Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Trigger-based Incremental Data Processing with Unified Sync and Async Model

In recent years, more and more applications in the cloud have needs to process large-scale on-line datasets, which evolve over time as new entries are added and existing entries are modified. Several programming frameworks, such as Percolator and Oolong, are proposed for such incremental data processing and can achieve efficient processing with an event-driven abstraction. However, these frameworks are inherently asynchronous, leaving the heavy burden of managing synchronization to applications' developers, which further significantly restricts their usabilities. In this study, we propose a trigger-based incremental computing framework in the cloud, called Domino, with both synchronous and asynchronous mechanisms to coordinate parallel triggers. With this new framework, both synchronous and asynchronous applications can be seamlessly developed. Use cases and extensive evaluation results confirm that it can deliver sufficient performance, and also is easy to use for incremental applications in large-scale distributed computing.

97 MATHEMATICS AND COMPUTING↗

Performance Testing and Assessment of Protection Scheme Using Real-Time Hardware-in-the-Loop and IEC 61850 Standard

The main challenge of the microgrid is to design a suitable protection scheme due to the complexity of the architecture of the microgrid. The importance of the proposed protection technique is threefold. First, it presents a co-simulation platform to integrate between a simulated model on power system computer aided design (PSCAD)/real time digital simulator computer aided design (RSCAD) software’s and physical devices schweitzer engineering laboratories (SEL) 421-7 relays to protect the microgrid that includes different resources connected based on inverter interface. Second, it presents a comprehensive hardware/software setup to test the protective relays in a closed loop system and shows how to configure the protective relay’s International Electrotechnical Commission 61850 communications. Third, IEEE 1588 standard is used to provide sub nanoseconds latency between the simulated model that emulated on real time digital simulator (RTDS) and the external devices. Also, the measurement signals are synchronized between RTDS and the external devices using giga-transceiver synchronization card (GTSYNC) interface card and SEL-2488 satellite-synchronized network clock. The results showed that the co-simulation infrastructure introduces a highly dependable design, analysis, and testing environment for cyber and physical data flow in the system. Besides that, the voltages at ac/dc sides and frequency at fault condition were maintained due to the energy storage device contributions at different modes of operation.

42 ENGINEERING↗

Grid Forming Fast Frequency Response for PMSG-Based Wind Turbines

Electric power systems are undergoing a rapid transition from fuel-based generation using synchronous generators to renewable generation interfaced by power electronics. In this context, a key challenge is using renewable generation with limited controllability to contribute to power system stability. In this work, we investigate grid-forming control of permanent magnet synchronous generator (PMSG) wind turbines. The proposed control and curtailment strategy supports the entire spectrum of standard functions of grid-following (e.g. maximum power point tracking (MPPT) and grid-forming control (e.g., primary frequency control) without explicit mode switching. A detailed case study is used to compare the performance of the proposed control at operating points corresponding to MPPT and frequency control with standard grid-forming and grid-following controls. Further, the results demonstrate that (i) the proposed energy balancing grid forming control is self-synchronizing in MPPT mode, (ii) the (limited) energy storage and controllability of wind turbines can be adequately utilized to provide grid support, and (ii) the proposed control exhibits good performance under variable wind speeds and does not result in a significant increase of wind turbine fatigue loads.

17 WIND ENERGY↗

Grid Forming Control Tuning for a Hybrid Inverter-Based Resource Power Plant

A hybrid inverter-based resource (IBR) power plant consists of grid-following (GFL) and grid-forming inverter-based resources (GFM-IBR) connected in parallel. Here, this research focuses on how to design and tune GFM's control parameters to ensure stable operation of the hybrid power plant for weak and strong grid conditions. We consider two design cases: one where the GFL-IBR does not provide frequency support, and one where it does. It is found that the GFM's power-frequency synchronizing system can lose stability when the power-frequency droop constant is large and/or the grid is strong. Additionally, if the GFL has its frequency support enabled, oscillation stability worsens. To explain the mechanism of the interactions, we construct a feedback system for the synchronizing loop, which consists of the GFM's power-frequency droop control that generates the GFM's synchronizing angle, the GFL's phase-locked loop that measures the voltage phase angle, the GFL's frequency-power control that generates its power order, and the rest of the system. The feedback system is effective in illustrating the potential stability risks. Successful design ensures that the hybrid power plant can operate smoothly and ride through grid disturbances.

feedback systems↗

Relative reproductive phenology and synchrony affect neonate survival in a nonprecocial ungulate

