Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Buildings Integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

High-bandwidth density silicon photonic resonators for energy-efficient optical interconnects

The growth of artificial intelligence applications demands ever larger and more complex deep learning models, dominating today's—and tomorrow's—data center and high-performance computing systems. While traditional electronics are failing to keep pace with application demands, silicon photonic (SiPh) interconnects have emerged as a necessary technology to support these systems. SiPh-driven wavelength-division multiplexing (WDM) offers a particularly promising path toward supporting incredibly high-aggregate link bandwidth in a compact and efficient form factor. One of the basic building blocks of these integrated WDM interconnects is the SiPh resonator. Their inherent wavelength selectivity and compact footprint allow for efficient data transmission multiplexed across dozens of carrier wavelengths. Used as add-drop (AD) filters, SiPh resonators are critical to constructing integrated tunable wavelength-selective optical circuit switches as well as for demultiplexing the different carrier wavelengths toward independent wavelength-insensitive photodiodes in a dense wavelength-division multiplexing receiver. Resonators in the all-pass (AP) configuration are widespread as well, allowing for wavelength-selective modulation to drive aggregate link bandwidths far beyond the individual channel data rate. Unlike SiPh Mach–Zehnder modulators (MZM), resonant modulators can be driven using low, complementary metal-oxide-semiconductor drive voltages, allowing for tight co-integration between photonic integrated circuits, fabricated with larger process node technologies, and electronic integrated circuits, designed to exploit the advantages of the latest node. To push toward practical peta-scale interconnects, a comprehensive review of SiPh resonators is required, addressing bottlenecks and design constraints at both the architecture and device levels. We first describe the predominant integrated link architectures and identify their limits. We then discuss the device-level design considerations that can be made for both AD and AP configuration resonators to overcome the system level limits with novel resonator device designs. Analytical models and numerical simulation of resonators are validated by experimental measurement of devices fabricated in a commercial 300-mm foundry, showing a clear path toward volume manufacturing. The demonstrated resonant modulators and filters support the feasibility of increasing the aggregate bandwidth of resonator-driven SiPh interconnects into the peta-scale regime.

42 ENGINEERING↗

Fort Yukon wood Energy Program Wood Boiler Deployment (Final Report)

The Fort Yukon Gwitchyaa Zhee Corporation (GZ) worked with partners on the development of an Integrated Biomass Energy Program for Fort Yukon. This integrated approach linked sustainable forest management with an in- village for -profit wood harvest and delivery business to displace diesel energy with wood energy for heat and power. The program was based on the concept of ecological, economic and social sustainability with a goal of displacing as much diesel and fuel oil as is technically feasible and sustainable; essentially systematically converting a village to significant amounts of wood use. Additionally, GZ worked with the Alaska Energy Authority (AEA) on the development of a rural power system upgrade (RPSU) project that replaced GZ’s existing antiquated diesel power plant and provided upgrades to the existing electrical distribution system. Due to the synergy of the two projects, the Biomass and RPSU projects were combined to provide improved operating efficiency, economy of scale and increased benefits to GZ, the Council of Athabascan Tribal Governments (CATG) and the community of Fort Yukon. The combined project is referred to as the Fort Yukon Combined heat and power (CHP) project. The purpose of the DOE Tribal Energy Program award was to support the preconstruction tasks and installation of wood boilers at the CATG clinic, and at the new GZ diesel power plant as part of an overall program to create a for- profit wood energy utility in Native Village of Fort Yukon. The CHP project provides biomass and diesel generation recovered heat via a new district heating system to the major commercial buildings in Fort Yukon. The CATG clinic will receive heat from a separate biomass boiler to their heating needs. The award from the Department of Energy (DOE) Tribal Energy Program was divided into two phases: Design/Permitting (phase 1) and Construction (phase 2). Phase 1 (Design & Permitting) is cost shared using State of Alaska Renewable Energy Funding (REF) funds through the Alaska Energy Authority (AEA). Phase 2 (Construction) was funded by DOE, AEA and US Department of Agriculture Rural Utility Service (USDA-RUS). Phase 1 of this grant, along with a separate grant from the Denali Commission provided funding for development of the wood delivery infrastructure necessary to support the CHP project. Under phase 2, This DOE grant supported final design of the boiler, bidding, purchase and transport of boilers, installation, technical support and engineering. The AEA and RUS grants supported permitting, final design, material and equipment purchase, and construction and installation of the new diesel power plant and district heating distribution system.

