Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Research on International Space Station - Building a Partnership for the Future

As its name implies, the International Space Station is a platform where the research programs of 16 partner nations are conducted. While each partner pursues its own research priorities, cooperation and coordination of the various national and agency research programs occurs at multiple levels, from strategic through tactical planning to experiment operations. Since 2000, a significant number of experiments have been carried out in the Russian ISS utilization program, which consists of the Russian national program of fundamental and applied research in 11 research areas and international cooperative programs and contract activities. The US research program began with simple payloads in 2000 and was significantly expanded with the addition of the US Laboratory module Destiny in 2001, and its outfitting with seven research racks to date. The Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japan Aerospace Exploration Agency (JAXA) have made use of international cooperative arrangements with both the US and Russia to implement a variety of investigations in diverse research areas, and in the case of ESA included the flights of crewmembers to ISS as part of Soyuz Science Missions. In the future, ESA and JAXA will add their own research modules, Columbus and Kibo, respectively, to expand research capabilities both inside and outside ISS. In the aftermath of the Columbia accident and the temporary grounding of the Space Shuttle fleet, all ISS logistics have relied on Russian Progress and Sopz vehicles. The Russian national program has continued as before the Shuttle accident, as have international cooperative programs and contract activities, both during long-duration expeditions and visiting taxi missions. In several instances, Russian international cooperative activities with JAXA and ESA have also involved the use of US facilities and crewmembers in successful truly multilateral efforts. The US research program was rapidly refocused after the Shuttle accident to rely on greatly reduced upmass, and for the first time in the ISS program, US research hardware was launched on Progress vehicles and returned with crews on Soyuz spacecraft. It is hoped that these small but significant steps in international cooperation will lead to even greater endeavors once the remaining research modules are added to ISS.

Gindl, Heinz↗

Ambiguous Tilt and Translation Motion Cues after Space Flight and Otolith Assessment during Post-Flight Re-Adaptation

Adaptive changes during space flight in how the brain integrates vestibular cues with other sensory information can lead to impaired movement coordination, vertigo, spatial disorientation and perceptual illusions following Gtransitions. These studies are designed to examine both the physiological basis and operational implications for disorientation and tilt-translation disturbances following short duration space flights.

Wood, Scott J.↗

Global Response of the Space Shuttle External Tank with the Presence of Intertank Stringer Cracks and Radius Blocks

After propellant was loaded into the external tank (ET), the November 5, 2010 launch of Space Shuttle mission STS-133 was scrubbed due to a gaseous hydrogen leak located in a vent line near the ground umbilical and ET connection. Subsequent visual inspections identified cracks in the sprayed-on foam insulation in the forward end of the ET intertank segment, adjacent to the liquid oxygen (LOX) tank, as shown in Figure 1. These cracks necessitated repair of the foam due to debris concerns that violated launch constraints. As part of the repair process, the affected foam was removed to reveal cracks in the underlying external hat stiffeners on the intertank, as shown in Figure 2. Ultimately, five stiffeners were discovered to be cracked adjacent to the LOX tank. As the managing center for the ET Project, NASA Marshall Space Flight Center (MSFC) coordinated failure investigation and repair activities among multiple organizations, which included the ET prime contractor (Lockheed Martin Space Systems Michoud Operations), the Space Shuttle Program Office at the NASA Johnson Space Center (JSC), the NASA Kennedy Space Center (KSC), and the NASA Engineering and Safety Center (NESC). STS-133 utilized the external tank designated as ET-137. Many aspects of the investigation have been reported previously in Refs. 1-7, which focus on the root cause of the failures, the flight readiness rationale and the local analyses of the stringer failures and repair. This paper summarizes the global analyses that were conducted on ET-137 as part of the NESC effort during the investigation, which was conducted primarily to determine if the repairs that were introduced to the stringers would alter the global response of the ET. In the process of the investigation, a new STAGS tabular input capability was developed to more easily introduce the aerodynamic pressure loads using a method that could easily be extended to incorporate finite element property data such as skin and stiffener thicknesses and beam cross-sectional properties.