Abstract Degree of reproductive synchronization in prey is hypothesized as a predator defense strategy reducing prey risk via predator satiation or predator avoidance. Species with precocial young, especially those exposed to specialist predators, should be highly synchronous to satiate predators (predator satiation hypothesis), while prey with nonprecocial (i.e. altricial) young, especially those exposed to generalist predators, should become relatively asynchronous to avoid predator detection (predator avoidance hypothesis). The white‐tailed deer Odocoileus virginianus in North America is an example of a nonprecocial ungulate that uses the hider strategy early in life; its primary predator (coyote; Canis latrans ) is a generalist, making white‐tailed deer a good model species to test the predator avoidance hypothesis. We used birth dates and known fates of white‐tailed deer neonates ( n = 1,032) across nine study sites varying in relative synchrony and predator assemblages to test the predator avoidance hypothesis. We predicted that relative birthing asynchrony of the population would increase relative survival at the population level; therefore, at the individual scale, neonate birth date nearer to mean birthing date in a respective population would not influence individual survival. Coyotes were responsible for the majority of predation events, and survival of those neonates increased the closer the individual was born to peak birthing season in each respective population. Also, at the population level, reproductive asynchronization negatively affected survival. Contrary to the predator avoidance hypothesis, our data indicate patterns in neonate survival for white‐tailed deer better support the predator satiation hypothesis at the individual and population level. Additionally, coyotes may present a selective force great enough to shift reproductive synchrony such that predator satiation may become a feasible defense strategy for neonates at local spatial scales. Our results indicate that synchronizing reproduction may still be the most effective strategy to reduce individual predation risk from generalist predators, particularly when the window of heightened resource availability to the prey is narrow. A free Plain Language Summary can be found within the Supporting Information of this article.

Michel, Eric S.↗

Asynchronous demographic responses to Pleistocene climate change in Eastern Nearctic vertebrates

Abstract Pleistocene climatic cycles altered species distributions in the Eastern Nearctic of North America, yet the degree of congruent demographic response to the Pleistocene among codistributed taxa remains unknown. We use a hierarchical approximate Bayesian computational approach to test if population sizes across lineages of snakes, lizards, turtles, mammals, birds, salamanders and frogs in this region expanded synchronously to Late Pleistocene climate changes. Expansion occurred in 75% of 74 lineages, and of these, population size trajectories across the community were partially synchronous, with coexpansion found in at least 50% of lineages in each taxonomic group. For those taxa expanding outside of these synchronous pulses, factors related to when they entered the community, ecological thresholds or biotic interactions likely condition their timing of response to Pleistocene climate change. Unified timing of population size change across communities in response to Pleistocene climate cycles is likely rare in North America.

Burbrink, Frank T.↗

SU-F-BRE-16: VMAT Commissioning and Quality Assurance (QA) of An Elekta Synergy-STM Linac Using ICOM Test HarnessTM

Purpose: To establish a set of tests based on the iCOM software that can be used to commission and perform periodic QA of VMAT delivery on the Elekta Synergy-S, commonly known as the Beam Modulator (BM). Methods: iCOM is used to create and deliver customized treatment fields to characterize the system in terms of 1) MLC positioning accuracy under static and dynamic delivery with full gantry rotation, 2) MLC positioning with known errors, 3) Maximum dose rate, 4) Maximum MLC speed, 5) Maximum gantry speed, 6) Synchronization: gantry speed versus dose rate, and 7) Synchronization: MLC speed versus dose rate. The resulting images were captured on the iView GT and exported in DICOM format to Dosimetry Check™ system for visual and quantitative analysis. For the initial commissioning phase, the system tests described should be supplemented with extensive patient QAs covering all clinically relevant treatment sites. Results: The system performance test suite showed that on our Synergy-S, MLC positioning was accurate under both static and dynamic deliveries. Intentional errors of 1 mm were also easily identified on both static and dynamic picket fence tests. Maximum dose rate was verified with stop watch to be consistently between 475-480 MU/min. Maximum gantry speed and MLC speed were 5.5 degree/s and 2.5 cm/s respectively. After accounting for beam flatness, both synchronization tests, gantry versus dose rate and MLC speed versus dose rate, were successful as the fields were uniform across the strips and there were no obvious cold/hot spots. Conclusion: VMAT commissioning and quality assurance should include machine characterization tests in addition to patient QAs. Elekta iCOM is a valuable tool for the design of customized VMAT field with specific MU, MLC leaf positions, dose rate, and indirect control of MLC and gantry speed at each of its control points.