09 BIOMASS FUELS↗

Efficient Refrigerated Display Cases - Can They Flex Their Power? Preprint

Refrigerated display cases are widely-used, critical equipment in supermarkets for maintaining product safety and quality. Energy-efficient medium temperature liquid-cooled refrigerated display cases can save 25-70% of the total supermarket energy, according to manufacturers. Traditionally, cases operate by maintaining a temperature around a user-input setpoint that is dependent on the product in the case. Although cases are major electrical energy consumers, they are hardly ever considered for implementing load-flexibility strategies. With added load-flexibility capabilities, refrigerated display cases can shed (reduce), or shift (by adding and subsequently shedding) load. Supermarkets can reduce their energy costs and enhance electric grid integrity by implementing these smart load-flexibility control strategies. Advanced controls can also enable load-shifting to coincide with optimum periods of renewable energy generation. This will further improve operational costs and reduce greenhouse gas emissions without compromising food safety and quality. In this research, we have evaluated the energy savings of liquid-cooled medium temperature display cases and developed load flexibility strategies leveraging an advanced controls system, a variable speed compressor, and heat rejection via a water-cooled condenser. This study further assessed the impact of load flexibility strategies in a controlled environment chamber for a single refrigerated display case.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

U.S. Industrial and Commercial Motor System Market Assessment Report Volume 1: Characteristics of the Installed Base

Motor systems are an integral part of our industrial and commercial facilities. They provide the motive force behind the fans, pumps, compressors, chillers, and conveyors in these facilities. Given their centrality to any facility’s operations, they are a critical energy end use to understand, particularly when developing technologies and policies to meet sustainability goals, improve productivity, and enhance resilience. In the late 1990s, the U.S. Department of Energy (DOE) conducted two seminal studies to better understand the installed stock and energy savings opportunities of industrial and commercial motor systems. In the industrial sector, The United States Industrial Electric Motor Systems Market Opportunities Assessment used primary data collected through onsite assessments and led to a greater understanding of the installed base of motor systems, their characteristics, and the opportunities for energy savings (U.S. Department of Energy, 2002). Notable findings included the following: Industrial motor systems consumed 679 billion kilowatt-hours (kWh) in 1994, representing 23 percent of U.S. electricity consumption. Cost-effective energy efficiency measures could result in 62-104 billion kWh of energy savings annually. Sixty-two percent of the energy savings potential was from fan, pump, and compressor end use equipment. Nearly half of motor system electricity consumption was attributable to approximately 3,500 facilities, or 1.5 percent of U.S. manufacturing facilities. Opportunities for Energy Savings in the Residential and Commercial Sectors with High Efficiency Electric Motors provided an evaluation of the installed stock of motor driven equipment in U.S. commercial and residential buildings and opportunities for utilization of high efficiency motors and variable speed technologies (Arthur D. Little, 1999). Notable findings included the following: Commercial motor systems consumed 343 billion kWh in 1995, with refrigeration and space conditioning constituting 93 percent of the total. Cost-effective energy efficiency measures could result in 51 billion kWh of energy savings annually. Due in no small part to these seminal studies, motor system technologies and usage characteristics have changed drastically since the late 1990s. Greater awareness of cost-effective strategies for reducing motor system electricity consumption have been developed and deployed. This includes several software tools, literature, and utility and government programs promoting energy efficiency improvements in motor driven systems. Additionally, several rounds of energy efficiency standards have been enacted, resulting in improved installed motor efficiency. The cost of variable speed drives has dropped substantially, and combined with utility rebate programs, has led to their greater adoption. Further, since these results were published, the U.S. manufacturing sector has undergone a massive transformation. Due to global competition, some sectors have relocated operations overseas. Others have brought operations onshore to avail low cost and abundant natural gas. Additionally, automation and robotics have pervaded the entire sector. Consequently, these two reports likely do not represent the current state of motor driven systems in U.S. industrial and commercial facilities. As cited in recent studies, the lack of current information on motor system electricity consumption and use characteristics limits the ability to conduct analysis on energy savings potential, develop technologies to address energy and productivity gaps, and develop programs to promote energy efficiency practices and technologies for motor systems (International Energy Agency, 2007; UNIDO, 2010; McKane and Hasanbeigi, 2011; Waide and Brunner, 2011). Specifically, the lack of information affects a range of stakeholders: Governments must rely on outdated information when setting research agendas, developing policies, and designing energy efficiency programs and offerings. Utilities and energy efficiency programs cannot identify the current market needs or potential impact when designing rebate and energy efficiency programs. Electric grid planners cannot identify motor system usage characteristics when developing plans to support the resilience of the electric grid. Manufacturers of motors, motor driven equipment, and drives are hampered when developing technologies to meet the needs of their market. Motor system end users are limited in their ability to identify energy saving opportunities within their own facilities because they do not have reliable benchmark information. In response to the lack of current information and analysis on industrial and commercial motor systems, the DOE initiated an update to these two studies. Launched in 2016 and led by Lawrence Berkeley National Laboratory (LBNL), the Motor System Market Assessment (MSMA) provides an updated, more comprehensive assessment of the installed stock of motor systems in both the industrial and commercial sectors, a review of the supply chains supporting motor and drives in the U.S., and the performance improvement opportunity available from using best available technologies and maintenance and operation practices. The outcomes of the MSMA are documented in three U.S. Industrial and Commercial Motor System Market Assessment reports, with this report being the first listed: 1. Volume 1: Characteristics of the Installed Base (this report) documents the findings on the installed base of motor systems in the U.S. industrial and commercial sectors. Quantification of energy savings potential is not documented in this report but in Volume 3. 2. Volume 2: Motors and Drives Supply Chain Review reviews the state of supply chains for motors and drives installed in U.S. industrial and commercial facilities, focusing on advanced motor and drive technologies and their constituent materials. 3. Volume 3: Energy Savings Opportunity analyzes the energy performance improvement opportunity for the installed base of U.S. industrial and commercial motor systems. This report has been prepared as a reference for motor system stakeholders. It provides factual information as could be best determined by the assessment results and avoids speculating on any findings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Addressing Regulatory Burdens to Accessing Solar Among Municipal, Commercial and Institutional Customers Through Collaborative Partnerships (Final Technical Report)

