Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimized”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

A Resilient Integrated Resource Planning Framework for Transmission Systems: Analysis and Optimization

This article presents a resilient Integrated Resource Planning (IRP) framework designed for transmission systems, with a specific focus on analyzing and optimizing responses to High-Impact Low-Probability (HILP) events. The framework aims to improve the resilience of transmission networks in the face of extreme events by prioritizing the assessment of events with significant consequences. Unlike traditional reliability-based planning methods that average the impact of various outage durations, this work adopts a metric based on the proximity of outage lines to generators to select HILP events. The system’s baseline resilience is evaluated by calculating load curtailment in different parts of the network resulting from HILP outage events. The transmission network is represented as an undirected graph. Graph-theoretic techniques are used to identify islands with or without generators, potentially forming segmented grids or microgrids. This article introduces Expected Load Curtailment (ELC) as a metric to quantify the system’s resilience. The framework allows for the re-evaluation of system resilience by integrating additional generating resources to achieve desired resilience levels. Optimization is performed in the re-evaluation stage to determine the optimal placement of distributed energy resources (DERs) for enhancing resilience, i.e., minimizing ELC. Case studies on the IEEE 24-bus system illustrate the effectiveness of the proposed framework. In the broader context, this resilient IRP framework aligns with energy sustainability goals by promoting robust and resilient transmission networks, as the optimal placement of DERs for resilience enhancement not only strengthens the system’s ability to withstand and recover from disruptions but also contributes to efficient resource utilization, advancing the overarching goal of energy sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of Decentralized Graph-Based Multi-Agent Reinforcement Learning with Digital Twin for Traffic Signal Optimization

Machine learning (ML) methods, particularly Reinforcement Learning (RL), have gained widespread attention for optimizing traffic signal control in intelligent transportation systems. However, existing ML approaches often exhibit limitations in scalability and adaptability, particularly within large traffic networks. This paper introduces an innovative solution by integrating decentralized graph-based multi-agent reinforcement learning (DGMARL) with a Digital Twin to enhance traffic signal optimization, targeting the reduction of traffic congestion and network-wide fuel consumption associated with vehicle stops and stop delays. In this approach, DGMARL agents are employed to learn traffic state patterns and make informed decisions regarding traffic signal control. The integration with a Digital Twin module further facilitates this process by simulating and replicating the real-time asymmetric traffic behaviors of a complex traffic network. The evaluation of this proposed methodology utilized PTV-Vissim, a traffic simulation software, which also serves as the simulation engine for the Digital Twin. The study focused on the Martin Luther King (MLK) Smart Corridor in Chattanooga, Tennessee, USA, by considering symmetric and asymmetric road layouts and traffic conditions. Comparative analysis against an actuated signal control baseline approach revealed significant improvements. Experiment results demonstrate a remarkable 55.38% reduction in Eco_PI, a developed performance measure capturing the cumulative impact of stops and penalized stop delays on fuel consumption, over a 24 h scenario. In a PM-peak-hour scenario, the average reduction in Eco_PI reached 38.94%, indicating the substantial improvement achieved in optimizing traffic flow and reducing fuel consumption during high-demand periods. These findings underscore the effectiveness of the integrated DGMARL and Digital Twin approach in optimizing traffic signals, contributing to a more sustainable and efficient traffic management system.

42 ENGINEERING↗

Multi-objective optimization of peel and shear strengths in ultrasonic metal welding using machine learning-based response surface methodology

Ultrasonic metal welding (UMW) is a solid-state joining technique with varied industrial applications. Despite of its numerous advantages, UMW has a relative narrow operating window and is sensitive to variations in process conditions. As such, it is imperative to quantitatively characterize the influence of welding parameters on the resulting joint quality. The quantification model can be subsequently used to optimize the parameters. Conventional response surface methodology (RSM) usually employs linear or polynomial models, which may not be able to capture the intricate, nonlinear input-output relationships in UMW. Furthermore, some UMW applications call for simultaneous optimization of multiple quality indices such as peel strength, shear strength, electrical conductivity, and thermal conductivity. To address these challenges, this paper develops a machine learning (ML)-based RSM to model the input-output relationships in UMW and jointly optimize two quality indices, namely, peel and shear strengths. The performance of various ML methods including spline regression, Gaussian process regression (GPR), support vector regression (SVR), and conventional polynomial regression models with different orders is compared. A case study using experimental data shows that GPR with radial basis function (RBF) kernel and SVR with RBF kernel achieve the best prediction accuracy. The obtained response surface models are then used to optimize a compound joint strength indicator that is defined as the average of normalized shear and peel strengths. In addition, the case study reveals different patterns in the response surfaces of shear and peel strengths, which has not been systematically studied in the literature. While developed for the UMW application, the method can be extended to other manufacturing processes.

