Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Suppression of Alfven Modes on the National Spherical Torus Experiment Upgrade with Outboard Beam Injection [Suppression of Alfven Modes on the NSTX-U with Outboard Beam Injection]

In this paper we present data from experiments on the National Spherical Torus Experiment Upgrade, where it is shown for the first time that small amounts of high pitch-angle beam ions can strongly suppress the counterpropagating global Alfven eigenmodes (GAE). GAE have been implicated in the redistribution of fast ions and modification of the electron power balance in previous experiments on NSTX. The ability to predict the stability of Alfven modes, and developing methods to control them, is important for fusion reactors like the International Tokamak Experimental Reactor, which are heated by a large population of nonthermal, super-Alfvenic ions consisting of fusion generated alpha's and beam ions injected for current profile control. We present a qualitative interpretation of these observations using an analytic model of the Doppler-shifted ion-cyclotron resonance drive responsible for GAE instability which has an important dependence on k(perpendicular to rho L). A quantitative analysis of this data with the HYM stability code predicts both the frequencies and instability of the GAE prior to, and suppression of the GAE after the injection of high pitch-angle beam ions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A cantilevered liquid-nitrogen-cooled silicon mirror for the Advanced Light Source Upgrade

This paper presents a novel cantilevered liquid-nitrogen-cooled silicon mirror design for the first optic in a new soft X-ray beamline that is being developed as part of the Advanced Light Source Upgrade (ALS-U) (Lawrence Berkeley National Laboratory, USA). The beamline is optimized for photon energies between 400 and 1400 eV with full polarization control. Calculations indicate that, without correction, this design will achieve a Strehl ratio greater than 0.85 for the entire energy and polarization ranges of the beamline. With a correction achieved by moving the focus 7.5 mm upstream, the minimum Strehl ratio is 0.99. This design is currently the baseline plan for all new ALS-U insertion device beamlines.

47 OTHER INSTRUMENTATION↗

Compensation of heat load deformations using adaptive optics for the ALS upgrade: a wave optics study

In this paper, a realistic wave optics simulation method has been developed to study how wavefront distortions originating from heat load deformations can be corrected using adaptive X-ray optics. Several planned soft X-ray and tender X-ray insertion-device beamlines in the Advanced Light Source upgrade rely on a common design principle. A flat, first mirror intercepts the white beam; vertical focusing is provided by a variable-line-space monochromator; and horizontal focusing comes from a single, pre-figured, adaptive mirror. A variety of scenarios to cope with thermal distortion in the first mirror are studied by finite-element analysis. The degradation of the intensity distribution at the focal plane is analyzed and the adaptive optics that correct it is modeled. The range of correctable wavefront errors across the operating range of the beamlines is reported in terms of mirror curvature and spatial frequencies. The software developed is a one-dimensional wavefront propagation package made available in the OASYS suite, an adaptable, customizable and efficient beamline modeling platform.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Testing sTGC with small angle wire edges for the ATLAS new small wheel muon detector upgrade

The LHC upgrade scheduled for 2018 is expected to significantly increase the accelerator's luminosity, and as a result the radiation background rates in the ATLAS Muon Spectrometer will increase too. Some of its components will have to be replaced in order to cope with these high rates. Newly designed small-strip Thin Gap chambers (sTGC) will replace them at the small wheel region. One of the differences between the sTGC and the currently used TGC is the alignment of the wires along the azimuthal direction. As a result, the outermost wires approach the detector's edge with a small angle. Such a configuration may be a cause for various problems. Two small dedicated chambers were built and tested in order to study possible edge effects that may arise from the new configuration. The sTGC appears to be stable and no spark have been observed, yet some differences in the detector response near the edge is seen and further studies should be carried out. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Beyond Hosting Capacity: Using Shortest-Path Methods to Minimize Upgrade Cost Pathways

This paper presents a graph-based forward looking algorithm applied to distribution planning in the context of distributed photovoltaic penetration. We study the target hosting capacity problem where the objective is to find the least-cost sequence of system upgrades to reach a predefined hosting capacity target value. We show that commonly used short-term cost minimization approaches often lead to suboptimal long-term solutions. By comparing our method against such myopic techniques on real distribution systems, we show that our algorithm is able to reduce the overall integration costs by looking at future decisions. Because hosting capacity is hard to compute, this problem requires efficient methods to search the space. We demonstrate that heuristics using domain-specific knowledge can be efficiently used to improve the algorithm performance, such that real distribution systems can be studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ETROC2 as the Final Version for CMS MTD Endcap Timing Layer (ETL) Upgrade

The ETROC2 is the first full-size full-functionality prototype design fully compatible with the final chip specifications for CMS ETL. The ETROC2 chips have been extensively tested and the results have been presented at IEEE NSS MIC RTSD 2024. We will present here new results including the bump bonding yield improvement study, the time walk correction (TWC) generality study with single pixel TWC applied to all pixels, the final SEU testing results using both heavy ion and proton beam, more beam test studies including different sensors and irradiated sensors, and readiness for the ETROC2 production for CMS ETL upgrade.

