Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Bi-objective approaches for home healthcare medical team planning and scheduling problem

In this paper, we study the medical team planning and scheduling in home healthcare within a weekly horizon, including the planning of nursing visits and the daily traveling route scheduling. Two objectives are considered: the first one is to minimize the total operation cost of the healthcare agency and the second one is to maximize the patient satisfaction. The problem is formulated as a mixed integer program, to seek for a trade-off between two objectives, with the characteristics of the patient requirements including nursing types, nursing frequency and service length considered. Medical team types, available service days and overwork penalty are also respected in the model. Then an ϵ-constraint method is adopted to obtain exact non-dominated solutions. To address large-scale problem instances, three heuristic approaches are developed to generate approximate Pareto fronts in a reasonable time. The set of non-dominated solutions are valuable for decision-making. Computational experiments are conducted and the results demonstrate the efficiency of the approaches.

97 MATHEMATICS AND COMPUTING↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

Science Goal Driven Observing and Spacecraft Autonomy

Spacecraft autonomy will be an integral part of mission operations in the coming decade. While recent missions have made great strides in the ability to autonomously monitor and react to changing health and physical status of spacecraft, little progress has been made in responding quickly to science driven events. For observations of inherently variable targets and targets of opportunity, the ability to recognize early if an observation will meet the science goals of a program, and react accordingly, can have a major positive impact on the overall scientific returns of an observatory and on its operational costs. If the onboard software can reprioritize the schedule to focus on alternate targets, discard uninteresting observations prior to downloading, or download a subset of observations at a reduced resolution, the spacecraft's overall efficiency will be dramatically increased. The science goal monitoring (SGM) system is a proof- of-concept effort to address the above challenge. The SGM will have an interface to help capture higher-level science goals from the scientists and translate them into a flexible observing strategy that SGM can execute and monitor. We are developing an interactive distributed system that will use on-board processing and storage combined with event-driven interfaces with ground-based processing and operations, to enable fast re-prioritization of observing schedules, and to minimize time spent on non-optimized observations. This paper will focus on our strategy for developing SGM and the technical challenges that we have encountered. We will discuss the SGM architecture as it applies to the proposed MIDEX-class mission Kronos. However, the architecture and interfaces will also be designed for easy adaptability to other observing platforms, including ground-based systems and to work with different scheduling and pipeline processing systems.

Jones, Jeremy↗

Lila: Optimal Dispatching in Probabilistic Temporal Networks using Monte Carlo Tree Search

Executing a Probabilistic Simple Temporal Network (PSTN) amounts at scheduling, i.e. \textit{dispatch}, a set of events under time uncertainty. This constitutes a NP-hard online optimization problem. The right execution time must be dynamically assigned to each event of the PSTN such that the temporal constraints are met, whereas activity durations are progressively observed as the execution unfolds. We propose a dispatching algorithm based on Monte Carlo Tree Search, called Lila, with the following characteristics: (i) it is an anytime algorithm, both offline and online, proven asymptotically optimal; (ii) it returns the current probability of success, either before or at any moment during operations; (iii) it handles any possible continuous or discrete, even non-parametric, probability distributions, as well as inter-dependencies between random variables, exogenous and endogenous uncertainty; and (iv) can be easily extended to handle probabilistic external events, PSTNs with resources, PSTNs with cutoff times and precondition chains, etc. Lila is universal in the sense that it can handle any dispatching protocol, simply by specifying it to the algorithm. It has the unlimited flexibility offered by the simulation paradigm, whilst it asymptotically converges to optimal decisions and/or robustness approximations.

Chien, Steve A.↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Optimizing $\mathrm{ACRT}$ to reduce inclusion formation during the $\mathrm{VGF}$ growth of cadmium zinc telluride: I. Computational approach

Theoretical computations reveal insight into parameters that govern the accelerated crucible rotation technique (ACRT) applied to the gradient freeze (VGF) growth of cadmium zinc telluride (CZT). A metric based on the classic Mullins and Sekerka instability criterion is put forth that provides a quantitative means of assessing the impact of different ACRT rotation schedules on morphological stability and inclusion formation during CZT growth. Here this metric is employed in a 2-k factorial design of experiments that identifies the maximum rotation rate as the most important ACRT parameter, followed by the acceleration period and the rest period. Subsequent optimization of rotation schedule is performed for a specific VGF growth system, and mechanistic explanations are provided for the preferred ACRT schedule, which improves interface stability via slower rotation rates and longer acceleration periods than would be applied using classical ACRT schedules.