The project focused on providing education to large energy customers, with a focus on local governments, to help them better understand and overcome barriers to solar energy adoption that currently exist (or could exist) in utility planning processes and/or within wholesale energy markets. The project team created accessible educational materials — ranging from reports to case studies to webinars — that could connect with stakeholders who rarely engage in these venues, have limited bandwidth to do so, and possess little previous knowledge of these issues. The project team focused on sharing lessons learned and best practices based on the experiences of other local governments and large energy users that have engaged on these issues, including the PJM Cities and Communities Coalition (PJMCCC). The project sought to better connect these customers and other stakeholders to deepen and expand opportunities for them to engage together on these issues, as well as build peer networks to facilitate the exchange of information. The project team held convenings of key partners — such as local governments, developers, regulators, utilities and large solar buyers — to discuss best practices, develop research products to broaden stakeholders’ knowledge base, and to foster these peer networks.

14 SOLAR ENERGY↗

High Temperature Syngas Cleanup Technology Scale-up and Demonstration Project

Gasification is a technology for clean energy conversion of diverse feedstocks into a wide variety of useful products such as chemicals, fertilizers, fuels, electric power, and hydrogen. Existing technologies can be employed to clean the syngas from gasification processes to meet the demands of such applications, but they are expensive to build and operate and consume a significant fraction of overall parasitic energy requirements, thus lowering overall process efficiency. RTI International has developed a warm syngas desulfurization process (WDP) utilizing a transport-bed reactor design and a proprietary attrition-resistant, high-capacity solid sorbent with excellent performance replicated at lab, bench, and pilot scales. Results indicated that WDP technology can improve both efficiency and cost of gasification plants. The WDP technology achieved ~99.9% removal of total sulfur (as either H 2 S or COS) from coal-derived syngas at temperatures as high as 600°C and over a wide range of pressures (20-80 bar, pressure independent performance) and sulfur concentrations. Based on the success of these tests, RTI negotiated a cooperative agreement with the U.S. Department of Energy for precommercial testing of this technology at Tampa Electric Company’s Polk Power Station IGCC facility in Tampa, Florida. The project scope also included a sweet water-gas-shift process for hydrogen enrichment and an activated amine process for 90+% total carbon capture. Because the activated amine process provides some additional non-selective sulfur removal, the integration of these processes was expected to reduce overall sulfur in the syngas to sub-ppmv concentrations, suitable for most syngas applications. The overall objective of this project was to mitigate the technical risks associated with the scale up and integration of the WDP and carbon dioxide capture technologies, enabling subsequent commercial-scale demonstration. The warm syngas cleanup pre-commercial test unit was designed and constructed on schedule and under budget and was operated for approximately 1,500 total hours utilizing ~20% of the IGCC’s total syngas as feed (~1.5 MM scfh of dry syngas). The WDP system reduced total sulfur levels to ~10 ppmv (~99.9% removal) from raw syngas that contained as high as 14,000 ppmv of total sulfur. The integration of WDP with the activated amine process enabled further reduction of total sulfur in the final treated syngas to the anticipated sub-ppmv concentrations (>99.99% removal), suitable for stringent syngas applications such as chemicals, fertilizers, and fuels. Techno-economic assessments by RTI and by third parties indicate potential for significant (up to 50%) capital and operating cost reductions for the entire syngas cleanup block when WDP technology is integrated with a broad spectrum of conventional and emerging carbon capture or acid gas removal technologies. This final scientific/technical report covers the pre-FEED, FEED, EPC, commissioning, and operation phases of this project, as well as system performance results. In addition, the report addresses other parallel-funded R&D efforts focused on development and testing of trace contaminant removal process (TCRP) sorbents, a direct sulfur recovery process (DSRP), and a novel sorbent for warm carbon dioxide capture, as well as pre-FEED, FEED, and techno-economic studies to consider the potential benefit for use of WDP for polygeneration of electric power and ammonia/urea fertilizers.

