Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “guidance document”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

SU-F-T-462: Lessons Learned From a Machine Incident Reporting System

Purpose: Linear accelerators must operate with minimal downtime. Machine incident logs are a crucial tool to meet this requirement. They providing a history of service and demonstrate whether a fix is working. This study investigates the information content of a large department linear accelerator incident log. Methods: Our department uses an electronic reporting system to provide immediate information to both key department staff and the field service department. This study examines reports for five linac logs during 2015. The report attributes for analysis include frequency, level of documentation, who solved the problem, and type of fix used. Results: Of the reports, 36% were documented as resolved. In another 25% the resolution allowed treatment to proceed although the reported problem recurred within days. In 5% only intermediate troubleshooting was documented. The remainder lacked documentation. In 60% of the reports, radiation therapists resolved the problem, often by clearing the appropriate faults or reinitializing a software or hardware service. 22% were resolved by physics and 10% by field service engineers. The remaining 8% were resolved by IT, Facilities, or resolved spontaneously. Typical fixes, in order of scope, included clearing the fault and moving on, closing and re-opening the patient session or software, cycling power to a sub-unit, recalibrating a device (e.g., optical surface imaging), and calling in Field Service (usually resolving the problem through maintenance or component replacement). Conclusion: The reports with undocumented resolution represent a missed opportunity for learning. Frequency of who resolves a problem scales with the proximity of the person’s role (therapist, physicist, or service engineer), which is inversely related to the permanence of the resolution. Review of lessons learned from machine incident logs can form the basis for guidance to radiation therapists and medical physicists to minimize equipment downtime and ensure safe operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

EMP Attachment 3: DOE-SC PNNL Site Dose Assessment Guidance

This Dose Assessment Guidance (DAG) describes methods to use to determine the maximally exposed individual (MEI) location and estimate dose impact to that individual under the U.S. Department of Energy (DOE) Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from DOC-SC PNNL Site operations. This guidance is an attachment to PNNL’s EMP (PNNL-20919) and addresses a discrete, vital subject area of the EMP that is subject to revision independent of the main text of the EMP document.

54 ENVIRONMENTAL SCIENCES↗

EMP Attachment 3 Dose Assessment Guidance

This Dose Assessment Guidance (DAG) describes methods used to comply with the reporting requirements for individual receptor and collective dose for radionuclide air emissions under the U.S. Department of Energy, Office of Science, Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP). The National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H, is the greatest driver for the requirements. This DAG applies to public dose from radioactive material releases to the air from PNNL Richland Campus and Marine Sciences Laboratory (Sequim, Washington). The application of Richland Campus ambient external dose results is also briefly discussed. The methods used to perform the biota dose assessment reported in the Site Environmental Report are discussed. This guidance is Attachment 3 to PNNL’s EMP (PNNL-20919) and addresses a discrete, vital subject area of the EMP that is subject to revision independent of the main text of the EMP document.

40 CFR 61 Subpart H↗

EMP, Attachment 3: Dose Assessment Guidance

This Dose Assessment Guidance (DAG) describes methods used to comply with the reporting requirements for dose to an individual member of the public receptor, collective dose, and biota dose for radionuclide air emissions under the U.S. Department of Energy, Office of Science, Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP). The National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H, is the greatest driver for the requirements. This DAG applies to public dose from radioactive material releases to the air from PNNL Richland Campus and PNNL Sequim Campus. Dose determinations from Richland Campus surveillance of ambient external dose and ambient air particulates is also briefly discussed. This guidance is Attachment 3 to PNNL’s EMP (PNNL-20919) and addresses a discrete, vital subject area of the EMP that is subject to revision independent of the main text of the EMP document.

40 CFR 61 Subpart H↗

EMP Attachment 3: Dose Assessment Guidance (Rev.3)

This Dose Assessment Guidance (DAG) describes methods used to comply with the reporting requirements for dose to an individual member of the public receptor, collective dose, and biota dose for radionuclide air emissions under the U.S. Department of Energy, Office of Science, Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP). The National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H, is the greatest driver for the requirements. This DAG applies to public dose from radioactive material releases to the air from PNNL-Richland Campus and PNNL Marine and Coastal Research Laboratory. Dose determinations from Richland Campus surveillance of ambient external dose and ambient air particulates is also briefly discussed. This guidance is Attachment 3 to PNNL’s EMP (PNNL-20919) and addresses a discrete, vital subject area of the EMP that is subject to revision independent of the main text of the EMP document.

40 CFR 61 Subpart H↗

EMP, Attachment 3: Dose Assessment Guidance (Rev.4)

This Dose Assessment Guidance (DAG) describes methods used to comply with the reporting requirements for dose to an individual member of the public receptor, collective dose, and biota dose for radionuclide air emissions under the U.S. Department of Energy, Office of Science, Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP). The National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H, is the greatest driver for the requirements. This DAG applies to public dose from radioactive material releases to the air from PNNL-Richland campus and PNNL-Sequim campus. Dose determinations from Richland campus surveillance of ambient external dose and ambient air particulates is also discussed. This guidance is Attachment 3 to PNNL’s EMP (PNNL-20919) and addresses a discrete, vital subject area of the EMP that is subject to revision independent of the main text of the EMP document.

