Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electrical Power System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

International Space Station Lithium-Ion Battery Start-Up and Cycling

The International Space Station (ISS) primary Electric Power System (EPS) was originally designed to use Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the ISS is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries were designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace Ni-H2 batteries approaching the end of their useful life and concurrently funded a Li-Ion ORU (Orbital Replacement Unit) and cell life testing project. The first set of 6 Li-ion battery replacements was launched in December 2016 and deployed in January 2017. This paper will discuss the Li-ion battery on-orbit cycling and the status of the Li-Ion cell and ORU life cycle testing.

International Space Station↗

Western Wind and Solar Integration Study Phase 2 (Presentation)

This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.

14 SOLAR ENERGY↗

Renewable Power Options for Electrical Generation on Kaua'i: Economics and Performance Modeling

The Hawaii Clean Energy Initiative (HCEI) is working with a team led by the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to assess the economic and technical feasibility of increasing the contribution of renewable energy in Hawaii. This part of the HCEI project focuses on working with Kaua'i Island Utility Cooperative (KIUC) to understand how to integrate higherlevels of renewable energy into the electric power system of the island of Kaua'i. NREL partnered with KIUC to perform an economic and technical analysis and discussed how to model PV inverters in the electrical grid.

14 SOLAR ENERGY↗

Introducing Uncertainty Components in Locational Marginal Prices for Pricing Wind Power and Load Uncertainties

With substantially increasing penetration levels of wind power, electric power system flexibility is needed to address the variability and uncertainty of wind power output. Thus, it has become an urgent issue to obtain an optimal trade-off between economics and reliability, and to price system uncertainties. This paper proposes a new electricity market-clearing mechanism based on locational marginal prices (LMPs) for pricing uncertain generation and load. The uncertainty contained locational marginal price (U-LMP) is derived from a distributionally robust chance-constrained optimal power flow (DRCC-OPF) model in which only the first-order and second-order moments of the uncertain sources' probability distribution are needed. Compared with traditional LMPs, the proposed U-LMP formulation includes two new uncertainty components: transmission line overload uncertainty price and generation violation uncertainty price. These LMP uncertainty components are the price signals reflecting the system costs as a result of wind generation and demand uncertainty at different locations. Finally, using parametric case studies, the relationship among uncertainty levels, system generation cost, and LMP uncertainty components are established. Case studies performed on the PJM 5-bus and IEEE 118-bus systems verify the proposed U-LMP method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incentivizing Distributed Energy Resource Participation in Grid Services

The bulk power system is experiencing a dramatic shift as renewable generation growth continues to accelerate. Large-scale renewables adoption will help societies transition to a low-carbon, low-cost, and environmentally friendly electrical power system. However, the transition from a paradigm of generation following load to one where load follows generation will require large-scale interconnection and coordinated operation of Distributed Energy Resources (DERs), supported by open communication protocols. In this future grid scenario, DER aggregations will provide critical grid services that enable high penetration levels of renewable generation. This position paper presents an Energy Service Interface (ESI) that defines scope for ensuring secure, trustworthy information exchange between grid service providers and DERs. The goal of the ESI is to encourage large-scale participation of DERs in order to provide grid services through dispatch of DER aggregations. This position paper also presents an open smart energy communications protocol that allows DERs to advertise their characteristics and participate in grid services, within constraints established by the ESI. The paper presents several monetization incentives that grid service providers could use to encourage large-scale DER participation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Plasma Chemical Conversion and Resource Generation Beyond Low-Earth Orbit

As humanity gears up for its return to the moon after more than half a century, collaborative efforts between NASA, Artemis Accords Partners, and private industry are underway to establish the necessary infrastructure and technologies for lunar habitation and eventual Mars exploration. However, the traditional ISS resupply and waste management model is impractical and economically infeasible for prolonged missions to the Moon and Mars. Advanced chemical conversion technologies are needed to generate vital consumable products from local planetary resources (ISRU) and recycled gasses and waste within semi-closed loop life-support systems. Low-temperature plasma reactors are emerging power-to-gas technologies with the potential to facilitate various chemical synthesis processes with hardware commonality and redundancy. In plasma-based systems, electrical power is used to ionize a feedstock gas, creating a highly reactive environment that leverages electron excitation chemistry to break stable molecular bonds and form value added products. Unlike thermal chemical processes, plasma reactors operate at non-equilibrium conditions, allowing for lower-temperature operation and instantaneous start-up, making them adaptable to intermittent power availability. Moreover, their scalability permits deployment in both portable astronaut systems and large-scale industrial setups for colonies. One promising application of plasmas is for CO 2 conversion. Carbon dioxide comprises 96% of the Martian atmosphere and is a byproduct of human respiration, which typically must be scrubbed and vented from space habitats. A plasma source integrated with membrane separation technology could generate a stream of oxygen for life support and rocket propellant. CO 2 splitting may also be beneficial as a precursor to manufacture carbon-based products and fuels in situ, like methane, methanol, and polyethylene. Plasma-assisted CO 2 conversion is a simpler case to study without the concern of selectivity and is the first step toward complex chemical synthesis. This work presents preliminary experimental case study from a plasma reactor for CO 2 conversion and casts a vision for the potential of plasma technologies in a sub-architecture for resource production to enable the next generation of human spaceflight activities.

