Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “execution time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

DREAMS and IMAGE: A Model and Computer Implementation for Concurrent, Life-Cycle Design of Complex Systems

Computing architectures are being assembled that extend concurrent engineering practices by providing more efficient execution and collaboration on distributed, heterogeneous computing networks. Built on the successes of initial architectures, requirements for a next-generation design computing infrastructure can be developed. These requirements concentrate on those needed by a designer in decision-making processes from product conception to recycling and can be categorized in two areas: design process and design information management. A designer both designs and executes design processes throughout design time to achieve better product and process capabilities while expanding fewer resources. In order to accomplish this, information, or more appropriately design knowledge, needs to be adequately managed during product and process decomposition as well as recomposition. A foundation has been laid that captures these requirements in a design architecture called DREAMS (Developing Robust Engineering Analysis Models and Specifications). In addition, a computing infrastructure, called IMAGE (Intelligent Multidisciplinary Aircraft Generation Environment), is being developed that satisfies design requirements defined in DREAMS and incorporates enabling computational technologies.

Hale, Mark A.↗

Mission Design Overview for Mars 2003/2005 Sample Return Mission

In May 2003, a new and exciting chapter in Mars exploration will begin with the launch of the first of three spacecraft that will collectively contribute toward the goal of delivering samples from the Red Planet to Earth. This mission is called Mars Sample Return (MSR) and will utilize both the 2003 and 2005 launch opportunities with an expected sample return in October 2008. NASA and CNES are major partners in this mission. The baseline mission mode selected for MSR is Mars orbit rendezvous (MOR), analogous in concept to the lunar orbit rendezvous (LOR) mode used for Apollo in the 1960s. Specifically, MSR will employ two NASA-provided landers of nearly identical design and one CNES-provided orbiter carrying a NASA payload of rendezvous sensors, orbital capture mechanisms, and an Earth entry vehicle (EEV). The high-level concept is that the landers will launch surface samples into Mars orbit, and the orbiter will retrieve the samples in orbit and then carry them back to Earth. The first element to depart for Mars will be one of the two landers. Currently, it is proposed that an intermediate class launch vehicle, such as the Boeing Delta 3 or Lockheed Martin Atlas 3A, will launch this 1800-kg lander from Cape Canaveral during the May 2003 opportunity. The lander will utilize a Type-1 transfer trajectory with an arrival at Mars in mid-December 2003. Landing will be aided by precision approach navigation and a guided hypersonic entry to achieve a touchdown accuracy of 10 km or better. Although the exact landing site has not yet been determined, it is estimated that lander resource constraints will limit the site to between 15 degrees north and south latitudes. Following touchdown, the lander will deploy a six-wheeled, 60-kg rover carrying an extensive suite of instruments designed to aid in the analysis of the local terrain and collection of core samples from selected rocks. The surface mission is currently designed around a concept called the surface traverse. Each traverse will involve the rover exploring a selected area of terrain up to 100 meters from the lander, the collection of rock core samples, and the delivery of the samples from the traverse back to a sample canister on the lander. Planning estimates indicate that up to three traverses may be possible during the expected 90-sol lifetime of the lander. The canister that will receive the samples from the rover will be attached to the top stage of a small solid-fueled rocket mounted to the deck of the lander. This rocket is called the Mars Ascent Vehicle (MAV) and consists of three stages weighing a total of about 140 kg. After the conclusion of the surface mission, the MAV will lift-off and insert the sample canister into a near-circular orbit with an altitude of about 600 km and inclination of 45 degrees. The sample canister will wait in this orbit until it is retrieved by the orbiter sometime in early 2007. In August 2005, the second lander and a CNES-provided orbiter weighing 2700 kg will depart for Mars. Currently, it is proposed that a single Ariane 5 provided by CNES will launch both of these two elements onto a Type-2 transfer trajectory. Although the orbiter and lander will be launched together, they will separate shortly after injection and will fly to Mars as two independent spacecraft. However, both spacecraft will perform a maneuver between 10 and 15 days after launch so that their arrival times at Mars differ by between 12 and 24 hours. This scheme will reduce the operational complexity at the encounter date. A set of four 60-kg surface probes will ride piggyback on the orbiter to Mars. These CNES-provided probes are called Netlanders and will serve as surface stations for scientific investigations independent of the Mars Sample Return goals. Starting approximately one month prior to arrival at Mars, the orbiter will begin to release the Netlanders one at a time. Each release cycle will take several days, and will include time for precision navigation to execute one or two maneuvers that will target the Netlanders to their proper landing site. All four deployment cycles will be completed prior to 10 days before arrival. Both the orbiter and lander will arrive in late-July 2006. Upon arrival, the lander will perform a precision landing and surface mission similar in concept to the one that was executed during the 2003 opportunity. Although the landing site for the 2005 opportunity has not been selected, it is expected to be different from the 2003 site to enhance the diversity of the collected samples. The orbiter's arrival at Mars will be highlighted by the first use of aerocapture to insert a spacecraft into a capture orbit around another planet. The choice of aerocapture, as opposed to a propulsive orbit insertion, was considered mission enabling due to a reduction of over 2000 m/s in mission AV. Aerocapture will be targeted to produce a 250 km x 1400 km capture orbit with an inclination of 45 degrees. Current analysis indicates that achieving this goal will require approximately six minutes of flight deep in the atmosphere with a targeted periapsis of approach of about 43 km. After factoring into account the penalty for carrying a heat shield to survive aerocapture, the net savings compared to a propulsive orbital insertion amounts to several hundred kilograms.

