators of the strong force.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FY23 Status Report of the Activated Materials Laboratory at the Advanced Photon Source

The Activated Materials Laboratory (AML) is a new radiological facility located at the Advanced Photon Source (APS) in Argonne National Laboratory (ANL), adjacent to the high-energy x-ray microscopy (HEXM) beamline in the long beamline building (LBB) constructed under the APS-upgrade (APS-U) project. The AML is a centralized facility to facilitate the safe conduct of experiments on activated materials at the APS. This report provides an overview of the status of the AML as a Nuclear Science User Facilities (NSUF) partner user facility in preparation for the general user access in 2024 upon the commissioning of the APS-U beamlines. Specifically, details are provided regarding the laboratory's scope, functionality, components, operational blueprint, and data management approach. The plans on augmenting the instrumentation, refining operational procedures and developing a robust data management strategy for FY24 and beyond are also discussed.

43 PARTICLE ACCELERATORS↗

Multi-Modal Characterization of Nuclear Fuels and Materials at the Idaho National Laboratory Materials & Fuels Complex

The Idaho National Laboratory (INL) leads cutting-edge research pertaining to the advancement of nuclear reactor technologies, including nuclear fuels and materials. The INL Irradiated Materials Characterization Laboratory (IMCL), Electron Microscopy Laboratory (EML), and future Sample Preparation Laboratory (SPL) are available to the nuclear research community to assess the behavior of nuclear fuels and materials, efficiently and comprehensively characterizing from the engineering to atomistic scale. The IMCL is a unique, 12,000-square-foot facility located at the INL Materials and Fuels Complex designed for analysis of irradiated materials. The facility operates advanced characterization instruments that are sensitive to vibration, temperature, and electromagnetic interference in modular radiological shielding and confinement systems, granting researchers the ability to assess the microstructural, chemical, mechanical and thermophysical properties of nuclear materials, especially irradiated fuels. The EML is dedicated to advanced characterization of materials with optical and electron microscopy tools, including scanning electron microscopy/focused-ion beam (SEM/FIB) and transmission electron microscopy (TEM). Upon construction, the SPL will be a 3 story, 49,000 sq. ft facility, that is the most modern reactor structural materials testing and analysis facility in the world, designed to investigate reactor structural materials in support of life-extension programs and development of advanced reactor concepts, including mechanical testing and advanced characterization capabilities. This presentation will showcase some of the main capabilities available at both IMCL, EML, and SPL, specifically illustrating how these characterization techniques are incorporated into multi-modal characterization work scopes to elucidate the degradation of nuclear structural materials and irradiated fuels.

36 MATERIALS SCIENCE↗

Mars Sample Return (MSR) Sample Receiving Facility (SRF) Assessment Study (MSAS)

NASA, in partnership with the European Space Agency (ESA), is seeking to return Martian geological and atmospheric samples to Earth for scientific study in the early 2030s. Due to the possibility that the samples could contain extraterrestrial life, Mars Sample Return (MSR) is classified as a Category V: Restricted Earth Return mission by the NASA Planetary Protection Office. As a result of this classification, a MSR Sample Receiving Facility (SRF) must not only provide a pristine environment to ensure samples are protected from terrestrial contamination for scientific investigations, it must also provide high-containment (biosafety level 4 [BSL-4]-equivalence) to isolate the samples from Earth’s biosphere until the samples are deemed safe for release and/or sterilized. The nominal utilization period for a SRF is anticipated to be 2-5 years and is intended to enable curation activities, biohazard assessment, select early science activities, and the rapid release of samples to the scientific community. However, to account for possible delays in schedule or the identification of extant life, this anticipated period of time must be flexible to accommodate schedule extensions and contingency plans. Due to requirements for high-level biological containment and cleanliness, a traditional receiving/curation facility cannot be utilized for MSR. Therefore, beginning in 2022, NASA Johnson Space Center is performing a MSR SRF Assessment Study (MSAS) to investigate the most optimal facility modality for a MSR SRF, as well as start to define programmatic early estimate of costs and schedules before the initial design phase begins. NASA is partnering with industry contractors (architectural and engineering firms with BSL-4 and cleanroom technology experience, as well as other contracted infrastructure and construction specialists) along with selected experts from NASA, ESA, existing U.S. BSL-4 facilities, and other U.S. government agencies, to carry out the assessment study. The MSAS should also aid in the future refinement of the science requirements (e.g., contamination control, equipment accommodations) before site-specific design would commence. As part of the MSAS, NASA is planning to assess an array of possibilities for a MSR SRF. One of the main considerations is the facility modality and whether an existing BSL-4 facility can be utilized (for some or all functions); or, if new constructure would be required, would a traditional fixed facility or a modular facility the best choice. MSAS will also investigate the ability of the modalities to accommodate two different facility capability endmembers: 1) a minimal facility focusing on biohazard assessment and curation tasks with a small footprint, and 2) an enhanced facility with additional capabilities to enable expedited processing and the completion of time-sensitive and (some) sterilization-sensitive science. The assessment is intended to generate information that will inform the selection of facility modalities for high-level conceptual design development. While the assessment study will focus on SRF requirements for accommodating curation, science, and sample safety assessment infrastructure, it will also consider an array of other factors, such as ease of access for international users, decommissioning, repurposing, future sale or lease following MSR’s use of the facility, and uncontained preparatory laboratory spaces. Upon completion of the study, the preferred modality and refined requirements would be utilized for site-specific design but will not be finalized until NASA’s completion of the National Environmental Policy Act (NEPA) process.