Liu, Tie Hui [Fermilab] (ORCID:0009000765225605)↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Electron Cyclotron Heating system status and upgrades on DIII-D

The Electron Cyclotron Heating (ECH) system on the DIII-D tokamak consists of six 110 GHz gyrotrons with corrugated coaxial 31.75 mm waveguide transmission lines and steerable launching mirrors. The system has been gradually updated, leading to increased experimental flexibility and a high system reliability of 91% in the past year. Operationally, the gyrotrons can generate up to a total of 4.8 MW of rf power for pulses up to 5 seconds in length. The maximum ECH energy injected into the DIII-D has been 16.6 MJ. The HE11 mode content is over 85% for all the lines, and the transmission coefficient is better than -1.1 dB for all the transmission lines, close to the theoretical value. A new depressed collector gyrotron was recently installed and was injecting up to 640 kW of power into the plasma during 2014-2015 tokamak operations. Three dual waveguide launchers, which can steer the RF beams ±20 degrees poloidally and toroidally, were used for real-time neoclassical tearing mode control and suppression. The launchers now have increased poloidal scanning speed and beam positioning accuracy of ~±2 mm at the plasma center. A new method of in-situ calibration of the mirror angle was used in conjunction with the upgrading of the encoders and motors for the launchers. Two more gyrotrons are expected to be installed and operational in 2015-2016. The first is a repaired 110 GHz, 1 MW gyrotron that had a gun failure after more than 11 years of operation at DIII-D. The second is a newly designed depressed collector tube in the 1.5 MW class, operating at 117.5 GHz, manufactured by Communications and Power Industries (CPI). It operates in the TE20,9 mode and has achieved 1.8 MW for short pulses during factory testing. Furthermore, this gyrotron is undergoing rework to address a high voltage standoff problem.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Test Results of 15 T Nb3Sn Quadrupole Magnet HQ01 with a 120 mm Bore for the LHC Luminosity Upgrade

In support of the luminosity upgrade of the Large Hadron Collider (LHC), the US LHC Accelerator Research Program (LARP) has been developing a 1-meter long, 120 mm bore Nb{sub 3}Sn IR quadrupole magnet (HQ). With a short sample gradient of 219 T/m at 1.9 K and a conductor peak field of 15 T, the magnet will operate under higher forces and stored-energy levels than that of any previous LARP magnet models. In addition, HQ has been designed to incorporate accelerator quality features such as precise coil alignment and adequate cooling. The first 6 coils (out of the 8 fabricated so far) have been assembled and used in two separate tests-HQ01a and HQ01b. This paper presents design parameters, summary of the assemblies, the mechanical behavior as well as the performance of HQ01a and HQ01b.

43 PARTICLE ACCELERATORS↗

Development and Test of a Single-Aperture 11 T $ \hbox{Nb}_{3}\hbox{Sn}$ Demonstrator Dipole for LHC Upgrades

The upgrade of the LHC collimation system foresees installation of additional collimators around the LHC ring. The longitudinal space for the collimators could be provided by replacing some 8.33 T NbTi LHC main dipoles with shorter 11 T Nb3Sn dipoles compatible with the LHC lattice and main systems. To demonstrate this possibility, FNAL and CERN have started a joint program with the goal of building a 5.5 m long twin-aperture dipole prototype suitable for installation in the LHC. The first step of this program is the development of a 2 m long single-aperture demonstrator dipole with a nominal field of 11 T at the LHC nominal current of 11.85 kA and ~ 20% margin. This paper describes the design, construction, and test results of the first single-aperture Nb3Sn demonstrator dipole model.

43 PARTICLE ACCELERATORS↗

Liquid nitrogen tests of a Torus coil for the Jefferson Lab 12GeV accelerator upgrade

A magnet system consisting of six superconducting trapezoidal racetrack-type coils is being built for the Jefferson Lab 12-GeV accelerator upgrade project. The magnet coils are wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. Each superconducting toroidal coil is force cooled by liquid helium, which circulates in a tube that is in good thermal contact with the inside of the coil. Thin copper sheets are soldered to the helium cooling tube and enclose the superconducting coil, providing cooling to the rest of the coil pack. As part of a rigorous risk mitigation exercise, each of the six coils is cooled with liquid nitrogen (LN2) to 80 K to validate predicted thermal stresses, verify the robustness and integrity of electrical insulation, and evaluate the efficacy of the employed conduction cooling method. This paper describes the test setup, the tests performed, and the findings.

