Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nuclear infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Infrastructure Investments in LAMDA: SEM Mill and Vault (NSUF 2019 Milestone Report)

This document summarizes the procurement, installation, and commissioning of a scanning electron microscope (SEM) mill produced by Fischione Instruments and a lead-shielded vault for specimen storage in support of Nuclear Science User Facility (NSUF) awards for use in Oak Ridge National Laboratory’s (ORNL) Low Activation Materials Development and Analysis (LAMDA) laboratory. The Model 1061 SEM mill is a tabletop ion milling system for advanced sample preparation of high-quality SEM samples. This device was chosen for its broad range of ion energies allowing for both rapid milling and final polishing of the sample surface. The purchase order with Fischione Instruments was released and awarded by ORNL procurement on September 11, 2018. The instrument was shipped in December of 2018 and was installed in the LAMDA laboratory in March of 2019. During the commissioning of this equipment, electron backscatter diffraction (EBSD) was performed on specimens before and after milling to show the enhanced surface quality. With the purchase of a lead vault dedicated to NSUF library materials co-located in the LAMDA laboratory, the NSUF program will be able to maintain a significant sample library in LAMDA. These specimens will be easily accessible for rapid turnaround experiment (RTE) awards and will reduce the overall cost of year-over-year storage and shipments to and from ORNL hot cell facilities. The contract to fabricate a fourth lead vault dedicated to NSUF specimen storage was awarded by ORNL procurement on August 10, 2018. Installation of the new vault was completed in January of 2019.

47 OTHER INSTRUMENTATION↗

Solar System Exploration Augmented by In-Situ Resource Utilization: Human Planetary Base Issues for Mercury and Saturn

Establishing a lunar presence and creating an industrial capability on the Moon may lead to important new discoveries for all of human kind. Historical studies of lunar exploration, in-situ resource utilization (ISRU) and industrialization all point to the vast resources on the Moon and its links to future human and robotic exploration. In references 1 through 9, a broad range of technological innovations are described and analyzed. Figures 1 depicts program planning for future human missions throughout the solar system which included lunar launched nuclear rockets, and future human settlements on the Moon. Figures 2 and 3 present the results for human Mercury missions, including LEO departure masses and round trip Mercury lander masses. Using in-situ resources, the missions become less burdensome to the LEO launch infrastructure. In one example using Mercury derived hydrogen, the LEO mass of the human Mercury missions can be reduced from 2,800 MT to 1,140 MT (Ref. 15). Additional analyses of staging options for human Mercury missions will be presented. Figures 4 shows an option for thermal control for long term in-space cryogenic storage and Figure 5 depicts the potentially deleterious elements emanating from Mercury that must be addressed, respectively. Updated analyses based on the visions presented will be presented. While advanced propulsion systems were proposed in these historical studies, further investigation of nuclear options using high power nuclear thermal and nuclear electric propulsion as well as advanced chemical propulsion can significantly enhance these scenarios. Human bases at Mercury may have to be resupplied from resources from regolith and water resources in permanently shadowed craters at its northern pole.

Mercury↗

Zero Trust Strategies for Chemical, Biological, Radiological, and Nuclear Detection Systems: D.1 Cyber Scenarios

The evolving landscape of cybersecurity necessitates a paradigm shift to a Zero Trust (ZT) model, which assumes breaches and continuously verifies trust. This approach reshapes how trust boundaries are established, focusing on identities, devices, networks, applications, and data, rather than solely relying on perimeter defenses such as firewalls. Central to this transformation is the National Institute of Standards and Technology's (NIST) Special Publication 800-207, outlining the Zero Trust Architecture (ZTA), along with Executive Order 14028, which mandates federal agencies to adopt ZT principles. Complementary to these efforts, the Cybersecurity and Infrastructure Security Agency (CISA) developed the Zero Trust Maturity Model (ZTMM), providing a framework with five pillars and three cross-cutting capabilities to guide agencies toward enhanced cybersecurity maturity. In support of these initiatives, the DHS Countering Weapons of Mass Destruction Office (CWMD) is applying ZT principles to secure Chemical, Biological, Radiological, and Nuclear (CBRN) detection systems. Recognizing the diverse deployment models and network connectivity of these systems—from stationary, non-networked units to mobile, cloud-connected devices—the Pacific Northwest National Laboratory (PNNL) is developing cybersecurity scenarios specifically for CBRN environments. These scenarios examine various configurations and technological capabilities, offering insights into the application of ZTMM pillars in enhancing the security postures of CBRN devices. The cybersecurity scenarios presented by PNNL are hypothetical, crafted to explore theoretical situations and stimulate discussion on the potential use or compromise of CBRN detection systems in varied contexts. These narratives are illustrative and do not reference any real events or actual networks. Instead, they employ generalized reference models to highlight concepts and potential issues within CBRN security, focusing on how Zero Trust strategies can be adapted to address these challenges effectively.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

