Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical distribution system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Voltage Calculations in Secondary Distribution Networks via Physics-Inspired Neural Network Using Smart Meter Data

The increasing penetration of distributed energy resources (DERs) leads to voltage issues across distribution networks, necessitating voltage calculations by utilities. Electric model-free voltage calculation offers an enticing solution. However, most researches mainly focus on primary distribution networks ignoring secondary distribution networks and commonly overlook extreme voltage case calculations, which require the model’s extrapolation abilities. Here, in addressing the gaps, this paper presents a customized physics-inspired neural network (PINN) model, the structure of which is inspired by the derived coupled power flow model of primary-secondary distribution networks. To ensure precision and rapid convergence, a crafted training framework for the PINN model is proposed. The PINN’s “structure-mimetic” design enables superior extrapolation for unseen scenarios and enhances physical information awareness. We demonstrate this through two applications: hosting capacity analysis and customer-transformer connectivity. The effectiveness and advantages of the proposed PINN model are validated on two public testing systems and one utility distribution feeder model.

Distribution network↗

Modeling District Heating and Cooling Systems with URBANopt, GeoJSON to Modelica Translator, and the Modelica Buildings Library

The URBANopt project has successfully leveraged OpenStudio/EnergyPlus to model buildings and electrical systems at an urban scale; however, URBANopt has lacked the ability to model district thermal energy systems until recently. This paper will present the modeling infrastructure that was developed specifically for the analysis of district heating and cooling systems, and how it is integrated into the existing URBANopt framework. The paper also discusses the development of new models added to the Modelica Buildings Library to model various district energy system components including loads, energy transfer stations (ETS), distribution networks, and central plants. The paper describes how different building loads can be modeled including time series, TEASER reduced-order models, or Spawn of EnergyPlus models. URBANopt District Energy Systems allows the user to switch between the various configurations.

district heating and cooling↗

Cost analysis of distributed storage in AC and DC microgrids

Building and microgrid designs with highly-distributed electrical storage have potential advantages over today's conventional topologies with centralized storage. Herein this paper studies the capital cost benefits of several residential behind-the-meter distributed-storage topologies, including AC and DC versions of systems with load-packaged batteries and resilient sub-networks. The study begins by defining the block configuration of each topology. This work then develops a model for the cost of the power electronics necessary to interface with the storage elements. Finally, the analysis develops a model for the total cost of each storage topology, incorporating the installation and soft costs. The results suggest that while the cost of power electronics is lower in centralized topologies, the total cost is lower for distributed storage due to the avoided costs of installation and permitting. This paper also explores the benefits of load-packaged batteries for savings in electrical infrastructure.

25 ENERGY STORAGE↗

Cyber–Physical System Security of Distribution Systems

The Information and Communications Technology (ICT) for control and monitoring of power systems is a layer on top of the physical power system infrastructure. The cyber system and physical power system components form a tightly coupled Cyber–Physical System (CPS). Sources of vulnerabilities arise from the computing and communication systems of the cyber–power grid. Cyber intrusions targeting the power grid are serious threats to the reliability of electricity supply that is critical to society and the economy. In a typical Information Technology environment, numerous attack scenarios have shown how unauthorized users can access and manipulate protected information from a network domain. The need for cyber security has led to industry standards that power grids must meet to ensure that the monitoring, operation, and control functions are not disrupted by cyber intrusions. Cyber security technologies such as encryption and authentication have been deployed on the CPS. Intrusion or anomaly detection and mitigation tools developed for power grids are emerging. Furthermore, this survey paper provides the basic concepts of cyber vulnerabilities of distribution systems and CPS security. The important ICT subjects for distribution systems covered in this paper include Supervisory Control And Data Acquisition, Distributed Energy Resources, including renewable energy and smart meters.