Lee, Wayne J.↗

A System for Planning Ahead

A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

Source record↗

Apollo: A Retrospective Analysis

The program to land an American on the Moon and return safely to Earth in the 1960s has been called by some observers a defining event of the twentieth century. Pulitzer Prize-winning historian Arthur M. Schlesinger, Jr., even suggested that when Americans two centuries hence study the twentieth century, they will view the Apollo lunar landing as the critical event of the century. While that conclusion might be premature, there can be little doubt but that the flight of Apollo 11 in particular and the overall Apollo program in general was a high point in humanity s quest to explore the universe beyond Earth. Since the completion of Project Apollo more than twenty years ago there have been a plethora of books, studies, reports, and articles about its origin, execution, and meaning. At the time of the twenty-fifth anniversary of the first landing, it is appropriate to reflect on the effort and its place in U.S. and NASA history. This monograph has been written as a means to this end. It presents a short narrative account of Apollo from its origin through its assessment. That is followed by a mission by mission summary of the Apollo flights and concluded by a series of key documents relative to the program reproduced in facsimile. The intent of this monograph is to provide a basic history along with primary documents that may be useful to NASA personnel and others desiring information about Apollo.

Launius, Roger D.↗

Improving the Representation of Snow Crystal Properties with a Single-Moment Mircophysics Scheme

Single-moment microphysics schemes are utilized in an increasing number of applications and are widely available within numerical modeling packages, often executed in near real-time to aid in the issuance of weather forecasts and advisories. In order to simulate cloud microphysical and precipitation processes, a number of assumptions are made within these schemes. Snow crystals are often assumed to be spherical and of uniform density, and their size distribution intercept may be fixed to simplify calculation of the remaining parameters. Recently, the Canadian CloudSat/CALIPSO Validation Project (C3VP) provided aircraft observations of snow crystal size distributions and environmental state variables, sampling widespread snowfall associated with a passing extratropical cyclone on 22 January 2007. Aircraft instrumentation was supplemented by comparable surface estimations and sampling by two radars: the C-band, dual-polarimetric radar in King City, Ontario and the NASA CloudSat 94 GHz Cloud Profiling Radar. As radar systems respond to both hydrometeor mass and size distribution, they provide value when assessing the accuracy of cloud characteristics as simulated by a forecast model. However, simulation of the 94 GHz radar signal requires special attention, as radar backscatter is sensitive to the assumed crystal shape. Observations obtained during the 22 January 2007 event are used to validate assumptions of density and size distribution within the NASA Goddard six-class single-moment microphysics scheme. Two high resolution forecasts are performed on a 9-3-1 km grid, with C3VP-based alternative parameterizations incorporated and examined for improvement. In order to apply the CloudSat 94 GHz radar to model validation, the single scattering characteristics of various crystal types are used and demonstrate that the assumption of Mie spheres is insufficient for representing CloudSat reflectivity derived from winter precipitation. Furthermore, snow density and size distribution characteristics are allowed to vary with height, based upon direct aircraft estimates obtained from C3VP data. These combinations improve the representation of modeled clouds versus their radar-observed counterparts, based on profiles and vertical distributions of reflectivity. These meteorological events are commonplace within the mid-latitude cold season and present a challenge to operational forecasters. This study focuses on one event, likely representative of others during the winter season, and aims to improve the representation of snow for use in future operational forecasts.

