Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TIME SHARING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Quantitative comparison of power production and power quality onshore and offshore: a case study from the eastern United States

Abstract. A major issue in quantifying potential power generation from prospective wind energy sites is the lack of observations from heights relevant to modern wind turbines, particularly for offshore where blade tip heights are projected to increase beyond 250 m. We present analyses of uniquely detailed data sets from lidar (light detection and ranging) deployments in New York State and on two buoys in the adjacent New York Bight to examine the relative power generation potential and power quality at these on- and offshore locations. Time series of 10 min wind power production are computed from these wind speeds using the power curve from the International Energy Agency 15 MW reference wind turbine. Given the relatively close proximity of these lidar deployments, they share a common synoptic-scale meteorology and seasonal variability with lowest wind speeds in July and August. Time series of power production from the on- and offshore location are highly spatially correlated with the Spearman rank correlation coefficient dropping below 0.4 for separation distances of approximately 350 km. Hence careful planning of on- and offshore wind farms (i.e., separation of major plants by > 350 km) can be used reduce the system-wide probability of low wind energy power production. Energy density at 150 m height at the offshore buoys is more than 40 % higher, and the Weibull scale parameter is 2 m s−1 higher than at all but one of the land sites. Analyses of power production time series indicate annual energy production is almost twice as high for the two offshore locations. Further, electrical power production quality is higher from the offshore sites that exhibit a lower amplitude of diurnal variability, plus a lower probability of wind speeds below the cut-in and of ramp events of any magnitude. Despite this and the higher resource, the estimated levelized cost of energy (LCoE) is higher from the offshore sites mainly due to the higher infrastructure costs. Nonetheless, the projected LCoE is highly competitive from all sites considered.

Foody, Rebecca↗

Direct Relationship Between Perceptual and Motor Variability

The time that elapses between stimulus onset and the onset of a saccadic eye movement is longer and more variable than can be explained by neural transmission times and synaptic delays (Carpenter, 1981, in: Eye Movements: Cognition & Visual Perception, Earlbaum). In theory, noise underlying response-time (RT) variability could arise at any point along the sensorimotor cascade, from sensory noise arising Vvithin the early visual processing shared Vvith perception to noise in the motor criterion or commands necessary to trigger movements. These two loci for internal noise can be distinguished empirically; sensory internal noise predicts that response time Vvill correlate Vvith perceived stimulus magnitude whereas motor internal noise predicts no such correlation. Methods. We used the data described by Liston and Stone (2008, JNS 28:13866-13875), in which subjects performed a 2AFC saccadic brightness discrimination task and the perceived brightness of the chosen stimulus was then quantified in a second 21FC perceptual task. Results. We binned each subject's data into quartiles for both signal strength (from dimmest to brightest) and RT (from slowest to fastest) and analyzed the trends in perceived brightness. We found significant effects of both signal strength (as expected) and RT on normalized perceived brightness (both p less than 0.0001, 2-way ANOVA), without significant interaction (p = 0.95, 2-way ANOVA). A plot of normalized perceived brightness versus normalized RT show's that more than half of the variance was shared (r2 = 0.56, P less than 0.0001). To rule out any possibility that some signal-strength related artifact was generating this effect, we ran a control analysis on pairs of trials with repeated presentations of identical stimuli and found that stimuli are perceived to be brighter on trials with faster saccades (p less than 0.001, paired t-test across subjects). Conclusion. These data show that shared early visual internal noise jitters perceived brightness and the saccadic motor output in parallel. While the present correlation could theoretically result, either directly or indirectly, from some low-level brainstem or retinal mechanism (e.g., arousal, pupil size, photoreceptor noise) that influences both visual and oculomotor circuits, this is unlikely given the earlier fin ding that the variability in perceived motion direction and smooth-pursuit motor output is highly correlated (Stone and Krauzlis, 2003, JOV 3:725-736), suggesting that cortical circuits contribute to the shared internal noise.

Liston, Dorion B.↗

Market Pricing and Settlements Analysis Considering Capacity Sharing and Reserve Substitutions of Operating Reserve Products

Electricity market pricing and settlement are the key signals for real-time dispatch and long-term investment decisions. Regional transmission operators (RTOs) in the U.S. adopt uniform pricing scheme, which is based on the marginal costs of supplying an incremental MW of electric services. The marginal cost of an electric service is highly dependent on the constraints in the pricing models of RTOs. A slight difference in constraint modeling of pricing model on energy and ancillary services could result in drastically different market clearing prices (MCPs), cleared reserve quantities, and associated revenue. RTOs in the U.S. have various market designs and assumptions in ancillary services modeling in capacity sharing and reserve substitutes. This paper examines four combination models of capacity sharing and reserve substitutes and analyzes the associated market implications. The numerical results present that 1) cascading reserve requirements have direct impact on reserve pricing schemes 2) both cascading reserve requirements and sharing capacity have significant impact on reserve MCPs and locational marginal prices, and thus result in drastically different reserve revenue, energy revenue, generation cost, and generation profit.