CONCEPTUAL PROCESS DESCRIPTION FOR THE MANUFACTURE OF LOW-ENRICHED URANIUM-MOLYBDENUM FUEL

The National Nuclear Security Agency Global Threat Reduction Initiative (GTRI) is tasked with minimizing the use of high-enriched uranium (HEU) worldwide. A key component of that effort is the conversion of research reactors from HEU to low-enriched uranium (LEU) fuels. The GTRI Convert Fuel Development program, previously known as the Reduced Enrichment for Research and Test Reactors program was initiated in 1978 by the United States Department of Energy to develop the nuclear fuels necessary to enable these conversions. The program cooperates with the research reactors’ operators to achieve this goal of HEU to LEU conversion without reduction in reactor performance. The programmatic mandate is to complete the conversion of all civilian domestic research reactors by 2014. These reactors include the five domestic high-performance research reactors (HPRR), namely: the High Flux Isotope Reactor at the Oak Ridge National Laboratory, the Advanced Test Reactor at the Idaho National Laboratory, the National Bureau of Standards Reactor at the National Institute of Standards and Technology, the Missouri University Research Reactor at the University of Missouri–Columbia, and the MIT Reactor-II at the Massachusetts Institute of Technology. Characteristics for each of the HPRRs are given in Appendix A. The GTRI Convert Fuel Development program is currently engaged in the development of a novel nuclear fuel that will enable these conversions. The fuel design is based on a monolithic fuel meat (made from a uranium-molybdenum alloy) clad in Al-6061 that has shown excellent performance in irradiation testing. The unique aspects of the fuel design, however, necessitate the development and implementation of new fabrication techniques and, thus, establishment of the infrastructure to ensure adequate fuel fabrication capability. A conceptual fabrication process description and rough estimates of the total facility throughput are described in this document as a basis for establishing preconceptual fabrication facility designs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

JHR Project: a future Material Testing Reactor working as an International user Facility: The key-role of instrumentation in support to the development of modern experimental capacity

Research and development on fuel and material behaviour under irradiation is a key issue for sustainable nuclear energy in order to meet specific needs by keeping the best level of safety. These needs mainly deal with a constant improvement of performances and safety in order to optimize the fuel cycle and hence to reach nuclear energy sustainable objectives. A sustainable nuclear energy requires a high level of performances in order to meet specific needs such as: - Pursuing improvement of the performances and safety of present and coming water cooled reactor technologies. This will require a continuous R and D support following a long-term trend driven by the plant life management, safety demonstration, flexibility and economics improvement. Experimental irradiations of structure materials are necessary to anticipate these material behaviours and will contribute to their optimisation. - Upgrading continuously nuclear fuel technology in present and future nuclear power plants to achieve better performances and to optimise the fuel cycle keeping the best level of safety. Fuel evolution for generation II, III and III+ is a key stake requiring developments, qualification tests and safety experiments to ensure the competitiveness and safety: experimental tests exploring the full range of fuel behaviour determine fuel stability limits and safety margins, as a major input for the fuel reliability analysis. To perform such accurate and innovative progress and developments, specific and ad hoc instrumentation, irradiation devices, measurement methods are necessary to be set up inside or beside the material testing reactor (MTR) core. These experiments require beforehand in situ and on line sophisticated measurements to accurately determine different key parameters such as thermal and fast neutron fluxes and nuclear heating in order to precisely monitor and control the conducted assays. The new Material Testing Reactor JHR (Jules Horowitz Reactor) currently under construction at CEA Cadarache research centre in the south of France will represent a major Research Infrastructure for scientific studies regarding material and fuel behavior under irradiation. It will also be devoted to medical isotopes production. Hence JHR will offer a real opportunity to perform R and D programs regarding needs above and hence will crucially contribute to the selection, optimization and qualification of these innovative materials and fuels. The JHR reactor objectives, principles and main characteristics associated to specific experimental devices associated to measurement techniques and methodology, their performances, their limitations and field of applications will be presented and discussed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Savannah River Remediation Liquid Waste Operations Making the Workplace Safer - Lean and Human Performance Improvement Initiatives - 17244