01 COAL, LIGNITE, AND PEAT↗

Report on the Use and Function of the Integrated Operations Capability Analysis Platform (ICAP) and the LWRS Innovation Portal (IP)

The commercial nuclear power industry has achieved excellent safety and reliability performance but is struggling to survive in an electricity market that is increasingly dominated by subsidized renewables and cheap natural gas. These challenges have forced utilities to explore previously uncharted avenues to drastically reduce the operations and maintenance costs of their plants which are the primary drivers of the total cost to produce electricity. The petrochemical industry faced similar challenges some years ago as the costs of extraction and processing were rising while their reservoirs were being depleted along with a drop-in commodity prices that resulted in unsustainable operations. In this challenging climate, they developed a business model called Integrated Operations (IO) that sought to utilize technology to enable news ways of working through the integration of people, technology, process and governance changes. The Light Water Reactor Sustainability (LWRS) program, working with IFE have developed an operating model via transferable learnings from the North Sea O&G industry. This framework is termed “Integrated Operations for Nuclear” (ION). ION is a transformation model that integrates the benefits and features of four principal factors: People, Technology, Process and Governance. The purpose of this report is to describe how to generate an ION business process analysis and utilize this information to reduce O&M costs. In order to make this job easier, DOE LWRS has created a suite of tools that will allow a person who is involved in a transformation effort at their company to build a solid documented business case for embarking on a major transformation effort. These tools, the Integrated Operations Capability Analysis Model (ICAP) and the LWRS Innovation Portal (IP) are described herein with instructions on their use. Instructions on how the interface with the EPRI Business Case Analysis Method (BCAM) are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

Application of automated measurement and verification to utility energy efficiency program data

Trustworthy savings calculations are critical to convincing regulators of both the cost-effectiveness of energy efficiency program investments and their ability to defer supply-side capital investments. Today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of energy efficiency programs. They also require time-consuming data acquisition. A spectrum of savings calculation approaches is used, with some relying more heavily on measured data and others relying more heavily on estimated, modeled, or stipulated data. The increasing availability of “smart” meters and devices that report near-real time data, combined with new analytical approaches to quantify savings, offers the potential to conduct M&V more quickly and at lower cost, with comparable or improved accuracy. Commercial energy management and information systems (EMIS) technologies are beginning to offer these ‘M&V 2.0’ capabilities, and program administrators want to understand how they might assist programs in quickly and accurately measuring energy savings. This paper presents the results of recent testing of the ability to use automation to streamline the M&V process. In this paper, we apply an automated whole-building M&V tool to historic data sets from energy efficiency programs to begin to explore the accuracy, cost, and time trade-offs between more traditional M&V, and these emerging streamlined methods that use high-resolution energy data and automated computational intelligence. For the data sets studied we evaluate the fraction of buildings that are well suited to automated baseline characterization, the uncertainty in gross savings that is due to M&V 2.0 tools’ model error, and indications of labor time savings, and how the automated savings results compare to prior, traditionally determined savings results. The results show that 70% of the buildings were well suited to the automated approach. In a majority of the cases (80%) savings and uncertainties for each individual building were quantified to levels above the criteria in ASHRAE Guideline 14. In addition the findings suggest that M&V 2.0 methods may also offer time-savings relative to traditional approaches. Lastly, we discuss the implications of these findings relative to the potential evolution of M&V, and pilots currently being launched to test how M&V automation can be integrated into ratepayer-funded programs and professional implementation and evaluation practice.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TCF - Sustainable Well Cement for Geothermal, Thermal Recovery, and Carbon Storage wells

Primary cementing is the most important operation performed on a subterranean well. Cement, placed in the annulus between the casing and the formations, serves as a hydraulic seal preventing fluids and gas migrations, protecting steel casing from corrosion, and supporting the well structure. Poor cementing jobs can be directly responsible for wells not reaching their full capacity, casing corrosion, compromised well integrity and, in the worst-case scenarios, well collapse. Geothermal, thermal recovery, and carbon storage wells offer environments that are especially difficult for cements to survive while the required lifespan of these wells can be years. In these wells currently used cements cannot provide durable well integrity, and new solutions are necessary. The necessity of stabilizing the electric grid, increasing its flexibility, and providing energy on demand will further expand the market of durable cement solutions for applications in high-temperature underground reservoir thermal energy storage wells (HT RTES). The design challenges of special cement systems for such wells originate from chemistry limitations of currently used well cements, aggressive environments, temperature and repeated shock conditions associated with them, and very weak formations that are not uncommon in these wells. During the last 70 years the most common systems for thermal-well construction have been Ordinary Portland Cement (OPC) (absolute majority of the wells), silica-lime system, and high aluminum cement-containing formulations. The major issues of calcium-silicate hydrates, that form during the hydration of OPC resulting in hardened material, are their poor chemical resistance to acids due to the calcium interactions with acid anions followed by its eventual dissolution, even in mild acids, such as carbonic acid from CO 2 dissolution, and inadequate bonding to the steel causing serious casing corrosion problems (Sugama & Pyatina, 2019). Performance of OPC-based cement may be significantly improved with organic additives; however, those are limited by their temperature stability. An alternative to calcium-silicate cement was developed by BNL and commercialized by Halliburton as ThermaLock TM cement. Calcium-aluminate-phosphate-based chemistry of the material allowed overcoming acid-resistance problems of OPC, especially in CO 2 -rich geothermal environments. In 2012-2015, building upon this experience, BNL developed Thermal Shock Resistant Cement (TSRC) with the support of Geothermal Technology Office (GTO) of DOE. TSRC has high-temperature stable chemistry, superior properties of cement-metal casing bond and corrosion protection (4-times better than currently used OPC-based formulation), significantly outperforms common well-cements in thermal-shock tests, has self-healing properties, and like ThermaLock TM is CO 2 resistant incorporating carbonate ions into stable hydrates (Gill et al., 2012).

