Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “APOLLO PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Demonstration of Capability to Simulate Particle Irregular Shape and Poly-Disperse Mixtures Within Lunar Lander Plume-Surface Interaction

Plume-Surface Interaction (PSI) between lander engine plumes and regolith soil creates hazards in obscuration and contamination by particle clouds, high-energy ejecta streams, and landing area cratering damage. The MSFC Fluid Dynamics Branch is developing simulation tools to offer a predictive PSI capability to NASA customers such as the Human Lander System (HLS) and Commercial Lunar Payload Services (CLPS). The Gas-Granular Flow Solver (GGFS) is the main application tool for coupled gas-particle two-phase flow simulations to predict the range of PSI effects from onset of surface erosion to deep crater formation. GGFS features an Eulerian-Eulerian modeling approach, treating both gas and granular material as interacting continuum phases. Modeling the lunar regolith granular material fluidic characteristics poses special challenges due to complex particle shapes and mixture composition. The lunar regolith is poorly sorted with broad particle size distributions and large fines content. It has significant cohesion, due to interlocking jagged particle shapes. Eulerian granular material flow modeling requires closure formulations for the granular material constitutive models (stress, friction, collisional and kinetic energy dissipation, drag, etc.). While closure models for spherical particles are available from particle kinetic theory, closure models for realistic non-spherical particles must be extracted from unit physics Discrete Element Model (DEM) particle interaction simulations and provided in the form of tabular datasets. The effects of particle irregular shape (non-spherical shape factors, angular particle surface roughness, and interlocking features) are simulated by approximating the particle features in the form of grouped elemental spheres to form composite particles in the DEM simulations. The effects of the wide range of regolith mixture particle sizes and the strong effects of the presence of the small particle sizes results in high cohesion and low porosity of the regolith mixture. The range of particle sizes is simulated by binning the particle sizes into an appropriate finite number of particle-size species and solving the problem as a species mixture. Combining these two modeling approaches enables simulations to capture both, the contributions of the irregular particle shape and the particle size distribution. The integration and maturation of the DEM-based constitutive model database generation process and poly-disperse mixture binning approach into the GGFS simulation framework are proceeding under funding by the NASA Game Changing Development program. The status of current capabilities will be presented in comparisons of crater characteristics resulting for spherical and irregular shape particles, and for mono-, bi-, and tri-disperse mixture simulations of Apollo LM plume-surface interaction. The computational results confirm the significance of including the particle shape and mixture effects. Going forward plans for the full implementation of the general poly-disperse regolith modeling capability and maturation towards NASA project application readiness under the GCD program will be presented.

Peter A. Liever↗

Assured crew return vehicle post landing configuration design and test

The 1991-1992 senior Mechanical and Aerospace Engineering Design class continued work on the post landing configurations for the Assured Crew Return Vehicle (ACRV) and the Emergency Egress Couch (EEC). The ACRV will be permanently docked to Space Station Freedom fulfilling NASA's commitment of Assured Crew Return Capability in the event of an accident or illness aboard Space Station Freedom. The EEC provides medical support and a transportation surface for an incapacitated crew member. The objective of the projects was to give the ACRV Project Office data to feed into their feasibility studies. Four design teams were given the task of developing models with dynamically and geometrically scaled characteristics. Groups one and two combined efforts to design a one-fifth scale model for the Apollo Command Module derivative, an on-board flotation system, and a lift attachment point system. This model was designed to test the feasibility of a rigid flotation and stabilization system and to determine the dynamics associated with lifting the vehicle during retrieval. However, due to priorities, it was not built. Group three designed a one-fifth scale model of the Johnson Space Center (JSC) benchmark configuration, the Station Crew Return Alternative Module (SCRAM) with a lift attachment point system. This model helped to determine the flotation and lifting characteristics of the SCRAM configuration. Group four designed a full scale EEC with changeable geometric and geometric and dynamic characteristics. This model provided data on the geometric characteristics of the EEC and on the placement of the CG and moment of inertia. It also gave the helicopter rescue personnel direct input to the feasibility study. Section 1 describes in detail the design of a one-fifth scale model of the Apollo Command Module Derivative (ACMD) ACRV. The objective of the ACMD Configuration Model Team was to use geometric and dynamic constraints to design a one-fifth scale working model of the Apollo Command Module Derivative (ACMD) configuration with a Lift Attachment Point (LAP) System. This model was required to incorporate a rigidly mounted flotation system and the egress system designed the previous academic year. The LAP system was to be used to determine the dynamic effects of locating the lifting points at different locations on the vehicle. The team was then to build and test the model; however, due to priorities, this did not occur. To better simulate the ACMD after a water landing, the nose cone section was removed and the deck area exposed. The areas researched during the design process were construction, center of gravity and moment of inertia, and lift attachment points.