The Savannah River Site, a U.S. Department of Energy facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 of the 51 tanks have been closed to date. Over the past three years, SRR implemented a Lean Business Management System to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. Like safety, continuous improvement is a fundamental core business value that starts at the top. The Lean Business System, led by our executive management team, drives quality, production and waste elimination by focusing on People using a structured Process that allows the workforce to identify and fix problems in their workplace. Many inefficiencies and quality related issues start with the desire to make systems fail-safe without defining the core requirements for which that process or program was created. This leads to added complexity and latent or inherent human performance issues embedded within our processes. While Lean can't fix all problems, a combination of strong nuclear safety culture, robust conduct of operations, active human performance improvement process, and a business practice of continuously looking for improvements leads to excellence across our industry and creates a culture that is worthy of promoting. Without strong management, our systems fail because no one sponsors or encourages those attributes we covet. Leadership starts at the top with our customer defining what provides 'value' to them, and filters down through to the organization and ultimately the workforce in day to day conduct of operations. It is imperative that our customer drives these desirable ideals through recognition and contractual requirements to encourage and support those behavioral traits that are critical to our ongoing success.This paper focuses on how the Lean Business Management System supports those attributes that we value: a strong nuclear safety culture; disciplined conduct of operations; and a culture of robust human performance and continuous improvement. These attributes in our daily work environment propel a safer, more consistent, more efficient workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SRR's 'Next Step' in the Lean Journey -Taking Lean to the Workforce - 17247

The Savannah River Site, a U.S. Department of Energy (DOE) facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. At SRR, the Lean business management system has been adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. The first step of the SRR Lean Journey was to formally identify areas of improvement and initiate Value Stream Analysis (VSAs) and Rapid Improvement Events (RIEs). SRR has achieved improvements in procedure implementation, work planning and control, project schedule compression, and engineering requirements. SRR is now phasing in the next phase of Lean through Managing for Daily Improvement (MDI), Visual Management and 5S (sort, set in order, shine, standardize, and sustain). MDI is a fundamental Lean principle in that we use our most valuable asset, our employees, to drive continuous improvement versus a smaller population through formal events. Part of MDI includes visual management where the workforce can go to a 'dashboard' to see and understand the company mission and status. 5S is a process where a work group improves performance in an area by addressing physical organization, efficiency, uniformity, standardization, and mechanisms to sustain improvements. 5S stands for: Sort, Set in Order, Shine, Standardize, and Sustain. This paper will focus on the 'Next Step' in SRR's Lean journey by address how SRR is implementing MDI and 5S to improve CONOPs, Project efficiencies, and worker engagement in day to day operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strengthening the Security of Operational Technology: Understanding Contemporary Bill of Materials