15 GEOTHERMAL ENERGY↗

MultiSector Dynamics: 2023 Inaugural Workshop Report

Preface The MultiSector Dynamics (MSD) Community of Practice (CoP) hosted an inaugural workshop on October 3-5, 2023 at the University of California, Davis, to bring together members of the MSD community of practice to advance understanding of the co-evolution of human and natural systems, and to build the next generation of tools that bridge sectors, scales, and systems to realize a more resilient and equitable future. The theme of the workshop was "Advancing Complex Adaptive Human-Earth Systems Science in a World of Interconnected Risks". This document outlines the motivation for the workshop, its goals and objectives, the application process, the agenda, overviews of the training sessions offered to the workshop participants and a summary of each breakout session. The MSD workshop report further discusses the feedback from workshop participants and presents some reflections and next steps. The MSD Workshop organizers thank the DOE Office of Science, Earth and Environmental System Modeling, MultiSector Dynamics program area for financial support of its activities through the Integrated Multisector Multiscale Modeling (IM3) project. For more information related to the broader DOE MultiSector Dynamics Program please see https://climatemodeling.science.energy.gov/program-area/multisector-dynamics. D.L.M. and C.M.B. acknowledge support from the Laboratory Directed Research and Development Program of Oak Ridge National Laboratory (ORNL), managed by UT-Battelle, LLC, for the US Department of Energy (DOE). Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither theUnited States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, complete- ness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial products, process, or service by trade name,trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. Pacific Northwest National Laboratory operated by Battelle for the United States Department of Energy Available from:Office of Scientific and Technical Information http://www.OSTI.gov multisectordynamics.org This work is made available under the terms of the Creative Commons Attribution- NonCommercial 4.0 International (CC BY-NC 4.0) https://creativecommons.org/licenses/by-nc/4 Suggested citation: Monier, E., Reed, P.M., Vernon, C.R., Hadjimichael, A., Brelsford, C.M., Burleyson, C.B., Dyreson, A.R., Fletcher, S.M., Giang, A., Gupta, R.S., Jackson, N.D., Jones, A.D., Lamontagne, J.R., McCollum, D.L., Morris, J.F., Moss, R.H., Peng, W., Saari, R.K., Srikrishnan, V., Szinai, J.K., Yoon, J. (2024) MultiSector Dynamics: 2023 Inaugural Workshop Report. MSD-LIVE Data Repository. doi:10.57931/2371710.

Monier, Erwan↗

Clean Condensing Gas Furnace

Natural gas furnaces are the most common space heating equipment in the U.S. residential and commercial building markets. However, current residential natural gas condensing furnaces generate substantial acidic condensate as well as significant emissions of sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO), hydrocarbons (HC), and methane (CH 4 ) contributing to environmental degradation of air, water, and soil. This report describes a novel solution to reduce the environmental impact of natural gas condensing furnaces based on the technology of a monolithic acidic gas reduction (AGR) catalyst for SOx trapping, NOx redox to nitrogen, and oxidation of formic acid, CO, HC, and CH 4 . The AGR technology offers the following benefits: (1) a neutral furnace condensate with a pH of ~7, allowing its safe release into the sewer system thus eliminating a second drainage system; (2) trapping and removing nearly all SOx emissions; (3) NOx emissions nearly at nearly 1-2 ng/J, more than 95% lower than new emissions standards in California; (4) the use of a low-cost heat exchanger as a condensing heat exchanger (HX) since the condensate is not acidic, avoiding the need for expensive stainless steel alloys; and (5) unburnt fuel energy recovery to boost efficiency.The AGR component and AGR-enabled furnace performance were broadly tested to determine their effects on long-term reliability and durability, as well as SOx storage and regeneration activity. The AGR regeneration does not impair the performance in achieving neutral condensate and ultra-low NOx emissions, and the AGR catalyst subjected to regeneration activities continued to function well and achieved slightly better annual fuel utilization efficiency (AFUE). The 400-hour reliability and durability test of the retrofitted condensing furnace with the AGR component shows that the furnace unit still achieves a neutral furnace condensate with a pH of ~7 and enables 0~3 ng/J of NOx emissions. However, the 400-hour operation slightly degraded the AFUE because of soot particle accumulation caused by frequent incomplete combustion owing to inappropriate condensate drainage during testing. Thus, proper condensate drainage is critical for AGR-enabled furnaces. Furthermore, neutron computed tomography was employed to survey the aged AGR component and demonstrate high-resolution 2D and 3D representations for the nondestructive diagnosis of the AGR component. The tomography showed that the AGR component did not deform or suffer broken AGR channels. A new AGR catalyst with low precious metal loading was preliminarily explored to identify a pathway of optimizing AGR material loading and maximizing acidic gas reduction at low cost. The new AGR component can reduce precious metal loading by 38% and still achieve neutral condensate and ultralow NOx emissions. The furnace with the AGR component of low Pt/Rh loading enables a maximum AFUE of 97%, which is meaningfully higher than the original furnace. Long-duration testing for the furnace enabled with the low precious metal loading AGR component will be vital in future research. Although the current work demonstrates a proof of concept for the AGR-enabled furnace, the AGR assembly needs to be optimized and integrated into the design of new OEM furnace products. Furthermore, the AGR technology can be applied not only for residential gas furnaces, but also for commercial rooftop units, gas heat pumps, gas-fired water heaters, combustion boilers, and other systems.