97 MATHEMATICS AND COMPUTING↗

Storm-DEPART (Damage Estimate Prediction and Recovery Tool)

Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Economics of Power System Transitions

Electricity generated by fossil fuels is dispatchable, meaning that generators can be turned on when needed. By contrast, renewable energy tends to be intermittent because of the variability of natural sources such as wind and sunlight. New approaches are needed to solve the challenges to electricity systems posed by the growing share of variable renewable energy (VRE) in these systems. Specifically, how should the physical power system and markets for electricity be structured to deliver electricity at low cost and reflect consumers’ preferences for reliability? Current power systems have largely achieved these two goals through a competitive market for generation based on marginal cost pricing and through mandated overcapacity to ensure 100 percent reliability to consumers. Decarbonization-induced increases in the share of generation from nondispatchable VRE create operational challenges: ensuring 100 percent reliability in a VRE-dominated system will be costly and inefficient. Preferences for reliability are heterogeneous, as some consumers will insist on 100 percent reliable energy, whereas others may be willing to forgo reliability for lower cost. In this article, we discuss ways to design a power system and electricity market that can address this inefficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration Study of Converter-Interfaced Combined Heat and Power Plants

Combined Heat and Power (CHP) systems, as a proven technology, provide numerous benefits to the plant owner by saving electricity bill, reducing carbon dioxide emissions, and improving electricity service reliability. However, their integration into the distribution grid faces many barriers including the complexity of grid code requirements and the lack of technical expertise in commercial and small industrial plants to interface with the utility and accelerate the interconnection process. To solve these issues, this study proposes a converter-interfaced solution for CHP integration. Simulations including various fault scenarios and load flow under different grid conditions are carried out to compare technical performances of the proposed solution with directly-coupled CHP. Results show that the generator size of converter-interfaced CHP can be reduced by approximately 25% and it also provides advantageous features such as reduced stress level under fault conditions and a better dynamic stability margin. In addition, a power factor controller is designed and reactive power from CHP is dispatched in such a way that the CHP plant is compliant with power factor requirements from utilities under all operating conditions.

Converter, Combined heat and power, Distributed en↗

Control of Low-Inertia Power Systems

Electric power systems are undergoing an unprecedented transition from fossil fuel–based power plants to low-inertia systems that rely predominantly on power electronics and renewable energy resources. This article reviews the resulting control challenges and modeling fallacies, at both the device and system level, and focuses on novel aspects or classical concepts that need to be revised in light of the transition to low-inertia systems. To this end, we survey the literature on modeling of low-inertia systems, review research on the control of grid-connected power converters, and discuss the frequency dynamics of low-inertia systems. Moreover, we discuss system-level services from a control perspective. Overall, we conclude that the system-theoretic mindset is essential to bridge different research communities and understand the complex interactions of power electronics, electric machines, and their controls in large-scale low-inertia power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVSE DERMS Controls [SWR-26-010]

An MQTT (Message Queuing Telemetry Transport) and OCPP (Open Charge Point Protocol) based remote smart charging controller framework for AC Electric Vehicle Supply Equipments (EVSEs). The code in this repo allows for the National Laboratory of the Rockies (NLR) controls to interface with the real Distributed Energy Resource Management System (DERMS) and EVSEs in NLR's ESIF Optimization and Control Laboratory (OCL). Different charge management algorithms can be tested to determine which power allocation method is most effective with the overall goal of demonstrating clear and well documented test results as well as providing functional control algorithms which could be utilized to provide effective smart charge management (SCM) at EV charging stations. Different power allocation methods are programmed in lab_demo_controller.py and include allocation based on first come first served, equal sharing, state of charge (SOC), priority factors, and behind the meter control methods.

Panossian, Nadia [National Laboratory of the Rocki↗

2020 Standard Scenarios Report: A U.S. Electricity Sector Outlook

This report summarizes the results of 47 forward-looking 'standard scenarios' of the U.S. power sector simulated by the National Renewable Energy Laboratory (NREL) using the Regional Energy Deployment System (ReEDS) and Distributed Generation (dGen) capacity expansion models. The annual Standard Scenarios, which are now in their sixth year, have been designed to capture a range of possible power system futures considering a variety of factors that impact power sector evolution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed electric field sensing using fibre optics in borehole environments