Lovejoy, Andrew E.↗

ExMC Technology Watch

The Technology Watch (Tech Watch) project is a NASA project that is operated under the Human Research Programs (HRP) Exploration Medical Capability (ExMC) element, and focuses on ExMC technology gaps. The project coordinates the efforts of several NASA centers, including the Johnson Space Center (JSC), Glenn Research Center (GRC), Ames Research Center (ARC), and the Langley Research Center (LaRC). The objective of Tech Watch is to identify emerging, high-impact technologies that augment current NASA HRP technology development efforts. Identifying such technologies accelerates the development of medical care and research capabilities for the mitigation of potential health issues encountered during human space exploration missions. The aim of this process is to leverage technologies developed by academia, industry and other government agencies and to identify the effective utilization of NASA resources to maximize the HRP return on investment. The establishment of collaborations with these entities is beneficial to technology development, assessment and/or insertion and further NASAs goal to provide a safe and healthy environment for human exploration. In 2012, the Tech Watch project expanded the scope of activities to cultivate student projects targeted at specific ExMC gaps, generate gap reports for a majority of the ExMC gaps and maturate a gap report review process to optimize the technical and managerial aspects of ExMC gap status. Through numerous site visits and discussions with academia faculty, several student projects were initiated and/or completed this past year. A key element to these student projects was the ability of the project to align with a specific ExMC technology or knowledge gap. These projects were mentored and reviewed by Tech Watch leads at the various NASA centers. Another result of the past years efforts was the population of the ExMC wiki website that now contains more the three quarters of the ExMC gap reports. The remaining gap reports will be completed in FY13. Finally, the gap report review process for all ExMC gaps was initiated. This review process was instrumental in ensuring that each gap report was thoroughly reviewed for accuracy and relevant content prior to its public release. In the upcoming year, the gap report review process will be refined such that in addition to the gap report update, programmatic information related to gap closure will also be emphasized.

Krihak, M.↗

Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.

terminal airspace↗

Time-Domain Astronomy with the Fermi GBM

The Fermi Gamma-ray Burst Monitor (GBM) is an all-sky monitoring instrument sensitive to energies from 8 kiloelectronvolts to 40 megaelectronvolts. Over the past 8 years of operation, the GBM has detected over 240 gamma-ray bursts per year and provided timely GCN (Gamma-ray Coordinates Network) notices with localization to few-degree accuracy for follow-up observations. In addition to GRBs, galactic transients, solar flares, and terrestrial gamma-ray flashes have also been observed. In recent years we have also been searching the continuous GBM data for electromagnetic counterpart to astrophysical neutrinos and gravitational wave events, as these are believed to be associated with gamma-ray bursts. With continuous data downlink every few hours and a temporal resolution of 2 microseconds, GBM is well suited for observing transients and supporting EM followup in the era of multi-messenger astronomy.

gamma-ray burst↗

Remote Sensing of Antarctic Sea Ice with Coordinated Aircraft and Satellite Data Acquisitions

Remote sensing of Antarctic sea ice is required to characterize properties of the vast sea ice cover to understand its long-term increase in contrast to the decrease of Arctic sea ice. For this objective, the OIB/TanDEM-X Coordinated Science Campaign (OTASC) was successfully conducted in 2017 to obtain contemporaneous and collocated remote sensing data from NASA's Operation IceBridge (OIB) and the German Aerospace Center (DLR) TanDEM-X Synthetic Aperture Radar (SAR) system at X-band together with Sentinel-1 and RADARSAT-2 SARs at C-band in conjunction with WorldView satellite spectral sensors, surface measurements, and field observations. The Weddell Sea and the Ross Sea were two primary regions while SAR data were also collected over six other regions in the Southern Ocean. Satellite SAR data included both polarimetric and interferometric capabilities to infer snow and sea ice information in three dimensions (3D), while OIB/P-3 aircraft data include snow radar together with altimeter data for snow and sea ice observations in 3D over the Weddell Sea. Across the Ross Sea, IcePOD and AntNZ/York-University flights were carried out together with satellite SAR data acquisitions.

OIB↗

Assistive Detect and Avoid for Pilots in the Cockpit

Aircraft not receiving radar services rely on see and avoid and radio coordination via Common Traffic Advisory Frequencies to remain well clear of each other and avoid mid-air collisions. Radio coordination is usually performed in the vicinity of non-towered airports whereas non-radar services en-route operations rely solely on see and avoid. This paper presents the results of a simulation study of the effectiveness of assistive detect and avoid technologies when used to enhance pilots’ ability to see and avoid nearby traffic. Three different experimental conditions are modeled, representing “unaided see and avoid”, “see and avoid with traffic advisories”, and “see and avoid with assistive detect and avoid technology”. The effectiveness of see and avoid is evaluated using a set of head-on, crossing, and overtaking encounter scenarios and a model of visual acquisition embedded in a Monte Carlo simulation. The effectiveness of assistive detect and avoid is estimated for the same encounter scenarios. A prototype system for detect and avoid and a summary of results are presented. Preliminary results strongly suggest that assistive detect and avoid could greatly enhance the capabilities of flight crews to avoid traffic and remain well clear.