03 NATURAL GAS↗

An Analysis of Extended Reality Mockups for Use in Verification: Phase 2

NASA commercial providers are increasing their use of Virtual Reality (VR) and Hybrid Reality (HR) technologies in their system development process. The use of these technologies, collectively referred to as Extended Reality (XR) technologies, has been limited to the development phase, but there have been requests to integrate VR and HR mockups into verifications. Verifications require, at minimum, a high-fidelity mockup for activities involving human participation (tests, demonstrations, inspections). HR technology shares many of the strengths but may not share some of the critical shortcomings of VR. Specifically, HR allows for integrating physical objects, such as a suit, which may be critical to evaluating a system. Adopting HR technology still has many of the same challenges as VR. Namely, there is little to no data about the validity of evaluations conducted with HR mockups, an established process, or criteria for evaluating the appropriateness of HR mockups. Because verifications are final and only need to happen once, HR mockups must be adequately vetted before being approved for use in verifications. Further hindering the adoption of these technologies is the lack of consensus on what constitutes a high-fidelity XR mockup. Even for physical mockups, there are guidelines and common criteria, but nothing has been formalized. Discussion about when an XR mockup can be used would be greatly helped by clearly defining what a high-fidelity XR mockup is and how it might be measured. The team will engage with relevant stakeholders to learn more about the benefits and challenges of adopting hybrid reality mockups for verification. The team will build upon work from Phase 1 by maturing a framework to guide decisions for evaluating XR mockups for use in verifications. The team will also conduct experimental studies to evaluate advantages and tradeoffs of hybrid/mixed reality relative to physical and virtual reality mockups. Finally, data from Phase 1 and Phase 2 will be synthesized into a set of best practices for developing and validating XR mockups for verification. We will highlight the work conducted to date in Phase 2. We will present the status of the XR for Verification Framework, a summary of best practices identified thus far, and give a synopsis of future work.

verification testing↗

TIMELY DELIVERY OF LASER INERTIAL FUSION ENERGY (LIFE)

The National Ignition Facility (NIF), the world's largest and most energetic laser system, is now operational at Lawrence Livermore National Laboratory. A key goal of the NIF is to demonstrate fusion ignition for the first time in the laboratory. Its flexibility allows multiple target designs (both indirect and direct drive) to be fielded, offering substantial scope for optimization of a robust target design. In this paper we discuss an approach to generating gigawatt levels of electrical power from a laser-driven source of fusion neutrons based on these demonstration experiments. This 'LIFE' concept enables rapid time-to-market for a commercial power plant, assuming success with ignition and a technology demonstration program that links directly to a facility design and construction project. The LIFE design makes use of recent advances in diode-pumped, solid-state laser technology. It adopts the paradigm of Line Replaceable Units utilized on the NIF to provide high levels of availability and maintainability and mitigate the need for advanced materials development. A demonstration LIFE plant based on these design principles is described, along with the areas of technology development required prior to plant construction. A goal-oriented, evidence-based approach has been proposed to allow LIFE power plant rollout on a time scale that meets policy imperatives and is consistent with utility planning horizons. The system-level delivery builds from our prior national investment over many decades and makes full use of the distributed capability in laser technology, the ubiquity of semiconductor diodes, high volume manufacturing markets, and U.S. capability in fusion science and nuclear engineering. The LIFE approach is based on the ignition evidence emerging from NIF and adopts a line-replaceable unit approach to ensure high plant availability and to allow evolution from available technologies and materials. Utilization of a proven physics platform for the ignition scheme is an essential component of an acceptably low-risk solution. The degree of coupling seen on NIF between driver and target performance mandates that little deviation be adopted from the NIF geometry and beamline characteristics. Similarly, the strong coupling between subsystems in an operational power plant mandates that a self-consistent solution be established via an integrated facility delivery project. The benefits of separability of the subsystems within an IFE plant (driver, chamber, targets, etc.) emerge in the operational phase of a power plant rather than in its developmental phase. An optimized roadmap for IFE delivery needs to account for this to avoid nugatory effort and inconsistent solutions. For LIFE, a system design has been established that could lead to an operating power plant by the mid-2020s, drawing from an integrated subsystem development program to demonstrate the required technology readiness on a time scale compatible with the construction plan. Much technical development work still remains, as does alignment of key stakeholder groups to this newly emerging development option. If the required timeline is to be met, then preparation of a viable program is required alongside the demonstration of ignition on NIF. This will enable timely analysis of the technical and economic case and establishment of the appropriate delivery partnership.

