Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utilization plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

American Samoa: Unlocking Renewable Energy Potential

Located approximately between Hawaii and New Zealand, American Samoa is the only U.S. territory in the southern hemisphere. American Samoa faces similar climate and energy resilience challenges as other Pacific islands: geographic remoteness, dependence on imported fossil fuels, and increased vulnerability to natural hazards like earthquakes, cyclones, and tsunamis. In 2022, the average electricity price for residential customers in American Samoa was approximately 45 cents/kilowatt-hour (kWh) - almost three times the U.S. average of 15 cents/kWh. Renewable energy represents a small but growing power system contribution, although American Samoa relies almost entirely on imported fossil fuels. The territory possesses substantial solar resources and wind and biomass resource potential. Planned renewable power projects include utility-scale solar photovoltaic (PV) and wind generation with battery storage systems.

American Samoa↗

Scoping Sampling at the Site 300 Water Line Project: Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Liverniore National Laboratory’s (LLNL) Mechanical Utilities Division (MUD) is currently scoping a project with the Project Management Office (PMO) Experimental Test Site 300 (S300) to install/upgrade roughly six miles of water line along established roads within the complex. This Sampling and Analysis Plan (SAP) outlines the requirements to collect an initial round of soil samples from the proposed alignment of the water line to provide preliminary data and information that can be used during project design. The samples will be submitted to an offsite contract laboratory for analysis.

54 ENVIRONMENTAL SCIENCES↗

Light Water Reactor Sustainability Program — A Summary of Collaborative Research and Development Activities

This report describes the collaborative research and development projects in which the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Program is engaged with industry, regulatory agencies, and other organizations to achieve outcomes that are directed at sustaining the U.S. nuclear power industryduring Fiscal Year 2018. One way that this Program accomplishes its objectives—to develop technologies and other solutions that can improve the reliability, sustain the safety, enhance the economic performance, and extend the life of current reactors—is by conducting research together with industry and key organizations through cooperative arrangements and plans, through coordinated planning and management of resources and activities, through periodic technical exchanges of data and information, or by other means of interaction (i.e., contracts, memoranda of understanding, non-disclosure agreements, etc.). Broadly, these interactions represent different types of collaborations—formal or informal agreements between two or more organizations to work on something together that may be for a short or extended duration and may involve a single purpose or broad set of goals. DOE’s research, development, and demonstration role focuses on enhancing the safe, efficient, and economical performance of the nation’s nuclear fleet while studying and mitigating aging phenomena and issues that are applicable to the service environments of operating reactors and require unique DOE laboratory expertise. Often, research and development (R&D) and demonstration activities are cost-shared, coordinated, or otherwise jointly conducted with industry, regulatory agencies, or other organizations through the aforementioned or other collaborative mechanisms. Operation of the existing fleet of plants to 60 years, extending the operating lifetimes of those plants beyond 60 years and, where practical, making further improvements in their productivity are essential to support the nation’s energy needs. Recently, several utilities have submitted or announced plans to submit applications to the U.S. NRC to begin the subsequent license-renewal process, extending the operating license period beyond 60 years from the date of their initial licensing. This marks an important planned milestone in the history of commercial nuclear power operations in the U.S.—one that underscores the long-term dependability of these plant designs and the commitment to their long-term performance by the organizations that operate them. The LWRS Program will continue to work with owner-operators to address the key issues needed to support the technical bases for continued safe long-term operation of our nation’s nuclear power assets.

42 ENGINEERING↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Efficacy of one-time rotenone application for Westslope Cutthroat Trout restoration in Boulder Creek, Montana

Abstract Objective Although piscicides are an important tool for native fish management, our understanding of native fish population dynamics posttreatment (i.e., in putatively vacant habitat) is limited. Methods Here, we describe long-term trends in size and abundance of Cutthroat Trout Oncorhynchus clarkii in Lower Boulder Lake and Boulder Creek (Montana). Result No significant differences were found before and after treatment with rotenone in mean length and population density in Boulder Creek. Posttreatment genetic samples from Boulder Lake and upper Boulder Creek consisted entirely of the Westslope Cutthroat Trout Oncorhynchus clarkii lewisi used to refound the population. Middle and lower Boulder Creek genetic samples contained 99.4% and 98.4% Westslope Cutthroat Trout, indicating that some nonnative (Yellowstone Cutthroat Trout Oncorhynchus clarkii bouvieri hybrid) fish survived the treatment. Population demographics showed robust recovery posttreatment; however, genetic results revealed the limitations of a one-time treatment—that is, an incomplete fish kill. Conclusion We demonstrate that Cutthroat Trout populations achieve recovery after rotenone treatment in the long term, but one-time rotenone treatments on large drainages often fail to totally eradicate populations. Therefore, managers should plan on multiple treatments and utilize environmental DNA to help achieve total removal of target species.

