Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

STS-36: Isolated Camera Breakfast Suit-up Walkout

Live footage shows the crewmembers of STS-36, Commander John O. Creighton, Pilot John H. Casper, Mission Specialists Richard M. Mullane, David C. Hilmers, and Pierre J. Thuot, having a traditional breakfast. The crew is also shown suiting up, and walking out to the Astronaut-van from the Operations and Checkout Building.

Source record↗

STS-37: TCDT Pad B Atlantis GRO (1 of 3)

Live footage shows the crewmembers of STS-37, Commander Steven R. Nagel, Pilot Kenneth D. Cameron, and Mission Specialists Jerry L. Ross, Jay Apt, and Linda M. Godwin, participating in Terminal Countdown Demonstration Test. The crew is seen in the breakfast room, in the Operations and Checkout Building suiting up and walking out to the Astronaut-Van. Scenes include the drive out to the launch pad, the boarding of the crew on the elevator, crew entrance in the White Room, and the ingress of the crew into the launch vehicle. Linda and Jerry are seen standing on the Gantry (bridge) looking out as they wait to enter the White Room to finish suiting up to enter the vehicle. Also shown are some beautiful panoramic views of the shuttle on the pad. This is tape 1 of 3. Tape 2 has a report # of NONP-NASA-VT-2000013417, and tape 3 has a report # of NONP-NASA-VT-2000013418.

Source record↗

Landstat 7 Views the World

The technical innovations of precise numerical radiometry, spectral differentiation and seasonally repetitive monitoring, introduced by the Landsat series of satellites, created a new measurement approach for terrestrial monitoring. The Landsat 7 mission, successfully initiated on April 15, 1999, reflects significant progress in realizing the scientific potential of this measurement strategy. Substantial improvements in calibration procedures, both prior to launch and during normal operations, have been accomplished to insure long-term stability in the acquired spectral radiometry. For the first time, Landsat 7 will be operated with a long-term data acquisition plan that will insure, barring national emergencies, that substantially cloud-free, seasonal coverage will be recorded and archived in the US for all land areas of the globe. The expected outcome of these efforts is a rapid improvement in our understanding of the Earth system, as well as conceptual knowledge that will underpin commercial application of this technology. The Cape Town 2000 Symposium will take place approximately nine months after the Landsat 7 satellite and instrument completed its engineering checkout phase and was placed in its final orbit in late June, 1999. Thus, this presentation will provide a timely status report, in a significant international setting, regarding the early on-orbit performance of the Landsat 7 spacecraft, the ETM+ instrument, and the long-term data acquisition strategy that has been implemented. The latest data display and visualization techniques will be utilized to present this significant new source of Earth observation data.

Williams, Darrel L.↗

Observed On-Orbit Background of the ACIS Detector on the Chandra X-Ray Observatory

We have analyzed calibration data acquired during the Orbital Activation and Checkout (OAC) phase of the Chandra X-ray Observatory (CXO) mission in order to characterize the background of the Advanced CCD Imaging Spectrometer (ACIS) produced by charged particles and non-cosmic X-rays. The ACIS instrument contains 8 Front-Illuminated (FI) CCDs and 2 Back-Illuminated (BI) CCDs. The FI and BI CCD)s exhibit dramatically different responses to enhancements in the particle flux. The F1 CCDs show relatively little increase in the overall count rate, typical increases are 1 - 3 counts/s; the BI CCDs show large excursions to as high as 100 counts/s. The duration of these intervals of enhanced background are highly variable ranging from 100 s to 5000 s. The spatial distribution of these background events is relatively flat across the power-law. The events produce morphologies which are similar to cosmic X-ray events, so that morphology alone cannot be used as a rejection criterion. We explore the correlation of these times of high background with the data from Chandra's on-board radiation monitor, the EPHIN (Electron, Proton, Helium Instrument particle detector) instrument and archival data from the Advanced Composition Explorer (ACE) satellite. We discuss strategies for observers to identify and exclude times of high background and to model and subtract the background events from their data.

Plucinsky, P. P.↗

Using Modern Design Tools for Digital Avionics Development

Using Modem Design Tools for Digital Avionics Development Shrinking development time and increased complexity of new avionics forces the designer to use modem tools and methods during hardware development. Engineers at the Marshall Space Flight Center have successfully upgraded their design flow and used it to develop a Mongoose V based radiation tolerant processor board for the International Space Station's Water Recovery System. The design flow, based on hardware description languages, simulation, synthesis, hardware models, and full functional software model libraries, allowed designers to fully simulate the processor board from reset, through initialization before any boards were built. The fidelity of a digital simulation is limited to the accuracy of the models used and how realistically the designer drives the circuit's inputs during simulation. By using the actual silicon during simulation, device modeling errors are reduced. Numerous design flaws were discovered early in the design phase when they could be easily fixed. The use of hardware models and actual MIPS software loaded into full functional memory models also provided checkout of the software development environment. This paper will describe the design flow used to develop the processor board and give examples of errors that were found using the tools. An overview of the processor board firmware will also be covered.

