Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Estimation of abatement potentials and costs of air pollution emissions in China

Understanding the air pollution emission abatement potential and associated control cost is a prerequisite to design cost ef?cient control policies. In this study, a linear programming algorithm model, International Control Cost Estimate Tool, was updated with cost data for applications of 56 types of end-of-pipe technologies and ?ve types of renewable energy in 10 major sectors namely power generation, industry combustion, cement pro-duction, iron and steel production, other industry processes, domestic combustion, transportation, solvent use, livestock rearing, and fertilizer use. The updated model was implemented to estimate the abatement potential and marginal cost of multiple pollutants in China. The total maximum abatement potentials of sulfur dioxide (SO2), nitrogen oxides (NOx), primary particulate matter (PM2.5), non-volatile organic compounds (NMVOCs), and ammonia (NH3) in China were estimated to be 19.2, 20.8, 9.1, 17.2 and 8.6 Mt, respectively, which accounted for 89.7%, 89.9%, 94.6%, 74.0%, and 80.2% of their total emissions in 2014, respectively. The associated control cost of such reductions was estimated as 92.5, 469.7, 75.7, 449.0, and 361.8 billion CNY in SO2, NOx, primary PM2.5, NMVOCs and NH3, respectively. Shandong, Jiangsu, Henan, Zhejiang, and Guangdong provinces exhibited large abatement potentials for all pollutants. Provincial disparity analysis shows that high GDP regions tend to have higher reduction potential and total abatement costs. End-of-pipe technologies tended be a cost-ef?cient way to control pollution in industries processes (i.e., cement plants, iron and steel plants, lime production, building ceramic production, glass and brick production), whereas such technologies were less cost- effective in fossil fuel-related sectors (i.e., power plants, industry combustion, domestic combustion, and transportation) compared with renewable energy. The abatement potentials and marginal abatement cost curves developed in this study can further be used as a crucial component in an integrated model to design optimized cost-ef?cient control policies.

Zhang, Fenfen↗

FORTRAN manpower account program

Computer program for determining manpower costs for full time, part time, and contractor personnel is discussed. Twelve different tables resulting from computer output are described. Program is written in FORTRAN 4 for IBM 360/65 computer.

Strand, J. N.↗

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

NASA Balloon Program Overview (2021-2023)

The United States National Aeronautics and Space Administration's (NASA) Balloon Program offers low-cost access to a near-space environment. As the science community's needs continue to evolve, the NASA Balloon Program adjusts to support the scientific community, providing enhanced capabilities across a spectrum of balloon-related disciplines. The disciplines supported by the NASA Balloon Program include astrophysics, heliophysics, planetary science, earth science, technology development, and education. A broad overview of the NASA Balloon Program that touches on critical highlights, including launch locations, standard systems, and development efforts will be presented. In addition, the specific campaigns supported from 2021 through 2023 will be discussed. The period under review witnessed significant strides in balloon technology, payload instrumentation, and mission design, all aimed at enhancing the Program's scientific capabilities—the integration of cutting-edge technologies allowed for executing ambitious missions, and fostering collaboration with domestic and international partners. Specific information on commercial satellite communications with off-the-shelf hardware will be provided. The Program's strategic goals, emphasizing its commitment to advancing atmospheric and astrophysical research, are highlighted via the GUSTO mission. The Galactic/Extragalactic ULDB Spectroscopic Terahertz Observatory or GUSTO mission was the first NASA Explorer-class mission to utilize the balloon platform. The Program is vital in supporting educational and outreach activities, fostering the next generation of scientists and engineers. Collaborative efforts with educational institutions and outreach programs have expanded public engagement and inspired students to pursue careers in STEM fields. The Program's versatility and success in facilitating groundbreaking research underscore its continued significance in advancing our understanding of the Earth and the universe.

GUSTO↗

Surface Systems and Interface Standardization

A key contribution to surface systems sustainability on Lunar and planetary surfaces is commonality between hardware and software interfaces. Generic interfaces for data, power, and fluids will reduce risk, promote interoperability, and define standard interfaces across surface exploration projects and programs. Standardized interfaces would be advantageous for improving efficiency and reducing overall complexity, which are critical considerations for future space exploration. Furthermore, it will provide cost reductions to NASA’s Artemis program over its life cycle (in Operations & Maintenance (O&M) and Logistics). Unique proprietary interfaces if considered or allowed would not only increase complexity but also add cost to the programs. Of course, understanding what will work and not work effectively in these unique environments such as the lunar surface is important. These unique environments require much needed intelligent design, prototyping, comprehensive testing, and field experience, utilizing consensus on common interface solutions.