Molthan, Andrew L.↗

Timeliner: Automating Procedures on the ISS

Timeliner has been developed as a tool to automate procedural tasks. These tasks may be sequential tasks that would typically be performed by a human operator, or precisely ordered sequencing tasks that allow autonomous execution of a control process. The Timeliner system includes elements for compiling and executing sequences that are defined in the Timeliner language. The Timeliner language was specifically designed to allow easy definition of scripts that provide sequencing and control of complex systems. The execution environment provides real-time monitoring and control based on the commands and conditions defined in the Timeliner language. The Timeliner sequence control may be preprogrammed, compiled from Timeliner "scripts," or it may consist of real-time, interactive inputs from system operators. In general, the Timeliner system lowers the workload for mission or process control operations. In a mission environment, scripts can be used to automate spacecraft operations including autonomous or interactive vehicle control, performance of preflight and post-flight subsystem checkouts, or handling of failure detection and recovery. Timeliner may also be used for mission payload operations, such as stepping through pre-defined procedures of a scientific experiment.

Brown, Robert↗

Wallops Ship Surveillance System

Approved as a Wallops control center backup system, the Wallops Ship Surveillance Software is a day-of-launch risk analysis tool for spaceport activities. The system calculates impact probabilities and displays ship locations relative to boundary lines. It enables rapid analysis of possible flight paths to preclude the need to cancel launches and allow execution of launches in a timely manner. Its design is based on low-cost, large-customer- base elements including personal computers, the Windows operating system, C/C++ object-oriented software, and network interfaces. In conformance with the NASA software safety standard, the system is designed to ensure that it does not falsely report a safe-for-launch condition. To improve the current ship surveillance method, the system is designed to prevent delay of launch under a safe-for-launch condition. A single workstation is designated the controller of the official ship information and the official risk analysis. Copies of this information are shared with other networked workstations. The program design is divided into five subsystems areas: 1. Communication Link -- threads that control the networking of workstations; 2. Contact List -- a thread that controls a list of protected item (ocean vessel) information; 3. Hazard List -- threads that control a list of hazardous item (debris) information and associated risk calculation information; 4. Display -- threads that control operator inputs and screen display outputs; and 5. Archive -- a thread that controls archive file read and write access. Currently, most of the hazard list thread and parts of other threads are being reused as part of a new ship surveillance system, under the SureTrak project.

Smith, Donna C.↗

Dynamically Alterable Arrays of Polymorphic Data Types

An application library package was developed that represents data packets for Deep Space Network (DSN) message packets as dynamically alterable arrays composed of arbitrary polymorphic data types. The software was to address a limitation of the present state of the practice for having an array directly composed of a single monomorphic data type. This is a severe limitation when one is dealing with science data in that the types of objects one is dealing with are typically not known in advance and, therefore, are dynamic in nature. The unique feature of this approach is that it enables one to define at run-time the dynamic shape of the matrix with the ability to store polymorphic data types in each of its indices. Existing languages such as C and C++ have the restriction that the shape of the array must be known in advance and each of its elements be a monomorphic data type that is strictly defined at compile-time. This program can be executed on a variety of platforms. It can be distributed in either source code or binary code form. It must be run in conjunction with any one of a number of Lisp compilers that are available commercially or as shareware.