The evolution of cyber-physical infrastructure has made its security more challenging. The last few years have witnessed a convergence of hardware and software segments in various domains, including operational technology (OT) which is responsible for carrying out critical tasks such as monitoring and controlling power grids, nuclear plants, transportation, and emergency services. Both hardware and software encapsulate numerous open source and proprietary subcomponents, making it crucial for end-users to understand the composition of the products they are using. For example, wind turbines incorporate thousands of lines of code (software) used for the turbine's design, planning, operation, and analytics in addition to the numerous hardware subcomponents that construct it. Due to the highly complex nature of software and hardware, knowledge of the components and subcomponents is required to mitigate cyber vulnerabilities and defend against cyberattacks. There has also been a transformation from a traditional linear supply chain into a global, dynamic, diverse, and interconnected system. The digitization of the supply chain makes it easier to find and exploit vulnerabilities. Critical infrastructures (e.g., power grids, oil, natural gas, water, and wastewater) rely on OT to function, and if the OT is compromised, equipment damage and potential interruption of services could result. A significant security measure to protect OT systems from disruption is to develop a supply chain bill of materials (BoM) corresponding to the software and hardware used in OT, along with attestations amongst vendors and asset owners. A supply chain BoM is a proactive way to understand the inherent vulnerabilities in the system and mitigate them in advance of being exploited. BoMs bolster the trust placed in the digital infrastructure and enhance software supply chain security by sustaining the management of component obsolescence and compliance, along with the seclusion of unsafe segments of a specific product. Adopting BoM tools is becoming increasingly important across various government sectors, as evidenced by the recent U.S. executive order on cybersecurity (NIST 2021). This paper aims to classify BoMs based on structure, functionality, component type, and architecture. The work also discusses case studies to further highlight the benefits of BoMs. In addition, it identifies missing pieces in existing BoM implementations so that future research may identify bounds on where it could expect to make improvements and directly enable researchers to identify promising areas for exploration. Further, the authors provide valuable recommendations to tool developers, researchers, and standardizing organizations (policymakers), additionally benefitting critical infrastructure owners and government executives. This aids in paving a path for future work, thereby, providing suggestions to determine a tool for consumers that best suit their needs.

97 MATHEMATICS AND COMPUTING↗

Results and Analysis of the Research and Development Work Scope Request for Information (DE-SOL-0008246)

The Department of Energy (DOE) Office of Nuclear Energy (NE) released a request for information (RFI) (DE-SOL-0008246) for “University, National Laboratory, Industry and International Input to the Office of Nuclear Energy’s Competitive Research and Development Work Scope Development” on April 13, 2015. DOE-NE solicited information for work scopes for the four main program areas as well as any others suggested by the community. The RFI proposal period closed on June 19, 2015. From the 124 responses, 238 individual work scopes were extracted. Thirty-three were associated with a DOE national laboratory, including Argonne National Laboratory (ANL), Brookhaven National Laboratory (BNL), Idaho National Laboratory (INL), Los Alamos National Laboratory (LANL), Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL). Thirty US universities submitted proposals as well as ten industrial/commercial institutions. Four major R&D areas emerged from the submissions, appearing in more than 15% of the proposed work scopes. These were: nuclear fuel studies, safety and risk analysis, nuclear systems analysis and design and advanced instrumentation and controls. Structural materials for nuclear power plants, used nuclear fuel disposition and various types of systems analysis were also popular, each appearing in more than 10% of the proposals. Nuclear Energy Enabling Technologies (NEET) was the most popular program area with 42% of the proposals referencing the NEET-CTD program. The order of the remaining programs was Fuel Cycle Technologies (FC) at 34%, Nuclear Energy Advanced Modeling and Simulation (NEAMS) at 29% and Reactor Concepts at 17%.

99 GENERAL AND MISCELLANEOUS↗

Transforming the U.S. Energy Infrastructure

The U.S. energy infrastructure is among the most reliable, accessible and economic in the world. On the other hand, the U.S. energy infrastructure is excessively reliant on foreign sources of energy, experiences high volatility in energy prices, does not practice good stewardship of finite indigenous energy resources and emits significant quantities of greenhouse gases (GHG). This report presents a Technology Based Strategy to achieve a full transformation of the U.S. energy infrastructure that corrects these negative factors while retaining the positives.