Lunar↗

Low-Cost Preform and Molding Processes

The entry cost for prototyping a composite component for manufacture using automated, high rate processes is prohibitively expensive in many cases, especially for small business, where tooling costs may be several $100k. Discussions with industry also indicate that many small companies, tier 1 and 2 suppliers, have an interest to mold composite parts but do not want to deal with the capital cost, material handling issues, and labor associated with dry fiber preforming operations. While the molders may locate near the end user for logistics reasons, it may be more cost effective for the performer to remain regional and invest in capital equipment to support preform automation, thus keeping costs to a minimum. This project was designed to explore and demonstrate several options to meet these industry needs. Dry fiber preforming approaches were evaluated which allow for low pressure resin infusion, single sided tooling options such a vacuum assisted resin transfer molding (VARTM) or low pressure resin transfer molding (RTM-light). Unlike sheet molding compound, SMC compression molding where typical molding pressures of 1000 psi are required to push material into the desired location; positioning of a dry fiber preform into the desired location on the tool allows for low molding pressures of 10-50 psi. Lower molding pressures allow for use of low cost, additive fabrication of polymeric tooling. Polymeric tooling is suitable for rapid part prototyping and limited production. Dry fiber preforming approaches evaluated included use of commercial chopped strand mat, robotic chopper gun deposition, and continuous fiber preform augmentation using tailored fiber placement (TFP). Use of chopped strand mat does not require a robotic deposition method, however a cutting table is generally required and there is typically 20-30% scrap generation. While various fiber areal weights are available, the preform is not readily optimized for minimal fiber use or weight savings. In contrast, a robotic chopper gun approach allows for localized deposition where fiber is required to meet structural requirements. The robotic method is highly automated and minimizes fiber scrap, however the capital cost of the equipment and engineering labor for programming can result in higher preform cost compared to chopped strand mat in certain cases depending on preform complexity. Dry fiber preforming using the robotic chopper gun method allows for creation of three dimensional forms. This approach may be ideal for molding in-house, or if the preforms stack together densely to allow for efficient shipping. Applications evaluated for this program considered trade-off between fabrication of a fully 3D preform versus production of a flat preform which is designed to readily drape into the final desired shape. Such a preform design greatly simplifies robotic programming and requires no specialized tooling. The flat preforms are easily stacked and shipped to the final molding location. Flat preforms are much easier to augment with TFP continuous fiber to provide local reinforcement. The demonstration and evaluation of these preforming and tooling methods were completed on three component applications. The first application was a battery box cover for an electric vehicle which was highly three dimensional. The second demonstrator article was comprised of complex contours and was used to demonstrate the use of TFP and RTM-light molding process. The third demonstration article was the roof of an operator’s cab for large construction equipment. The roof is relatively flat however it is comprised of complex changes in thickness which clearly demonstrate the advantage of robotic chopper gun approach as compared to using numerous preform layers of chopped strand mat. The cost trades for the various preforming methods are summarized to help guide the reader as to preforming method considerations. Finally, these demonstrations all used glass fiber roving. A fourth, exploratory task was added to evaluate the ability to make preforms using Zoltek’s carbon fiber split tow roving. We were able to adapt the chopper gun to make flat preforms for laminate testing, but further development effort would be required to make suitable preforms.