James, Mark↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

A Flexible Multibody Approach to Space Launch System Liftoff Pad Separation with Umbilical Disconnect

A flexible multibody dynamic framework is applied to the Space Launch System (SLS) liftoff Coupled Loads Analysis (CLA), enabling computational efficiencies and systematic inclusion of components and various nonlinearities. The objective of this work is to simulate the SLS liftoff transient pad separation event inclusive of umbilical disconnects. The vehicle stacking preloads and cryogenically induced preloads, due to the fueling of the Core Stage (CS), are integrated via specialized deformed coupling procedure to ensure full capture of the liftoff transient event. The Vehicle Stabilizer System (VSS) hydraulic struts are nonlinear and provide amplitude dependent damping, significantly contributing to the liftoff transient event. Ground Extensible Columns (EC) provide additional stiffness and preloads on the Mobile Launcher (ML), also significantly contributing to the liftoff transient. An advanced Henkel-Mar algorithm, with separation and re-contact, thus tracking the potential post separation re-contact between the booster aft skirt and ML, the umbilicals and vehicle, and ground EC separation. For this system level nonlinear dynamic simulation, the flexible multibody framework provides a systematic approach for the addition of component specific algorithms to enforce nonlinearities. This multibody framework is similar to an object-oriented programming language integrating classes of associated subroutines. As such, the complexities associated with the nonlinear CLA are greatly reduced, facilitating simplified bookkeeping as well as accelerating the execution of the nonlinear time-domain simulations.

Joel W Sills Jr.↗

A Flexible Multibody Approach to Space Launch System Liftoff Pad Separation with Umbilical Disconnect

A flexible multibody dynamic framework is applied to the Space Launch System(SLS)liftoff Coupled Loads Analysis(CLA), enabling computational efficiencies and systematic inclusion of component nonlinearities. This work simulates the SLS liftoff transient pad separation event inclusive of umbilical disconnects and preload strain energy release (twang). For this system level nonlinear dynamic simulation, the flexible multibody framework provides a systematic approach for the addition of component specific algorithms to enforce the subject nonlinearities. As such, the complexities associated with the nonlinear CLA are greatly reduced, facilitating simplified bookkeeping as well as accelerating the execution of the nonlinear time-domain simulations.

Joel W Sills↗

Analysis of Alternative Architectures for Cargo Lunar Landers

NASA’s Human Landing System (HLS) program has been working with commercial partners to develop human-class lunar landers to return the first American woman and next American man to the lunar surface in the mid 2020’s. In an effort to expand human presence beyond low Earth orbit, NASA’s Artemis program aims to facilitate a sustainable, long-term human presence in cis-lunar space. A component of this will require significant infrastructure to be delivered to the lunar surface. Delivering this infrastructure will require a significant lander capability that has yet to be developed. A thorough understanding of cargo lunar lander architectures is required such that select alternatives can be identified that best support the Artemis program’s objective of sustainability. The goal of this study is to aid NASA and its partners in the understanding of the cargo lunar lander trades space, as well as identify potential robust alternatives. The results will support NASA as it moves forward with key activities such as requirements formulation, agency strategic planning, and potential cargo lunar lander procurements. The study builds off of recent work performed by the Human Landing System program’s Architecture and Systems Analysis group to encompass a broad trade space of cargo lunar lander architecture alternatives. The current trade space as depicted by the morphological matrix and mission graph in Fig. 1 and Fig. 2, respectively, includes key alternative options that have become highly relevant due to current HLS activities and include on-orbit refueling, active cryogenic fluid management, Earth orbit aggregation, and global lunar access. The authors believe that there is also a statistically relevant impact of lander-payload configuration on the primary structure of the vehicle that could greatly impact alternative selection. Because of this, several conceptual lander-payload configurations will be evaluated to determine the level of impact. The current set of conceptual configurations are shown in Fig. 3 and Fig. 4. To aid the conceptual evaluation of these configurations, a catalogue of notional payloads has been developed that represent a wide range of masses and volumes that are expected to be delivered in support of a sustained human lunar presence, including pressurized and unpressurized rovers, surface habitats, power systems, and other support infrastructure. In order to execute this study in a timely fashion, a similar approach to that utilized in a similar 2019 study focused on 2024 human lunar sorties will be employed [1]. The team utilized a novel architecture synthesis framework currently being developed by NASA/MSFC to evaluate over 600,000 lunar lander architectures over a two month time frame [2]. From this large data set, varying ground rules and assumptions were applied as filters to explore the trade space to identify alternatives which exhibited robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The set of Earth-Moon system Delta-Vs assumed from the 2019 study, shown in Fig. 5, will be repurposed to accelerate model formulation for this effort. Additionally, current efforts in collaboration with the Georgia Institute of Technology’s Aerospace System Design Lab will be integrated to provide probabilistic modeling of the cargo lunar lander architectures to aid in identifying robust design alternatives [3]. The approach will help minimize potential impacts due to large levels of uncertainty inherent to pre phase-A conceptual design. By leveraging these past and present studies and partnerships, a highly detailed set of data can be generated in a short time period to aid NASA in the coming years to support the goal of a sustained human lunar presence.

