Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Transonic wind tunnel tests of A.015 scale space shuttle orbiter model, volume 1

Transonic wind tunnel tests were run on a 0.015 scale model of the Space Shuttle Orbiter Vehicle in an eight-foot tunnel during August 1975. The purpose of the program was to obtain basic shuttle aerodynamic data through a full range of elevon and aileron deflections, verification of data obtained at other facilities, and effects of Reynolds numbers. The first part of a discussion of test procedures and results in both tabular and graphical form were presented. Tests were performed at Mach numbers from 0.35 to 1.20, and at Reynolds numbers for 3.5 million to 8.2 million per foot. The angle of attack was varied from -1 to +20 degrees at sideslip angles of -2, 0, +2 degrees. Sideslip was varied from -6 to +8 degrees at constant angles of attack from 0 to +20 degrees. Various aileron and ailevon settings were tested for various angles of attack.

Struzynski, N. A.↗

Transonic wind tunnel tests of a .015 scale space shuttle orbiter model, volume 2

Transonic wind tunnel tests were run on a 0.015 scale model of the Space Shuttle Orbiter Vehicle in an eight-foot tunnel during August 1975. The purpose of the program was to obtain basic shuttle aerodynamic data through a full range of elevon and aileron deflections, verification of data obtained at other facilities, and effects of Reynolds numbers. The second part of a discussion of test procedures and results in both tabular and graphical form were presented. Tests were performed at Mach numbers from 0.35 to 1.20, and at Reynolds numbers from 3.5 million to 8.2 million per foot. The angle of attack was varied from -2 to +20 degrees at sideslip angles of -2, 0, +2 degrees. Sideslip was varied from -6 to +8 degrees at constant angles of attack from 0 to +20 degrees. Various aileron and ailevon settings were tested for various angles of attack.

Struzynski, N. A.↗

Transonic high Reynolds number stability and control characteristics of a 0.015-scale remotely controlled elevon model (44-0) of the space shuttle orbiter tested in calspan 8-foot TWT (LA70)

Transonic Wind Tunnel tests were run on a .015 scale model of the space shuttle orbiter vehicle in the 8-foot transonic wind tunnel. Purpose of the test program was to obtain basic shuttle aerodynamic data through a full range of elevon and aileron deflections, verification of data obtained at other facilities, and effects of Reynolds number. Tests were performed at Mach numbers from .35 to 1.20 and Reynolds numbers from 3,500,000 to 8,200,000 per foot. The high Reynolds number conditions (nominal 8,000,000/foot) were obtained using the ejector augmentation system. Angle of attack was varied from -2 to +20 degrees at sideslip angles of -2, 0, and +2 degrees. Sideslip was varied from -6 to +8 degrees at constant angles of attack from 0 to +20 degrees. Aileron settings were varied from -5 to +10 degrees at elevon deflections of -10, 0, and +10 degrees. Fixed aileron settings of 0 and 2 degrees in combination with various fixed elevon settings between -20 and +5 degrees were also run at varying angles of attack.

Parrell, H.↗

Orbital construction demonstration study. Volume 1: Executive summary

A conceptual design and program plan for an Orbital Construction Demonstration Article (OCDA), that can be used for technology growth and verification, and as the construction facility for a variety of large structures is presented. The OCDA design includes a large work platform, a rotating manipulator boom, a 250 kw solar array, and a core module of subsystems with a total mass of 37,093 kg, that can be assembled in three shuttle flights. An analysis of OCDA continued utility potential indicates that a shuttle tended platform with 250 kW of power can effectively be used to construct highly beneficial antenna systems and large demonstration articles that advance solar power satellite technologies. The construction of 100 m parabolic reflectors for use as a radiometer for measuring soil moisture and water salinity was found to be within the capabilities of OCDA concept. With 252 fixed beams for high population centers, and 16 scanning beams for rural areas, the antenna has the potential to significantly improve U.S. space based communications systems. The OCDA, that is slightly increased in size, was found adequate to build a large 2 MW solar array which, when coupled to a transmit antenna, demonstrate power transfer from space to ground.

