Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Utah”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

NASA's Space Launch System Takes Shape

Major hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of a major new capability for deep space human exploration. SLS continues to pursue a 2018 first launch of Exploration Mission 1 (EM-1). At NASA's Michoud Assembly Facility near New Orleans, LA, Boeing completed welding of structural test and flight liquid hydrogen tanks, and engine sections. Test stands for core stage structural tests at NASA's Marshall Space Flight Center, Huntsville, AL. neared completion. The B2 test stand at NASA's Stennis Space Center, MS, completed major structural renovation to support core stage green run testing in 2018. Orbital ATK successfully test fired its second qualification solid rocket motor in the Utah desert and began casting the motor segments for EM-1. Aerojet Rocketdyne completed its series of test firings to adapt the heritage RS-25 engine to SLS performance requirements. Production is under way on the first five new engine controllers. NASA also signed a contract with Aerojet Rocketdyne for propulsion of the RL10 engines for the Exploration Upper Stage. United Launch Alliance delivered the structural test article for the Interim Cryogenic Propulsion Stage to MSFC for tests and construction was under way on the flight stage. Flight software testing at MSFC, including power quality and command and data handling, was completed. Substantial progress is planned for 2017. Liquid oxygen tank production will be completed at Michoud. Structural testing at Marshall will get under way. RS-25 hotfire testing will verify the new engine controllers. Core stage horizontal integration will begin. The core stage pathfinder mockup will arrive at the B2 test stand for fit checks and tests. EUS will complete preliminary design review. This paper will discuss the technical and programmatic successes and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce↗

Osiris-REx Spacecraft Current Status and Forward Plans

The NASA New Frontiers OSIRIS-REx spacecraft executed a flawless launch on September 8, 2016 to begin its 23-month journey to near-Earth asteroid (101955). The primary objective of the OSIRIS-REx mission is to collect and return to Earth a pristine sample of regolith from the asteroid surface. The sampling event will occur after a two-year period of remote sensing that will ensure a high probability of successful sampling of a region on the asteroid surface having high science value and within well-defined geological context. The OSIRIS-REx instrument payload includes three high-resolution cameras (OCAMS), a visible and near-infrared spectrometer (OVIRS), a thermal imaging spectrometer (OTES), an X-ray imaging spectrometer (REXIS), and a laser altimeter (OLA). As the spacecraft follows its nominal outbound-cruise trajectory, the propulsion, power, communications, and science instruments have undergone basic functional tests, with no major issues. Outbound cruise science investigations include a search for Earth Trojan asteroids as the spacecraft approaches the Sun-Earth L4 Lagrangian point in February 2017. Additional instrument checkouts and calibrations will be carried out during the Earth gravity assist maneuver in September 2017. During the Earth-moon flyby, visual and spectral images will be acquired to validate instrument command sequences planned for Bennu remote sensing. The asteroid Bennu remote sensing campaign will yield high resolution maps of the temperature and thermal inertia, distributions of major minerals and concentrations of organic matter across the asteroid surface. A high resolution 3d shape model including local surface slopes and a high-resolution gravity field will also be determined. Together, these data will be used to generate four separate maps that will be used to select the sampling site(s). The Safety map will identify hazardous and safe operational regions on the asteroid surface. The Deliverability map will quantify the accuracy with which the navigation team can deliver the spacecraft to and from specific sites on the asteroid surface. The Sampleability map quantifies the regolith properties, providing an estimation of how much material would be sampled at different points on the surface. The final Science Value map synthesizes the chemical, mineralogical, and geological, observations to identify the areas of the asteroid surface with the highest science value. Here, priority is given to organic, water-rich regions that have been minimally altered by surface processes. Asteroid surface samples will be acquired with a touch-and-go sample acquisition system (TAGSAM) that uses high purity pressurized N2 gas to mobilize regolith into a stainless steel canister. Although the mission requirement is to collect at least 60 g of material, tests of the TAGSAM routinely exceeded 300 g of simulant in micro-gravity tests. After acquiring the sample, the spacecraft will depart Bennu in 2021 to begin its return journey, with the sample return capsule landing at the Utah Test and Training Range on September 23, 2023. The OSIRIS-REx science team will carry out a series of detailed chemical, mineralogical, isotopic, and spectral studies that will be used to determine the origin and history of Bennu and to relate high spatial resolution sample studies to the global geological context from remote sensing. The outline of the sample analysis plan is described in a companion abstract.