Source record↗

Assured crew return vehicle post landing configuration design and test

The 1991-1992 senior Mechanical and Aerospace Engineering Design class continued work on the post landing configurations for the Assured Crew Return Vehicle (ACRV) and the Emergency Egress Couch (EEC). The ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment of Assured Crew Return Capability in the event of an accident or illness aboard Space Station Freedom. The EEC provides medical support and a transportation surface for an incapacitated crew member. The objective of the projects was to give the ACRV Project Office data to feed into their feasibility studies. Four design teams were given the task of developing models with dynamically and geometrically scaled characteristics. Groups one and two combined effort to design a one-fifth scale model of the Apollo Command Module derivative, an on-board flotation system, and a lift attachment point system. This model was designed to test the feasibility of a rigid flotation and stabilization system and to determine the dynamics associated with lifting the vehicle during retrieval. However, due to priorities, it was not built. Group three designed a one-fifth scale model of the Johnson Space Center (JSC) benchmark configuration, the Station Crew Return Alternative Module (SCRAM) with a lift attachment point system. This model helped to determine the flotation and lifting characteristics of the SCRAM configuration. Group four designed a full scale EEC with changeable geometric and dynamic characteristics. This model provided data on the geometric characteristics of the EEC and on the placement of the CG and moment of inertia. It also gave the helicopter rescue personnel direct input to the feasibility study.

Anderson, Loren A.↗

Mars Orbit Rendezvous Strategy for the Mars 2003/2005 Sample Return Mission

The primary objective of the Mars 2003/2005 Sample Return Project is to return Martian surface materials to Earth from two different sites by the year 2008. The baseline mission plan relies heavily on the use of a Mars orbit rendezvous strategy similar to the lunar orbit rendezvous scheme used for the Apollo missions. The 2003 mission consists of a single spacecraft comprised of a Lander, Rover, and Mars ascent vehicle (MAV). The 2003 mission will be launched on a Delta-III-class launch vehicle in May/June 2003 and arrive at Mars in December 2003/January 2004. The Lander deploys the Rover to collect surface samples from several sites and return them to the Lander where they are transferred to a sample canister onboard the MAV. The MAV is launched into a low Mars orbit (targeted for 600 km circular, 45 deg inclination) and releases the sample canister to await retrieval by an Orbiter launched in 2005. (The sample canister is a passive vehicle with no maneuvering capability.) The duration of Mars surface operations is at most about 90 days. The 2005 mission consists of two separate spacecraft: a Lander/Rover/MAV spacecraft identical to that used for the 2003 mission and an Orbiter carrying an Earth Entry Vehicle (EEV). Both spacecraft will be launched on a single Ariane-5 in August 2005 and arrive at Mars in July/August 2006. A second sample canister is delivered to Mars orbit using the same scenario as was used for the 2003 mission. The Orbiter uses aerocapture for insertion into Mars orbit (targeted for 250 x 1400 km, 45 deg inclination). During its approximately one-year stay at Mars, the Orbiter will search for and attempt to rendezvous first with the 2003 sample canister and then with the 2005 sample canister. After retrieval, each sample canister is transferred to the EEV. The Orbiter departs Mars in July 2007 and returns to Earth in October 2008 on a trajectory targeted for landing at the Utah Test and Training Range (UTTR). After deploying the EEV, the Orbiter performs a deflection maneuver to avoid reentry into Earth's atmosphere.

DAmario, Louis A.↗

My Life as a NASA Test Subject

In addition to Joe McMann’s duties as project engineer and technical manager, he was a test subject for spacesuits, life support systems, and other systems under his purview for over 18 years. During this Spacesuit Knowledge Capture event, he shared his experiences as a test subject during the Gemini, Apollo, and Space Shuttle Programs, which include both comical and serious lessons learned.