99 GENERAL AND MISCELLANEOUS↗

Progression of Safe and Compliant Demolition of Hanford's Plutonium Finishing Plant - 16566

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is about to begin demolition of the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is in the final stages of preparing to demolish the building by the Tri-Party Agreement Milestone date of September 30, 2016. Since 2008, employees have prepared approximately 85 percent of the building for demolition. All of the 52 pencil-shaped processing tanks and 95 percent of the 238 glove boxes have been removed. Work is progressing on dispositioning remaining glove boxes, filter boxes and ventilation ducts and chemical and drain lines. Demolition is scheduled to start in early 2016. In addition to wrapping up tasks like source term removal (or preparation for removal during pre-demolition) and decontamination, the project is also developing the strategy and process to perform physical open air demolition, including the use of 3D renderings and computer generated illustrations of building infrastructure to safely and compliantly demolish the building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent MCNP6 ® Code Developments and Improvements for Nuclear Engineering Applications [Slides]

The Los Alamos MCNP Monte Carlo radiation transport code has been the international gold standard for particle transport applications for over three decades. Many developments to the code have taken place with several significant new feature additions, major improvements, and enhancements to existing features. With significant institutional and programmatic investment in the code since the time of the last public release in 2018, important code development and infrastructure modernization has taken place and remains a high priority for all ongoing efforts across the code development team.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

WRPS MEETING THE CHALLENGE OF TANK WASTE

Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two-and-a-half years to modernize the infrastructure in Hanford's tank farms. WRPS issued 850 subcontracts totaling more than $152 million with nearly 76 percent of that total awarded to small businesses. WRPS used the funding to upgrade tank farm infrastructure, develop technologies to retrieve and consolidate tank waste and extend the life of two critical operating facilities needed to feed waste to the WTP. The 222-S Laboratory analyzes waste to support waste retrievals and transfers. The laboratory was upgraded to support future WTP operations with a new computer system, new analytical equipment, a new office building and a new climate-controlled warehouse. The 242-A Evaporator was upgraded with a control-room simulator for operator training and several upgrades to aging equipment. The facility is used to remove liquid from the tank waste, creating additional storage space, necessary for continued waste retrievals and WTP operation. The One System Integrated Project Team is ajoint effort ofWRPS and Bechtel National to identify and resolve common issues associated with commissioning, feeding and operating the Waste Treatment Plant. Two new facilities are being designed to support WTP hot commlsslomng. The Interim Hanford Storage project is planned to store canisters of immobilized high-level radioactive waste glass produced by the vitrification plant. The facility will use open racks to store the 15-foot long, two-foot diameter canisters of waste, which require remote handling. The Secondary Liquid Waste Treatment Project is a major upgrade to the existing Effluent Treatment Facility at Hanford so it can treat about 10 million gallons of liquid radioactive and hazardous effluent a year from the vitrification plant. The One System approach brings the staff of both companies together to identify and resolve WTP safety issues. A questioning attitude is encouraged and an open forum is maintained for employees to raise issues. WRPS is completing its mission safely with record-setting safety performance. Since WRPS took over the Hanford Tank Operations Contract in October 2008, the recordable injury rate has decreased 43 percent, while the lost work-days rate decreased by 30 percent. The company recently surpassed three million hours worked without a lost workday accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design Report for the Irradiated Materials Characterization Laboratory (IMCL)

This document describes the design at a conceptual level for the Irradiated Materials Characterization Laboratory (IMCL) to be located at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The IMCL is an 11,000-ft2, Hazard Category-2 nuclear facility that is designed for use as a state of the-art nuclear facility for the purpose of hands-on and remote handling, characterization, and examination of irradiated and nonirradiated nuclear material samples. The IMCL will accommodate a series of future, modular, and reconfigurable instrument enclosures or caves. To provide a bounding design basis envelope for the facility-provided space and infrastructure, an instrument enclosure or cave configuration was developed and is described in some detail. However, the future instrument enclosures may be modular, integral with the instrument, or reconfigurable to enable various characterization environments to be configured as changes in demand occur. They are not provided as part of the facility.

