Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “functional performance testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Computer Component Tester

Carlos Horvath of the Burroughs Corporation, inspired by information published in NASA Tech Briefs, developed the AC/DC tester which checks out ECL (Emitter Coupled Logic) devices and their functionality within the computer. Each ECL device has a specific task in the computer's operation; the tester determines whether the device is performing that function properly. Horvath's invention allows rapid manual checking without extensive programming as it is required by other test methods; thus the ECL tester makes it easier to find out what is malfunctioning, and does the job faster.

Source record↗

Validation of a Scalable Solar Sailcraft

The NASA In-Space Propulsion (ISP) program sponsored intensive solar sail technology and systems design, development, and hardware demonstration activities over the past 3 years. Efforts to validate a scalable solar sail system by functional demonstration in relevant environments, together with test-analysis correlation activities on a scalable solar sail system have recently been successfully completed. A review of the program, with descriptions of the design, results of testing, and analytical model validations of component and assembly functional, strength, stiffness, shape, and dynamic behavior are discussed. The scaled performance of the validated system is projected to demonstrate the applicability to flight demonstration and important NASA road-map missions.

Murphy, D. M.↗

Programs for Testing Processor-in-Memory Computing Systems

The Multithreaded Microbenchmarks for Processor-In-Memory (PIM) Compilers, Simulators, and Hardware are computer programs arranged in a series for use in testing the performances of PIM computing systems, including compilers, simulators, and hardware. The programs at the beginning of the series test basic functionality; the programs at subsequent positions in the series test increasingly complex functionality. The programs are intended to be used while designing a PIM system, and can be used to verify that compilers, simulators, and hardware work correctly. The programs can also be used to enable designers of these system components to examine tradeoffs in implementation. Finally, these programs can be run on non-PIM hardware (either single-threaded or multithreaded) using the POSIX pthreads standard to verify that the benchmarks themselves operate correctly. [POSIX (Portable Operating System Interface for UNIX) is a set of standards that define how programs and operating systems interact with each other. pthreads is a library of pre-emptive thread routines that comply with one of the POSIX standards.]

Katz, Daniel S.↗

Assembly of catalytic complexes from randomized oligonucleotides

The early evolution of life relied on catalytic RNAs (ribozymes) for central functions. To test whether early catalysts could have assembled from multiple short nucleic acid fragments in random sequence environments, we performed an in vitro selection from a short RNA library in the presence of 256 different DNA 20-nucleotide oligomers. High-throughput sequencing and biochemical analysis showed that most of the selected 1331 RNA sequences required at least one DNA for activity. Representatives for four of six RNA clusters that depended on DNA cofactors were active even when the 256 DNAs were replaced by completely random DNA 20-nucleotide oligomers. The formation of these catalytic complexes and the recruitment of oligonucleotide cofactors from completely random libraries demonstrate an important principle for the emergence of the earliest oligonucleotide catalysts.

Xu Han↗

Coaxial Cables for Martian Extreme Temperature Environments

Work was conducted to validate the use of the rover external flexible coaxial cabling for space under the extreme environments to be encountered during the Mars Science Laboratory (MSL) mission. The antennas must survive all ground operations plus the nominal 670-Martian-day mission that includes summer and winter seasons of the Mars environment. Successful development of processes established coaxial cable hardware fatigue limits, which were well beyond the expected in-flight exposures. In keeping with traditional qualification philosophy, this was accomplished by subjecting flight-representative coaxial cables to temperature cycling of the same depth as expected in-flight, but for three times the expected number of in-flight thermal cycles. Insertion loss and return loss tests were performed on the coaxial cables during the thermal chamber breaks. A vector network analyzer was calibrated and operated over the operational frequency range 7.145 to 8.450 GHz. Even though some of the exposed cables function only at UHF frequencies (approximately 400 MHz), the testing was more sensitive, and extending the test range down to 400 MHz would have cost frequency resolution. The Gore flexible coaxial cables, which were the subject of these tests, proved to be robust and displayed no sign of degradation due to the 3X exposure to the punishing Mars surface operations cycles.