07 ISOTOPE AND RADIATION SOURCES↗

Quantum coherence–driven self-organized criticality and nonequilibrium light localization

Self-organized criticality emerges in dynamical complex systems driven out of equilibrium and characterizes a wide range of classical phenomena in physics, geology, and biology. We report on a quantum coherence–controlled self-organized critical transition observed in the light localization behavior of a coherence-driven nanophotonic configuration. Our system is composed of a gain-enhanced plasmonic heterostructure controlled by a coherent drive, in which photons close to the stopped-light regime interact in the presence of the active nonlinearities, eventually synchronizing their dynamics. In this system, on the basis of analytical and corroborating full-wave Maxwell-Bloch computations, we observe quantum coherence–controlled self-organized criticality in the emergence of light localization arising from the synchronization of the photons. It is associated with two first-order phase transitions: one pertaining to the synchronization of the dynamics of the photons and the second pertaining to an inversionless lasing transition by the coherent drive. The so-attained light localization, which is robust to dissipation, fluctuations, and many-body interactions, exhibits scale-invariant power laws and absence of finely tuned control parameters. We also found that, in this nonequilibrium dynamical system, the effective critical “temperature” of the system drops to zero, whereupon one enters the quantum self-organized critical regime.

36 MATERIALS SCIENCE↗

Orientational dynamics of a ferronematic liquid crystal in a rotating magnetic field

The behavior of the orientational structure of a ferronematic in a rotating uniform magnetic field is investigated using the continual theory. The time-dependent system of equations describing the dynamics of the ferronematic is derived. The dependences of the angles of rotation of the director and of the magnetization of the ferronematic on the velocity of field rotation are determined for various values of the material parameters. Two regimes (synchronous and asynchronous) of rotation of the ferronematic structure are detected. In the synchronous regime, the director rotates with the frequency of the magnetic field and a constant phase delay. The asynchronous regime is characterized by a time-dependent phase delay. The dependence of the critical angular velocity of magnetic field rotation, which determines the boundary between the synchronous and asynchronous regimes, on the magnetic field strength is derived.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Mixed Presence Collaboration using Scalable Visualizations in Heterogeneous Display Spaces

Mixed presence collaboration involves remote collaboration between multiple collocated groups. This paper presents the design and results of a user study that focused on mixed presence collaboration using large-scale tiled display walls. The research was conducted in order to compare data synchronization schemes for multi-user visualization applications. Our study compared three techniques for sharing data between display spaces with varying constraints and affordances. The results provide empirical evidence that using data sharing techniques with continuous synchronization between the sites lead to improved collaboration for a search and analysis task between remotely located groups. We have also identified aspects of synchronized sessions that result in increased remote collaborator awareness and parallel task coordination. It is believed that this research will lead to better utilization of large-scale tiled display walls for distributed group work.

data-conferencing↗

Rootless Operations for MPI (RLO) v0.1

Flexible communication routines that enable high-performance computing (HPC) applications to operate with less synchronization are a great benefit to application algorithm creation and developer productivity. Further, communication operations that reduce synchronization in HPC applications while continuing to scale well are critical to application performance in the exascale era. We have implemented mechanisms that allow an application to scalably execute bcast/iAllReduce from any MPI rank without specifying the origin of the message in advance, demonstrating application development flexibility, highly scalable operation, and reduced application synchronization.

Li, Tonglin↗

Virtual machine-based simulation platform for mobile ad-hoc network-based cyber infrastructure

In modeling and simulating complex systems such as mobile ad-hoc networks (MANETs) in de-fense communications, it is a major challenge to reconcile multiple important considerations: the rapidity of unavoidable changes to the software (network layers and applications), the difficulty of modeling the critical, implementation-dependent behavioral effects, the need to sustain larger scale scenarios, and the desire for faster simulations. Here we present our approach in success-fully reconciling them using a virtual time-synchronized virtual machine(VM)-based parallel ex-ecution framework that accurately lifts both the devices as well as the network communications to a virtual time plane while retaining full fidelity. At the core of our framework is a scheduling engine that operates at the level of a hypervisor scheduler, offering a unique ability to execute multi-core guest nodes over multi-core host nodes in an accurate, virtual time-synchronized manner. In contrast to other related approaches that suffer from either speed or accuracy issues, our framework provides MANET node-wise scalability, high fidelity of software behaviors, and time-ordering accuracy. The design and development of this framework is presented, and an ac-tual implementation based on the widely used Xen hypervisor system is described. Benchmarks with synthetic and actual applications are used to identify the benefits of our approach. The time inaccuracy of traditional emulation methods is demonstrated, in comparison with the accurate execution of our framework verified by theoretically correct results expected from analytical models of the same scenarios. In the largest high fidelity tests, we are able to perform virtual time-synchronized simulation of 64-node VM-based full-stack, actual software behaviors of MANETs containing a mix of static and mobile (unmanned airborne vehicle) nodes, hosted on a 32-core host, with full fidelity of unmodified ad-hoc routing protocols, unmodified application executables, and user-controllable physical layer effects including inter-device wireless signal strength, reachability, and connectivity.