Joe McMann↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration directs NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. This decision was reached after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by building on the Apollo Program and other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Snoddy, Jim↗

MoonRIDERS: NASA and Hawaiis Innovative Lunar Surface Flight Experiment for Landing in Late 2017

Recently, NASA Kennedy Space Center, Hawaii's state aerospace agency PISCES, and two Hawaii high schools Iolani and Kealakehe have come together in a unique collaboration called MoonRIDERS. This strategic partnership will allow Hawaii students to participate directly in sending a science experiment to the surface of the moon. The MoonRIDERS project started in the spring of 2014, with each institution responsible for its own project costs and activities. PISCES, given its legislative direction in advancing planetary surface systems, saw this collaboration as an important opportunity to inspire a young generation and encourage STEM (Science, Technology, Engineering, and Mathematics) learning. Under the guidance of PISCES and NASA, the students will be involved hands-on from start to finish in the engineering, testing, and validation of a space technology called the Electrodynamic Dust Shield (EDS). Dust is a critical issue for space exploration, as evidenced by the Apollo lunar missions and Mars rovers and landers. Dust creates a number of problems for humans and hardware, including inhalation, mechanical interference, wear and tear on spacesuits, inhibition of heat transfer on radiators, and reduced efficiency of solar panels. To address this, the EDS is designed to work on a variety of materials, and functions by generatingelectrodynamic fields to clear away the dust. The Google Lunar XPRIZE (GLXP), a space competition "designed to inspire pioneers to do robotic space transport on a budget," serves as a likely method for the MoonRIDERS to get their project to the moon. The EDS would potentially be flown as a hosted payload on a competitor's lander (still to be chosen). This briefing will provide an overview of the technology, the unique partnership, progress update and testing leading to this flight opportunity.

Payload experiment↗

Environmental projects. Volume 7: Environmental resources document

The Goldstone Deep Space Communications Complex (GDSCC) in Barstow, California, is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Goldstone is managed, directed and operated by the Jet Propulsion Laboratory of Pasadena, California. The GDSCC includes five distinct operational sites: Echo, Venus, Mars, Apollo, and Mojave Base. Within each site is a Deep Space Station (DPS), consisting of a large dish antenna and its support facilities. As required by NASA directives concerning the implementation of the National Environmental Policy Act, each NASA field installation is to publish an Environmental Resources Document describing the current environment at the installation, including any adverse effects that NASA operations may have on the local environment.

Kushner, Len↗

Argonne Leadership Computing Facility 2024 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every goal set by DOE for the calendar year (CY) 2024. In CY 2024, the ALCF operated Polaris, an AMD and NVIDIA-based Hewlett Packard Enterprise (HPE) Apollo 6500 Gen10+ system that provides a powerful platform for breakthrough science and prepares applications and workloads for Aurora, Argonne National Laboratory’s Intel-HPE exascale computer. Since going into production in August 2022, Polaris has supported research teams from the DOE Exascale Computing Project (ECP), which concluded in 2024, and from ALCF’s Aurora Early Science Program (ESP). Polaris delivered a total of 2555.7K node-hours to 17 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) 2024 projects and 601.6K node-hours to ASCR Leadership Computing Challenge (ALCC) projects (12 of which were awarded during the 2023–2024 ALCC year and 11 of which were awarded during the 2024–2025 ALCC year), as well as providing substantial time for Director’s Discretionary (DD) projects (966.2K node-hours). As Table ES.1 shows, Polaris performed exceptionally well in terms of overall availability (97.7 percent), scheduled availability (99.6 percent), and utilization (94.7 percent; Table 2.1). In CY 2024, ALCF supported more than 2,000 users. As of March 18, 2025, ALCF’s users have published 254 papers in peer-reviewed journals and technical proceedings.

97 MATHEMATICS AND COMPUTING↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020 by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage (EDS). This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo era experts to derive other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, WIlliam↗

Principles for Integrating Mars Analog Science, Operations, and Technology Research