Source record↗

Overview of the instrumentation program

This program is aimed at developing sensors and measurement systems capable of obtaining the data necessary for the verification of computational models of the structural behavior, the fatigue life, and the environmental conditions pertinent to advanced reusable space propulsion systems. One of the characteristics of measurement systems needed to verify codes is that the sensors must be nonintrusive or at least minimally intrusive so as not to significantly perturb the conditions being measured. This leads to a heavy emphasis on laser optical techniques and on thin-film sensors. Another characteristic of such instruments is that they must be highly accurate and produce very high spatial and temporal resolution of the parameter being measured. The measurement systems needed generally fall into a number of broad categories. First there are the measurements needed on the surfaces of components such as turbine blades and vanes. Some of the desired parameters are temperature, strain, and heat flux. Another broad category encompasses those measurements needed in the flow environment around these components. Here, the desired results are high resolution maps of such parameters as flow velocity, temperature, density, pressure, and species concentration. The remaining category deals with measurements necessary for monitoring the health of the engine. This category has loomed ever more important since the Challenger disaster. An optical method for determining the characteristics of the plume is presented. Holographic measurement of structural damage is also presented.

Nieberding, William C.↗

Validation of the dynamic response of a blade-element UH-60 simulation model in hovering flight

The dynamic fidelity of an operational blade-element simulation model of the UH-60 helicopter is assessed for the hovering and low-speed flight regimes. Nonparametric frequency-domain identification techniques and time-history comparisons are used to determine the validity of total-vehicle on-axis and coupled responses. A dedicated flight-test program was conducted to provide data used in the analysis. The flight-test techniques and data verification methods employed are briefly described. Frequency-domain methods are applied to the model and to several model components in order to isolate deficiencies and verify refinements and corrections. Model deficiencies are also identified by using side-by-side pilot assessments of a motion-base simulation and of a test aircraft. Model updates are found to significantly improve fidelity in the frequency range that is of interest to handling-qualities research. The applicability of the model to high-bandwidth flight-control research is also discussed.

Dalang-Secretan, Marie-Alix↗

Software assurance standard

This standard specifies the software assurance program for the provider of software. It also delineates the assurance activities for the provider and the assurance data that are to be furnished by the provider to the acquirer. In any software development effort, the provider is the entity or individual that actually designs, develops, and implements the software product, while the acquirer is the entity or individual who specifies the requirements and accepts the resulting products. This standard specifies at a high level an overall software assurance program for software developed for and by NASA. Assurance includes the disciplines of quality assurance, quality engineering, verification and validation, nonconformance reporting and corrective action, safety assurance, and security assurance. The application of these disciplines during a software development life cycle is called software assurance. Subsequent lower-level standards will specify the specific processes within these disciplines.

Source record↗

Helium 2 slosh in low gravity

This paper describes the status and plans for the work being performed under NASA NRA contract NASW-4803 so that members of the Microgravity Fluid Dynamics Discipline Working Group are aware of this program. The contract is a cross-disciplinary research program and is administered under the Low Temperature Microgravity Research Program at the Jet Propulsion Laboratory. The purpose of the project is to perform low-gravity verification experiments on the slosh behavior of He II to use in the development of a CFD model that incorporates the two-fluid physics of He II. The two-fluid code predicts a different fluid motion response in low-gravity environment from that predicted by a single-fluid model, while the 1g response is identical for the both types of model.