ancillary services↗

The JPL telerobotic Manipulator Control and Mechanization (MCM) subsystem

The Manipulator Control and Mechanization (MCM) subsystem of the telerobot system provides the real-time control of the robot manipulators in autonomous and teleoperated modes and real time input/output for a variety of sensors and actuators. Substantial hardware and software are included in this subsystem which interfaces in the hierarchy of the telerobot system with the other subsystems. The other subsystems are: run time control, task planning and reasoning, sensing and perception, and operator control subsystem. The architecture of the MCM subsystem, its capabilities, and details of various hardware and software elements are described. Important improvements in the MCM subsystem over the first version are: dual arm coordinated trajectory generation and control, addition of integrated teleoperation, shared control capability, replacement of the ultimate controllers with motor controllers, and substantial increase in real time processing capability.

Hayati, Samad↗

Siting and sizing of public–private charging stations impacts on household and electric vehicle fleets

To facilitate the provision of electric vehicle charging stations (EVCS) in urban areas, this study investigates the benefits of co-locating fleet-owned chargers with public charging stations to enable construction incentives and cord-sharing cost savings. Shared EVCS can serve charging demand from both user types: private (household) EV owners and those managing fleet vehicles – like shared and fully automated EV (SAEV) fleets. Using POLARIS to simulate all person-travel across the 6-county Austin, Texas region, new EVCS were sited and sized with DC fast-charging (DCFC) plugs to lower operating and construction costs while providing public + private (PP) service across an 81-square-mile core geofence (where 200 SAEVs were active) over 24-hour days. When co-location is permitted, 115 DCFC cords were added to the 23 existing (publicly available) stations to enable SAEVs and household EVs (HHEVs) charging access, within the geofence. Each 250-mile-range SAEV was simulated to travel an average of 330 miles per day, serve over 92 person-trips, and recharge 2.7 times a day (for 2.4 h per session). The new DCFC plugs were primarily added to public EVCS at shopping centers and schools, and in residential settings along freeways. The average plug served 4.8 EVs per day. Most co-located PP EVCS permitted immediate (no-wait) charging, except for 2 stations along freeways that averaged 8 min of wait time to begin charging. In conclusion, the co-location strategy lowered fleet owners’ initial EVCS construction costs by 12 % (thanks to cord-sharing to avoid cord duplication), while reducing SAEV wait times to just 3.1 min (versus 10.7 min if SAEV managers had to build and operate their own EVCS).

EV charging modeling↗

Scenario-Based Task Design for Airline Pilot Anticipatory Behaviors: Asynchronous Assessment of Complex Cognitive Skills

Airline pilots must anticipate potential threats to passenger safety and efficient flight. Such anticipation needs to occur at both the system and individual levels, yet no formal training for these anticipatory behaviors currently exists. The emerging field of resilience engineering provides a framework to explore this problem. Given the complex nature of this problem, the assessment portion of the project constituted a challenge. Simulator time is expensive as simulators are costly to run, and they are extremely limited in number. Also, by the nature of their work, pilots as a group are hard to connect with in person; thus, asynchronous methods were adopted. Further, to ensure that authentic pilot behaviors were observed, task-based scenarios were used rather than focus group or interview protocols. This session explores the design of asynchronous learning and a measure for assessing pilot anticipatory behaviors outside of a simulator to help design learning opportunities for pilots. The scenario-based and active assessment items will be discussed in detail, and demonstrations of these items will be shared. These items constitute the bulk of the challenge for this work. At the time of this writing, data is being collected to assess the effectiveness of the interactive training module and validate the measures. This data will be analyzed and presented as part of the session. This will include any linkages between the scenario-based and traditional assessment items.

task design↗

The development of performance, interference, sharing and coordination criteria

The criteria for sharing and coordination between the Earth Exploration Satellite service and other radio services is not fully developed at this time. The purpose is to develop a plan showing how the necessary criteria might be developed. Some criteria does exist in the form of general restrictions, protection criteria, and coordination procedures for space and terrestrial services sharing the same bands. Determining suitable criteria for EES bands depends on the use of the band and the shared services. For example the criteria developed for EES passive sensing band will be developed in a manner different than for a telemetry band. In either case the resultant criteria will be related to, and can be referenced from the system noise power or equivalent noise temperature.

Tillotson, Tom↗

Climate Model Diagnostic Analyzer

The comprehensive and innovative evaluation of climate models with newly available global observations is critically needed for the improvement of climate model current-state representation and future-state predictability. A climate model diagnostic evaluation process requires physics-based multi-variable analyses that typically involve large-volume and heterogeneous datasets, making them both computation- and data-intensive. With an exploratory nature of climate data analyses and an explosive growth of datasets and service tools, scientists are struggling to keep track of their datasets, tools, and execution/study history, let alone sharing them with others. In response, we have developed a cloud-enabled, provenance-supported, web-service system called Climate Model Diagnostic Analyzer (CMDA). CMDA enables the physics-based, multivariable model performance evaluations and diagnoses through the comprehensive and synergistic use of multiple observational data, reanalysis data, and model outputs. At the same time, CMDA provides a crowd-sourcing space where scientists can organize their work efficiently and share their work with others. CMDA is empowered by many current state-of-the-art software packages in web service, provenance, and semantic search.