During the Apollo program, the scientific community and NASA used terrestrial analog sites for understanding planetary features and for training astronauts to be scientists. Human factors studies (Harrison, Clearwater, & McKay 1991; Stuster 1996) have focused on the effects of isolation in extreme environments. More recently, with the advent of wireless computing, we have prototyped advanced EVA technologies for navigation, scheduling, and science data logging (Clancey 2002b; Clancey et al., in press). Combining these interests in a single expedition enables tremendous synergy and authenticity, as pioneered by Pascal Lee's Haughton-Mars Project (Lee 2001; Clancey 2000a) and the Mars Society s research stations on a crater rim on Devon Island in the High Canadian Arctic (Clancey 2000b; 2001b) and the Morrison Formation of southeast Utah (Clancey 2002a). Based on this experience, the following principles are proposed for conducting an integrated science, operations, and technology research program at analog sites: 1) Authentic work; 2) PI-based projects; 3) Unencumbered baseline studies; 4) Closed simulations; and 5) Observation and documentation. Following these principles, we have been integrating field science, operations research, and technology development at analog sites on Devon Island and in Utah over the past five years. Analytic methods include work practice simulation (Clancey 2002c; Sierhuis et a]., 2000a;b), by which the interaction of human behavior, facilities, geography, tools, and procedures are formalized in computer models. These models are then converted into the runtime EVA system we call mobile agents (Clancey 2002b; Clancey et al., in press). Furthermore, we have found that the Apollo Lunar Surface Journal (Jones, 1999) provides a vast repository or understanding astronaut and CapCom interactions, serving as a baseline for Mars operations and quickly highlighting opportunities for computer automation (Clancey, in press).

Clancey, William J.↗

MSFC Skylab Apollo Telescope Mount summary mission report

A summary of the Apollo Telescope Mount (ATM) performance during the 8.5-month Skylab mission is presented. A brief description of each ATM system, system performance summaries, discussion of all significant ATM anomalies which occurred during the Skylab mission, and, in an appendix, a summary of the Skylab ATM Calibration Rocket Project (CALROC) are provided. The text is supplemented and amplified by photographs, drawings, curves, and tables. The report shows that the ATM not only met, but exceeded premission performance criteria, and that participation of man in space for this scientific investigation greatly enhanced the quality and quantity of the data attained.

Morse, A. R.↗

High Intensity Lighting

Nightime illumination is an important part of round-the-clock pre-launch preparations because NASA uses TV and film cameras to monitor each step of the preliminaries and at times to identify the cause of malfunction during countdown. Generating a one billion candlepower beam visible 50 miles away, the lamps developed by Duro-Test Corporation provide daylight quality light that eliminates color distortion in film and TV coverage. The lighting system was first used at Kennedy Space Center in 1968 for the launch of Apollo 8. Modified versions are available in wide range of applications, such as the battery of spotlights with colored filters that light up Niagara Falls, as well as the lamps used in the projectors for the Smithsonian's IMAX Theatre, indoor theatres with supersized screens and outdoor projection systems.

Source record↗

Lunar Mapping and Modeling Project

The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses. The project draws on expertise from several NASA and non-NASA organizations (MSFC, ARC, GSFC, JPL, CRREL US Army Cold Regions Research and Engineering Laboratory, and the USGS). LMMP will utilize data predominately from the Lunar Reconnaissance Orbiter, but also historical and international lunar mission data (e.g. Apollo, Lunar Orbiter, Kaguya, Chandrayaan-1), as available and appropriate, to meet Constellation s data needs. LMMP will provide access to this data through a single intuitive and easy to use NASA portal that transparently accesses appropriately sanctioned portions of the widely dispersed and distributed collections of lunar data, products and tools. Two visualization systems are being developed, a web-based system called Lunar Mapper, and a desktop client, ILIADS, which will be downloadable from the LMMP portal. LMMP will provide such products as local and regional imagery and DEMs, hazard assessment maps, lighting and gravity models, and resource maps. We are working closely with the LRO team to prevent duplication of efforts and to ensure the highest quality data products. While Constellation is our primary customer, LMMP is striving to be as useful as possible to the lunar science community, the lunar commercial community, the lunar education and public outreach (E/PO) community, and anyone else interested in accessing or utilizing lunar data. A beta version of the portal and visualization systems is expected to be released in late 2009, with a version 1 release planned for early 2011.

Noble, Sarah K.↗

Winged cargo return vehicle. Volume 1: Conceptual design

The Advanced Design Project (ADP) allows an opportunity for students to work in conjunction with NASA and other aerospace companies on NASA Advanced Design Projects. The following volumes represent the design report: Volume 1 Conceptual Design; Volume 2 Wind Tunnel Tests; Volume 3 Structural Analysis; and Volume 4 Water Tunnel Tests. The project chosen by the University of Minnesota in conjunction with NASA Marshall Space Flight Center for this year is a Cargo Return Vehicle (CRV) to support the Space Station Freedom. The vehicle is the third generation of vehicles to be built by NASA, the first two being the Apollo program, and the Space Shuttle program. The CRV is to work in conjunction with a personnel launch system (PLS) to further subdivide and specialize the vehicles that NASA will operate in the year 2000. The cargo return vehicle will carry payload to and from the Space Station Freedom (SSF).

