Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Efficient computerized model for dynamic analysis of energy conversion systems

In searching for the optimum parameters that minimize the total life cycle cost of an energy conversion system, various combinations of components are examined and the resulting system performance and associated economics are studied. The systems performance and economics simulation computer program (SPECS) was developed to fill this need. The program simulates the fluid flow, thermal, and electrical characteristics of a system of components on a quasi-steady state basis for a variety of energy conversion systems. A unique approach is used in which the set of characteristic equations is solved by the Newton-Raphson technique. This approach eliminates the tedious iterative loops which are found in comparable programs such as TRNSYS or SOLTES-1. Several efficient features were also incorporated such as the centralized control and energy management scheme, and analogous treatment of energy flow in electrical and mechanical components, and the modeling of components of similar fundamental characteristics using generic subroutines. Initial tests indicate that this model can be used effectively with a relatively small number of time steps and low computer cost.

Hughes, R. D.↗

Energy Reduction: Challenging Mindsets

Presentation from the Save Energy Now LEADER Industrial Sustainability and Energy Management Showcase.

ITP, Save Energy Now, LEADER, Nissan, energy, redu↗

Utilities Reduction: Stamping NNAS

Presentation from the Save Energy Now LEADER Industrial Sustainability and Energy Management Showcase.

ITP, Save energy now, Utilities, LEADER, Nissan↗

Test-Bed Studies Examine PoE

As LED lighting efficacy has steadily improved, and as Power over Ethernet (PoE) standards have evolved to support larger loads, PoE has become viable for an increasing number of lighting devices and applications. As a result, a growing number of lighting manufacturers are introducing PoE lighting systems, making this a potentially disruptive technology. Such systems typically promise enhanced energy management capabilities including accurate reporting of energy use-but we're in the early stages of adoption and there is still a lot we don't know. For example, how exactly is energy use being reported? Which system components are included in reported energy? Is energy loss in PoE cables and connections being reported? Do PoE lighting system architectures vary, and if so, how does that affect their energy use?

Tuenge, Jason R.↗

Pueblo of Laguna Utility Authority Renewable Energy Feasibility Study

The project, “Renewable Energy Feasibility Study” was designed to expand upon previous work done by the Tribe in evaluating utility formation, generation development opportunities, examining options for creating self-sufficiency in energy matters, and integrating energy management with the Tribe’s economic development goals. The evaluation of project locations and economic analysis, led to a focus primarily on solar projects.

14 SOLAR ENERGY↗

A framework for monitoring-based commissioning: Identifying variables that act as barriers and enablers to the process

The practice of monitoring-based commissioning (MBCx) using energy management and information systems (EMIS) has been shown to enable and help sustain up to 20% energy savings in buildings. Despite research that has quantified the costs, benefits, and energy savings of MBCx, the process remains under-utilized. To understand why MBCx is not more frequently adopted and how to encourage its use, this research synthesizes qualitative data from over 40 organizations, currently engaging in MBCx. The outcome of this research is a framework containing variables that emerged from the qualitative data, marked as barriers or enablers, organized by phases of the MBCx process. The framework is comprised of 51 emergent variables that fall within 13 different categories. The variables that most frequently act as barriers are data configuration, measurement & verification (M&V), developing specifications for EMIS, and data architecture. Although some variables that act as barriers for one organization were identified as enablers for another. For example, payback/ROI was considered a barrier 7 times and an enabler 3 times. One organization had difficulty making the business case for the initial investment for MBCx due to lack of cost information, while another was able to justify large investments with documented savings of previously implemented measures identified through MBCx. The framework formally validates barriers found in previous research, and can be used by practitioners to better understand common experiences with MBCx. This research also highlights the need for a similar collective data set to validate common enablers to MBCx and also the need for empirical research to determine relationships between variables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Laboratories for the 21st Century: An Introduction to Low-Energy Design (Revised)