40 CFR 61 Subpart H↗

Cryogenic Pupil Alignment Test Architecture for Aberrated Pupil Images

A document describes cryogenic test architecture for the James Webb Space Telescope (JWST) integrated science instrument module (ISIM). The ISIM element primarily consists of a mechanical metering structure, three science instruments, and a fine guidance sensor. One of the critical optomechanical alignments is the co-registration of the optical telescope element (OTE) exit pupil with the entrance pupils of the ISIM instruments. The test architecture has been developed to verify that the ISIM element will be properly aligned with the nominal OTE exit pupil when the two elements come together. The architecture measures three of the most critical pupil degrees-of-freedom during optical testing of the ISIM element. The pupil measurement scheme makes use of specularly reflective pupil alignment references located inside the JWST instruments, ground support equipment that contains a pupil imaging module, an OTE simulator, and pupil viewing channels in two of the JWST flight instruments. Pupil alignment references (PARs) are introduced into the instrument, and their reflections are checked using the instrument's mirrors. After the pupil imaging module (PIM) captures a reflected PAR image, the image will be analyzed to determine the relative alignment offset. The instrument pupil alignment preferences are specularly reflective mirrors with non-reflective fiducials, which makes the test architecture feasible. The instrument channels have fairly large fields of view, allowing PAR tip/tilt tolerances on the order of 0.5deg.

Bos, Brent↗

Hanford Double-Shell Tank Extent-of-Condition Review - 15498

During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. A formal leak assessment, documented in RPP-ASMT-53793, Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure.1 To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records was performed for Hanford’s remaining twenty-seven DSTs. Review involved research of 241 boxes of historical project documentation to better understand the condition of the Hanford DST farms, noting similarities in construction difficulties/issues to tank AY-102. Information gathered provides valuable insight regarding construction difficulties, future tank operations decisions, and guidance of the current tank inspection program. Should new waste storage tanks be constructed in the future, these reviews also provide valuable lessons-learned.

Johnson, J. M.↗

Hanford double-shell tank extent-of-condition construction review - 15498

During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. A formal leak assessment, documented in RPP-ASMT-53793, Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure. To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records was performed for Hanford's remaining twenty-seven DSTs. Review involved research of 241 boxes of historical project documentation to better understand the condition of the Hanford DST farms, noting similarities in construction difficulties/issues to tank AY-102. Information gathered provides valuable insight regarding construction difficulties, future tank operations decisions, and guidance of the current tank inspection program. Should new waste storage tanks be constructed in the future, these reviews also provide valuable lessons-learned.(authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OC7 Phase I Definition Document

The Offshore Code Comparison Collaboration 7 (OC7) project is organized under the International Energy Agency Wind Technology Collaboration Programme Task 56 with an objective to evaluate and enhance the predictive accuracy of engineering-level modeling tools used in the design of offshore wind energy systems. Phase I of OC7 is focused on improving the models and modeling practices of hydrodynamic viscous loads on floating offshore wind turbine platforms. In alignment with this goal, Work Package 1.1 of OC7 Phase I is formulated to investigate the modeling of hydrodynamic viscous loads on several different geometric components commonly encountered with floating offshore wind platform designs, including cylindrical columns, heave plates, and rectangular pontoons. Work Package 1.1 also explores the dependence of hydrodynamic coefficients on the sea state to drive toward practical guidance on how these coefficients can be selected or adjusted for different conditions. This report outlines the motivation and objectives behind each subphase of OC7 Phase I, along with the necessary technical specifications and load case definitions to guide the project participants. It also serves as an important part of the project documentation for future modelers who would like to reproduce this work or make use of the data and information generated from the OC7 project.

17 WIND ENERGY↗

Cyber-Informed Engineering Validation Methods and Guidance

Validation is an important step in any systems engineering process to ensure the correct system was made to fulfill stakeholders’ needs, goals, and expectations. In the context of Cyber-Informed Engineering (CIE), validation ensures cyber impact is reduced through implemented design choices and CIE requirements. This document details a process in validating CIE-based design choices relative to their effectiveness at mitigating high consequence events. The document includes a case study to illustrate the CIE validation process. The case study explores the implementation of CIE validation within the engineering lifecycle of a chemical mixing plant.

