Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

iROSA Computational Model Development and Integration for the International Space Station

The power generation capability of the International Space Station (ISS) is being augmented with the installation of new solar arrays. The new solar arrays, named iROSA (ISS Roll Out Solar Array), are installed in front of original main truss solar arrays and integrate into the existing structure and electrical power system of the ISS. However, iROSA represents significant changes in technology for solar arrays compared to the original solar arrays on the ISS main truss. Knowing the power capabilities of the augmented solar arrays is critical for near-term and long-term mission planning and utilization. This new iROSA installation thus requires updates to be made to the prior-day methods of calculating power generation capability for the ISS. New types of solar cells and array designs, both electrically and structurally, present challenges for concurrent computational modeling of both the original solar arrays and the newer iROSA. This presentation will detail the development and integration of the computational models to calculate the power for the augmented arrays on ISS and the evaluation of the model to ensure that it functions with and without iROSA and returns accurate predictions of power generation in nominal and off-nominal conditions.

International Space Station↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor (CCM) which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

NASA Exploration Hardware Status and Crew Feedback from Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Boundary-Layer-Transition Measurements in Full-Scale Flight

Chemical sublimation has been employed for boundary-layer-flow visualization on the wings of a supersonic fighter airplane in level flight at speeds near a Mach number of 2.0. The tests have shown that laminar flow can be obtained over extensive areas of the wing with practical wing-surface conditions. In addition to the flow visualization tests, a method of continuously monitoring the conditions of the boundary layer has been applied to flight testing, using heated temperature resistance gages installed in a Fiberglas "glove" installation on one wing. Tests were conducted at speeds from a Mach number of 1.2 to a Mach number of 2.0, at altitudes from 35,000 feet to 56,000 feet. Data obtained at all angles of attack, from near 0 deg to near 10 deg, have shown that the maximum transition Reynolds number on the upper surface of the wing varies from about 2.5 x 10(exp 6) at a Mach number of 1.2 to about 4 x 10(exp 6) at a Mach number of 2.0. On the lower surface, the maximum transition Reynolds number varies from about 2 x 10(exp 6) at a Mach number of 1.2 to about 8 x 10(exp 6) at a Mach number of 2.0.

SUPERSONIC FLOW↗

Coating permits use of strain gage in water and liquid hydrogen

Strain gage installation covered with a three-layer coating of commercial materials makes measurements in water and liquid hydrogen. It consists of a selected foil strain gage bonded with a modified commercial heat-curring epoxy cement. The outer protective layer of the gage installation may develop cracks when immersed in liquid hydrogen.

Berven, B. B.↗

Pressure probe compensates for dimensional tolerance variations

Flexible, compressible spring-loaded pressure probe measures the static pressure between the rotor stages on an axial-flow fuel pump. This probe is used in installation where a drilled static pressure tap or a rigid impulse tube cannot be used. Its parameters must be specially determined for each installation.

Birner, R. A.↗

Web belt load measuring instrument has excellent stability

Web belt system measures belt or strap load. It is partially disassembled and installed on an existing belt without cutting or re-threading the belt. A strain gage, installed on one of the support beams, eliminates errors due to uneven loading.

Walker, R. R.↗

Pipe joints reinforced in place with fitted aluminum sleeves

Installation of an aluminum sleeve, using specially designed tools, reinforces solder- sealed ferrule joints in installed small-diameter aluminum tubing. Tubing joints reinforced by this method withstand considerable torsional tensional, and vibrational stresses at moderately elevated temperatures.

Cortez, I., Jr.↗

Waveguide feeder system for the Goonhilly satellite-communication earth station

There are two features which distinguish the feeder arrangements at a satellite earth station from those used in conventional microwave line-of-sight links. The first is the importance of low loss in all waveguides and components and the second is the need for rotating joints. Losses are important in the receive direction because they contribute significantly to the overall system noise temperature while, in the transmit direction, not only do they waste expensive transmitter power but localized points of high loss can give rise to the formation of arcs when the power is applied. Rotating joints are required on the elevation axis of the aerial to permit waveguide connection between apparatus in the turntable cabin and on the dish. In the installation at Goonhilly, three separate waveguide connections are required between the turntable cabin and the focus platform; one each for the Telstar and Relay transmitters operating at 6390 and 1725 Mc/s respectively, and one for the receiver feed, routed via the maser cabin on the back of the dish and operating at 4170 and 4080 Mc/s. Dominate-mode rectangular waveguide is used for these runs, and the components and installation practices used follow normal practice as far as possible.

GROUND STATION↗

Thermal radiation shields for piping in vacuum environments

System of thermal radiation shielding reduces radiant heat transfer in vacuum installations containing piping which carries working fluids. Method employs successive layers of spacers and rolled metal shields which are easily installed or removed, expedites efficient removal of entrapped gases, and adapts easily to small pipings.

Spagnuolo, A. C.↗

Hermetically sealed vibration damper

Simple fluidic vibration damper for installation at each pivotal mounting between gimbals isolates inertial measuring units from external vibration and other disruptive forces. Installation between each of the three gimbal axes can dampen vibration and shock in any direction while permitting free rotation of the gimbals.

Wheatley, D. G.↗