Messenger, Scott↗

Satellite-Based Drought Reporting on the Navajo Nation

The Navajo Nation (NN) is the largest reservation in the US, and faces challenges related to water management during long-term and widespread drought episodes. The Navajo Nation is a federally recognized tribe, which has boundaries within Arizona, New Mexico, and Utah. The Navajo Nation has a land area of over 70,000 square kilometers. The Navajo Nation Department of Water Resources (NNDWR) reports on drought and climatic conditions through the use of regional Standardized Precipitation Index (SPI) values and a network of in-situ rainfall, streamflow, and climate data. However, these data sources lack the spatial detail and consistent measurements needed to provide a coherent understanding of the drought regime within the Nation's regional boundaries. This project, as part of NASA's Western Water Applications Office (WWAO), improves upon the recently developed Drought Severity Assessment Tool (DSAT) to ingest satellite-based precipitation data to generate SPI values for specific administrative boundaries within the reservation. The tool aims to: (1) generate SPI values and summary statistics for regions of interest on various timescales, (2) to visualize SPI values within a web-map application, and (3) produce maps and comparative statistical outputs in the format required for annual drought reporting. The co-development of the DSAT with NN partners is integral to increasing the sustained use of Earth Observations for water management applications. This tool will provide data to support the NN in allocation of drought contingency dollars to the regions most adversely impacted by declines in water availability.

Satellite-based↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.

Hutt, John J.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Full-Scale Passive Earth Entry Vehicle Landing Tests: Methods and Measurements

During the summer of 2016, a series of drop tests were conducted on two passive earth entry vehicle (EEV) test articles at the Utah Test and Training Range (UTTR). The tests were conducted to evaluate the structural integrity of a realistic EEV vehicle under anticipated landing loads. The test vehicles were lifted to an altitude of approximately 400m via a helicopter and released via release hook into a predesignated 61 m landing zone. Onboard accelerometers were capable of measuring vehicle free flight and impact loads. High-speed cameras on the ground tracked the free-falling vehicles and data was used to calculate critical impact parameters during the final seconds of flight. Additional sets of high definition and ultra-high definition cameras were able to supplement the high-speed data by capturing the release and free flight of the test articles. Three tests were successfully completed and showed that the passive vehicle design was able to withstand the impact loads from nominal and off-nominal impacts at landing velocities of approximately 29 m/s. Two out of three test resulted in off-nominal impacts due to a combination of high winds at altitude and the method used to suspend the vehicle from the helicopter. Both the video and acceleration data captured is examined and discussed. Finally, recommendations for improved release and instrumentation methods are presented.

Littell, Justin D.↗

CubeSat with Nanostructured Sensing Instrumentation for Planetary Exploration

This report provides a summary of the work performed under NIAC Phase I award NNX15AL86G entitled "CubeSat with Nanostructured Sensing Instrumentation for Planetary Exploration". The objective of this research is to investigate the feasibility of an innovative, low cost, CubeSat based planetary mission concept for in situ "ground truth"analysis of small asteroids and comets. The project includes an instrument study and a mission/spacecraft design study. The instrument study concerns with the development of anew TiO2 nanotube sensor with integrated compound semiconductor nanowires to determine surface composition element via neutron activated analysis (NAA). The mission/spacecraft design study concerns with the development of CubeSat based lander to small asteroids and comets. The Phase I study suggests that our concept is feasible and could provide significant benefit to NASA's future planetary missions. This research was carried out at the University of Southern California and the University of Utah.

Satellites↗

Preparing for Planetary Surface Exploration by Measuring Habitat Dust Intrusion with Filter Tests During an Analogue Mars Mission

As humans venture deeper into space more issues related to operations will become apparent. While the perils ofdust particles may not be widely recognized, it is one of the major issues astronauts will face on the surface of theMoon and Mars. Dust particles present a problem for both astronaut health and equipment as revealed during theApollo era lunar surface missions. Dust particles cling to spacesuits and field gear, which upon ingress would begincirculating throughout the spacecraft or habitat. An astronaut's health is compromised by the dust particle's potentialto embed in the lungs and cause respiratory illnesses. The extreme abrasiveness and granularity of the particles makeit near impossible to completely shield a spacecraft or habitat from dust related damage. NASA's Glenn ResearchCenter collaborated with Crew 188 at the Mars Desert Research Station (MDRS) in Utah to measure how much dustentered the habitat during a series of extravehicular activities (EVAs), or surface excursions. A NASA GRCdeveloped multistage filter system, coined the Scroll Filter System, was tested, for its effectiveness in removing dustthat entered the airlock and habitat after the EVAs. An optical particle counter measured the ambient airlockparticulates five times including: before the start of operations; after the crew left for EVA; in the middle of the EVAwith the settled air; before the crew entered the airlock after EVA; and finally, after the crew simulated repressurizationand suit brushing off in the airlock. Data was also collected in several of the working environmentlocations around MDRS and outside the habitat in the wind. Data collected from this research will help establishfilter equipment for life support systems and prescribed operations for astronaut transition from a planetary surfaceinto a desired clean habitat. Measurements may aid in updating a baseline expected dust load for a surface habitatand further facilitate the mitigation of astronaut's exposure to dust particles on the surface of celestial bodies.