A.D. Harrington↗

Is Clean Hydrogen Production a Good Fit for Questa? (Final Economic Impact Results) [Slides]

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN↗

Is Clean Hydrogen Production a Good Fit for Questa? Final Economic Impact Results

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN↗

Development and life-testing of 10 kW class thermal arcjet engines

A facility to develop and test thermal arcjet engines over extended periods of time has been constructed and is described in this paper. It consists of a large vacuum tank, high capacity vacuum pumps, a 100 kW power supply and a large ammonia propellant storage and delivery system. The facility is instrumented to measure electrical power dissipated in the engine, propellant mass flow rate and developed thrust. Pressures and temperatures up to 2400 K can also be measured. The entire facility is computer-controlled and can be operated unattended for many weeks. Two 30 kW thermal arcjet engines that have been designed, built and are being tested in this facility are also described.

Pivirotto, T. J.↗

Low Cost Large Core Vehicle Structures Assessment

Boeing Information, Space, and Defense Systems executed a Low Cost Large Core Vehicle Structures Assessment (LCLCVSA) under contract to NASA Marshall Space Flight Center (MSFC) between November 1997 and March 1998. NASA is interested in a low-cost launch vehicle, code named Magnum, to place heavy payloads into low earth orbit for missions such as a manned mission to Mars, a Next Generation Space Telescope, a lunar-based telescope, the Air Force's proposed space based laser, and large commercial satellites. In this study, structural concepts with the potential to reduce fabrication costs were evaluated in application to the Magnum Launch Vehicle (MLV) and the Liquid Fly Back Booster (LFBB) shuttle upgrade program. Seventeen concepts were qualitatively evaluated to select four concepts for more in-depth study. The four structural concepts selected were: an aluminum-lithium monocoque structure, an aluminum-lithium machined isogrid structure, a unitized composite sandwich structure, and a unitized composite grid structure. These were compared against a baseline concept based on the Space Shuttle External Tank (ET) construction. It was found that unitized composite structures offer significant cost and weight benefits to MLV structures. The limited study of application to LFBB structures indicated lower, but still significant benefits. Technology and facilities development roadmaps to prepare the approaches studied for application to MLV and LFBB were constructed. It was found that the cost and schedule to develop these approaches were in line with both MLV and LFBB development schedules. Current Government and Boeing programs which address elements of the development of the technologies identified are underway. It is recommended that NASA devote resources in a timely fashion to address the specific elements related to MLV and LFBB structures.

Hahn, Steven E.↗

The DUNE Phase II Detectors

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy for the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the previous European Strategy for Particle Physics. The construction of DUNE Phase I is well underway. DUNE Phase II consists of a third and fourth far detector module, an upgraded near detector complex, and an enhanced > 2 MW beam. The fourth FD module is conceived as a 'Module of Opportunity', aimed at supporting the core DUNE science program while also expanding the physics opportunities with more advanced technologies. The DUNE collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This submission to the 'Detector instrumentation' stream focuses on technologies and R&D for the DUNE Phase II detectors. Additional inputs related to the DUNE science program, DUNE software and computing, and European contributions to Fermilab accelerator upgrades and facilities for the DUNE experiment, are also being submitted to other streams.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Specific SPS construction studies: Construction tasks, construction base

A concept for building the 5000 MW reference solar power satellite in Earth orbit is discussed. The system uses silicon solar cells. The GEO base has contiguous facilities for concurrent assembly and subsequent mating of the satellite energy conversion system and its power transmission antenna. The end builder construction system uses 10 synchronized beam machines to automatically fabricate continuous longitudinal beams for the energy conversion system.

Mccaffrey, R. W.↗

The DUNE Science Program

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy for the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the previous European Strategy for Particle Physics. The construction of DUNE Phase I is well underway. DUNE Phase II consists of a third and fourth far detector module, an upgraded near detector complex, and an enhanced > 2 MW beam. The fourth FD module is conceived as a 'Module of Opportunity', aimed at supporting the core DUNE science program while also expanding the physics opportunities with more advanced technologies. The DUNE collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This submission to the 'Neutrinos and cosmic messengers', 'BSM physics' and 'Dark matter and dark sector' streams focuses on the physics program of DUNE. Additional inputs related to DUNE detector technologies and R&D, DUNE software and computing, and European contributions to Fermilab accelerator upgrades and facilities for the DUNE experiment, are also being submitted to other streams.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

External view construction for database uniformization

Database uniformization refers to the building of a common user interface facility to support uniform access to any or all of a collection of distributed heterogeneous databases. A proposed solution for database uniformization includes a global data manager which accepts a user's query on the user's global view and returns the results by consulting the various databases. In this paper the external-to-conceptual mapping component of the global data manager is described and the design using portions of sample NASA GSFC databases is illustrated with typical applications.

Grant, J.↗

STS-114: Discovery Mission Status Briefing

This video features mid-deck payloads being stowed at Pad 39B, a ribbon cutting ceremony at the NASA Shuttle Launch Facility (SLF) Air Traffic Control Tower and footage of the air traffic control radar constructed at Shiloh. The STS-114 Crewmembers, Commander, Eileen Collins, Pilot, James Kelly, Mission Specialist, Charles Camarda, Mission Specialist, Wendy Lawrence, Mission Specialist, Soichi Noguchi, JAXA, Mission Specialist, Stephen Robinson, and Mission Specialist Andrew Thomas are shown arriving at the Shuttle Landing Facility at Kennedy Space Center. Eileen Collins introduces each crew member and talks to the news media about their role during this mission. The astronauts are also shown during their spacesuit fit check at the Operations and Control Center (O&C) and footage of a practice flight is presented. The start of the countdown clock in the firing room 3 of the launch control center is shown

Source record↗