42 ENGINEERING↗

A model to calculate fatigue damage caused by partial waking during wind farm optimization

Abstract. Wind turbines in wind farms often operate in waked or partially waked conditions, which can greatly increase the fatigue damage. Some fatigue considerations may be included, but currently a full fidelity analysis of the increased damage a turbine experiences in a wind farm is not considered in wind farm layout optimization because existing models are too computationally expensive. In this paper, we present a model to calculate fatigue damage caused by partial waking on a wind turbine that is computationally efficient and can be included in wind farm layout optimization. The model relies on analytic velocity, turbulence, and load models commonly used in farm research and design, and it captures some of the effects of turbulence on the fatigue loading. Compared to high-fidelity simulation data, our model accurately predicts the damage trends of various waking conditions. We also perform example wind farm layout optimizations with our presented model in which we maximize the annual energy production (AEP) of a wind farm while constraining the damage of the turbines in the farm. The results of our optimization show that the turbine damage can be significantly reduced, more than 10 %, with only a small sacrifice of around 0.07 % to the AEP, or the damage can be reduced by 20 % with an AEP sacrifice of 0.6 %.

17 WIND ENERGY↗

IEA Wind Energy Task 37 System Engineering Aerodynamic Optimization Case Study: Preprint

This paper presents the results from the first IEA Wind Task 37 aerodynamic optimization case study. Eight participants applied their optimization tools to a purely aerodynamic problem and the results were compared. Overall, the different tools produced widely different designs, while there was better agreement in the improvement achieved. This highlights the fact that further investigation is needed to try to understand these differences and develop best practices. There were too many differences between the different analysis and optimization codes to determine the sources of these differences. However, several potential sources of discrepancy were identified for further investigation. One hypothesis is that one potential source of discrepancy is that the design problem itself is relatively flat in design directions of constant loading. This flatness would impact the convergence in the optimization, and at the same time mean that discrepancies in the design itself would be less severe.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Optimal Efficiency and Operational Cost Savings: A Framework for Automated Rooftop PV Placement

Residential energy consumers are charged based on a utility rate structure, such as net metering or feed-in tariff. To lower consumers' electricity bills, expensive batteries are deployed to reduce the electricity fed from the grid during peak hours. However, strategic photovoltaic (PV) panel placement enables the reduction of operational energy cost while considering the spatial feasibility and efficiency for hosting rooftop PV. In this paper, we present a framework to automatically identify the optimal location of rooftop PV panels on residential buildings. Our framework integrates multiple workflows, including energy and environmental simulation, parametric modeling, and optimization to identify the ideal location of PV panels to balance the demand and supply at a building and community scale. These workflows are linked using the Grasshopper plug-in for Rhinoceros CAD software. The framework includes two different workflows, each satisfying a target for optimal PV placement: (a) maximizing PV panel efficiency, where users aim to maximize energy generation, and (b) minimizing operational energy cost, where "best'' panels are selected considering utility rates for operational energy cost. Our framework is demonstrated in a residential community in Fort Collins, Colorado, to generate the optimal PV placement for each of the two aforementioned targets. Results from the two workflows are compared to illustrate the effect of PV location and orientation on solar energy production efficiency and operational energy cost. The developed workflows are introduced as tools within the Grasshopper plug-in to investigate the solar potential of rooftop PV panels while taking into account factors such as contextual shading, utility rate structures, and buildings' energy demand profiles.

30 DIRECT ENERGY CONVERSION↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

Optimization Methodology of Pebble Bed HTGR Start-Up and Running-in Strategy

In recent years interest in advanced reactor technologies has increased significantly. However, the methods used for analysis of traditional nuclear reactors are insufficient to consider all the different and varied advanced reactor designs without further development. One promising advanced reactor design is the pebble bed reactor (PBR). PBRs possess unique operational and fuel cycle features that require the development of specific analysis methodologies to adequately design and analyze the systems. There is a need in PBR research for a capability to analyze and optimize the process of transitioning from the start-up reactor core to the equilibrium core (known as the “running-in” of the reactor). The start-up of a PBR and the transition to the equilibrium core is a complex, multi-physics challenge that has not yet been well researched and has many opportunities for design, analysis, and optimization of the process. In this research, a methodology is defined to consider the potential strategies in PBR start-up and run-in to the equilibrium core. Multiple candidate software are considered, and their pros and cons are discussed for the PBR-specific application in the methodology. A preliminary software selection for the physics engine is made, and initial verification of key modules is performed. Software to support optimization of the reactor run-in strategies through reduced order modeling (ROM) and machine learning are considered. Challenges for a full implementation of the methodology are discussed. Additional code selections and verification of models relevant to the application are needed before full demonstration of the methodology can be achieved and an optimal strategy determined.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital Twin Development for Real Time Optimization