42 ENGINEERING↗

Spacesuit Soft Upper Torso Sizing Systems

The passive sizing system consists of a series of low-profile pulleys attached to the front and back of the shoulder bearings on a spacesuit soft upper torso (SUT), textile cord or stainless steel cable, and a modified commercial ratchet mechanism. The cord/cable is routed through the pulleys and attached to the ratchet mechanism mounted on the front of the spacesuit within reach of the suited subject. Upon actuating the ratchet mechanism, the shoulder bearing breadth is changed, providing variable upper torso sizing. The active system consists of a series of pressurizable nastic cells embedded into the fabric layers of a spacesuit SUT. These cells are integrated to the front and back of the SUT and are connected to an air source with a variable regulator. When inflated, the nastic cells provide a change in the overall shoulder bearing breadth of the spacesuit and thus, torso sizing. The research focused on the development of a high-performance sizing and actuation system. This technology has application as a suit-sizing mechanism to allow easier suit entry and more accurate suit fit with fewer torso sizes than the existing EMU (Extravehicular Mobility Unit) suit system. This advanced SUT will support NASA s Advanced EMU Evolutionary Concept of a two-sizes-fit-all upper torso for replacement of the current EMU hard upper torso (HUT). Both the passive and nastic sizing system approaches provide astronauts with real-time upper torso sizing, which translates into a more comfortable suit, providing enhanced fit resulting in improved crewmember performance during extravehicular activity. These systems will also benefit NASA by reducing flight logistics as well as overall suit system cost. The nastic sizing system approach provides additional structural redundancy over existing SUT designs by embedding additional coated fabric and uncoated fabric layers. Two sizing systems were selected to build into a prototype SUT: one active and one passive. From manned testing, it was found that both systems offer good solutions to sizing a SUT to fit a crewmember. This new system provided improved suit don/doff over existing spacesuit designs as well as providing better fit at suit operational pressure resulting in improved comfort and mobility. It was found that a SUT with a sizing system may solve several problems that have plagued existing HUT designs, and that a SUT with a sizing system may be a viable option for advanced suit architectures.

Graziosi, David↗

Development of an IVE/EVA Compatible Prototype Cold-Gas Cubesat Propulsion System at NASA/JSC

Cold-gas propulsion systems are well suited for some applications because they are simple to design and build, have low operating costs, and are non-toxic. The inherent tradeoff, however, is their relatively low impulse density. Nevertheless, a modest propulsion system, sized for Cubesats and designed for affordability, presents an attractive system solution for some missions, such as an on-orbit inspection free-flyer. NASA has a long-standing effort to develop propulsion systems appropriate for very high delta-V cubesat missions, such as geo transfer orbits, and there are commercially available Cubesat propulsion systems with considerably more impulse capability, but, these are both prohibitively expensive for some development customers and face compatibility constraints for crewed applications, such as operation within ISS. A relatively conventional cold-gas system has been developed at NASA/JSC taking advantage of existing miniature industrial components, additive manufacturing techniques and in-house qualification of the system. The result is a nearly modular system with a 1U form factor. Compressed nitrogen is stored in a small high-pressure tank, then regulated and distributed to 12 thrusters. Maneuvering thrust can be adjusted, with a typical value of 40 mN, and the delta-V delivered to a 3U Cubesat would be approximately 7 m/s. These values correspond to the performance parameters for an inspection mission previously established at JSC for inspection of the orbiter prior to reentry. Environmental testing was performed to meet ISS launch and workmanship standards, along with the expected thermal environment for an inspection mission. Functionality has been demonstrated, and performance in both vacuum and relevant blow down scenarios was completed. Several avenues for further improvement are also explored. Details of the system, components, integration, tests, and test data are presented in this paper.