99 GENERAL AND MISCELLANEOUS↗

The Hybrid Propellant Module (HPM): A New Concept for Space Transfer in the Earth's Neighborhood and Beyond

The safe, affordable and effective transfer of ever-larger payloads and eventually personnel beyond Low Earth Orbit (LEO) is a major challenge facing future commercial development and human exploration of space. Without reusable systems, sustained exploration or large scale development beyond LEO appears to be economically non-viable. However, reusable systems must be capable of both good fuel efficiency and "high utilization of capacity", or else economic costs will remain unacceptably high. Various options exist that can provide high fuel efficiency - for example, Solar Electric Propulsion Systems (SEPS) - but only at the cost of low thrust and concomitant long transit times. Chemical propulsion systems offer the potential for high thrust and short transit times - including both cryogenic and non-cryogenic options - but only at the cost of relatively low specific impulse (Isp). Nuclear thermal propulsion systems offer relatively good thrust-to-weight and Isp - but involve public concerns that may be insurmountable for all except the most-critical of public purposes. Fixed infrastructures have been suggested as one approach to solving this challenge; for example, rotating tether approaches. However, these systems tend to suffer from high initial costs or unacceptable operational constraints. A new concept has been identified - the Hybrid Propellant Module (HPM) - that integrates the best features of both chemical and solar electric transportation architectures. The HPM approach appears to hold promise of solving the issues associated with other approaches, opening a new family of capabilities for future space exploration and development of near-Earth space and beyond. This paper provides a summary overview of the challenge of Earth neighborhood transportation and discusses how various systems concepts might be applied to meet the needs of these architectures. The paper describes a new approach, the HPM, and illustrates the application of the concept for a typical mission concept. The paper concludes with a discussion of needed technologies and a possible timeline for the development and evolution of this class of systems concepts.

Mankins, John C.↗

Current Status and Potential Impacts Regarding the Proposed Development of a Rail Line to the Yucca Mountain Nuclear Waste Repository

This paper provides a description of the current status regarding the proposed development of a rail line to the Yucca Mountain Nuclear Waste Repository in Nye County, Southern Nevada, which includes potential impacts analyzed during the National Environmental Policy Act (NEPA) process, and the subsequent creation of an Environmental Impact Statement (EIS) for the rail line. Potential impacts are addressed within the context of impacts to natural and human environmental resources found within the geographic area of the proposed federal project. Potential impacts to these resources have been fully analyzed in the Rail Alignment Draft EIS (DEIS). This paper includes a summary of the potential impacts analyzed in the DEIS. Examples of potential impacts include land use conflicts, air quality, water use, and impacts to biological and cultural resources, among others. In conclusion: Based on its obligations under the NWPA and its decision to select the mostly rail scenario for the transportation of spent nuclear fuel and high-level radioactive waste, DOE needs to ship these materials by rail in Nevada to a repository at Yucca Mountain. DOE prepared the Rail Alignment EIS to provide the background, data, information, and analyses to help decision makers and the public understand the potential environmental impacts that could result from constructing and operating a railroad for shipment of spent nuclear fuel, high-level radioactive waste, and other materials from an existing rail line in Nevada to a repository at Yucca Mountain. This railroad would consist of a rail line, railroad operations support facilities, and other related infrastructure. DOE will use the Rail Alignment EIS to decide whether to construct and operate the proposed railroad, and if so, to: - Select a rail alignment (Caliente rail alignment or Mina rail alignment) in which to construct the railroad; - Select the common segments and alternative segments within either a Caliente rail alignment or a Mina rail alignment. The Department would use the selected common segments and alternative segments to identify the public lands to be included in right-of-way applications; - Decide where to construct proposed railroad operations support facilities; - Decide whether to restrict use of the rail line to DOE trains, or whether to allow commercial shippers to operate over the rail line; and - Determine what mitigation measures to implement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Hybrid Energy Systems - Regional Studies. West Texas and Northeastern Arizona

The primary objective of this study is to conduct a preliminary dynamic analysis of two realistic hybrid energy systems (HES) including a nuclear reactor as the main baseload heat generator (denoted as nuclear HES or nuclear hybrid energy systems [NHES]) and to assess the local (e.g., HES owners) and system (e.g., the electric grid) benefits attainable by the application of NHES in scenarios with multiple commodity production and high penetration of renewable energy. It is performed for regional cases - not generic examples - based on available resources, existing infrastructure, and markets within the selected regions. This study also briefly addresses the computational capabilities developed to conduct such analyses, reviews technical gaps, and suggests some research paths forward.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