Lampton, Jared↗

Use of system code to estimate equilibrium tritium inventory in fusion DT machines, such as ARIES-AT and components testing facilities

ITER is under construction and will begin operation in 2020. This is the first 500 MWfusion class DT device, and since it is not going to breed tritium, it will consume most of the limited supply of tritium resources in the world. Yet, in parallel, DT fusion nuclear component testing machines will be needed to provide technical data for the design of DEMO. It becomes necessary to estimate the tritium burn-up fraction and corresponding initial tritium inventory and the doubling time of these machines for the planning of future supply and utilization of tritium. With the use of a system code, tritium burn-up fraction and initial tritium inventory for steady state DT machines can be estimated. Estimated tritium burn-up fractions of FNSF-AT, CFETR-R and ARIES-AT are in the range of 1–2.8%. Corresponding total equilibrium tritium inventories of the plasma flow and tritium processing system, and with the DCLL blanket option are 7.6 kg, 6.1 kg, and 5.2 kg for ARIES-AT, CFETR-R and FNSF-AT, respectively.

99 GENERAL AND MISCELLANEOUS↗

MO-H-19A-04: Multichannel CW Ultrasonic Thermometry for Imaging Therapeutic Dose Fields in Water

Purpose: To develop a scalable, multichannel ultrasonic thermometry system suitable for imaging clinical-beam dose distributions in a water phantom. Method: A small, glass-walled rectangular water phantom (15 cm × 20 cm × 30 cm) was filled with distilled water, and two ultrasonic transducers were placed on the outside, against opposing walls, approximately 5 cm below the water line, and were aligned to optimize transmission/reception of ultrasound between them. Two synchronized lock-in amplifiers were connected to the transducers to enable full-duplex operation of two separate ultrasonic frequency channels configured to transmit simultaneously through the same volume of water and thereby provide independent measurements of the temperature-dependent ultrasonic phase lag. Controlled heating of the water via immersed power resistors provided a means to study dependence of measured phase lag on temperature change for both channels; cross-correlation of the phase outputs enabled much smaller temperature fluctuations in the phantom to be used to ascertain the noise floor and achievable temperature resolution. Results: Temperature measurements from both channels, converted from phase measurements via polynomials available in the literature, exhibited the expected linear dependence of ultrasonic phase on temperature change (measured via calibrated thermistor probe). Cross-correlation analysis of phase fluctuations yielded rms noise estimates of approximately 1-2 microKelvin, comparable to that observed in standard water calorimeters. Conclusion: Phase-sensitive detection of cw ultrasound has been shown to provide temperature sensitivity needed for calorimetry of external treatment beams, and the present simple demonstration establishes that multiple channels may be run simultaneously without phase disturbances that currently affect time-of-flight techniques utilizing phase-detection. Immediate plans include doubling the number of sensors, to enable a simple tomographic reconstruction, and to test the system in Clinac x-rays and electron beams.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-E-J-17: Intra-Fractional Prostate Movement Correction During Treatment Delivery Period for Prostate Cancer Using the Intra-Fractional Orthogonal KV-MV Image Pairs

Purpose: To evaluate the intra-fractional prostate movement range during the beam delivery and implement new IGRT method to correct the prostate movement during the hypofractionated prostate treatment delivery. Methods: To evaluate the prostate internal motion range during the beam delivery, 11 conventional treatments were utilized. Two-arc RapidArc plans were used for the treatment delivery. Orthogonal KV imaging is performed in the middle of the treatment to correct intra-fractional prostate movement. However, it takes gantry-mounted on-board imaging system relative long time to finish the orthogonal KV imaging because of gantry rotation. To avoid gantry movement and accelerate the IGRT processing time, orthogonal KV-MV image pair is tested using the OBI daily QA Cube phantom. Results: The average prostate movement between two orthogonal KV image pairs was 0.38cm (0.20cm ∼ 0.85cm). And the interval time between them was 6.71 min (4.64min ∼ 9.22 min). 2-arc beam delivery time is within 3 minutes for conventional RapidArc treatment delivery. Hypofractionated treatment or SBRT need 4 partial arc and possible non-coplanar technology, which need much longer beam delivery time. Therefore prostate movement might be larger. New orthogonal KV-MV image pair is a new method to correct the prostate movement in the middle of the beam delivery if real time tracking method is not available. Orthogonal KV-MV image pair doesn’t need gantry rotation. Images were acquired quickly which minimized possible new prostate movement. Therefore orthogonal KV-MV image pair is feasible for IGRT. Conclusion: Hypofractionated prostate treatment with less PTV margin always needs longer beam delivery time. Therefore prostate movement correction during the treatment delivery is critical. Orthogonal KV-MV imaging pair is efficient and accurate to correct the prostate movement during treatment beam delivery. Due to limited fraction number and high dose per fraction, the MV imaging dose is negligible.