This booklet is an introduction to several new strategies for designing, developing, and retrofitting energy-efficient laboratories. It is the result of a collaboration among staff at the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP), several national laboratories, and their contractors. They are collaborating to meet the goals of a joint EPA-DOE initiative, 'Laboratories for the 21st Century,' which was established to help government and private-sector laboratory designers, engineers, owners, and operators work together to increase operating efficiency and reduce costs. This booklet describes many energy-efficient strategies that can be done during laboratory planning and programming; design; engineering; and commissioning, operation, and maintenance. There is also a discussion of on-site power generation and clean sources of electricity from renewable energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of E4 Training and Field Auditing of GSA Heartland Region Facilities

To assess the impact of energy efficiency expert evaluation (E4) training and field audits performed since 2007, the Federal Energy Management Program (FEMP) undertook a follow-up study on the implementation of E4 recommendations and an analysis of energy savings. The building property manager and O and M contractor of each facility were interviewed to obtain feedback and implementation status of the E4 recommendations. Overall, there were more than 160 recommendations documented in the E4 reports; about 50% of these recommendations were fully implemented and the remaining 50% either partially implemented or not implemented. In four buildings, the E4 recommendations were aligned with American Recovery and Reinvestment Act of 2009 (ARRA) projects replacing HVAC equipment or upgrading the building control system. The E4 recommendations were not followed-up in two buildings because of uncertainty of the long-term use of the facility or personnel changes. Results of this followon study are reported in this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate thecomplexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of theinvestment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in acoordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of automated measurement and verification to utility energy efficiency program data

Trustworthy savings calculations are critical to convincing regulators of both the cost-effectiveness of energy efficiency program investments and their ability to defer supply-side capital investments. Today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of energy efficiency programs. They also require time-consuming data acquisition. A spectrum of savings calculation approaches is used, with some relying more heavily on measured data and others relying more heavily on estimated, modeled, or stipulated data. The increasing availability of “smart” meters and devices that report near-real time data, combined with new analytical approaches to quantify savings, offers the potential to conduct M&V more quickly and at lower cost, with comparable or improved accuracy. Commercial energy management and information systems (EMIS) technologies are beginning to offer these ‘M&V 2.0’ capabilities, and program administrators want to understand how they might assist programs in quickly and accurately measuring energy savings. This paper presents the results of recent testing of the ability to use automation to streamline the M&V process. In this paper, we apply an automated whole-building M&V tool to historic data sets from energy efficiency programs to begin to explore the accuracy, cost, and time trade-offs between more traditional M&V, and these emerging streamlined methods that use high-resolution energy data and automated computational intelligence. For the data sets studied we evaluate the fraction of buildings that are well suited to automated baseline characterization, the uncertainty in gross savings that is due to M&V 2.0 tools’ model error, and indications of labor time savings, and how the automated savings results compare to prior, traditionally determined savings results. The results show that 70% of the buildings were well suited to the automated approach. In a majority of the cases (80%) savings and uncertainties for each individual building were quantified to levels above the criteria in ASHRAE Guideline 14. In addition the findings suggest that M&V 2.0 methods may also offer time-savings relative to traditional approaches. Lastly, we discuss the implications of these findings relative to the potential evolution of M&V, and pilots currently being launched to test how M&V automation can be integrated into ratepayer-funded programs and professional implementation and evaluation practice.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Plug-in Electric Vehicle Interactions with a Small Office Building: An Economic Analysis using DER-CAM

It is generally believed that plug-in electric vehicles (PEVs) offer environmental and energy security advantages compared to conventional vehicles. Policies are stimulating electric transportation deployment, and PEV adoption may grow significantly. New technology and business models are being developed to organize the PEV interface and their interaction with the wider grid. This paper analyzes the PEVs' integration into a building's Energy Management System (EMS), differentiating between vehicle to macrogrid (V2M) and vehicle to microgrid (V2m) applications. This relationship is modeled by the Distributed Energy Resources Customer Adoption Model (DER-CAM), which finds optimal equipment combinations to meet microgrid requirements at minimum cost, carbon footprint, or other criteria. Results derive battery value to the building and the possibility of a contractual affiliation sharing the benefit. Under simple annual fixed payments and energy exchange agreements, vehicles are primarily used to avoid peak demand charges supplying cheaper off-peak electricity to the building during workdays.

24 POWER TRANSMISSION AND DISTRIBUTION↗