Architectures↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Dynamical Decoupling for Measuring and Suppressing Crosstalk

Dynamical decoupling (DD) is a noise-mitigating strategy in which sequences of pulses are applied to single qubits to average out their interaction with the environment. DD has been extensively studied and demonstrated for suppressing single-qubit decoherence and can be tailored for different noise spectrum. We report another important adaptation of DD where crosstalk between qubits are suppressed. We demonstrate the efficiency of this procedure on quantum circuits on superconducting transmon-based quantum devices. We designed a family of syncopated DD sequences that effectively suppress ZZ coupling between qubit pairs, which is the dominating crosstalk form on the device. We insert DD to a quantum circuit whenever single qubits are idle (often during two-qubits gates on other qubits). While standard periodic DD suppress crosstalk between these qubits and their neighbors, the syncopated DD further decouples crosstalk between these qubits. We further designed short sequences that maximize the application of DD without adding time to the quantum circuit execution. Such DD sequences yield significant improvement of the performance of the algorithm on the hardware. The performance is further boosted by combining DD with another mitigation strategy, randomized compilation. Our work demonstrated that syncopated DD is effective and practical way to suppress crosstalk in quantum circuits and serves as a great probe to characterize the crosstalk and inform hardware design.

Quantum Computing↗

Mission Design Strategies for Rendezvous and Servicing of Sun-Earth Libration Point Missions

With the launch of the James Webb Space Telescope (JWST) and future launches of the Roman Space Telescope (RST) and larger telescopes such as the proposed Habitable Worlds Observatory (HWO), the questions of where and how to rendezvous to enable servicing of these telescope missions arise. To aid in determining the allowable locations to rendezvous for servicing from a trajectory design approach, our previous research and analysis has shown feasible transfer trajectories between the Sun-Earth Libration L2 region (Quasi-Halo orbit) and the Earth Moon vicinity (Distant Retrograde Orbit (DRO), Quasi-Halo Orbit, Halo Orbit, and Near Rectilinear Halo Orbit (NRHO)), along with the related transfer constraints and the corresponding total fuel mass costs. We now focus on operational-like optimal scenarios for these transfers to complete a rendezvous to permit servicing at various Libration orbit locations. In this paper, we address how operational navigation and maneuver execution uncertainties impact the rendezvous timing and fuel mass (via ΔV). While optimization techniques are applied to ensure minimal ΔVs, we also analyze various transfer trajectory durations and rendezvous arrival geometries. The analysis presented includes dynamical system approaches and applies optimization through several tools including the Adaptive Trajectory Design (ATD) module as an initial guess, numerical computation using the General Mission Analysis Tool (GMAT) and Systems Tool Kit (STK) with higher fidelity perturbation modeling, and recently developed optimization tools that incorporate dynamical systems directly into the optimization process. Transfer trajectory options examined include a direct transfer from Earth versus departures from the previously examined Earth-Moon regime orbits, e.g. NRHOs and DROs. A return from Sun-Earth to lunar vicinity for a complete servicing after a rendezvous in Sun-Earth orbit is also considered. The resultant ΔV’s for each scenario is provided with discussions on various transfer trades, rendezvous considerations, and orbital limitations from the dynamical systems. A Poincare-like mapping of trajectory and rendezvous conditions categorize feasible and optimum transfer approaches, dependent on Sun-Earth orbit mission parameters. The focus of this research addresses questions for upcoming trades regarding servicing options for current and future Sun-Earth L1 and L2 missions. By doing a comprehensive analysis approach (dynamical systems + high fidelity optimization with true operational constraints), this paper will serve as a guide for mission architecture and operational trade considerations.