42 ENGINEERING↗

Buildings Sector Scenarios: Demand-side data to support energy system planning in the United States

The US energy system is in a period of high uncertainty about load growth, its implications for the energy generation mix, and downstream impacts on customer energy costs. In this context, there is a need for comprehensive, credible, and readily-customized projections of energy demand to ensure that planning decisions account for end-use management opportunities to improve system reliability and affordability. Here we introduce the Buildings Sector Scenarios (BSS) dataset, which includes a benchmark suite of such projections for the buildings sector — a key source of energy consumption, peak electricity demand, and consumer energy expenditures. The dataset contains projections through 2050 covering the contiguous United States (CONUS) resolved down to the county, hourly level by sector and end use for electricity demand and to the state, annual level by sector and end use for non-electric fuels. We summarize the BSS analysis workflow and the tools and datasets that support it, document key BSS scenario inputs and modeling assumptions, and outline BSS scenario outputs. We assess the technical quality of the dataset against historical surveys and projected estimates of buildings sector demand. Finally, we provide guidance on how stakeholders can access, use, and reproduce the dataset, and/or create new scenarios to explore their own analysis questions.

Langevin, Jared↗

Exploring Grid-Interactive Efficient Building Strategies for Laboratories Through Energy Modeling

Laboratories are often overlooked in demand flexibility research due to constraints on their operations as mission critical facilities, despite the major role they play in an organization's emissions. Laboratories consume 3-4 times more energy than a typical office building and are commonly the largest energy users on any campus. Consequently, most laboratories in the United States are significant contributors to their organization's carbon footprint if their energy needs are met through the combustion of fossil fuels. As part of the initiative to decarbonize laboratories, this report documents an analysis on specifically grid-interactive efficient building (GEB) opportunities for reducing energy costs and emissions associated with laboratory operations. The goal of this initiative was to provide a case study and guidance on how to use OpenStudio and REopt as modeling tools for GEB technologies and strategies in laboratory environments across different climate zones in the United States. The analysis found that efficiency-based GEB strategies had the most significant impact on laboratory operations, while load-shedding and load-shifting GEB strategies produced smaller results. The culmination of these approaches applied across all five climate zones generated on average: 1) 28% energy cost savings and 30% greenhouse gas (GHG) emissions reductions, and 2) 4% enhanced energy cost savings under a time-of-use (TOU) pricing schedule compared to traditional pricing schemes. Grid-interactive efficiency building measures were found to produce the greatest energy savings in both electricity and natural gas, particularly in regions with high electrical loads, such as warm climates for cooling. Laboratories that had high levels of natural gas consumption, meanwhile, experienced the greatest emission reductions. The report concludes with an analysis on the opportunities for flexible loads in lab spaces and how small-scale measures in addition to opaque pricing structures for peak demand could become barriers to demand flexibility planning. The report also explores how electrifying laboratory buildings with heat pumps could reduce energy costs and GHG emissions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adopting Code Verification Methodology Based on Model Form

Code verification is an essential part of credibility analysis for computational models. It assesses whether the mathematical model is implemented correctly into the code and whether the numerical methods behave consistently, and is done before solution verification and validation. Robust guidance for code verification exists in the literature. However, there is no known, concise guide for selecting the approach based on the model form that also presents an overview of the common elements. This document was written to address this gap as an accessible reference for beginning a code-verification effort.

97 MATHEMATICS AND COMPUTING↗

Adapting Code Verification Methodology to Model Form

Code verification is an essential part of credibility analysis for computational models. It assesses whether the mathematical model is implemented correctly into the code and whether the numerical methods behave consistently, and is done before solution verification and validation. Robust guidance for code verification exists in the literature. However, there is no known, concise guide for selecting the approach based on the model form that also presents an overview of the common elements. This document was written to address this gap as an accessible reference for beginning a code-verification effort.

97 MATHEMATICS AND COMPUTING↗

Study to determine operational and performance criteria for STOL aircraft operating in low visibility conditions

The operational and performance criteria for civil CTOL passenger-carrying airplanes landing in low visibilities depend upon the characteristics of the airplane, the nature and use of the ground and airborne guidance and control systems, and the geometry and lighting of the landing field. Based upon these criteria, FAA advisory circulars, airplane and equipment design characteristics, and airline operational and maintenance procedures were formulated. The documents are selected, described, and discussed in relationship to the potential low weather minima operation of STOL aircraft. An attempt is made to identify fundamental differences between CTOL and STOL aircraft characteristics which could impact upon existing CTOL documentation. Further study and/or flight experiments are recommended.

Gorham, J. A.↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU09-OP2-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Variant fuel compact lot LEU09-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU09. LEU09 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-93073A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enriched uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93073A can be found in ORNL/TM-2008/134. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-12. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 3.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 B&W UO₂ Compact Lot LEU11-OP2-Z (Revision 1)

This document is a compilation of characterization data for the candidate AGR-2 B&W UO 2 fuel compact lot LEU11-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU11. LEU11 came from Babcock and Wilcox (B&W) coated particle lot G73H-10-93085B, which was an upgraded batch of TRISO-coated 500 μm nominal diameter, 9.6% low enriched uranium oxide kernels (LEU). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73AA-10-69308. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73H-10-93085B can be found in ORNL/TM-2009/255. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 4.3 of SPC-923 provides the property requirements for the heat treated UO 2 compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-14. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 4.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