60 APPLIED LIFE SCIENCES↗

SU-F-J-172: Hybrid MR/CT Compatible Phantom for MR-Only Based Radiotherapy

Purpose: Development of hybrid MR/CT compatible phantom was introduced to fully establish MR image only radiation treatment and this suggested technique using in-house developed hybrid MR/CT compatible phantom image would utilize to generate radiation treatment planning and perform dose calculation without multi-modal registration process or generation of pseudo CT. Methods: Fundamental characteristics for “hybrid MR/CT compatible phantom” was established: Relaxation times equivalent to human tissue, dielectric properties, homogeneous relaxation times, sufficient strength to fabricate a torso, ease of handling, a wide variety of density material for calibration, chemical and physical stability over an extended time. For this requirements, chemical component in each tested plug which would be tissue equivalent to human tissue on MR and CT image and production of phantom body and plug was performed. Chemical component has described below: Agaros, GdCl{sub 3}, NaN{sub 3}, NaCl, K{sub 2}Co{sub 3}, deionized-distilled water. Various mixture of chemical component to simulate human tissue on both MR and CT image was tested by measuring T1, T2 relaxation time and signal intensity (SI) on MR image and Hounsfield unit (HU) on CT and each value was compared. The hybrid MR/CT compatible phantom with 14 plugs was designed and has made. Total height and external diameter was decided by internal size of 32 channel MR head-coil. Results: Tissue-equivalent chemical component materials and hybrid MR/CT compatible phantom was developed. The range of T1, T2 relaxation time and SI on MR image, HU on CT was acquired and could be adjusted to correspond to simulated human tissue. Conclusion: Current result shows its possibility for MR-only based radiotherapy and the best mixing rate of chemical component for tissue-equivalent image on MR and CT was founded. However, additional technical issues remain to be overcome. Conversion of SI on MR image into HU and dose calculation based on converted MRI will be progressing.

60 APPLIED LIFE SCIENCES↗

Assessing Self-Definition and Relatedness in Level of Personality Functioning

The two polarities model (TPM) of personality organizes psychological assessment and psychotherapy and connects to personality disorder diagnosis using the DSM-5 Alternative Model for Personality Disorders (AMPD). The authors developed scales assessing the TPM from an existing self-report measure for level of personality functioning (LPF), a core component of the AMPD. Iterative content analyses of the LPF measure yielded scales for Autonomy and Communion corresponding to dimensions of the TPM. The scales were refined via internal consistency analyses using a measure of psychological attachment and studied in development and validation samples. Associations with relevant external criteria were explored in a series of multiple regressions. Furthermore, the new content-based LPF scales were illustrated with a case vignette. Although the new Autonomy/Communion scales await further validation prior to clinical use, initial evidence suggests that they may bridge the nomological nets of the TPM and AMPD and potentially offer clinical utility in assessment and treatment planning.

60 APPLIED LIFE SCIENCES↗

Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?

The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment plan for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.

33 ADVANCED PROPULSION SYSTEMS↗

Connecting LWRS Human Factor Engineering R&D to NUREG-0711 Elements and Modification Activities in Nuclear Power Plants

This Report documents the connection between DOE INL LWRS HFE R&D activities and the technical content of NUREG-0711 Results Summary Reports. Since the current and most recent LWRS HFE activities are associated with modernization and modification of nuclear power electric generating stations, this Report will limit its scope to these topics. NUREG-0711 Results Summary Reports content is shared with US nuclear generating stations by INL HFE staff through HFE Technical Reports to identify potential HEDs with planned upgrades. With such information, utilities have confidence that their upgraded HMIs, operating procedures, conduct of operations, and training with the upgraded systems will ensure their continued safe control of the nuclear plant. The utilities use the HFE Technical Reports as basis documents in their licensing processes used to modify the plant (LAR or 10CFR50.59). For plant modifications, LWRS HFE R&D activities commence as early as an agreement is reached between the utility and the LWRS Program staff. The multiple interfaces usually result in the two organizations meeting at INL, at the utility’s site, and at the vendor’s facility. Since there generally is a shortage of utility based HFE experience, INL HFE staff supports the HFE related utility modernization & modification (obsolescence) activities whenever requested.

