Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

PNNL CRADA No. 488, Amendment 2 with Natel Energy, Inc.: The Center Sender

Under the Cooperative Research and Development Agreement (CRADA) No. 488, awarded to Natel Energy, Inc. (Natel) for third place in the Fish Protection Prize 2020 initiative, research was conducted on the Center Sender concept, a simple physical or combined physical and electrical device intended to guide fish to the safest path through a hydropower intake or water diversion. Applying this to a hydropower turbine, the Center Sender can be designed to divert fish to the center of the turbine, where blade velocities are slower and the risk of severe injuries due blade strike, pinching, and grinding are reduced.

13 HYDRO ENERGY↗

Integrated Basin-Scale Opportunity Assessment Initiative: Scoping Assessment for the Bighorn River Basin

The Basin-Scale Opportunity Assessment (BSOA) Initiative, led by the U.S. Department of Energy’s (DOE’s) Water Power Program, established an integrative, three-phase approach for assessing complementary hydropower-environmental opportunities at the scale of a river basin. Phase 1 of this approach is a scoping assessment process for a given river basin that is intended to provide initial identification, classification, screening, and integration of possible hydropower and environmental opportunities for DOE and basin stakeholders to consider carrying forward as appropriate. Phases 2 and 3 involve greater stakeholder engagement and technical analysis pertaining to potential opportunities identified during Phase 1. Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) developed a technical approach and methodology for BSOA Phase 1 assessments and performed assessments for the Bighorn, Connecticut, and Roanoke River basins. This report summarizes the Phase 1 assessment for the Bighorn River basin.

13 HYDRO ENERGY↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY↗

Optimize the Autonomous Sensor Fish Device for Understanding Interactions of Aquatic Animals with Marine and Hydrokinetic and Hydro Systems (CRADA 476) Final Report

This project at the Pacific Northwest National Laboratory (PNNL) enhances our understanding of how aquatic life interacts with marine renewable energy (MRE) and hydropower systems through the development and testing of advanced sensor technology. The Marine Sensor Fish (MSF) and its smaller variants, the Sensor Fish Mini (SF Mini) and Flexible Sensor Fish (FSF), measure critical environmental stressors, such as shear forces, pressure changes, and strike impacts, that are essential for assessing the risks posed by energy devices, including tidal turbines, hydropower installations, and other MRE infrastructure. Rigorous field testing has shown that these tools are effective in capturing detailed data on turbulence, pressure variations, strike impacts, and other stressors near these devices, providing valuable insights into the conditions faced by aquatic species. Economically, these tools offer renewable energy developers a practical solution for streamlining environmental assessments and ensuring regulatory compliance, ultimately reducing costs associated with evaluating and mitigating ecological impacts. This research also benefits the public by promoting the growth of renewable energy sources that protect aquatic ecosystems, advancing both sustainable energy production and environmental stewardship.

13 HYDRO ENERGY↗

Grid Resiliency using Hydro-based Microgrids During Wildfires

The primary objective of this project is to assess the techno-economic viability of hydropower resources with supplementary investments, including microgrid controllers, storage solutions, load banks, additional generation like diesel generators, communication links, and transmission infrastructure. The aim is to enable these systems to operate autonomously (in islanded mode) and ensure grid resiliency during and after wildfire events. The project seeks to establish a comprehensive framework for setting up hydropower-based microgrids, from risk estimation to final investment decisions. These microgrids can provide critical support during emergencies and offer additional grid stability and revenue opportunities during regular operations and other system contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FERC Licensing Proceeding Environmental Study Determination Letter

This dataset summarized the back-and-forth of study submittals and issuances from Aldrovandi et al. (2021) for seven licensed hydropower projects presented as case studies in Aldrovandi et al. (2021), leveraging information from six of the seven case study projects documented in Pracheil et al. (2019), Sci Tot Env 687: 1245-1260. This information was mined from documents containing information on environmental studies conducted for US federal hydropower licensing. Documents included were found in the FERC eLibrary and was summarized and presented in Aldrovandi et al. (2021). A description of the types of documents used in this dataset can be found in Aldrovandi et al. (2021).