Plasma↗

Strategic planning for power system restorations

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Onboard power line conditioning system for an electric or hybrid vehicle

A power line quality conditioning system for a vehicle includes an onboard rechargeable direct current (DC) energy storage system and an onboard electrical system coupled to the energy storage system. The energy storage system provides DC energy to drive an electric traction motor of the vehicle. The electrical system operates in a charging mode such that alternating current (AC) energy from a power grid external to the vehicle is converted to DC energy to charge the DC energy storage system. The electrical system also operates in a vehicle-to-grid power conditioning mode such that DC energy from the DC energy storage system is converted to AC energy to condition an AC voltage of the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric propulsion in 1965.

Electric propulsion in 1965, discussing electron bombardment and contact ionization thrustors, nuclear and solar-electric power systems, etc

ELECTRON BOMBARDMENT↗

Cathodes Delivered for Space Station Plasma Contactor System

The International Space Station's (ISS) power system is designed with high-voltage solar arrays that typically operate at output voltages of 140 to 160 volts (V). The ISS grounding scheme electrically ties the habitat modules, structure, and radiators to the negative tap of the solar arrays. Without some active charge control method, this electrical configuration and the plasma current balance would cause the habitat modules, structure, and radiators to float to voltages as large as -120 V with respect to the ambient space plasma. With such large negative floating potentials, the ISS could have deleterious interactions with the space plasma. These interactions could include arcing through insulating surfaces and sputtering of conductive surfaces as ions are accelerated by the spacecraft plasma sheath. A plasma contactor system was baselined on the ISS to prevent arcing and sputtering. The sole requirement for the system is contained within a single directive (SSP 30000, paragraph 3.1.3.2.1.8): "The Space Station structure floating potential at all points on the Space Station shall be controlled to within 40 V of the ionospheric plasma potential using a plasma contactor." NASA is developing this plasma contactor as part of the ISS electrical power system. For ISS, efficient and rapid emission of high electron currents is required from the plasma contactor system under conditions of variable and uncertain current demand. A hollow cathode plasma source is well suited for this application and was, therefore, selected as the design approach for the station plasma contactor system. In addition to the plasma source, which is referred to as a hollow cathode assembly, or HCA, the plasma contactor system includes two other subsystems. These are the power electronics unit and the xenon gas feed system. The Rocketdyne Division of Boeing North American is responsible for the design, fabrication, assembly, test, and integration of the plasma contactor system. Because of technical and schedule considerations, the NASA Lewis Research Center was asked to manufacture and deliver the engineering model, the qualification model, and the flight HCA units for the plasma contactor system as government furnished equipment. To date, multiple units have been built. One cathode has demonstrated approximately 28 000-hr lifetime, two development HCA units have demonstrated over 15 000-hr lifetime, and one HCA unit has demonstrated more than 38 000 ignitions. All eight flight HCA's have been manufactured, acceptance tested, and are ready for delivery to the flight contractor.

Patterson, Michael J.↗

Chapter 16 - Predictive Analytics for Comprehensive Energy Systems State Estimation

Energy sustainability is a subject of concern to many nations in the modern world. It is critical for electric power systems to diversify energy supply to include systems with different physical characteristics, such as wind energy, solar energy, electrochemical energy storage, thermal storage, bio-energy systems, geothermal, and ocean energy. Each system has its own range of control variables and targets. To be able to operate such a complex energy system, big-data analytics become critical to achieve the goal of predicting energy supplies and consumption patterns, assessing system operation conditions, and estimating system states - all providing situational awareness to power system operators. This chapter presents data analytics and machine learning-based approaches to enable predictive situational awareness of the power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

International Space Station Power System Model Validated

System Power Analysis for Capability Evaluation (SPACE) is a computer model of the International Space Station's (ISS) Electric Power System (EPS) developed at the NASA Glenn Research Center. This uniquely integrated, detailed model can predict EPS capability, assess EPS performance during a given mission with a specified load demand, conduct what-if studies, and support on-orbit anomaly resolution.