Hyde, David W.↗

Reference H Cycle 3 Stability, Control, and Flying Qualities Batch Assessments

This work is an update of the assessment completed in February of 1996, when a preliminary assessment report was issued for the Cycle 2B simulation model. The primary purpose of the final assessment was to re-evaluate each assessment against the flight control system (FCS) requirements document using the updated model. Only a limited number of final assessments were completed due to the close proximity of the release of the Langley model and the assessment deliverable date. The assessment used the nonlinear Cycle 3 simulation model because it combines nonlinear aeroelastic (quasi-static) aerodynamic with hinge moment and rate limited control surface deflections. Both Configuration Aerodynamics (Task 32) and Flight Controls (Task 36) were funded in 1996 to conduct the final stability and control assessments of the unaugmented Reference H configuration in FY96. Because the two tasks had similar output requirements, the work was divided such that Flight Controls would be responsible for the implementation and checkout of the simulation model and Configuration Aerodynamics for writing Madab "script' files, conducting the batch assessments and writing the assessment report. Additionally, Flight Controls was to investigate control surface allocations schemes different from the baseline Reference H in an effort to fulfill flying qualities criteria.

Henderson, Dennis K.↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

Mars Observer Spacecraft Processing

Footage shows various Mars Observer activities. Scenes include the checkout of the radar pin, the arrival of both the transfer orbit stage and the Mars Observer Spacecraft. Also shown are the mating of the spacecraft, pre-launch activities, countdown, animation of the Martian Environment, and replays of the launching of the Titan satellite.

Source record↗

Thermal Performance of LANDSAT-7 ETM+ Instruments During First Year in Flight

Landsat-7 was successfully launched into orbit on April 15, 1999. After devoting three months to the t bakeout and cool-down of the radiative cooler, and on- t orbit checkout, the Enhanced Thematic Mapper Plus (ETM+) began the normal imaging phase of the mission in mid-July 1999. This paper presents the thermal performance of the ETM+ from mid-July 1999 to mid-May 2000. The flight temperatures are compared to the yellow temperature limits, and worst cold case and worst hot case flight temperature predictions in the 15-orbit mission design profile. The flight temperature predictions were generated by a thermal model, which was correlated to the observatory thermal balance test data. The yellow temperature limits were derived from the flight temperature predictions, plus some margins. The yellow limits work well in flight, so that only several minor changes to them were needed. Overall, the flight temperatures and flight temperature predictions have good agreement. Based on the ETM+ thermal vacuum qualification test, new limits on the imaging time are proposed to increase the average duty cycle, and to resolve the problems experienced by the Mission Operation Team.

Choi, Michael K.↗

GeoSAR: A Radar Terrain Mapping System for the New Millennium

GeoSAR Geographic Synthetic Aperture Radar) is a new 3 year effort to build a unique, dual-frequency, airborne Interferometric SAR for mapping of terrain. This is being pursued via a Consortium of the Jet Propulsion Laboratory (JPL), Calgis, Inc., and the California Department of Conservation. The airborne portion of this system will operate on a Calgis Gulfstream-II aircraft outfitted with P- and X-band Interferometric SARs. The ground portions of this system will be a suite of Flight Planning Software, an IFSAR Processor and a Radar-GIS Workstation. The airborne P-band and X-band radars will be constructed by JPL with the goal of obtaining foliage penetration at the longer P-band wavelengths. The P-band and X-band radar will operate at frequencies of 350 Mhz and 9.71 Ghz with bandwidths of either 80 or 160 Mhz. The airborne radars will be complemented with airborne laser system for measuring antenna positions. Aircraft flight lines and radar operating instructions will be computed with the Flight Planning Software The ground processing will be a two-step step process. First, the raw radar data will be processed into radar images and interferometer derived Digital Elevation Models (DEMs). Second, these radar images and DEMs will be processed with a Radar GIS Workstation which performs processes such as Projection Transformations, Registration, Geometric Adjustment, Mosaicking, Merging and Database Management. JPL will construct the IFSAR Processor and Calgis, Inc. will construct the Radar GIS Workstation. The GeoSAR Project was underway in November 1996 with a goal of having the radars and laser systems fully integrated onto the Calgis Gulfstream-II aircraft in early 1999. Then, Engineering Checkout and Calibration-Characterization Flights will be conducted through November 1999. The system will be completed at the end of 1999 and ready for routine operations in the year 2000.