Source record↗

Spinoff 2009

Topics covered include: Image-Capture Devices Extend Medicine's Reach; Medical Devices Assess, Treat Balance Disorders; NASA Bioreactors Advance Disease Treatments; Robotics Algorithms Provide Nutritional Guidelines; "Anti-Gravity" Treadmills Speed Rehabilitation; Crew Management Processes Revitalize Patient Care; Hubble Systems Optimize Hospital Schedules; Web-based Programs Assess Cognitive Fitness; Electrolyte Concentrates Treat Dehydration; Tools Lighten Designs, Maintain Structural Integrity; Insulating Foams Save Money, Increase Safety; Polyimide Resins Resist Extreme Temperatures; Sensors Locate Radio Interference; Surface Operations Systems Improve Airport Efficiency; Nontoxic Resins Advance Aerospace Manufacturing; Sensors Provide Early Warning of Biological Threats; Robot Saves Soldier's Lives Overseas (MarcBot); Apollo-Era Life Raft Saves Hundreds of Sailors; Circuits Enhance Scientific Instruments and Safety Devices; Tough Textiles Protect Payloads and Public Safety Officers; Forecasting Tools Point to Fishing Hotspots; Air Purifiers Eliminate Pathogens, Preserve Food; Fabrics Protect Sensitive Skin from UV Rays; Phase Change Fabrics Control Temperature; Tiny Devices Project Sharp, Colorful Images; Star-Mapping Tools Enable Tracking of Endangered Animals; Nanofiber Filters Eliminate Contaminants; Modeling Innovations Advance Wind Energy Industry; Thermal Insulation Strips Conserve Energy; Satellite Respondent Buoys Identify Ocean Debris; Mobile Instruments Measure Atmospheric Pollutants; Cloud Imagers Offer New Details on Earth's Health; Antennas Lower Cost of Satellite Access; Feature Detection Systems Enhance Satellite Imagery; Chlorophyll Meters Aid Plant Nutrient Management; Telemetry Boards Interpret Rocket, Airplane Engine Data; Programs Automate Complex Operations Monitoring; Software Tools Streamline Project Management; Modeling Languages Refine Vehicle Design; Radio Relays Improve Wireless Products; Advanced Sensors Boost Optical Communication, Imaging; Tensile Fabrics Enhance Architecture Around the World; Robust Light Filters Support Powerful Imaging Devices; Thermoelectric Devices Cool, Power Electronics; Innovative Tools Advance Revolutionary Weld Technique; Methods Reduce Cost, Enhance Quality of Nanotubes; Gauging Systems Monitor Cryogenic Liquids; Voltage Sensors Monitor Harmful Static; and Compact Instruments Measure Heat Potential.

Source record↗

Dust Solution Testing Initiative (DuSTI): Infusing Commercial Off the Shelf Dust Mitigation Technologies with NASA Practices

Dust is one of the most significant hazards to human lunar exploration. However, since the Apollo program concluded, limited research has been performed on lunar dust mitigation technologies. The safety of the crew members and sustainability of habitats, science, and supporting hardware depend on effective dust mitigation techniques and technologies. As NASA pursues a new generation of lunar missions with the Artemis program, the project team will pursue dust mitigation solutions with the Dust Solution Testing Initiative (DuSTI). DuSTI is a lunar dust mitigation effort that involves performing tests on commercial off the shelf (COTS) technologies over FY21. DuSTI will preform component and subsystem tests in dusty environments for up to five technologies with high potential. The specific technologies identified for study were selected based on several factors, including a market analysis of current terrestrial dust mitigation applications, availability of the technology, accessibility of various testing facilities, and cost of procurement. These technologies support the active and passive dust mitigation requirements of filtration systems, electro-mechanical systems, electro-static systems, surface coatings, textiles, and silicone polymers. Technology Readiness Level (TRL) will be increased by validating components in relevant environments. For example, if the COTS technology is at a TRL 9 for terrestrial use but at a 4-5 TRL for use in the lunar environment, we will test that technology in a lunar dust environment to increase the TRL for use on the Moon.

lunar dust↗