13 HYDRO ENERGY↗

FERC Licensing Proceeding Environmental Study Life Cycle

This dataset summarized the back-and-forth of study submittals and issuances from Aldrovandi et al. (2021) for seven licensed hydropower projects presented as case studies in Aldrovandi et al. (2021), leveraging information from six of the seven case study projects documented in Pracheil et al. (2019), Sci Tot Env 687: 1245-1260. This information was mined from documents containing information on environmental studies conducted for US federal hydropower licensing. Documents included were found in the FERC eLibrary and was summarized and presented in Aldrovandi et al. (2021). A description of the types of documents used in this dataset can be found in Aldrovandi et al. (2021).

13 HYDRO ENERGY↗

PNNL-ANL Hydrometeorological Super Ensemble

The current dataset contains data upload links to the following **hydrologic (water balance), river routing (water management), and hydropower simulation** data over CONUS: * Climate Forcing: **Livneh** (https://www.nature.com/articles/sdata201542) * Simulation Scenario: **Historical** * Simulation Period: **1971-2013 (1972-2013 for Hydropower)** * Simulation Models: **VIC (Variable Infiltration Capacity)**, **mosartwmpy (Model for Scale Adaptive River Transport-Water Management in Python)**, and **PNNL B1Hydro** * Output Format: **NetCDF** and **CSV**

Tidwell, Vincent C [Pacific Northwest National Lab↗

An Evaluation of Energy Storage Cost and Performance Characteristics

The energy storage industry continues to expand globally as costs continue to fall and opportunities in consumer, transportation and grid applications are defined. As the rapid evolution of the industry continues, it has become increasingly important to understand how varying technologies compare in terms of cost and performance. This paper defines and evaluates cost and performance parameters of six battery energy storage technologies (BESS) - lithium-ion batteries, lead-acid batteries, redox flow batteries, sodium-sulfur batteries, sodium metal halide batteries, and zinc-hybrid cathode batteries - four non-BESS storage technologies - pumped storage hydropower, flywheels, compressed air energy storage, and ultracapacitors - and combustion turbines. Cost and performance information was compiled based on an extensive literature review, conversations with vendors and stakeholders, and costs of systems procured at sites across the United States. Detailed cost and performance estimates are presented for 2018 and projected out to 2025. Annualized costs were also calculated for each technology.

Mongird, Kendall↗

Experimental Observation of Inertial Particles through Idealized Hydroturbine Distributor Geometry

To increase and maintain existing hydropower capacity within biological performance-based regulations, predictive simulation methods are needed that can reliably estimate the risk to fish passing through flow passage routes at hydropower facilities. One of the central challenges is to validate the software capabilities for simulating the trajectories, including collisions, of inertial particles against laboratory data. In this work, neutrally buoyant spherical- and rod-shaped beads were released upstream of laboratory-scale geometries representative of the distributor of a hydroturbine. The experimental campaign involved a test matrix of 24 configurations with variations in bead geometry, collision target geometry, flow speeds, and release locations. A total of more than 10,000 beads were recorded using high-speed video cameras and analyzed using particle tracking software. Collision rates from 1–7% were observed for the cylinder geometry and rates of 1–23% were observed for the vane array over the range of test configurations.

13 HYDRO ENERGY↗

Evaluation of GloFAS-Seasonal Forecasts for Cascade Reservoir Impoundment Operation in the Upper Yangtze River

Standard impoundment operation rules (SIOR) are pre-defined guidelines for refilling reservoirs before the end of the wet season. The advancement and availability of the seasonal flow forecasts provide the opportunity for reservoir operators to use flexible and early impoundment operation rules (EIOR). These flexible impoundment rules can significantly improve water conservation, particularly during dry years. In this study, we investigate the potential application of seasonal streamflow forecasts for employing EIOR in the upper Yangtze River basin. We first define thresholds to determine the streamflow condition in September, which is an important period for decision-making in the basin, and then select the most suitable impoundment operation rules accordingly. The thresholds are used in a simulation–optimization model to evaluate different scenarios for EIOR and SIOR by multiple objectives. We measure the skill of the GloFAS-Seasonal forecast, an operational global seasonal river flow forecasting system, to predict streamflow condition according to the selected thresholds. The results show that: (1) the 20th and 30th percentiles of the historical September flow are suitable thresholds for evaluating the possibility of employing EIOR; (2) compared to climatological forecasts, GloFAS-Seasonal forecasts are skillful for predicting the streamflow condition according to the selected 20th and 30th percentile thresholds; and (3) during dry years, EIOR could improve the fullness storage rate by 5.63% and the annual average hydropower generation by 4.02%, without increasing the risk of flooding. GloFAS-Seasonal forecasts and early reservoir impoundment have the potential to enhance hydropower generation and water utilization.