Radke, Christopher↗

Cost-Benefit Analysis of High-Strength Materials for Safety-Related Nuclear Reinforced Concrete Shear Walls

A numerical parametric investigation was conducted to determine the economic benefits of utilizing high-strength concrete and high-strength steel reinforcing bar (rebar) in reinforced concrete (RC) shear walls for nuclear power plant structures. Thick RC shear walls with low height-to-length aspect ratios (i.e., aspect ratios, h{sub w}/l{sub w}≤2.0, where h{sub w} is the wall height and l{sub w} is the wall length) are the most common lateral load resisting members in non-containment, safety-related nuclear structures. Typically, the walls are reinforced with multiple layers of overlapping, large-diameter vertical and horizontal rebar on each face. These heavily-reinforced walls provide large lateral stiffness and strength to prevent significant deformations and/or cracking that could compromise the integrity of the nuclear facility. However, this design adversely affects constructability as the rebar cages become highly congested. The time, labor, and materials required for this construction lead to high overall project costs. There has been a recent research thrust in the U.S. to allow high-strength rebar in non-nuclear building structures. While some of this research (e.g., steel properties, bond, anchorage) is applicable to RC structures in general, there are important differences specific to nuclear structures, such as much thicker walls (often controlled by radiation and thermal cycling), larger reinforcement ratios, and increased susceptibility to shear-controlled behavior (due to low aspect ratios). An important limiting factor for non-nuclear structures in seismic regions is the reduced deformation capacity of high-strength rebar as compared with normal-strength rebar used in current practice. Differences in seismic design philosophy lessen this limitation for nuclear structures (i.e., nuclear structures are designed more conservatively and allowed to undergo significantly smaller nonlinear displacements), making high-strength rebar a promising alternative to reinforcement currently permissible in the ACI 349-13 code requirements, which govern the design of nuclear safety-related concrete structures. To improve constructability and economy, this study investigates the benefits of using high-strength rebar [i.e., ASTM A615 Grade 550 (U.S. Grade 80); ASTM A1035 Grades 690 and 830 (U.S. Grades 100 and 120), where the grade indicates the specified yield strength of the steel in MPa (ksi)] together with high-strength concrete [compression strengths up to 138 MPa (20.0 ksi)] in RC nuclear shear walls. These strength ranges represent steel and concrete materials that are commercially available in the U.S. High-strength rebar can significantly reduce the required steel areas, thereby reducing material/fabrication costs, reducing rebar congestion (fewer/smaller bars and bar layers), and facilitating concrete consolidation and placement. Previous research on the use of high-strength rebar and/or high-strength concrete in nuclear RC structures does not exist in North America. A recent study assessed the potential of high-strength steel to reduce the rebar volume in non-nuclear building construction. In Japan, researchers investigated the use of high-strength materials in safety-related nuclear RC structures, but did not explore the economic benefits of these materials. To address this knowledge gap, the current paper describes a numerical parametric investigation on the potential cost savings of nuclear shear walls with high-strength rebar and/or concrete through comparisons against state-of-practice walls with normal-strength materials. Overall, the results demonstrate that significant economic benefits can be realized by implementing high-strength rebar and concrete in these structures. (authors)

36 MATERIALS SCIENCE↗

Thermographic process monitoring in powderbed based additive manufacturing

Selective Laser Melting is utilized to build metallic parts directly from CAD-Data by solidification of thin powder layers through application of a fast scanning laser beam. In this study layerwise monitoring of the temperature distribution is used to gather information about the process stability and the resulting part quality. The heat distribution varies with different kinds of parameters including scan vector length, laser power, layer thickness and inter-part distance in the job layout which in turn influence the resulting part quality. By integration of an off-axis mounted uncooled thermal detector the solidification as well as the layer deposition are monitored and evaluated. Errors in the generation of new powder layers usually result in a locally varying layer thickness that may cause poor part quality. For effect quantification, the locally applied layer thickness is determined by evaluating the heat-up of the newly deposited powder. During the solidification process space and time-resolved data is used to characterize the zone of elevated temperatures and to derive locally varying heat dissipation properties. Potential quality indicators are evaluated and correlated to the resulting part quality: Thermal diffusivity is derived from a simplified heat dissipation model and evaluated for every pixel and cool-down phase of a layer. This allows the quantification of expected material homogeneity properties. Maximum temperature and time above certain temperatures are measured in order to detect hot spots or delamination issues that may cause a process breakdown. Furthermore, a method for quantification of sputter activity is presented. Since high sputter activity indicates unstable melt dynamics this can be used to identify parameter drifts, improper atmospheric conditions or material binding errors. The resulting surface structure after solidification complicates temperature determination on the one hand but enables the detection of potential surface defects on the other hand. These issues and proper key figures for thermographic monitoring of the Selective Laser Melting process are discussed in the paper. Even though microbolometric temperature measurement is limited to repetition rates in the Hz-regime and sub megapixel resolution, current results show the feasibility of process surveillance by thermography for a limited section of the building platform in a commercial system.

42 ENGINEERING↗