Presented is Deep Space Network (DSN) progress in flight project support, tracking and data acquisition (TDA) research and technology, network engineering, hardware and software implementation, and operations.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Presented is Deep Space Network (DSN) progress in flight project support, tracking and data acquisition (TDA) research and technology, network engineering, hardware and software implementation, and operations.
Preparation is being made by the DSN to monitor the stability of its clocks and frequency standards in the 64 meter net by means of VLBI. Since variations in the earth's rotation rate represent an error source to VLBI clock synchronization, the Allan Variance of the earth rotation was calculated to find that, in a long-term sense at least, these variations do not noticeably increase the differential instability of two clocks as measured by Intercontinental VLBI.
The capability to generate spacecraft frequency predictions which include the refractive bending effects induced during signal passage through a planetary atmosphere is a pivotal element of the DSN Radio Science System. This article describes the current implementation effort to develop planetary atmosphere modeling and prediction capability.
The status of the Viking Deep Space Network Mark 3 '77 data subsystem implementation project and related testing at DSS 42/43 from 1 September through 31 October 1977 are reported. The Viking DSN discrepancy reporting system, Viking command support, tracking support, and periodic tests conducted with the Viking spacecraft are also discussed.
The Network Operations Control Center (NOCC) Block 3 configuration is in the process of being upgraded to provide the capabilities required to support Voyager and Pioneer Venus 1978 Project commitments as well as to support Deep Space Station changes arising from the Mark 3 DSN Data Subsystem implementation. Information is given on the hardware and software changes necessary to implement such capabilities.
Prediction telemetry recording and playback capability was implemented in the DSN to meet PV-78 mission requirements. Test data, along with theoretical considerations, gives assurance that the data degradation commitment of 1.5 db will be met, and it is anticipated that in actual performance the design goal of 1.0 db will be met. The major technical problems requiring solution were elimination of image in the OLR and the reduction of analog recorder instabilities. These were solved through the use of single-sideband mixing techniques and the use of newer generation analog recorders.
Activities of the DSN network operations organization in support of the Helios Project from February 15, 1978 through April 15, 1978 are reported. Mark 3 data subsystems (MDS) testing at the Deep Space Station 2 (Goldstone, Calif.) is included.
The JPL energy consumption computer program developed as a useful tool in the on-going building modification studies in the DSN energy conservation project is described. The program simulates building heating and cooling loads and computes thermal and electric energy consumption and cost. The accuracy of computations are not sacrificed, however, since the results lie within + or - 10 percent margin compared to those read from energy meters. The program is carefully structured to reduce both user's time and running cost by asking minimum information from the user and reducing many internal time-consuming computational loops. Many unique features were added to handle two-level electronics control rooms not found in any other program.
Tracking and data acquisition research and technology for the DSN is discussed.
Deep Space Network support is detailed for Viking spacecraft activities and the Viking command and tracking system. Viking DSN Mark 3 data subsystem implementation related testing is also discussed.
Ongoing Pioneer project operations (Pioneers 6 through 11) are briefly mentioned. The DSN prelaunch preparations and launch operations for the Pioneer Venus orbiter are described in detail, along with a brief update on the Pioneer Venus multiprobe launch and encounter preparations.
The optimum acquisition sweep strategy was determined for a PN code despreader when the a priori probability density function was not uniform. A psuedo noise spread spectrum system was considered which could be utilized in the DSN to combat radio frequency interference. In a sample case, when the a priori probability density function was Gaussian, the acquisition time was reduced by about 41% compared to a uniform sweep approach.
A UNIBUS monitor was designed and constructed to facilitate development of hardware interfaces with the PDP 11 minicomputer. The monitor provides useful displays of UNIBUS conditions and provides the user with a flexible diagnostic tool. It can also serve as a simple display and data entry device, permitting extremely simple input/output (I/O) for development software. At this time, the monitor is being used with the DSN planetary radar system, which uses a PDP 11.
Unattended station operation was implemented that permitted full operational control from the network operations center (NOCC). Sensors were installed in the mechanical subsystem to monitor critical functions and to permit automated premission checkout of the subsystem, automated reaction to component failure, and identification of failed components under control of the antenna pointing computer. This monitoring installation is a prototype for monitoring equipment to be installed throughout the DSN.
The VLBI-laser intercomparison system for assessing geodetic measurements is described. The primary objective of the DSN VLBI-laser intercomparison project is the accurate measurement of baseline vectors, both length and direction, between established geodetic benchmarks. A second objective is the intercomparison between both satellite and lunar laser ranging techniques with VLBI.
The key characteristics functional requirements, and operation of the radio science subsystem are discussed as they pertain to usage of deep radio sources by the DSN VLBI system.
How gravitational radiation affects Doppler tracking is briefly described. The status of the analyses of the sensitivities achievable with the NASA-JPL Deep Space Network(DSN) is given.
New Z-corrections which resulted from recent translator path delay calibrations made at DSS 14, 43, and 63 with newly developed DSN Portable Zero Delay Assemblies are presented. The test results indicate a successful transfer of technology from development to implementation and to the operations phase.