36 MATERIALS SCIENCE↗

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

Energy and Emission Prediction for Mixed-Vehicle Transit Fleets Using Multi-task and Inductive Transfer Learning

Public transit agencies are focused on making their fixed-line bus systems more energy efficient by introducing electric (EV) and hybrid (HV) vehicles to their fleets. However, because of the high upfront cost of these vehicles, most agencies are tasked with managing a mixed-fleet of internal combustion vehicles (ICEVs), EVs, and HVs. In managing mixed-fleets, agencies require accurate predictions of energy use for optimizing the assignment of vehicles to transit routes, scheduling charging, and ensuring that emission standards are met. The current state-of-the-art is to develop separate neural network models to predict energy consumption for each vehicle class. Although different vehicle classes’ energy consumption depends on a varied set of covariates, we hypothesize that there are broader generalizable patterns that govern energy consumption and emissions. In this paper, we seek to extract these patterns to aid learning to address two problems faced by transit agencies. First, in the case of a transit agency which operates many ICEVs, HVs, and EVs, we use multi-task learning (MTL) to improve accuracy of forecasting energy consumption. Second, in the case where there is a significant variation in vehicles in each category, we use inductive transfer learning (ITL) to improve predictive accuracy for vehicle class models with insufficient data. As this work is to be deployed by our partner agency, we also provide an online pipeline for joining the various sensor streams for fixed-line transit energy prediction. Here, we find that our approach outperforms vehicle-specific baselines in both the MTL and ITL settings.

97 MATHEMATICS AND COMPUTING↗

Model-based predictive control of multi-stage air-source heat pumps integrated with phase change material-embedded ceilings

This paper presents a model-based predictive control strategy to optimize the operations of phase change material (PCM) ceiling panels coupled with a multi-stage air-source heat pump. A three-stage prototype heat pump unit has been built and tested in the laboratory, with the low and medium stages designed for space heating/cooling and the high compression stage dedicated to charging of the PCM energy storage. To facilitate optimal control of the integrated heat pump system, a mixed-integer linear programming formulation is derived through linearization of the heat pump model and a mixed-integer reformulation of the PCM dynamic governing equations. A predictive control strategy is synthesized based on the resultant control formulation and implemented in a receding horizon scheme that optimizes the PCM charging and the zone temperature schedules simultaneously to leverage both the passive (associated with building construction materials) and active (PCM) storage capacities of a building. The control strategy has been tested along with three benchmarking control scenarios using a co-simulation platform for a prototypical detached house in Atlanta, GA. In this study, test results showed that application of the proposed control strategy to the PCM-integrated heat pump could provide 27.1% electricity cost savings while a fine tuned rule-based control strategy could achieve cost savings of 20.4%, compared to a baseline case without PCM storage, under a time-of-use rate tariff.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exploring performance and energy tradeoffs for irregular applications: A case study on the Tilera many-core architecture

High performance, parallel applications with irregular data accesses are becoming a critical workload class for modern systems. In particular, the execution of such workloads on emerging many-core systems is expected to be a significant component of applications in data mining, machine learning, scientific computing and graph analytics. However, power and energy constraints limit the capabilities of individual cores, memory hierarchy and on-chip interconnect of such systems, thus leading to architectural and software trade-os that must be understood in the context of the intended application’s behavior. Irregular applications are notoriously hard to optimize given their data-dependent access patterns, lack of structured locality and complex data structures and code patterns. We have ported two irregular applications, graph community detection using the Louvain method (Grappolo) and high-performance conjugate gradient (HPCCG), to the Tilera many-core system and have conducted a detailed study of platform-independent and platform-specific optimizations that improve their performance as well as reduce their overall energy consumption. To conduct this study, we employ an auto-tuning based approach that explores the optimization design space along three dimensions - memory layout schemes, GCC compiler flag choices and OpenMP loop scheduling options. We leverage MIT’s OpenTuner auto-tuning framework to explore and recommend energy optimal choices for different combinations of parameters. We then conduct an in-depth architectural characterization to understand the memory behavior of the selected workloads. Finally, we perform a correlation study to demonstrate the interplay between the hardware behavior and application characteristics. Using auto-tuning, we demonstrate whole-node energy savings and performance improvements of up to 49:6% and 60% relative to a baseline instantiation, and up to 31% and 45:4% relative to manually optimized variants.

auto tuning↗

The effect of rare earth (RE 3+ ) ionic radii on transparent lanthanide-tellurite glass-ceramics: correlation between ‘hole-formalism’ and crystallization