In the past decade, rapid advances in distributed optical fibre sensing technologies have made it possible to record various geophysical data (e.g. strain, temperature and pressure) continuously in both time and space along the fibre, providing an unprecedented quantity and spatial density of data compared to traditional geophysical measurements as well as reducing data acquisition cost. To date, no distributed fibre-based electromagnetic field sensing system has been implemented although electromagnetic sensing could have a broad range of applications to geophysical imaging and monitoring in borehole environments. The goal of this paper is to provide a theoretical feasibility study regarding the design and use of an electromagnetic sensing optical fibre for geophysical applications. First, we present the sensitivity analysis of a ‘hypothetical’ optical fibre coated with polyvinylidene fluoride, a polymer that provides relatively high piezoelectric properties, yet unlike ceramics, is flexible. Next, using a two-dimensional electromagnetic modelling algorithm, we simulate the earth electric-field-to-fibre-strain transfer function and estimate the theoretical sensitivity of the optical fibre to electric fields. Given the state-of-the-art distributed acoustic sensing strain sensitivities in the picometres strain range, our numerical modelling analysis suggests that a perfectly coupled polyvinylidene fluoride–coated optical fibre can measure electric field values in the mV/m to V/m amplitude range. We then apply a cylindrically symmetric modelling algorithm to simulate numerical models demonstrating the applicability of such a fibre in an oilfield environment. Scenarios investigated employ an electric field source and suggest that the measurements can be used to distinguish the oil versus water ratio with a fibre mounted inside a producing steel cased oil well as well as distinguishing between brine and hydrocarbon filled reservoir zones with a fibre located outside of the casing.

58 GEOSCIENCES↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2022

A summary of NREL's good stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, infrastructure and capability upgrades, and examples of R&D impact. In fiscal year 2022, ESIF researchers made breakthroughs in everything from long-duration energy storage and cybersecurity visualizations to a world record in heavy-duty hydrogen vehicle fueling, and built out research assets to advance microgrid operation and controls, renewable hydrogen production, electric vehicles, energy-efficient buildings, and more.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Multiscale Electricity Modeling for Evaluating Carbon Capture and Sequestration Technologies (MEME-CCS)

This effort employs and adapts a rigorous multiscale electricity modeling platform at the National Renewable Energy Laboratory (NREL) to evaluate carbon capture and sequestration (CCS) and negative emissions technologies (NET) from the ARPA-E FLECCS program. NREL's modeling platform includes the Regional Energy Deployment System (ReEDS) electric sector capacity expansion model, which projects future electricity generation mixes at sub-state-level resolution that are downscaled to the unit-level to enable hourly, zonal or nodal electricity production cost modeling in the PLEXOS model. The ReEDS-PLEXOS modeling suite is well-established for examining electric sector futures with high renewable energy penetrations, energy storage, electrification, and distributed generation. The key advancement proposed herein utilizes collaboration with CCS experts at the University of Wyoming (U.WY) and the FLECCS technology development teams to create innovative methods for representing CCS and NET in the ReEDS and PLEXOS models. Expanded technology options and new operational parameterizations are integrated into these models to allow an unprecedented combination of scope and resolution for exploring the future of CCS and NET. The resulting capabilities permit wide-ranging scenario analysis to assess CCS and NET deployment under alternative scenarios of CO2 prices and competitiveness of flexible CCS and NET technologies. We demonstrate sample deployment and operational outcomes to show how these models are being used to assess the future potential for FLECCS technologies and their impacts on the U.S. electricity system. These products will help an emerging CCS/NET industry in the United States by providing economics-driven guidance to technology developers while informing policy and investment decisions in the public and private sectors.

capacity expansion↗

Storm-DEPART (Damage Estimate Prediction and Recovery Tool)

Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low-cost embedded optical sensing systems for distribution transformer monitoring

There is a mounting need for low-cost monitoring with online sensing technologies to maintain grid reliability and uptime. Here we introduce an innovative low-cost, embedded optical sensing technology initially focused on transformers that was developed and demonstrated at a major electric utility, Con Edison. A version of it that can be retrofitted onto existing transformers in the field was also developed. Two new 500 kVA distribution network transformers were built with embedded fiber-optic (FO) sensors and qualified per industry standards. Vibration, temperature, and corrosion were key parameters monitored. The first transformer with embedded FO sensors was installed at a Con Edison facility and monitored at our team’s office. The second one was installed in an urban street-side underground location with online data processing/feature extraction algorithms and monitored through a wireless router. Additionally, an older transformer was also retrofitted. Data analysis was done on these transformers showing promising correlations with their corresponding loading cycles. Furthermore, key events such as the transformer primary-side energizing, and other events were detected. In general, the technology was demonstrated over 6 months across the 3 transformers instrumented with promising results. Thus, it has the potential to enable predictive maintenance for transformers and other grid assets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops a machine learning based approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurement. The machine learning model is developed by using random forest algorithm. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

advanced metering infrastructure↗