54 ENVIRONMENTAL SCIENCES↗

The International Summer School on Land Cover Change and Hydroclimate of the La Plata Basin

The La Plata Basin (LPB) in southern South America has been subject to land cover and land use changes (LCLUCs) since colonial times and with an accelerated rate in the last decades and over extensive areas. The work of Ameghino even suggested that there were relations between those land use changes and the frequency of droughts and floods in the region. Despite this early knowledge, not much is known of the potential impacts of LCLUC on the hydroclimate of the La Plata basin. Besides, over the last century much of the La Plata Basin has had a reported increase in precipitation and heavy rains, and these changes along with an increase in population growth - have resulted in more adverse effects from flooding. To draw attention to these issues, during two weeks in November 2009 the International Summer School on Land Cover Change and Hydroclimate of the La Plata Basin was organized at the grounds of the Itaip Hydropower Plant in Brazil. The school was the result of the combination of interests between the La Plata Basin Regional Hydroclimate Project, the Inter-American Institute for Global Change Research (IAI), and the International Hydroinformatics Center (IHC) in Itaip . LPB is an umbrella project endorsed by the Global Energy and Water Cycle Experiment (GEWEX) and the Climate Prediction and Variability (CLIVAR), both of the World Climate Research Programme (WCRP). LPB has made a priority to train young scientists and promote interdisciplinary collaborations in areas related to Climate, Hydrology, Ecology and Agriculture. The IAI, with a similar agenda, was a natural partner to develop this Summer School, which in turn benefited from Itaipu s interest in relating with the scientific community of neighboring countries. The choice of location (Itaip Technological Park) was made so that participants could relate research usually done at academic institutions to applications and operations at one of the largest hydropower plants in the world. The school was attended by 45 advanced graduate students and young scientists with different backgrounds from seven countries, including less technically advanced ones in the region..

Berbery, Ernesto Hugo↗

Quantifying Water Storage Change and Land Subsidence Induced by Reservoir Impoundment Using GRACE, Landsat, and GPS Data

The construction of hydropower dams is a common strategy to support a country's increasing need for electricity and river water management for industry and agriculture. Although the hydrological and geophysical impacts of water relocation are usually assessed prior to impoundment, their accuracy is generally limited due to the lack of in situ observations, especially in a remote area. This study presents a workflow to quantify the terrestrial water storage change (TWS) and land subsidence induced by a reservoir's water impoundment using multiple satellite observations (GRACE, Landsat), land surface models (CABLE, GLDAS, NCEP, ECMWF), and GPS data. The study site is the Bakun Dam, located in Sarawak, Malaysia, which is the largest hydropower dam in Southeast Asia. Commencing operation in late 2010, the dam induced a change of water mass and lake surface area that was clearly observed by GRACE and Landsat observations, respectively. During the 17-month impounding period (from August 2010 to December 2011), GRACE observed a dramatic increase of approximately 200 mm equivalent water height, while Landsat detected an increased lake extent of around 600 km2. In this paper, a forward model is developed to determine the increased water surface level corresponding to GRACE observations, estimated to be about 120 m. In contrast to GRACE, the TWS derived from land surface models cannot capture the increased TWS, due to the lack of reservoir routing algorithms in the models. In addition, the land subsidence was calculated using the disk load model constructed based on the GRACE-derived lake level and Landsat-derived lake extent; the result is validated with the GPS data from BIN1 station, located at the western coast of Borneo. The commencement stage of the Bakun Dam induces the large-scale land subsidence, which causes the GPS-BIN1 station to subside by ~9 mm, and move toward the Bakun Lake by ~4 mm. Computation of the surface displacements directly from GRACE spherical harmonic coefficient data fails to capture the subsidence feature, mainly due to the truncation error. Overall, this study demonstrates that evaluating GRACE in conjunction with Landsat, LSMs, and GPS data allows the exploitation of the gravity signal at a much smaller spatial scale than its intrinsic resolution. Benefiting from global coverage, the newly developed satellite-based algorithm is a valuable tool for assessing the impacts of reservoir operation on hydrological and geophysical changes from local to regional scales.