Rare earth (RE) doped transparent tellurite glass-ceramics (GCs) are widely explored for their application as advanced photonic materials. Specifically, the growth of RE based “anti-glass” crystalline phases in transparent GCs enhances their effective functionality. Enormous studies on the properties of GCs revealed that optimization of glass composition and heat-treatment schedule are the foremost factors that affect the transparency of the GCs. Nevertheless, the direct effect of RE 3+ ions on the crystallization mechanism of glass has hardly been reported. Therefore, a base glass of the composition La 2 O 3 –Gd 2 O 3 –TiO 2 –TeO 2 (LGTT) is doped with RE 3+ ions (Ce 3+ , Pr 3+ , Nd 3+ , Sm 3+ , Eu 3+ , Tb 3+ , and Dy 3+ ) with varied ionic radii. Rietveld refinement from XRD of GCs confirms that (La/Gd) 2 Te 6 O 15 phases are precipitated, where dopants Ce, Pr and Nd occupy La sites, while Sm, Eu, Tb, and Dy occupy Gd sites. The configurational heat-capacity (ΔC p ) from DSC is found to be lower for larger ionic radii REs (Ce, Pr, Nd) than smaller ionic radii REs (Sm, Eu, Tb, Dy) thereby exhibiting higher chemical ordering followed by faster crystal growth rate in the former. However, the transparency retention profile of different RE-doped GCs follows the trend Eu:Tb > Sm:Dy > Nd > Pr > Ce, confirming the ionic radii effect. In addition to the ionic radii effect, in this work, we propose a ‘Hole-Formalism’ concept to explain the observed trend. It is further corroborated with an identical neutron diffraction pattern and ΔC p values for these ion pairs Sm 3+ : Dy 3+ (4f 5 : 4f 9 ) and Eu 3+ : Tb 3+ (4f 6 : 4f 8 ) results in a similar crystallization mechanism, transmission profile and fine-scale microstructures of these RE-based tellurite GCs.

36 MATERIALS SCIENCE↗

Smart Building Start (SBS) (CRADA 480)

The idea of Smart Building Start (SBS) is to manage the on/off scheduling of HVAC equipment in buildings in an optimal way in order to achieve comfort conditions at the designated times with the minimal use of energy. This concept is also known as Optimal Start and it has typically been used in buildings to start up equipment based on predictions made for a representative (or average) zone in a building. This means that zones that could have waited longer to receive conditioned air are activated too early leading to unnecessary energy loss. The approach proposed in this project is to develop and implement a distributed version of optimal start that will consider the individual requirements of all treated zones. The developed control strategy will enable smart start of the central plant as well as further localized control over each individual zone by means of setpoint adjustment so that zones are not conditioned too early thereby reducing energy use compared to the current state of the art. This project is a collaboration between PNNL and Verdicity with the goal being to bring the research concept of SBS to commercialization. The SBS algorithm(s) will be implemented and hosted on the PNNL-developed open-platform VOLTTRON which will accelerate bringing the research to practice. It is anticipated that this project will lead to new IP surrounding the algorithm and its decentralized deployment. The project will also further demonstrate the success of VOLTRON as a flexible platform for implementation of innovative algorithms for improving energy efficiency in buildings. Previous studies on smart building start carried out by PNNL have indicated potential energy savings on the order of 10-15% for multi-zone buildings compared to conventional strategies. Verdicity currently has a number of customers who can benefit from the use of this technology. PNNL will work with Verdicity to identify any key gaps in the integrated software and jointly work to enhance and customize it for Verdicity and to integrate it with their existing products for use at their customers’ sites. The proposed work will help previously funded Federal research and development technology investments find their way into a viable commercial market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flight-test results using nonlinear control with the F-8C digital fly-by-wire aircraft

The design and operation of the cooperative advanced digital research experiment (CADRE) to develop nonlinear pitch flight control algorithms is described, and the results of an in-flight evaluation using the F-8C digital fly-by-wire (DFBW) research aircraft are presented. The CADRE controller is described, including the initial filter, linear command prefilter, nonlinear command prefilter, and gain scheduling. The variable-integral control-to-optimize response of the controller is considered, and CADRE parameter combinations are addressed. The remotely-augmented-vehicle interface used in the DFBW aircraft experiment is discussed. The distanct-tracking and close-formation tracking evaluation tasks for the aircraft are described along with evaluation configurations, and the test results are presented and discussed. The latter indicate that a nonlinear adaptive controller is a feasible control system technique for the fighter tracking task.

Larson, R. R.↗

Advanced timeline systems

The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

Bulfin, R. L.↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