Ross, Graham O.↗

Putting EVM to the Test

IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

Kerby, Jerald↗

Development of Advanced Verification and Validation Procedures and Tools for the Certification of Learning Systems in Aerospace Applications

Adaptive control technologies that incorporate learning algorithms have been proposed to enable automatic flight control and vehicle recovery, autonomous flight, and to maintain vehicle performance in the face of unknown, changing, or poorly defined operating environments. In order for adaptive control systems to be used in safety-critical aerospace applications, they must be proven to be highly safe and reliable. Rigorous methods for adaptive software verification and validation must be developed to ensure that control system software failures will not occur. Of central importance in this regard is the need to establish reliable methods that guarantee convergent learning, rapid convergence (learning) rate, and algorithm stability. This paper presents the major problems of adaptive control systems that use learning to improve performance. The paper then presents the major procedures and tools presently developed or currently being developed to enable the verification, validation, and ultimate certification of these adaptive control systems. These technologies include the application of automated program analysis methods, techniques to improve the learning process, analytical methods to verify stability, methods to automatically synthesize code, simulation and test methods, and tools to provide on-line software assurance.

Jacklin, Stephen↗

(abstract) Cassini MLI Balnkets High-Temperature Exposure Tests

The trajectory required for the Cassini spacecraft to reach Saturn will subject the spacecraft to a 0.61 AU temperature environment at perihelion. Temperatures on some sunlit blanket surfaces at 0.61 AU can reach levels that are beyond the service capability of the conventional Mylar/Dacron net MLI. The majority of the blanket surfaces, however, will experience temperatures with an upper bound of 250(deg) C. The maximum allowable temperature for Mylar/Dacron net is determined to be 220(deg)C. Kapton can withstand temperatures in excess of 400(deg) C; however, the high cost of embossed Kapton relative to Mylar/Dacron net requires a baseline design which includes a standard layup and a high-temperature layup. The high-temperature layup is utilized at a limited number of locations, while at least 90% of the blankets are of the standard layup. The verification of both layups' capability to meet all temperature requirements has been accomplished by a comprehensive test program which addressed their high-temperature survivability, effective emittance, and optical and electrical properties. This paper focuses on the high-temperature exposure tests which helped define the hybrid standard layup, and which demonstrated the adequacy of both layups in withstanding their respective thermal environments.

temperature control insulation Cassini↗

Assemby, test, and launch operations for the Mars Exploration Rovers

In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

Assembly, Test, and Launch Operations (ATLO)↗

Developing Flexible Discrete Event Simulation Models in an Uncertain Policy Environment

On February 1st, 2010 U.S. President Barack Obama submitted to Congress his proposed budget request for Fiscal Year 2011. This budget included significant changes to the National Aeronautics and Space Administration (NASA), including the proposed cancellation of the Constellation Program. This change proved to be controversial and Congressional approval of the program's official cancellation would take many months to complete. During this same period an end-to-end discrete event simulation (DES) model of Constellation operations was being built through the joint efforts of Productivity Apex Inc. (PAl) and Science Applications International Corporation (SAIC) teams under the guidance of NASA. The uncertainty in regards to the Constellation program presented a major challenge to the DES team, as to: continue the development of this program-of-record simulation, while at the same time remain prepared for possible changes to the program. This required the team to rethink how it would develop it's model and make it flexible enough to support possible future vehicles while at the same time be specific enough to support the program-of-record. This challenge was compounded by the fact that this model was being developed through the traditional DES process-orientation which lacked the flexibility of object-oriented approaches. The team met this challenge through significant pre-planning that led to the "modularization" of the model's structure by identifying what was generic, finding natural logic break points, and the standardization of interlogic numbering system. The outcome of this work resulted in a model that not only was ready to be easily modified to support any future rocket programs, but also a model that was extremely structured and organized in a way that facilitated rapid verification. This paper discusses in detail the process the team followed to build this model and the many advantages this method provides builders of traditional process-oriented discrete event simulations.