36 MATERIALS SCIENCE↗

Application of Design of Experiments and Surrogate Modeling within the NASA Advanced Concepts Office, Earth-to-Orbit Design Process

Decisions made during early conceptual design have a large impact upon the expected life-cycle cost (LCC) of a new program. It is widely accepted that up to 80% of such cost is committed during these early design phases.1 Therefore, to help minimize LCC, decisions made during conceptual design must be based upon as much information as possible. To aid in the decision making for new launch vehicle programs, the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) provides rapid turnaround pre-phase A and phase A concept definition studies. The ACO team utilizes a proven set of tools to provide customers with a full vehicle mass breakdown to tertiary subsystems, preliminary structural sizing based upon worst-case flight loads, and trajectory optimization to quantify integrated vehicle performance for a given mission.2 Although the team provides rapid turnaround for single vehicle concepts, the scope of the trade space can be limited due to analyst availability and the manpower requirements for manual execution of the analysis tools. In order to enable exploration of a broader design space, the ACO team has implemented an Advanced Design Methods (ADM) based approach. This approach applies the concepts of Design of Experiments (DOE) and surrogate modeling to more exhaustively explore the trade space and provide the customer with additional design information to inform decision making. This paper will first discuss the automation of the ACO tool set, which represents a majority of the development e ort. In order to t a surrogate model within tolerable error bounds a number of DOE cases are needed. This number will scale with the number of variable parameters desired and the complexity of the system's response to those variables. For all but the smallest design spaces, the number of cases required cannot be produced within an acceptable timeframe using a manual process. Therefore, automation of the tools was a key enabler for the successful application of an ADM approach to an ACO design study. Following the overview of the tool set automation, an example problem will be given to illustrate the implementation of the ADM approach. The example problem will first cover the inclusion of Ground Rules and Assumptions (GR&A) for a study. The GR&A are very important to the study as they determine the constraints within which a trade study can be conducted. These trades must ultimately reconcile with the customer's desired output and any anticipated \what if" questions. The example problem will then illustrate the setup and execution of a DOE through the automated ACO tools. This process is accomplished more efficiently in this work by splitting the tools into two separate environments. The first environment encompasses the structural optimization and mass estimation tools, while the second is focused on trajectory optimization. Surrogate models are t to the outputs of each environment and are integrated via connection of the surrogate equations. Throughout this process, checks are implemented to compare the output of the surrogates to the output of manually run cases to ensure that the error of the final surrogates is at an acceptable level. The conclusion of the example problem demonstrates the utility of the ADM based approach. Using surrogate models gives the ACO team the ability to visualize vehicle sensitivities to various design parameters and identify regions of interest within the design space. The ADM approach can thus be used to inform concept down selection and isolate promising vehicle configurations to be explored in more detail through the manual design process. In addition it provides the customer with an almost instantaneous turnaround on any \what if" questions that may arise within the bounds of the surrogate model. This approach ultimately expands the ability of the ACO team to provide its customer with broad and rapid turnaround trade studies for launch vehicle conceptual design. The ability to identify a selection of designs which can meet the customer requirements will have the potential to lower LCC of launch vehicle designs originating from ACO.

Zwack, Mathew R.↗

Application of Design of Experiments and Surrogate Modeling within the NASA Advanced Concepts Office, Earth-to-Orbit Design Process

Decisions made during early conceptual design have a large impact upon the expected life-cycle cost (LCC) of a new program. It is widely accepted that up to 80% of such cost is committed during these early design phases. Therefore, to help minimize LCC, decisions made during conceptual design must be based upon as much information as possible. To aid in the decision making for new launch vehicle programs, the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) provides rapid turnaround pre-phase A and phase A concept definition studies. The ACO team utilizes a proven set of tools to provide customers with a full vehicle mass breakdown to tertiary subsystems, preliminary structural sizing based upon worst-case flight loads, and trajectory optimization to quantify integrated vehicle performance for a given mission. Although the team provides rapid turnaround for single vehicle concepts, the scope of the trade space can be limited due to analyst availability and the manpower requirements for manual execution of the analysis tools. In order to enable exploration of a broader design space, the ACO team has implemented an advanced design methods (ADM) based approach. This approach applies the concepts of design of experiments (DOE) and surrogate modeling to more exhaustively explore the trade space and provide the customer with additional design information to inform decision making. This paper will first discuss the automation of the ACO tool set, which represents a majority of the development effort. In order to fit a surrogate model within tolerable error bounds a number of DOE cases are needed. This number will scale with the number of variable parameters desired and the complexity of the system's response to those variables. For all but the smallest design spaces, the number of cases required cannot be produced within an acceptable timeframe using a manual process. Therefore, automation of the tools was a key enabler for the successful application of an ADM approach to an ACO design study. Following the overview of the tool set automation, an example problem will be given to illustrate the implementation of the ADM approach. The example problem will first cover the inclusion of ground rules and assumptions (GR&A) for a study. The GR&A are very important to the study as they determine the constraints within which a trade study can be conducted. These trades must ultimately reconcile with the customer's desired output and any anticipated "what if" questions. The example problem will then illustrate the setup and execution of a DOE through the automated ACO tools. This process is accomplished more efficiently in this work by splitting the tools into two separate environments. The first environment encompasses the structural optimization and mass estimation tools, while the second is focused on trajectory optimization. Surrogate models are fit to the outputs of each environment and are "integrated" via connection of the surrogate equations. Throughout this process, checks are implemented to compare the output of the surrogates to the output of manually run cases to ensure that the error of the final surrogates is at an acceptable level. The conclusion of the example problem demonstrates the utility of the ADM based approach. Using surrogate models gives the ACO team the ability to visualize vehicle sensitivities to various design parameters and identify regions of interest within the design space. The ADM approach can thus be used to inform concept down selection and isolate promising vehicle configurations to be explored in more detail through the manual design process. In addition it provides the customer with an almost instantaneous turnaround on any ''what if" questions that may arise within the bounds of the surrogate model. This approach ultimately expands the ability of the ACO team to provide its customer with broad and rapid turnaround trade studies for launch vehicle conceptual design. The ability to identify a selection of designs which can meet the customer requirements will help ensure lower LCC of launch vehicle designs originating from ACO.