Maneuver Design↗

Summary of Technical Interchange Meetings (TIMs) Designed to Enable Earth Independent Medical Operations (EIMO)

The Exploration Medical Capability Element (ExMC) in NASA’s Human Research Program hosted a series of TIMs in 2023-2024 designed to stimulate discussion around specific topics with the goal of enabling EIMO. In context of the thematic constituent elements of EIMO, namely pre-mission planning, acute/emergent/prolonged medical decision making, supply/resource management and task load management, subject matter experts from industry, academia and government (NASA and other Agencies) provided valuable and actionable guidance and recommendations. Earth-based medical experts will remain indispensable for pre-mission planning, however, management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets to enable support of astronaut health and performance and reduce overall mission risk. Key to achieving these enhancements is providing an integrated data system platform capable of utilizing multiple data streams in concert with a variety of on-board databases and passive monitoring of video and wearable sensors to enable a multi-modal, agentic AI-based clinical decision support system (CDSS) to support crew medical officer (CMO) medical decision-making. The EIMO series of TIMs (I-V) have proven to be instructive and portend a significant paradigm shift will be necessary to maintain crew health and performance on exploration class missions. Importantly, since the expected paradigm shift will be significantly different from the methods of operation that have been employed for the majority of missions from the inception of human spaceflight to date, any proposed methods must be deployed in the setting of ongoing operations early and be “tested, reviewed and practiced” while reliable back-up is available to facilitate an Enterprise-wide level of comfort and acceptance. Serious constraints on data transmission coupled with a large and expanding universe of on-board medical informatics data streams will necessitate implementation of a CDSS to supplant the current reliance on support provided by ground-based SMEs. Establishment of trust in the system by CMO/crew and the ground-based medical support team will be essential. Co-development of a CDSS with industry partners will assure that state of the art tools can be employed, and industry efficiencies can be leveraged. Training regimens, materials and tools must evolve to be responsive (just-in-time training) and facilitate autonomous execution of procedures. Proficiency metrics should be established and be based on validated competencies or milestones as opposed to a prescribed number of training hours. Training should be prioritized for broad, translatable skills that have universal application across a variety of medical conditions. Repetition was deemed to be the key to achieving proficiency and emphasis should lie in procedural training which is known to extinguish more rapidly than diagnostic skills. Advanced tools, e.g., extended reality, can provide more realistic and effective training. Use of advanced probabilistic risk assessment tools will be essential to optimize the medical system capability while carefully balancing risk relative to mass/power/volume limitations. Importance of factoring use-life of medical supplies and maintaining awareness of redundancy and opportunity to re-purpose under off nominal situations was emphasized. Consideration of adopting optimized performance standards vs. “good-enough” performance thresholds is warranted. The use of legacy systems as opposed to creating new systems may be preferable. Managing task load and associated cognitive load will be essential to maintain operational safety and behavioral health. ExMC aspires to create a shared EIMO paradigm and strategic vision for advancing medical system design through novel technologies, training, protocols, and support capabilities, built upon the spirit of successful strategies and innovations over the past six decades of space medicine operations.

Jay Lemery↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