Torus, SSC-NbTi, LN2 cold test, FEA, epoxy potting↗

Nb3Sn High Field Magnets for the High Luminosity LHC Upgrade Project

The High Luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11 T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11 T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets.

43 PARTICLE ACCELERATORS↗

11 T Twin-Aperture Nb$_3$Sn Dipole Development for LHC Upgrades

FNAL and CERN are developing a twin-aperture 11 T Nb3Sn dipole suitable for installation in the LHC. This paper describes the design and parameters of the 11 T dipole developed at FNAL for the LHC upgrades in both single-aperture and twin-aperture configurations, and presents details of the constructed dipole models. Results of studies of magnet quench performance, quench protection and magnetic measurements performed using short 1 m long coils in the dipole mirror and single-aperture configurations are reported and discussed.

43 PARTICLE ACCELERATORS↗

Structural Analysis of Thermal Shields During a Quench of a Torus Magnet for the 12 GeV Upgrade

A toroidal magnet system consisting of six superconducting coils is being built for the Jefferson Lab 12- GeV accelerator upgrade project. This paper details the analysis of eddy current effects during a quench event on the aluminum thermal shield. The shield has been analyzed for mechanical stresses induced as a result of a coil quench as well as a fast discharge of the complete magnet system. The shield has been designed to reduce the eddy current effects and result in stresses within allowable limits.

43 PARTICLE ACCELERATORS↗

An Investigation into the Electromagnetic Interactions between a Superconducting Torus and Solenoid for the Jefferson Lab 12 GeV Upgrade

The Jefferson Lab 12 GeV Upgrade in Hall B will need CLAS12 detector that requires two superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a Toroidal configuration (Torus) and the second is an actively shielded solenoidal magnet (Solenoid). Both the torus and solenoid are located in close proximity to one another and are surrounded by sensitive detectors. This paper investigates the electromagnetic interactions between the two systems during normal operation as well as during various fault scenarios as part of a Risk Assessment and Mitigation (RAM).

Torus, actively shielded, Solenoid, SSC-NbTi,Ruthe↗

Electromagnetic and Mechanical Analysis of the Coil Structure for the CLAS12 Torus for 12 GeV Upgrade

The torus magnet for the CLAS12 spectrometer is a 3.6 T superconducting magnet being designed and built as part of the Jefferson Lab 12 GeV Upgrade. The magnet consists of six coil case assemblies mounted to a cold central hub. The coil case assembly consists of an aluminum case and cover enclosing an epoxy vacuum impregnated coil pack. The coil pack consists of a 117 turn double-pancake winding wrapped with 2 layers of 0.635 mm thick copper cooling sheets. The coil case assembly is cooled by supercritical helium at 4.6 K. This report details the structural analysis of the coil case assembly and the assessment of the coil pack stresses. For the normal operation of the torus magnet, the coil case assembly was analyzed for cool down to 4.6 K and the Lorentz forces at normal operating current. In addition to the normal operating configuration, the coil case assembly was analyzed for Lorentz forces arising from coil misalignment and current imbalances. The allowable stress criteria for the magnet followed the approach of the ASME codes. Primary stresses were limited to the lesser of 2/3 times the yield strength or 1/3 times the ultimate tensile strength. Primary plus secondary stresses were limited to 3 times the primary stress allowable. The analysis was performed using ANSYS Maxwell to calculate the magneto-static loads and ANSYS Mechanical to calculate the stresses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

FMEA on the superconducting torus for the Jefferson Lab 12 GeV accelerator upgrade

As part of the Jefferson Lab 12GeV accelerator upgrade project, Hall B requires two conduction cooled superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. Both magnets are to be wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. This paper describes the various failure modes in torus magnet along with the failure modes that could be experienced by the torus and its interaction with the solenoid which is located in close proximity.

43 PARTICLE ACCELERATORS↗

Overview of torus magnet coil production at Fermilab for the Jefferson Lab 12-GeV Hall B upgrade

Fermi National Accelerator Laboratory (Fermilab) fabricated the torus magnet coils for the 12 GeV Hall B upgrade at Jefferson Laboratory (JLab). The production consisted of 6 large superconducting coils for the magnet and 2 spare coils. The toroidal field coils are approximately 2 m x 4 m x 5 cm thick. Each of these coils consists of two layers, each of which has 117 turns of copper-stabilized superconducting cable which will be conduction cooled by helium gas. Due to the size of the coils and their unique geometry, Fermilab designed and fabricated specialized tooling and, together with JLab, developed unique manufacturing techniques for each stage of the coil construction. In conclusion, this paper describes the tooling and manufacturing techniques required to produce the six production coils and two spare coils needed by the project.

43 PARTICLE ACCELERATORS↗