Kobrick, Ryan L.↗

Retrieval of Daily Maps of PM2.5 Aerosol in the Problematic California Valleys: Bright, Speckled Reflectances, Thin AOT, but High Pollution

The San Joaquin Valley suffers from severe episodes of respirable aerosol (PM2.5) in wintertime.We provide maps of aerosol episodes using daily snapshots of PM2.5 and its changing features despite numerous difficulties inherent to sampling the region. Linear relationships relating aerosol optical thickness (AOT) to PM2.5 give an explained variance of approximately 3.The GEO-CAPE mission has as a goal the provision of relevant measures of respirable aerosol to the community,but has not formulated a science goal beyond the limited goal of retrieval of AOT, bringing the usefulness of GEO-CAPE into doubt.Our special focus was on the DISCOVER-AQ period, Jan-Feb 2013, which had many supporting measurements.Both high pollution and retrieval difficulties tend to occur in many Mediterranean agricultural regions like the San Joauin. One difficulty is the relatively bright surfaces with considerable exposed soil. NASAs MAIAC and MODIS Deep Blue retrieval techniques are shown to have considerable skill even at low aerosol optical thickness (AOT) values, as evaluated by concurrent AERONET sunphotometer measurements.More significantly, these AOT values can correspond to high daytime PM2.5 since aerosol mixed layer depth is thin and variable, 200m 600 m. The thin layers derive from typical subsidence of dry air between more stormy periods. This situation provides an advantage: water vapor column is also almost completely limited to a similar mixed layer depth, and can thus serve as a measure of aerosol dilution.Using the MAIAC Water Vapor Column:In order to make the maps below, we used the MAIAC data but subtracted partial water-vapor columns estimated from MERRA Reanalysis Data availabe from the GSFC GMAO using kriging. We did not use the mixed-layer estimates from MERRA, since such analyses were found problematic during our forecasting exercises for DISCOVER-AQ. Observations from the aircraft soundings suggested that this overlying moisture was mostly due to larger scale flows, not ML venting.However, the specific humidity at the surface and a nearly well-mixed ML was analyzed by kriging from the surface network (MesoWest, University of Utah). These were thought to be truer, uninfluenced by physical process modeling that combines with data observations. (TBD: How different are they?) Procedure: Subtract overlying partial water columns from MAIAC column water and divide this by a surface value of water vapor. (MAIAC column is expressed in cm of water, i.e., water vapor at surface conditions.This method appears to bring out useful details in the distribution of submicron particles in the very problematic Wintertime San Joaquin Valley, and allow analysis of pollution episodes throughout the valley, rather than long-term averages.

san joaquin valley↗

Genesis Mission Bulk Metallic Glass Solar Wind Collector: Characterization of Return Samples Available for Re-Allocation

The Genesis mission collected solar wind atoms for 28 months with a variety of collectors mounted on a spacecraft. A total of fifteen pure materials were selected as collectors based on engineering and science requirements. One of the materials was the bulk metallic glass (BMG). It was intended for collecting noble gases and solar energetic particles (SEP). This material is an amorphous metal which was custom made by C.C. Hays at the California Institute of Technology. The final glass composition is Zr58.5Nb2.8Cu15.6Ni12.8Al10.3 (in atom percent). The BMG was located on top of the wafer array mechanism and was exposed for the entire time the science canister was open (~28 months). Fortunately, the BMG did not suffer any serious damage and was intact after the Genesis canister’s “hard-landing” into the Utah desert (Fig. 1).

Gonzalez, C. P.↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

Great Basin Ecological Forecasting II: Assessing and Forecasting Live Fuel Moisture Content of Wildfire Fuels for the Eastern Great Basin to Improve Wildfire Timing and Severity Predictions

The eastern Great Basin (EGB) extends throughout the states of Arizona, Colorado,Idaho, Utah, and Wyoming, covering approximately 411,000 km2. In recent years, wildfires in the EGB have increased in frequency and size, representing a growing concern for our partners at the Bureau of Land Management (BLM), the National Weather Service (NWS), and the Great Basin Coordination Center (GBCC). Live fuel moisture (LFM) is an important factor in predicting wildfire risk, as dry vegetation requires less energy to combust than wet vegetation. Land managers currently derive LFM levels from just 165 in situ sites in the EGB. In order to provide partners with a more accurate assessment of LFM, the team used data from the National Elevation Dataset, Aqua and Terra Moderate Resolution Imaging Spectroradiometer, and Suomi National Polar-orbiting Partnership Visible Infrared Imaging Radiometer Suite. These datasets include vegetation indices, evapotranspiration, and topographic variables, which were used to create biweekly forecasts of LFM throughout the EGB. An accuracy assessment was conducted using historical in situ data from our partners at the BLM and the GBCC. This model allowed our partners to make informed decisions regarding resource allocation in response to the predicted timing and severity of wildfires in the EGB.