Thompson, Thomas↗

STS-39 Discovery Rollback to the OPF High Bay #2 (Shots of Doors)

Shown is Discovery rolling back to the Orbiter Processing Facility (OPF) High Bay 2 for repair. High Bay 2, located west of the Vehicle Assembly Building (VAB), is used for external tank (ET) checkout and storage and as a contingency storage area for orbiters.

Source record↗

STS-40/SLS-1 Breakfast/Suit-up/Depart O&C/Ingress/Launch with isolated Views

Live footage shows the crew members, Commander Bryan D. O'Connor, Pilot Sidney M. Gutierrez, Mission Specialists James P. Bagian, Tamara E. Jernigan, M. Rhea Seddon, and Payload Specialists F. Drew Gaffney, and Millie-Hughes Fulford, sitting down at the traditional breakfast table. The crew is also seen suiting-up, entering the elevator, leaving the Operations and Checkout Building (O&C), and getting into the Astro-van. Scenes also show the crew members entering the vehicle as well as various isolated morning launch views, and some beautiful panoramic shots of the shuttle on the launch pad.

Source record↗

The Observed On-Orbit Background of the ACIS Instrument of the Chandra X-Ray Observatory

We have analyzed calibration data acquired during the Orbital Activation and Checkout (OAC) phase of the Chandra X-ray Observatory (CXO) mission in order to characterize the background of the Advanced CCD Imaging Spectrometer (ACIS) produced by charged particles and non-cosmic x-rays. The ACIS instrument contains eight Front-Illuminated (FI) CCDs and two Back-Illuminated (BI) CCDs. The FI and BI CCDs exhibit dramatically different responses to enhancements in the particle flux. The FI CCDs show relatively little increase in the overall count rate, typical increases are 1-3 counts/s; the BI CCDs show large excursions to as high as 100 counts/s. The directions of these intervals of enhanced background are highly variable ranging from 100 s to 5000 s. The spatial distribution of these background events is relatively flat across the detectors. The spectral distribution can be characterized by a simple power law. The events produce morphologies which are similar to cosmic x-ray events, so that morphology alone cannot be used as a rejection criterion. We explore the correlation of these times of high background with the data from Chandra's on-board radiation monitor, the EPHIN (Electron, Proton, Helium Instrument particle detector) instrument and archival data from the Advanced Composition Explorer (ACE) satellite. We discuss strategies for observers to identify and exclude times of high background and to model and subtract the background events from their data.

Plucinsky, Paul P.↗

STS-46 Crew Training

The crew of STS-46, Commander Loren J. Shriver, Pilot Andrew M. Allen, and Mission Specialists Franklin R. Chang-Diaz, Jeffrey A. Hoffman, Claude Nicollier, Marsha S. Ivins, and Franco Malerba are seen at various stages of their training. Footage includes firefighting training, helmet fit and T-38 checkout, bailout training in the weightless environment training facility, and remote manipulator training. The crew uses a computer simulation and the shuttle engineering simulator to practice using the tethered satellite system.

Source record↗

STS-49 Endeavour/Compiled Video for Editors

Compiled footage includes shots taken of the rollout of Endeavour at Palmdale, CA, the departure and arrival of Endeavour for Kennedy Space Center (KSC), main engine three installation, solid rocket booster (SRB) segment lift and stack at the Vehicle Assembly Building (VAB), external tank mate to SRB, Intelsat rotation at the Vertical Processing Facility (VPF), Endeavour rollover from the Orbiter Processing Facility (OPF) to VAB, rollout to Pad B, and the flight readiness firing (FRF). The crew is seen during the Terminal Countdown and Demonstration Test (TCDT) training activities, at breakfast, suiting up, and exiting the Operations and Checkout (O&C) Building.

Source record↗

STS-46 Eureca/TSS/Compiled Tape for Editors

Compiled footage shows shots of the Tethered Satellite System (TSS) lift in the Operations and Checkout (O&C) Building, TSS move onto satellite assembly section, the Eureca arrival and offload at Kennedy Space Center (KSC), Eureca instrument and tracker installation, the solar panel battery installation, and Eureca high-gain antenna deploy. The astronaut crew is seen at the O&C building for the TSS site test, and Atlantis rolls out to Pad B.

Source record↗

STS-56/TCDT O&C Walkout

The crew of STS-56, Commander Kenneth D. Cameron, Pilot Stephen S. Oswald, and Mission Specialists C. Michael Foale Ph.D., Kenneth D. Cockrell, and Ellen Ochoa are seen exiting the Operations and Checkout (O&C) Building on their way to the bus that will take them to the launch pad.

Source record↗