97 MATHEMATICS AND COMPUTING↗

Data from Managing Flowering Time in Miscanthus and Sugarcane to Facilitate Intra- and Intergeneric Crosses

Miscanthus is a close relative of saccharum and a potentially valuable genetic resource for improving sugarcane. Differences in flowering time within and between miscanthus and saccharum hinders intra- and interspecific hybridizations. A series of greenhouse experiments were conducted over three years to determine how to synchronize flowering time of saccharum and miscanthus genotypes. We found that day length was an important factor influencing when miscanthus and saccharum flowered. Sugarcane could be induced to flower in a central Illinois greenhouse using supplemental lighting to reduce the rate at which days shortened during the autumn and winter to 1 min d-1, which allowed us to synchronize the flowering of some sugarcane genotypes with Miscanthus genotypes primarily from low latitudes. In a complementary growth chamber experiment, we evaluated 33 miscanthus genotypes, including 28 M. sinensis , 2 M. floridulus , and 3 M. ×giganteus collected from 20.9° S to 44.9° N for response to three day lengths (10 h, 12.5 h, and 15 h). High latitude-adapted M. sinensis flowered mainly under 15 h days, but unexpectedly, short days resulted in short, stocky plants that did not flower; in some cases, flag leaves developed under short days but heading did not occur. In contrast, for M. sinensis and M. floridulus from low latitudes, shorter day lengths typically resulted in earlier flowering, and for some low latitude genotypes, 15 h days resulted in no flowering. However, the highest ratio of reproductive shoots to total number of culms was typically observed for 12.5 h or 15 h days. Latitude of origin was significantly associated with culm length, and the shorter the days, the stronger the relationship. Nearly all entries achieved maximal culm length under the 15 h treatment, but the nearer to the equator an accession originated, the less of a difference in culm length between the short-day treatments and the 15 h day treatment. Under short days, short culms for high-latitude accessions was achieved by different physiological mechanisms for M. sinensis genetic groups from the mainland in comparison to those from Japan; for mainland accessions, the mechanism was reduced internode length, whereas for Japanese accessions the phyllochron under short days was greater than under long days. Thus, for M. sinensis , short days typically hastened floral induction, consistent with the expectations for a facultative short-day plant. However, for high latitude accessions of M. sinensis , days less than 12.5 h also signaled that plants should prepare for winter by producing many short culms with limited elongation and development; moreover, this response was also epistatic to flowering. Thus, to flower M. sinensis that originates from high latitudes synchronously with sugarcane, the former needs day lengths >12.5 h (perhaps as high as 15 h), whereas that the latter needs day lengths <12.5 h.

Feedstock Production↗

Managing flowering time in Miscanthus and sugarcane to facilitate intra- and intergeneric crosses

Miscanthus is a close relative of Saccharum and a potentially valuable genetic resource for improving sugarcane. Differences in flowering time within and between Miscanthus and Saccharum hinders intra- and interspecific hybridizations. A series of greenhouse experiments were conducted over three years to determine how to synchronize flowering time of Saccharum and Miscanthus genotypes. We found that day length was an important factor influencing when Miscanthus and Saccharum flowered. Sugarcane could be induced to flower in a central Illinois greenhouse using supplemental lighting to reduce the rate at which days shortened during the autumn and winter to 1 min d -1 , which allowed us to synchronize the flowering of some sugarcane genotypes with Miscanthus genotypes primarily from low latitudes. In a complementary growth chamber experiment, we evaluated 33 Miscanthus genotypes, including 28 M . sinensis , 2 M . floridulus , and 3 M . ×giganteus collected from 20.9° S to 44.9° N for response to three day lengths (10 h, 12.5 h, and 15 h). High latitude-adapted M . sinensis flowered mainly under 15 h days, but unexpectedly, short days resulted in short, stocky plants that did not flower; in some cases, flag leaves developed under short days but heading did not occur. In contrast, for M . sinensis and M . floridulus from low latitudes, shorter day lengths typically resulted in earlier flowering, and for some low latitude genotypes, 15 h days resulted in no flowering. However, the highest ratio of reproductive shoots to total number of culms was typically observed for 12.5 h or 15 h days. Latitude of origin was significantly associated with culm length, and the shorter the days, the stronger the relationship. Nearly all entries achieved maximal culm length under the 15 h treatment, but the nearer to the equator an accession originated, the less of a difference in culm length between the short-day treatments and the 15 h day treatment. Under short days, short culms for high-latitude accessions was achieved by different physiological mechanisms for M . sinensis genetic groups from the mainland in comparison to those from Japan; for mainland accessions, the mechanism was reduced internode length, whereas for Japanese accessions the phyllochron under short days was greater than under long days. Thus, for M . sinensis , short days typically hastened floral induction, consistent with the expectations for a facultative short-day plant. However, for high latitude accessions of M . sinensis , days less than 12.5 h also signaled that plants should prepare for winter by producing many short culms with limited elongation and development; moreover, this response was also epistatic to flowering. Thus, to flower M . sinensis that originates from high latitudes synchronously with sugarcane, the former needs day lengths >12.5 h (perhaps as high as 15 h), whereas that the latter needs day lengths <12.5 h.