10 CFR 50.59↗

The Bridge

To be presented April 5 at the National Radiological Emergency Preparedness Conference: https://www.nationalrep.org/ - an annual conference of federal, state, utility and other stakeholders who plan and prepare for nuclear power plant emergencies. Co-author/presenter is Brennen Brunner (New Hampshire Dept of Public Health).

61 RADIATION PROTECTION AND DOSIMETRY↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

BuildingsBench: A Large-Scale Dataset of 900K Buildings and Benchmark for Short-Term Load Forecasting

The BuildingsBench datasets consist of: - Buildings-900K: A large-scale dataset of 900K buildings for pretraining models on the task of short-term load forecasting (STLF). Buildings-900K is statistically representative of the entire U.S. building stock. - 7 real residential and commercial building datasets for benchmarking two downstream tasks evaluating generalization: zero-shot STLF and transfer learning for STLF. Buildings-900K can be used for pretraining models on day-ahead STLF for residential and commercial buildings. The specific gap it fills is the lack of large-scale and diverse time series datasets of sufficient size for studying pretraining and finetuning with scalable machine learning models. Buildings-900K consists of synthetically generated energy consumption time series. It is derived from the NREL End-Use Load Profiles (EULP) dataset (see link to this database in the links further below). However, the EULP was not originally developed for the purpose of STLF. Rather, it was developed to "...help electric utilities, grid operators, manufacturers, government entities, and research organizations make critical decisions about prioritizing research and development, utility resource and distribution system planning, and state and local energy planning and regulation." Similar to the EULP, Buildings-900K is a collection of Parquet files and it follows nearly the same Parquet dataset organization as the EULP. As it only contains a single energy consumption time series per building, it is much smaller (~110 GB). BuildingsBench also provides an evaluation benchmark that is a collection of various open source residential and commercial real building energy consumption datasets. The evaluation datasets, which are provided alongside Buildings-900K below, are collections of CSV files which contain annual energy consumption. The size of the evaluation datasets altogether is less than 1GB, and they are listed out below: 1. ElectricityLoadDiagrams20112014 2. Building Data Genome Project-2 3. Individual household electric power consumption (Sceaux) 4. Borealis 5. SMART 6. IDEAL 7. Low Carbon London A README file providing details about how the data is stored and describing the organization of the datasets can be found within each data lake version under BuildingsBench.

Array↗

Bias correcting regional scale Earth system model projections: novel approach using empirical mode decomposition

Bias correction is a crucial step in using Earth system model outputs for assessments, as it adjusts systematic errors by comparing the model to observations. However, standard methods – ranging from mean-based linear scaling to distribution-based quantile mapping typically treat bias correction as a single-scale process, overlooking the fact that biases can manifest differently across daily, seasonal, and annual timescales. In this study, we propose a novel, timescale-aware bias-correction approach built on Empirical Mode Decomposition. By decomposing the meteorological signal into multiple oscillatory components and aggregating them to represent distinct timescales, we apply targeted corrections to each component, thereby preserving both short- and long-term structure in the data. Experimental illustrations show that the timescale-aware EMDBC framework matches the performance of conventional quantile-delta mapping (QDM) at the native daily scale and achieves progressively larger bias reductions at bi-weekly, seasonal, and annual scales. As a result, the proposed approach offers a more robust path to accurate and reliable Earth system projections, strengthening their utility for resilience and adaptation planning.

Ganguli, Arkaprabha [Argonne National Laboratory (↗

Modular space station, phase B extension. Information management advanced development. Volume 5: Software assembly

The development of uniform computer program standards and conventions for the modular space station is discussed. The accomplishments analyzed are: (1) development of computer program specification hierarchy, (2) definition of computer program development plan, and (3) recommendations for utilization of all operating on-board space station related data processing facilities.

Gerber, C. R.↗