Zwack, Mathew R.↗

Pareto Efficient Policy for Supervisory Power Management Control

n this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV opera- tion as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

Markov chain↗

Centralized Stochastic Optimal Control of Complex Systems

In this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV operation as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

complex systems↗

Application of Design of Experiments and Surrogate Modeling within the NASA Advanced Concepts Office, Earth-to-Orbit Design Process

Decisions made during early conceptual design have a large impact upon the expected life-cycle cost (LCC) of a new program. It is widely accepted that up to 80% of such cost is committed during these early design phases [1]. Therefore, to help minimize LCC, decisions made during conceptual design must be based upon as much information as possible. To aid in the decision making for new launch vehicle programs, the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) provides rapid turnaround pre-phase A and phase A concept definition studies. The ACO team utilizes a proven set of tools to provide customers with a full vehicle mass breakdown to tertiary subsystems, preliminary structural sizing based upon worst-case flight loads, and trajectory optimization to quantify integrated vehicle performance for a given mission [2]. Although the team provides rapid turnaround for single vehicle concepts, the scope of the trade space can be limited due to analyst availability and the manpower requirements for manual execution of the analysis tools. In order to enable exploration of a broader design space, the ACO team has implemented an advanced design methods (ADM) based approach. This approach applies the concepts of design of experiments (DOE) and surrogate modeling to more exhaustively explore the trade space and provide the customer with additional design information to inform decision making. This paper will first discuss the automation of the ACO tool set, which represents a majority of the development effort. In order to fit a surrogate model within tolerable error bounds a number of DOE cases are needed. This number will scale with the number of variable parameters desired and the complexity of the system's response to those variables. For all but the smallest design spaces, the number of cases required cannot be produced within an acceptable timeframe using a manual process. Therefore, automation of the tools was a key enabler for the successful application of an ADM approach to an ACO design study. Following the overview of the tool set automation, an example problem will be given to illustrate the implementation of the ADM approach. The example problem will first cover the inclusion of ground rules and assumptions (GR&A) for a study. The GR&A are very important to the study as they determine the constraints within which a trade study can be conducted. These trades must ultimately reconcile with the customer's desired output and any anticipated "what if" questions.

Zwack, Mathew R.↗

Just in Time in Space or Space Based JIT

Our satellite systems are mega-buck items. In today's cost conscious world, we need to reduce the overall costs of satellites if our space program is to survive. One way to accomplish this would be through on-orbit maintenance of parts on the orbiting craft. In order to accomplish maintenance at a low cost I advance the hypothesis of having parts and pieces (spares) waiting. Waiting in the sense of having something when you need it, or just-in-time. The JIT concept can actually be applied to space processes. Its definition has to be changed just enough to encompass the needs of space. Our space engineers tell us which parts and pieces the satellite systems might be needing once in orbit. These items are stored in space for the time of need and can be ready when they are needed -- or Space Based JIT. When a system has a problem, the repair facility is near by and through human or robotics intervention, it can be brought back into service. Through a JIT process, overall system costs could be reduced as standardization of parts is built into satellite systems to facilitate reduced numbers of parts being stored. Launch costs will be contained as fewer spare pieces need to be included in the launch vehicle and the space program will continue to thrive even in this era of reduced budgets. The concept of using an orbiting parts servicer and human or robotics maintenance/repair capabilities would extend satellite life-cycle and reduce system replacement launches. Reductions of this nature throughout the satellite program result in cost savings.