Ramesham, Rajeshuni↗

Plant Atrium System for Food Production in NASA's Deep Space Habitat Tests

Future human space exploration missions will need functional habitat systems. Possible concepts are assessed for integration issues, power requirements, crew operations, technology, and system performance. A food production system concept was analyzed at NASA Desert Research and Technology Studies (DRATS) in 2011, and at NASA JSC in 2012. System utilizes fresh foods (vegetables and small fruits) which are harvested on a continuous basis. Designed to improve crew's diet and quality of life without interfering with other components or operations.

Massa, Gioia D.↗

TAO Test Vector Evaluation Rev. 1

A group of encounter sets is evaluated as a standard for defining and refining both performance-based and functional-based terminal area MOPS requirements. DAIDALUS-alerting is used together with a variety of sensor configurations: (1) ADS-B level surveillance, (2) TCAS II, (3) ground-based RADAR with three different sets of error parameters.

Adami, Tony↗

Recording and wear characteristics of 4 and 8 mm helical scan tapes

Performance data of media on helical scan tape systems (4 and 8 mm) is presented and various types of media are compared. All measurements were performed on a standard MediaLogic model ML4500 Tape Evaluator System with a Flash Converter option for time based measurements. The 8 mm tapes are tested on an Exabyte 8200 drive and 4 mm tapes on an Archive Python drive; in both cases, the head transformer is directly connected to a Media Logic Read/Write circuit and test electronics. The drive functions only as a tape transport and its data recover circuits are not used. Signal to Noise, PW 50, Peak Shift and Wear Test data is used to compare the performance of MP (metal particle), BaFe, and metal evaporate (ME). ME tape is the clear winner in magnetic performance but its susceptibility to wear and corrosion, make it less than ideal for data storage.

Peter, Klaus J.↗

Profile-Following Entry Guidance Using Linear Quadratic Regulator Theory

This paper describes one of the entry guidance concepts that is currently being tested as part of Marshall Space Flight Center's Advance Guidance and Control Project. The algorithm is of the reference profile tracking type. The reference profile consists of the reference states, range-to-go, altitude, and flight path angle, and reference controls, bank angle and angle of attack, versus energy. A linear control law using state feedback is used with energy-scheduled gains. The gains are obtained offline using Matlab's steady state linear quadratic regulator function. Lateral trajectory control is effected by performing periodic bank sign reversals based on a heading error corridor. A description and results of the AG&C test cases on which it has been tested are given. Although it is not anticipated that the algorithm will be quite as robust as algorithms with onboard trajectory re-generation capability, the results nevertheless show it to be very robust with respect to varying initial conditions and works satisfactorily even for entries from widely different orbits than that of the reference profile. Moreover, the commanded bank and angle of attack histories are very smooth, making it easier for the attitude control system to implement the guidance commands. Finally, results indicate that the guidance gains are more or less trajectory-independent which is a potentially useful property.

Dukeman, Greg A.↗

Sim to Flight: Evaluating Flight Path Management Automation in High Density Urban Environments

Combined simulation and flight testing enable the study of single- and multi-aircraft performance of onboard automation systems for dynamic flight path management (FPM). The National Aeronautics and Space Administration (NASA) is investigating system performance and functional capabilities of such automation for immersion into complex, high density, future operations such as Urban Air Mobility (UAM). This paper provides an overview of a series of interdependent sim-to-flight research activities involving large-scale batch simulations, human-in-the-loop verification, and flight-test validation of a research prototype FPM automation system. Together, they significantly contributed to a functional assessment of FPM automation functionality in a live-virtual-constructive (LVC) operating environment characterized by two live aircraft and hundreds of virtual aircraft interacting in a modeled complex urban airspace. Initial simulation and flight test results, future work, and conclusions are presented.