Hojnicki, Jeffrey S.↗

Multifunctional Solar Energy Systems Research Project

The solar energy available within the visible portion of the solar spectrum is about 300 W/m 2 (43%) and that available in the UV and IR portion is about 400 W/m 2 (57%). This provides opportunities for developing integrated energy systems that capture and use specific wavelengths of the solar spectrum for different purposes. For example: biofuels from photosynthetic microbes use only the visible light; solar cells use a narrow band of the solar spectrum that could be either mostly in the visible or in the IR regions of the solar spectrum, depending on the photovoltaic materials, e.g., gallium antimonide (GaSb) cells utilize predominately IR radiation; and finally, solar panels that heat water utilize a broad range of wavelengths (visible plus IR). The basic idea of this research is that sunlight has many possible end-use applications including both direct use and energy conversion schemes; it is technically feasible to develop multifunctional solar energy systems capable of addressing several end-use needs while increasing the overall solar energy utilization efficiency when compared to single-purpose solar technologies. Such a combination of technologies could lead to more cost-competitive "multifunctional" systems that add value and broaden opportunities for integrated energy systems. The goal of this research is to increase the overall energy efficacy and cost competitiveness of solar systems. The specific objectives of this research were: 1) Evaluate the efficacy of a combined photobioreactor and electric power system; 2) Improve the reliability and cost effectiveness of hybrid solar lighting systems – a technology in which sunlight is collected and distributed via optical fibers into the interior of a building; 3) Evaluate the efficacy of using filtered light to increase the production of biomass in photobioreactors and provide more solar energy for other uses; 4) Evaluates several concepts for wavelength shifting such that a greater percentage of the solar spectrum energy can be used for photosynthesis.

09 BIOMASS FUELS↗

High-Efficiency and Low-Carbon Energy Storage and Power Generation System for Electric Aviation

This report summarizes the work performed by University of California San Diego (UCSD) – Honeywell Aerospace (Honeywell) team for the U.S. Department of Energy/Advanced Research Projects Agency-Energy (DOE/ARPA-E) under Phase 1 (April 2021 – October 2023) project, Cooperative Agreement DE-AR0001347 entitled “High-Efficiency and Low-Carbon Energy Storage and Power Generation System for Electric Aviation”. The main objective of this project is to develop and demonstrate an energy storage and power generation (ESPG) system operating on bio liquid natural gas (LNG) for electric aviation applications. The ESPG system concept in this project is a fuel cell, battery, and gas turbine hybrid system that incorporates an innovative solid oxide fuel cell (SOFC) technology. This SOFC technology has two main novel elements: (i) a lightweight and compact stack architecture that consists of cells and cell modules in electrical parallel and series connections (the module design) and (ii) exceptionally high performance, direct methane thin-film cells on porous substrate made by sputtering deposition process. This fuel cell has the specific power and volumetric power density suitable for electric aviation applications. Based on the current status of the SOFC technology, the Phase 1 work focused on the following activities: (i) ESPG System Modeling – to design and optimize an aircraft SOFC-based ESPG system concept that met the performance, weight and cost targets; (ii) Cell Material Development and Scaleup – to demonstrate scalability of the sputtering process for manufacture of thin-film SOFC cells of practical sizes, confirm the exceptional performance of sputtered cells, improve cell stability and durability for operation with hydrogen and methane fuel, and develop a suitable electrically conducting porous substrate to replace the current non-conducting ceramic substrate; (iii) Stack Development – to design and manufacture stack components for the stack architecture, evaluate and select a suitable sealant, and build and operate multi-cell stacks to demonstrate stack operation, and (iv) Technology to Market – to develop business models and commercialization plans, conduct various market and technology analysis and estimate SOFC and ESPG system costs.

25 ENERGY STORAGE↗

Stirling Convertor Control for a Concept Rover at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for potential use as an electric power system for space science missions. This generator would make use of the free-piston Stirling cycle to achieve higher conversion efficiency than currently used alternatives. NASA GRC initiated an experiment with an ASRG simulator to demonstrate the functionality of a Stirling convertor on a mobile application, such as a rover. The ASRG simulator made use of two Advanced Stirling Convertors to convert thermal energy from a heat source to electricity. The ASRG simulator was designed to incorporate a minimum amount of support equipment, allowing integration onto a rover powered directly by the convertors. Support equipment to provide control was designed including a linear AC regulator controller, constant power controller, and Li-ion battery charger controller. The ASRG simulator is controlled by a linear AC regulator controller. The rover is powered by both a Stirling convertor and Li-ion batteries. A constant power controller enables the Stirling convertor to maintain a constant power output when additional power is supplied by the Li-ion batteries. A Li-ion battery charger controller limits the charging current and cut off current of the batteries. This paper discusses the design, fabrication, and implementation of these three controllers.

Blaze-Dugala, Gina M.↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Role of Renewable Energy, Storage, and Demand Response in Karnataka's Power Sector Future

Karnataka ranks fourth among Indian states in installed capacity of renewable energy, which accounts for over 50% of its resource mix. The state is positioned to play a leading role in India's energy transition and contribute to meeting national targets for renewable energy thanks, in part, to ambitious state goals to develop Karnataka's abundant zero carbon energy resources and plans to phase out new investments in thermal plants. Power system stakeholders in Karnataka are faced with the challenge of planning a generation portfolio that accounts for the variability of wind and solar resources, meets increasing and shifting electricity demand, and satisfies operational and reliability requirements. The objective of this study is to evaluate least-cost pathways for Karnataka's electric power system through 2050. The capacity expansion model developed for this study identifies power system investment and operational decisions for every year (2020-2050) for all of India, with detailed representation of the state of Karnataka. The study led to five high-level results and provides a framework for recurring planning studies to meet changing system conditions and needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