Natthachet Tangdamrongsub↗

Quantifying Water Storage Change and Land Subsidence Induced by Reservoir Impoundment Using GRACE, Landsat, and GPS Data

The construction of hydropower dams is a common strategy to support a country's increasing need for electricityand river water management for industry and agriculture. Although the hydrological and geophysical impacts ofwater relocation are usually assessed prior to impoundment, their accuracy is generally limited due to the lack ofin situ observations, especially in a remote area. This study presents a workflow to quantify the terrestrial waterstorage change (TWS) and land subsidence induced by a reservoir's water impoundment using multiple satelliteobservations (GRACE, Landsat), land surface models (CABLE, GLDAS, NCEP, ECMWF), and GPS data. The studysite is the Bakun Dam, located in Sarawak, Malaysia, which is the largest hydropower dam in Southeast Asia.Commencing operation in late 2010, the dam induced a change of water mass and lake surface area that wasclearly observed by GRACE and Landsat observations, respectively. During the 17-month impounding period(from August 2010 to December 2011), GRACE observed a dramatic increase of approximately 200mmequivalent water height, while Landsat detected an increased lake extent of around 600 km2. In this paper, aforward model is developed to determine the increased water surface level corresponding to GRACE observations,estimated to be about 120 m. In contrast to GRACE, the TWS derived from land surface models cannotcapture the increased TWS, due to the lack of reservoir routing algorithms in the models. In addition, the landsubsidence was calculated using the disk load model constructed based on the GRACE-derived lake level andLandsat-derived lake extent; the result is validated with the GPS data from BIN1 station, located at the westerncoast of Borneo. The commencement stage of the Bakun Dam induces the large-scale land subsidence, whichcauses the GPS-BIN1 station to subside by ~9 mm, and move toward the Bakun Lake by ~4 mm. Computation ofthe surface displacements directly from GRACE spherical harmonic coefficient data fails to capture the subsidencefeature, mainly due to the truncation error. Overall, this study demonstrates that evaluating GRACE inconjunction with Landsat, LSMs, and GPS data allows the exploitation of the gravity signal at a much smallerspatial scale than its intrinsic resolution. Benefiting from global coverage, the newly developed satellite-basedalgorithm is a valuable tool for assessing the impacts of reservoir operation on hydrological and geophysicalchanges from local to regional scales.

Tangdamrongsub, Natthachet↗

Tool to Predict TDG for the Columbia River Basin

The authors propose a simplified method for determining total dissolved gas (TDG) uptake at hydropower facilities on the Mid-Columbia River. This work constitutes a significant contribution to a much larger effort aimed at improving real-time optimized scheduling of hydropower systems with respect to TDG constraint and control.

54 ENVIRONMENTAL SCIENCES↗

Restoring the Grand Canyon Ecosystem: Evidence from Dynamic Systems Theory

Constructing and operating dams for hydropower generation can impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests, coupled with federal relicensing requirements that aim to minimize environmental impacts, have put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from Lees Ferry, Colorado, just downstream of Glen Canyon Dam on the Colorado River, to determine how the dimensionality of the river system has changed over time and to evaluate the effectiveness of a new operating policy put into place after the 1992 Grand Canyon Protection Act was passed. While the post-dam period governed by hydropower operations is characterized by high dimensional, stochastic behavior, the pre-dam and post-modification periods are low dimensional and less complex, demonstrating the success of the new operating policy in mirroring the natural flow regime. Our analysis also suggests that applying a strictly deterministic or stochastic modeling approach to historical flow data does not appropriately capture the varying complexity of the Colorado River system during the three distinct periods of hydrologic behavior.

13 HYDRO ENERGY↗

Restoring Flow Regimes after Dam Construction and Operation: Evidence from Dynamic Systems Theory

Dams provide a variety of benefits to society, including hydropower generation, flood control, recreation, and water supply for municipal, industrial, and agricultural customers. However, constructing and operating dams for these purposes can negatively impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests has put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from eight rivers in the US to determine the dimensionality of each operating period and to analyze trends based on the primary purpose of dam operation. Hydropower dams operated without flow restrictions exhibit high dimensional, stochastic behavior. However, the system dimensionality is reduced to approximately three variables when ramping restrictions are implemented, or in cases where an afterbay is present to reregulate flows. This low dimensional behavior is more similar to natural flow regimes. For dams operated primarily for flood control or water supply, the flow regimes are typically low dimensional and more deterministic.

13 HYDRO ENERGY↗