In the real-time optimization operation process of the integrated energy system, digital twin (DT) can support operators to find optimal dispatching strategy. In this research, the DT framework interfacing (external) system-level simulation model, RAVEN, and Python-based optimization framework has been developed. Simple demonstration of finding optimal input values minimizing an objective function with the DT framework has been presented.

25 ENERGY STORAGE↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LMFR design and optimization methodology

This paper presents and applies a methodology for designing and optimizing Liquid Metal-cooled Fast Reactors (LMFRs). The methodology, called the Design and Optimization Methodology (DOM), achieves its goals by the effective exploration of a search space. The paper presents two case studies to demonstrate DOM. Both studies were based on the WEC long-life core LFR design. In the first study, DOM was used to explore the search space in the vicinity of the WEC (Westinghouse Electric Company LLC) long-life core LFR design trying to find a more optimized design. The objective of this optimization attempt was to reduce the fuel cycle cost. The WEC long-life core LFR design uses uranium mononitride (UN) fuel with natural nitrogen enrichment. In the second study, DOM was used to design a competitive UN fueled Lead-cooled Fast Reactor (LFR) which uses {sup 15}N enriched UN fuel. Based on the results from the second study, an estimation of the {sup 15}N enrichment cost required to obtain an economic core was performed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Geometry Optimization of Cable-Based Actuation for Small-Scale Model Testing of a Floating Marine Turbine: Preprint

This research aims to apply combined wave and tidal current loads to a small-scale floating marine current turbine in a wave tank, where an actuation system applies hydrodynamic and mooring forces on the hardware based on results from a simulation. We use a real-time hybrid test setup with physical wave forcing from the wave tank and simulated current and mooring forces implemented through a tensioned cable array. For this paper, we developed an optimization algorithm that adjusts the hardware geometry of the cable array to achieve more efficient tension allocation across the cables for the loads that need to be actuated. By adjusting the points where the cables are attached to the floating platform and the angles between the platform and the winches, an optimal cable geometry can be found to minimize tension variations in the lines, maintain the desired pretension, and prevent excessive tensions. We present the optimization problem formulation, the actuation system evaluation approach, and optimization results that show effective cable actuation setups that are being considered for implementation in the wave tank tests.

cable-based actuation↗

Integration of Decentralized Graph-Based Multi-Agent Reinforcement Learning with Digital Twin for Traffic Signal Optimization

Machine learning (ML) methods, particularly Reinforcement Learning (RL), have gained widespread attention for optimizing traffic signal control in intelligent transportation systems. However, existing ML approaches often exhibit limitations in scalability and adaptability, particularly within large traffic networks. This paper introduces an innovative solution by integrating decentralized graph-based multi-agent reinforcement learning (DGMARL) with a Digital Twin to enhance traffic signal optimization, targeting the reduction of traffic congestion and network-wide fuel consumption associated with vehicle stops and stop delays. In this approach, DGMARL agents are employed to learn traffic state patterns and make informed decisions regarding traffic signal control. The integration with a Digital Twin module further facilitates this process by simulating and replicating the real-time asymmetric traffic behaviors of a complex traffic network. The evaluation of this proposed methodology utilized PTV-Vissim, a traffic simulation software, which also serves as the simulation engine for the Digital Twin. The study focused on the Martin Luther King (MLK) Smart Corridor in Chattanooga, Tennessee, USA, by considering symmetric and asymmetric road layouts and traffic conditions. Comparative analysis against an actuated signal control baseline approach revealed significant improvements. Experiment results demonstrate a remarkable 55.38% reduction in Eco_PI, a developed performance measure capturing the cumulative impact of stops and penalized stop delays on fuel consumption, over a 24 h scenario. In a PM-peak-hour scenario, the average reduction in Eco_PI reached 38.94%, indicating the substantial improvement achieved in optimizing traffic flow and reducing fuel consumption during high-demand periods. These findings underscore the effectiveness of the integrated DGMARL and Digital Twin approach in optimizing traffic signals, contributing to a more sustainable and efficient traffic management system.

actuated signal control↗

Shape Optimization of Header Pipes in Power Plants for Enhanced Efficiency and Environmental Sustainability

In a power plant, the header pipe plays a pivotal role in optimizing the performance of diverse systems by serving as a central conduit for the collection and distribution of steam within the plant. This paper investigates the significance of header pipes within power plant setups, highlighting their critical influence on reliability, efficiency, and the performance of the power plant as a whole. The concept of shape optimization emerges as a crucial factor in power plant design and operation, with the potential to maximize performance while minimizing the use of materials. Shape optimization not only enhances efficiency but also contributes to reducing the environmental footprint of power plant installations. In this paper, we initially developed a methodology designed for optimizing header shapes with the primary goal of reducing the usage of costly new alloy materials and lowering the overall maintenance operation expenses. Secondly, we conducted a case study based on an authentic header sourced from an operational power plant.