Ecological Forecasting↗

Great Basin Ecological Forecasting II: Assessing and Forecasting Live Fuel Moisture Content of Wildfire Fuels for the Eastern Great Basin to Improve Wildfire Timing and Severity Predictions

The eastern Great Basin (EGB) extends throughout the states of Arizona, Colorado, Idaho, Utah, and Wyoming, covering approximately 411,000 sq.km. In recent years, wildfires in the EGB have increased in frequency and size, representing a growing concern for our partners at the Bureau of Land Management (BLM), the National Weather Service (NWS), and the Great Basin Coordination Center (GBCC). Live fuel moisture (LFM) is an important factor in predicting wildfire risk, as dry vegetation requires less energy to combust than wet vegetation. Land managers currently derive LFM levels from just 165 in situ sites in the EGB. In order to provide partners with a more accurate assessment of LFM, the team used data from the National Elevation Dataset, Aqua and Terra Moderate Resolution Imaging Spectroradiometer, and Suomi National Polar-orbiting Partnership Visible Infrared Imaging Radiometer Suite. These datasets include vegetation indices, evapotranspiration, and topographic variables, which were used to create biweekly forecasts of LFM throughout the EGB. An accuracy assessment was conducted using historical in situ data from our partners at the BLM and the GBCC. This model allowed our partners to make informed decisions regarding resource allocation in response to the predicted timing and severity of wildfires in the EGB.

Ecological Forecasting↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Genesis failure investigation report

On January 7, 2001, the Genesis spacecraft lifted off from Cape Canaveral. Its mission was to collect solar wind samples and return those samples to Earth for detailed analysis by scientists. The mission proceeded successfully for three-and-a-half years. On September 8, 2004, the spacecraft approached Earth, pointed the Sample Return Capsule (SRC) at its entry target, and then fired pyros that jettisoned the SRC. The SRC carried the valuable samples collected over the prior 29 months. The SRC also contained the requisite hardware (mechanisms, parachutes, and electronics) to manage the process of entry, descent, and landing (EDL). After entering Earth’s atmosphere, the SRC was expected to open a drogue parachute. This should have been followed by a pyro event to release the drogue chute, and then by a pyro event to deploy the main parachute at an approximate elevation of 6.7 kilometers. As the SRC descended to the Utah landing site, helicopters were in position to capture the SRC before the capsule touched down. On September 8, 2004, observers of the SRC’s triumphant return became concerned as the NASA announcer fell silent, and then became even more alarmed as they watched the spacecraft tumble as it streaked across the sky. Long-distance cameras clearly showed that the drogue parachute had not deployed properly.

UNKNOWN↗

1-AU calibration activities for Stardust Earth Return

In January 2006, the Stardust spacecraft will deliver its Sample Return Capsule to the recovery site at the Utah Test and Training Range. Stardust will return dust samples from comet Wild 2 colleced in January 2004. During Earth return, the trajectory will be perturbed by small firings of the spacecraft reaction control thrusters. Calibration of these fireings is essential to ensure meeting Earth entry requirements. This paper will describe such calibrations performed between superior conjunctions when Stardust was about 1 AU from the Sun.

Williams, Ken↗

Case Study of Meteoroid Fluence on a Mars Sample Return Mission

The Mars Sample Return Campaign must satisfy a Back Planetary Protection requirement that limits the risk of biological contamination of the Earth by Martian microbes. The Earth Re-turn Orbiter (ERO), being developed by the European Space Agency (ESA), will carry a Capture, Containment and Return System (CCRS), which is being developed by NASA to retrieve orbiting samples (OS) from Mars orbit, surround them with two containment layers to create a Contained OS (COS), and transfer the COS to the Earth Entry System (EES), which will be re-leased by ERO to carry the samples through entry, descent and landing at the Utah Test and Training Range. Micrometeoroid impact damage to the Thermal Protection System (TPS) of the EES, which may occur at any time in the ERO mission, is recognized as a potential risk driver for loss of sample containment that needs to be rigorously assessed. A Micrometeoroid Protection System (MMPS) will be implemented to limit that risk. The MMPS consists of a shield covering the TPS called the Micrometeoroid Garage (MMG) and a system of cameras to inspect the TPS. An extensive study was performed by the CCRS Project in collaboration with the NASA Engineering and Safety Center (NESC)to assess the probability of damage to the MMG and TPS by meteoroids over the entire ERO mission. This included the computation of the meteoroid fluence on the MMG and directly on the TPS after EES separation, and assessment of damage to the MMG and TPS via hypervelocity impact tests, hydrocode simulations, and empirical damage prediction and ballistic limit equations (BLEs). The focus of this paper is the meteoroid fluence on the MMG.

Micrometeoroid↗