Miranda, David J.↗

Design and Analysis of Modules for Segmented X-Ray Optics

Future X-ray astronomy missions demand thin, light, and closely packed optics which lend themselves to segmentation of the annular mirrors and, in turn, a modular approach to the mirror design. The modular approach to X-ray Flight Mirror Assembly (FMA) design allows excellent scalability of the mirror technology to support a variety of mission sizes and science objectives. This paper describes FMA designs using slumped glass mirror segments for several X-ray astrophysics missions studied by NASA and explores the driving requirements and subsequent verification tests necessary to qualify a slumped glass mirror module for space-flight. A rigorous testing program is outlined allowing Technical Development Modules to reach technical readiness for mission implementation while reducing mission cost and schedule risk.

McClelland, Ryan S.↗

Verification and Validation of the General Mission Analysis Tool (GMAT)

This paper describes the processes and results of Verification and Validation (V&V) efforts for the General Mission Analysis Tool (GMAT). We describe the test program and environments, the tools used for independent test data, and comparison results. The V&V effort produced approximately 13,000 test scripts that are run as part of the nightly buildtest process. In addition, we created approximately 3000 automated GUI tests that are run every two weeks. Presenting all test results are beyond the scope of a single paper. Here we present high-level test results in most areas, and detailed test results for key areas. The final product of the V&V effort presented in this paper was GMAT version R2013a, the first Gold release of the software with completely updated documentation and greatly improved quality. Release R2013a was the staging release for flight qualification performed at Goddard Space Flight Center (GSFC) ultimately resulting in GMAT version R2013b.

GMAT↗

Functional Fault Model Development Process to Support Design Analysis and Operational Assessment

A functional fault model (FFM) is an abstract representation of the failure space of a given system. As such, it simulates the propagation of failure effects along paths between the origin of the system failure modes and points within the system capable of observing the failure effects. As a result, FFMs may be used to diagnose the presence of failures in the modeled system. FFMs necessarily contain a significant amount of information about the design, operations, and failure modes and effects. One of the important benefits of FFMs is that they may be qualitative, rather than quantitative and, as a result, may be implemented early in the design process when there is more potential to positively impact the system design. FFMs may therefore be developed and matured throughout the monitored system's design process and may subsequently be used to provide real-time diagnostic assessments that support system operations. This paper provides an overview of a generalized NASA process that is being used to develop and apply FFMs. FFM technology has been evolving for more than 25 years. The FFM development process presented in this paper was refined during NASA's Ares I, Space Launch System, and Ground Systems Development and Operations programs (i.e., from about 2007 to the present). Process refinement took place as new modeling, analysis, and verification tools were created to enhance FFM capabilities. In this paper, standard elements of a model development process (i.e., knowledge acquisition, conceptual design, implementation & verification, and application) are described within the context of FFMs. Further, newer tools and analytical capabilities that may benefit the broader systems engineering process are identified and briefly described. The discussion is intended as a high-level guide for future FFM modelers.

Verification↗

Developing and Implementing a Process to Verify and Validate the NASA InSight Mission’s Instrument Command Products

The NASA InSight Mars lander is a roboticspacecraft which is investigating the interior structure of Marsthrough a series of seismological measurements andexperiments. Much of the commanding of activities performedby the instruments was done using ‘blocks’ – reusable functionswritten in Virtual Machine Language stored onboard thespacecraft– and sequences (series of commands) that werecreated by teams to operate their instruments. It was vital thatthese blocks and sequences (collectively called commandproducts) be thoroughly examined prior to onboard executionusing a comprehensive test program to reduce risk to thespacecraft and instruments and ensure smooth operations onthe surface of Mars. The Verification and Validation (V&V)process that was designed and implemented during the monthsleading up to InSight’s launch and landing successfullyuncovered a number of issues that could have causedoperational delays or impacted hardware. The process alsohelped adapt ground tools to better model onboard activities,create operational principles to avoid unintended consequencesduring flight, and generate a reference database for commandproduct use during operations. This allowed InSight to meet itssurface operations goals in the desired timeframe. This paperdescribes the development, implementation and results ofInSight’s command product V&V process, its contribution tomission success, and challenges faced.

Cloutier, Kyle↗