collision, detect and avoid, resolution, well clea↗

Assistive Detect and Avoid for Pilots in the Cockpit

Aircraft not receiving radar services rely on see and avoid and radio coordination via Common Traffic Advisory Frequencies to remain well clear of each other and avoid mid-air collisions. Radio coordination is usually performed in the vicinity of non-towered airports whereas non-radar services en-route operations rely solely on see and avoid. This paper presents the results of a simulation study of the effectiveness of assistive detect and avoid technologies when used to enhance pilots’ ability to see and avoid nearby traffic. Three different experimental conditions are modeled, representing “unaided see and avoid”, “see and avoid with traffic advisories”, and “see and avoid with assistive detect and avoid technology”. The effectiveness of see and avoid is evaluated using a set of head-on, crossing, and overtaking encounter scenarios and a model of visual acquisition embedded in a Monte Carlo simulation. The effectiveness of assistive detect and avoid is estimated for the same encounter scenarios. A prototype system for detect and avoid and a summary of results are presented. Preliminary results strongly suggest that assistive detect and avoid could greatly enhance the capabilities of flight crews to avoid traffic and remain well clear.

collision↗

Autonomous Multi-Sensor Coordination: The Science Goal Monitor

Many dramatic earth phenomena are dynamic and coupled. In order to fully understand them, we need to obtain timely coordinated multi-sensor observations from widely dispersed instruments. Such a dynamic observing system must include the ability to Schedule flexibly and react autonomously to sciencehser driven events; Understand higher-level goals of a sciencehser defined campaign; Coordinate various space-based and ground-based resources/sensors effectively and efficiently to achieve goals. In order to capture transient events, such a 'sensor web' system must have an automated reactive capability built into its scientific operations. To do this, we must overcome a number of challenges inherent in infusing autonomy. The Science Goal Monitor (SGM) is a prototype software tool being developed to explore the nature of automation necessary to enable dynamic observing. The tools being developed in SGM improve our ability to autonomously monitor multiple independent sensors and coordinate reactions to better observe dynamic phenomena. The SGM system enables users to specify what to look for and how to react in descriptive rather than technical terms. The system monitors streams of data to identify occurrences of the key events previously specified by the scientisther. When an event occurs, the system autonomously coordinates the execution of the users' desired reactions between different sensors. The information can be used to rapidly respond to a variety of fast temporal events. Investigators will no longer have to rely on after-the-fact data analysis to determine what happened. Our paper describes a series of prototype demonstrations that we have developed using SGM and NASA's Earth Observing-1 (EO-1) satellite and Earth Observing Systems' Aqua/Terra spacecrafts' MODIS instrument. Our demonstrations show the promise of coordinating data from different sources, analyzing the data for a relevant event, autonomously updating and rapidly obtaining a follow-on relevant image. SGM was used to investigate forest fires, floods and volcanic eruptions. We are now identifying new Earth science scenarios that will have more complex SGM reasoning. By developing and testing a prototype in an operational environment, we are also establishing and gathering metrics to gauge the success of automating science campaigns.

Koratkar, Anuradha↗

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert↗

Coordinated control of a dual-arm dexterous robot using full immersion telepresence and virtual reality

Telepresence is an approach to teleoperation that provides egocentric, intuitive interactions between an operator and a remote environment. This approach takes advantage of the natural cognitive and sensory motor skills of an on-board crew and effectively transfers them to a slave robot. A dual alarm dexterous robot operating under telepresence control has been developed and initial evaluations of the system performing candidate EVA, IVA and planetary geological tasks were conducted. The results of our evaluation showed that telepresence control is very effective in transferring the operator's skills to the slave robot. However, the results also showed that, due to the kinematic and dynamics inconsistencies between the operator and the robot, a limited amount of intelligent automation is also required to carry out some to the tasks. Therefore, several enhancements have been made to the original system to increase the automated capabilities of the control system without losing the benefits of telepresence.

Li, Larry↗

Workshop on Dust on Mars

A workshop was organized to stimulate and coordinate research on the properties of Martian dust, its distribution on the planet, and the processes affecting its yearly deposition, erosion, and transport. A great deal of research was carried out to understand local, regional, and global aspects of the Martian dust transport cycle, with the goal being definition of the currently active processes and their relation to those operating over the long term. To date, however, most individual research projects have centered around interpretation of single data sets (visual images, IRTM, radar, etc.), and these many efforts were not coordinated. Many of the details of short and long term dust-related processes, as inferred from the various single data sets, are still not agreed upon. It was the intent of this workshop to encourage the informal exchange of ideas among several researchers currently investigating various aspects of the problem and to investigate cooperative efforts to synthesize the individual approaches into a unified understanding of the present seasonal and yearly Martian sediment transport cycles.