20 FOSSIL-FUELED POWER PLANTS↗

Accelerated CO2 Storage Optimization Using Multi-Resolution Fourier Neural Operator at the Illinois Basin Decatur Project (IBDP)

This paper presents a deep learning-based approach for optimizing CO2 injection in carbon capture and storage (CCS) operations. We developed a multi-resolution machine learning model to significantly reduce data generation costs. Utilizing this proxy model, we implemented a multi-objective genetic algorithm to optimize well control during the CO2 injection process. The proposed approach was applied to the Illinois Basin Decatur Project (IBDP), successfully optimizing the CO2 injection schedule based on three key objectives: maximizing the amount of CO2 stored, maximizing sweep efficiency, and minimizing pressure increase. The use of the proxy model accelerated the optimization workflow by two orders of magnitude, while the cost of data generation for the proxy model was reduced by 90% by utilizing a coarse-scale model.

accelerated CO2 storage optimization↗

A high fidelity and user-friendly equation-oriented optimization model for carbon capture using a novel water-lean solvent

Research Triangle Institute (RTI) International and SLB have developed a novel water-lean solvent technology for carbon capture, demonstrating low specific reboiler duty (SRD) values at capture rates exceeding 90%. At the Technology Centre Mongstad (TCM) pilot plant, the technology achieved an SRD of 2.55 GJ/t-CO2 at 95% capture, utilizing an intercooler and a 5°C temperature approach in the lean/rich solvent cross exchanger. To meet varying carbon capture targets for Front End Engineering and Design (FEED) studies and to enable real-time optimization and advanced process control, an efficient optimization model is required. This model needs to minimize energy demand for a given capture rate and determine optimal operating parameters in response to fluctuating flue gas conditions. While an existing Aspen Plus simulation model, developed by RTI and SLB, accurately matches TCM plant data, its sequential modular (SM) strategy is too slow for real-time applications due to recycle streams and tight heat integration inherent in solvent-based carbon capture processes. Although an equation-oriented (EO) modeling strategy is more suitable for optimizing these processes, its adoption has been limited by several factors: feature limitations in Aspen Plus EO mode (e.g., lack of balance block support), a less user-friendly interface for variable identification and loop solving, complex troubleshooting of convergence issues, and the necessity for accurate initial values.

carbon capture↗

A Workflow to Optimize Fast Neutron Irradiation in A Thermal Neutron Spectrum Test Reactor Leveraging Open-Source Tools

The Advanced Test Reactor (ATR) located at Idaho National Laboratory (INL) is one of the key nuclear engineering research and testing facilities within the US Department of Energy (DOE). The ATR is one of few high-power research reactors in the world with different application including accelerated testing of nuclear fuel, materials irradiation in a very high neutron flux environment, and medical radioisotope production [1]. Also, the ATR offers opportunities for testing fast spectrum fission and fusion reactor materials. The key challenges in this area are in further detailing and optimizing a fast spectrum environment within a thermal test reactor. This challenge involves researching, developing, and testing novel concepts for the multiplying of neutron populations into ever higher energy spectra in high flux test reactors like ATR. The main objective of this work is to investigate candidate materials for establishing a fast neutron experiment irradiation in thermal neutron spectrum test reactors which can be accomplished by filtering thermal and epithermal neutrons and boosting fast neutrons at designated irradiation positions. However, adding these filters will render the neutron spectrum and the criticality of the system. The selection of the thickness and material layers should be accomplished by developing an optimization design algorithm that is applicable for ATR to enhance the fast neutron spectrum irradiation utilizing high-fidelity Monte Carlo methods along with advanced machine learning capabilities. This paper presents workflow for design optimization to enhance fast neutron irradiation in the ATR. The workflow leverages open-source tools to develop an algorithm that is viable to ATR and can be leveraged in other reactors. The following sections discuss the development of the experiment design optimization workflow and its application to ATR irradiation positions.

42 - ENGINEERING↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