VanOrsdel, Kathleen G.↗

Application and Interpretation of Acumen Risk ® Schedule and Cost Risk Analysis

Schedule risk and cost risk analyses use statistical techniques to predict a level of confidence in meeting a program’s completion date and cost. This paper describes how to interpret key Schedule Risk Analysis (SRA) and Cost Risk Analysis (CRA) results to determine the likelihood that the program completion dates are met, how much management reserve (MR) is needed to provide the acceptable certainty of completion by a specific date, and the risks and activities that are most likely to delay or add cost to a project. The combined process is often called a Schedule/Cost Uncertainty and Risk Analysis or “SCURA.”

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 40 KW of Solar Cell Modules for the Large Scale Production Task a Low Cost Silicon Solar Array Project

Forty kilowatts of solar cell modules was produced in this program. This is equivalent to 4123 modules. The average power output per module was 9.7 watts at 16.5 volts, 60 C and 100 mW/sq cm. The peak production rate was 200 modules per week which is equal to 1.9 kW per week. This rate was sustained for over four and one-half months and is equivalent to 100 kW per year. This final report covers the solar cell module design, electrical and power performance, module preproduction environmental test results, production and shipping schedule, program summary, and delivery. A cost analysis section is written. Particular emphasis on the percentage of labor and material utilized in constructing a solar cell module is presented. Also included are cost reduction recommendations.

Jones, G. T.↗

Energy Efficiency Program Typology and Data Metrics: Enabling Multi-State Analyses Through the Use of Common Terminology

In order to compile and analyze information about energy efficiency programs across the country, it is necessary to have a common categorization of program types as well as definitions of the metrics that define program performance and characteristics. As part of an effort to analyze the cost per unit of savings for utility-customer funded, end-use energy efficiency programs, LBNL developed a program typology with standardized program categories, as well as metrics and associated definitions that describe program characteristics, costs and impacts. These definitions and naming conventions facilitate meta-analysis of program results and could simplify the analyses and use of such information by a wide range of entities engaged in reporting and assessing the impacts of energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integral Airframe Structures (IAS): Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs

The Integral Airframe Structures (IAS) program investigated the feasibility of using "integrally stiffened" construction for commercial transport fuselage structure. The objective of the program was to demonstrate structural performance and weight equal to current "built-up" structure with lower manufacturing cost. Testing evaluated mechanical properties, structural details, joint performance, repair, static compression, and two-bay crack residual strength panels. Alloys evaluated included 7050-T7451 plate, 7050-T74511 extrusion, 6013-T6511x extrusion, and 7475-T7351 plate. Structural performance was evaluated with a large 7475-T7351 pressure test that included the arrest of a two-bay longitudinal crack, and a measure of residual strength for a two-bay crack centered on a broken frame. Analysis predictions for the two-bay longitudinal crack panel correlated well with the test results. Analysis activity conducted by the IAS team strongly indicates that current analysis tools predict integral structural behavior as accurately as built-up structure. The cost study results indicated that, compared to built-up fabrication methods, high-speed machining structure from aluminum plate would yield a recurring cost savings of 61%. Part count dropped from 78 individual parts on a baseline panel to just 7 parts for machined IAS structure.

Munroe, J.↗

A Multiobjective Optimization Framework for Online Stochastic Optimal Control in Hybrid Electric Vehicles

The increasing urgency to extract additional efficiency from hybrid propulsion systems has led to the development of advanced power management control algorithms. In this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV operation as a controlled Markov chain and we show that the control policy yielding the Pareto optimal solution minimizes online the long-run expected average cost per unit time criterion. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion. Both solutions achieved the same cumulative fuel consumption demonstrating that the online Pareto control policy is an optimal control policy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