Lee, S.↗

Sensor fusion III: 3-D perception and recognition; Proceedings of the Meeting, Boston, MA, Nov. 5-8, 1990

The volume on data fusion from multiple sources discusses fusing multiple views, temporal analysis and 3D motion interpretation, sensor fusion and eye-to-hand coordination, and integration in human shape perception. Attention is given to surface reconstruction, statistical methods in sensor fusion, fusing sensor data with environmental knowledge, computational models for sensor fusion, and evaluation and selection of sensor fusion techniques. Topics addressed include the structure of a scene from two and three projections, optical flow techniques for moving target detection, tactical sensor-based exploration in a robotic environment, and the fusion of human and machine skills for remote robotic operations. Also discussed are K-nearest-neighbor concepts for sensor fusion, surface reconstruction with discontinuities, a sensor-knowledge-command fusion paradigm for man-machine systems, coordinating sensing and local navigation, and terrain map matching using multisensing techniques for applications to autonomous vehicle navigation.

Schenker, Paul S.↗

Considerations for Isochronous Data Services over the Proximity-1 Space Link

Future mission concepts for robotic and human explorations will involve a high level of real time control/monitoring operations such as tele-operation for spacecraft rendezvous and surface mobile platforms carrying life-support equipments. The timely dissemination of voice, command, and real-time telemetry for monitoring and coordination purposes is critical for mission success. It is envisioned that future missions will require a network infrastructure capable of supporting isochronous data services. The CCSDS Proximity-1 Space Link Protocol1 could be used to provide isochronous service over the surface-to-Earth relay as well as "beyond-the-horizon" communications between distant Lunar or Mars surface elements. This paper will analyze the latency, jitter, and throughput performance of the Proximity-1 protocol for isochronous applications. In particular we will focus on constrained scenarios where the protocol operates in full-duplex mode, carrying isochronous traffic in one direction and error-controlled traffic in the other direction. We analyze the impact of the strict priority scheme in Proximity-1 on delay jitter and the impact of the isochronous traffic on the efficiency of the reliable data transfer in the other direction, and discuss methods for performance optimization. In general, jitter performance is driving by relative loading of isochronous traffic on the forward link compared to the acknowledgement traffic. Under light loading condition, the upper-bound of the delay jitter is the transmission duration of an acknowledgement frame on the forward link; for higher loading scenarios, the maximum jitter is scaled up by the inverse of the residual bandwidth, i.e., the spare capacity available in the forward link to carry isochronous traffic.

isochronous communications↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗

RL10 ignition limits test for Shuttle Centaur

During routine development testing of the RL10A-3-3B engine a potential no-ignition condition was encountered when operating at certain propellant inlet conditions within the Shuttle Centaur G operating region. The conditions, the resulting investigative program, and methods to correct the potential problem are discussed. The Shuttle Centaur program was cancelled prior to completion of this effort. Although the RL10 engine in the Atlas Centaur vehicle is required by specification to operate over a wide range of propellant inlet conditions. The vehicle actually operates over a narrow range of conditions. This factor, combined with configuration differences between Atlas Centaur (or Titan Centaur) and the Shuttle Centaur RL10 engines, indicates the ignition problem does not exist for these vehicles. As a precautionary measure the vehicle manufacturer was requested to coordinate with Pratt and Whitney any anticipated changes in propellant inlet conditions from the current narrow range. An engineering change will be proposed for future RL10 deliveries to provide more consistent propellant flow to the igniter. This will permit operation of the engine throughout the wide range specification inlet conditions if desired.

Source record↗

Dynamic Path Planning Automation Concept for Advanced Air Mobility

Advanced Air Mobility (AAM) aims to develop an air transportation system for novel air vehicles between local, regional, intraregional, and urban places. Safety and efficiency of increasingly complex AAM operations are expected to require extensive use of automation, ranging from controlling the revolutionary new aircraft to managing flights dynamically in the high tempo airspace and aerodrome operations. Both onboard and ground automation will play central roles in assisting AAM operators with managing the flight paths of their fleet. This document presents a concept for dynamic path planning (DPP) automation applicable to AAM and other flight operations. The role of the DPP automation system is fivefold: (1) it creates a flight path with desired qualities of being feasible, deconflicted, harmonized, flexible, and optimal; (2) it monitors the progress of flight in a dynamic operating environment; (3) it supports the user in evaluating continued acceptability of the flight path in changing conditions; (4) it revises the flight path as needed to maintain the desired flight path qualities; and (5) it coordinates the flight path with airspace users and service providers. Key users of the DPP automation system include flight planners, pilots, and airspace service providers The concept allows for the system to be installed onboard the aircraft as well as on the ground. The system responds automatically to the dynamic operating environment to ensure that a safe and operationally acceptable flight path is available throughout the flight.

Vivek Sharma↗