Advanced Air Mobility↗

International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

Ray, Charles D.↗

Flight set 360T004 (STS-30) field joint protection system, volume 7

The Redesigned Solid Rocket Motors (RSRM) of the Space Transportation System have three field joints that are protected by the Joint Protection Systems (JPS). The igniter heater was mounted on the igniter flange. This report documents the performance of the JPS and igniter heaters on the pad and the post-flight condition of the JPS components. All observations that were written up as Squawks and/or Problem Reports are also discussed. The primary heaters performed satisfactorily and maintained the field joint temperatures within the required temperature range. A secondary heater failed Dielectric Withstanding Voltage (DWV) test during the joint closeout prior to launch. This heater was not used, however, since the primary heater functioned properly. Post-test inspection revealed that pin A of the heater power cable was shorted to the connector shell. Design changes have been implemented to resolve the heater power cable problem. All field joint assemblies met all of the performance requirements.

Hale, Elgie↗

Procedure for estimating stability and control parameters from flight test data by using maximum likelihood methods employing a real-time digital system

A maximum likelihood parameter estimation procedure and program were developed for the extraction of the stability and control derivatives of aircraft from flight test data. Nonlinear six-degree-of-freedom equations describing aircraft dynamics were used to derive sensitivity equations for quasilinearization. The maximum likelihood function with quasilinearization was used to derive the parameter change equations, the covariance matrices for the parameters and measurement noise, and the performance index function. The maximum likelihood estimator was mechanized into an iterative estimation procedure utilizing a real time digital computer and graphic display system. This program was developed for 8 measured state variables and 40 parameters. Test cases were conducted with simulated data for validation of the estimation procedure and program. The program was applied to a V/STOL tilt wing aircraft, a military fighter airplane, and a light single engine airplane. The particular nonlinear equations of motion, derivation of the sensitivity equations, addition of accelerations into the algorithm, operational features of the real time digital system, and test cases are described.

Grove, R. D.↗

Static performance of a 13.97 cm (5.5 inch) diameter model VTOL lift fan

A tip-turbine-driven fan of the type currently being used in wind tunnel tests of VTOL lift fan models was tested. Values of thrust, weight flow, exit total and static pressure, exit swirl angle, and turbine temperature drop were measured as a function of fan speed for several inlet and exit configurations. A standard fan performance map was also obtained.

Lowe, W. H.↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

Extreme Environment Hot Fire Durability of Post-Processed Additively Manufactured GRCop-Alloy Combustion Chambers in LOX/Hydrogen and LOX/Methane

Extreme environment survivability of metal additive manufactured (AM) GRCop-alloy thrust chambers has been demonstrated in different bi-propellants at near stoichiometric and even oxygen rich combustion. GRCop-alloy chambers tested at NASA Marshall Space Flight Center (MSFC) have accumulated over 26,000 seconds of hot fire duration and over 500 starts. These chambers are produced using an AM process called laser powder bed fusion (L-PBF). A major feature of this process is high wall surface roughness which can be customized in post processing to leverage various performance advantages. Post-processing can include heat treatment, final machining, polishing, and welding and is key to hardware survivability in extreme environments. Surface finish enhancement techniques were applied to the hot wall and coolant channels to reduce the overall total heat load to the chamber walls. Performance optimization of various thrust class TCA’s is a strategic technology goal of NASA MSFC. Three different chamber geometries using cryogenic methane and de-ionized water as coolants were hot fire tested to obtain their life cycle, pressure drop, and heat load performances. Several 1.2K lbf LOX/H2 chambers, 1K lbf LOX/CH4 chambers, and 7K lbf LOX/CH4 chambers were tested. All post-processed configurations performed remarkably well when subjected to extreme hot fire test conditions. Streaking and blanching due to localized oxygen rich conditions were observed on some test articles in their as-built surface finish state. However, this is actually a function of the injector mixing and only serves to further establish the durability of L-PBF GRCop-alloy thrust chambers. Several different polishing techniques were applied to the hot wall and integrated coolant channels prior to hot fire testing and their performances assessed. Overall, AM produced GRCop chambers are extremely reliable, durable, and customizable to the desired performance metrics.

grcop↗

Orion Launch Abort System Performance on Exploration Flight Test 1

This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, R.↗