54 ENVIRONMENTAL SCIENCES↗

Renewable Source Controls for Grid Stability

The goal of this study was to evaluate the small signal and transient stability of the Western Electricity Coordinating Council (WECC) under high penetrations of renewable energy, and to identify control technologies that would improve the system performance. The WECC is the regional entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. Transient stability is the ability of the power system to maintain synchronism after a large disturbance while small signal stability is the ability of the power system to maintain synchronism after a small disturbance. Transient stability analysis usually focuses on the relative rotor angle between synchronous machines compared to some stability margin. For this study we employed generator speed relative to system speed as a metric for assessing transient stability. In addition, we evaluated the system transient response using the system frequency nadir, which provides an assessment of the adequacy of the primary frequency control reserves. Small signal stability analysis typically identifies the eigenvalues or modes of the system in response to a disturbance. For this study we developed mode shape maps for the different scenarios. Prony analysis was applied to generator speed after a 1.4 GW, 0.5 second, brake insertion at various locations. Six different WECC base cases were analyzed, including the 2022 light spring case which meets the renewable portfolio standards. Because of the difficulty in identifying the cause and effect relationship in large power system models with different scenarios, several simulations were run on a 7-bus, 5-generator system to isolate the effects of different configurations. Based on the results of the study, for a large power system like the WECC, incorporating frequency droop into wind/solar systems provides a larger benefit to system transient response than replacing the lost inertia with synthetic inertia. From a small signal stability perspective, the increase in renewable penetration results in subtle changes to the system modes. In general, mode frequencies increase slightly, and mode shapes remain similar. The system frequency nadir for the 2022 light spring case was slightly lower than the other cases, largely because of the reduced system inertia. However, the nadir is still well above the minimum load shedding frequency of 59.5 Hz. Finally, several discrepancies were identified between actual and reported wind penetration, and additional work on wind/solar modeling is required to increase the fidelity of the WECC models.

power system stability↗

Continued Data Acquisition Development

This task focused on improving techniques for integrating data acquisition of secondary particles correlated in time with detected cosmic-ray muons. Scintillation detectors with Pulse Shape Discrimination (PSD) capability show the most promise as a detector technology based on work in FY13. Typically PSD parameters are determined prior to an experiment and the results are based on these parameters. By saving data in list mode, including the fully digitized waveform, any experiment can effectively be replayed to adjust PSD and other parameters for the best data capture. List mode requires time synchronization of two independent data acquisitions (DAQ) systems: the muon tracker and the particle detector system. Techniques to synchronize these systems were studied. Two basic techniques were identified: real time mode and sequential mode. Real time mode is the preferred system but has proven to be a significant challenge since two FPGA systems with different clocking parameters must be synchronized. Sequential processing is expected to work with virtually any DAQ but requires more post processing to extract the data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Implementing a Terrestrial Timing Solution: Best Practices

This document is an overview and guide on the concept of precision time and how an alternative terrestrial timing solution to the Global Positioning System (GPS) can be implemented. What follows is a set of recommendations and best practices, derived from research at Oak Ridge National Laboratory (ORNL), across industry, and within the U.S. government, to implement a system of precision timing synchronization to support resilient operations for the U.S. grid. Precision time is a fundamental necessity for operating the grid today, and it becomes even more important as the grid modernizes with clean energy sources, microgrids, and precision sensors placed throughout the grid system to ensure failureresistant operations. The Global Navigation Satellite System (GNSS), which includes (GPS), is currently the primary provider of precision timing today. A terrestrial-based system for time delivery and synchronization to augment GPS is outlined below and it would provide secure time, synchronized with Coordinated Universal Time (UTC), in the event of outages or other interruptions associated with time delivery.

47 OTHER INSTRUMENTATION↗

Progress in developing a superconducting accelerator for efficient eBeam and X-ray production

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

43 PARTICLE ACCELERATORS↗