cloud computing↗

Vector-model-supported optimization in volumetric-modulated arc stereotactic radiotherapy planning for brain metastasis

Long planning time in volumetric-modulated arc stereotactic radiotherapy (VMA-SRT) cases can limit its clinical efficiency and use. A vector model could retrieve previously successful radiotherapy cases that share various common anatomic features with the current case. The prsent study aimed to develop a vector model that could reduce planning time by applying the optimization parameters from those retrieved reference cases. Thirty-six VMA-SRT cases of brain metastasis (gender, male [n = 23], female [n = 13]; age range, 32 to 81 years old) were collected and used as a reference database. Another 10 VMA-SRT cases were planned with both conventional optimization and vector-model-supported optimization, following the oncologists' clinical dose prescriptions. Planning time and plan quality measures were compared using the 2-sided paired Wilcoxon signed rank test with a significance level of 0.05, with positive false discovery rate (pFDR) of less than 0.05. With vector-model-supported optimization, there was a significant reduction in the median planning time, a 40% reduction from 3.7 to 2.2 hours (p = 0.002, pFDR = 0.032), and for the number of iterations, a 30% reduction from 8.5 to 6.0 (p = 0.006, pFDR = 0.047). The quality of plans from both approaches was comparable. From these preliminary results, vector-model-supported optimization can expedite the optimization of VMA-SRT for brain metastasis while maintaining plan quality.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nonsingular exponential gravity: A simple theory for early- and late-time accelerated expansion

A theory of exponential modified gravity which explains both early-time inflation and late-time acceleration, in a unified way, is proposed. The theory successfully passes the local tests and fulfills the cosmological bounds and, remarkably, the corresponding inflationary era is proven to be unstable. Numerical investigation of its late-time evolution leads to the conclusion that the corresponding dark energy epoch is not distinguishable from the one for the {Lambda}CDM model. Several versions of this exponential gravity, sharing similar properties, are formulated. It is also shown that this theory is nonsingular, being protected against the formation of finite-time future singularities. As a result, the corresponding future universe evolution asymptotically tends, in a smooth way, to de Sitter space, which turns out to be the final attractor of the system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Inconsistencies between Long-Term Trends in Storminess Derived from the 20CR Reanalysis and Observations

Global atmospheric reanalyses have become a common tool for both validation of climate models and diagnostic studies, such as assessing climate variability and long-term trends. Currently, the Twentieth Century Reanalysis (20CR), which assimilates only surface pressure reports, sea ice, and sea surface temperature distributions, represents the longest global reanalysis dataset available covering the period from 1871 to the present. Currently the 20CR dataset is extensively used for the assessment of climate variability and trends. In this work, the authors compare the variability and long-term trends in northeast Atlantic storminess derived from 20CR and from observations. A well-established storm index derived from pressure observations over a relatively densely monitored marine area is used. It is believed that both variability and long-term trends derived from 20CR and from observations are inconsistent. Specifically, both time series show opposing trends during the first half of the twentieth century: both storm indices share a similar behavior only for the more recent periods. While the variability and long-term trend derived from the observations are supported by a number of independent data and analyses, the behavior shown by 20CR is quite different, indicating substantial inhomogeneities in the reanalysis, most likely caused by the increasing number of observations assimilated into 20CR over time. The latter makes 20CR likely unsuitable for the identification of trends in storminess in the earlier part of the record, at least over the northeast Atlantic. The results imply and reconfirm previous findings that care is needed in general when global reanalyses are used to assess long-term changes.

54 ENVIRONMENTAL SCIENCES↗

Shared Activity Coordination

Interacting agents that interleave planning and execution must reach consensus on their commitments to each other. In domains where agents have varying degrees of interaction and different constraints on communication and computation, agents will require different coordination protocols in order to efficiently reach consensus in real time. We briefly describe a largely unexplored class of real-time, distributed planning problems (inspired by interacting spacecraft missions), new challenges they pose, and a general approach to solving the problems. These problems involve self-interested agents that have infrequent communication but collaborate on joint activities. We describe a Shared Activity Coordination (SHAC) framework that provides a decentralized algorithm for negotiating the scheduling of shared activities in a dynamic environment, a soft, real-time approach to reaching consensus during execution with limited communication, and a foundation for customizing protocols for negotiating planner interactions. We apply SHAC to a realistic simulation of interacting Mars missions and illustrate the simplicity of protocol development.

coordination↗

Parallel discrete event simulation: A shared memory approach

With traditional event list techniques, evaluating a detailed discrete event simulation model can often require hours or even days of computation time. Parallel simulation mimics the interacting servers and queues of a real system by assigning each simulated entity to a processor. By eliminating the event list and maintaining only sufficient synchronization to insure causality, parallel simulation can potentially provide speedups that are linear in the number of processors. A set of shared memory experiments is presented using the Chandy-Misra distributed simulation algorithm to simulate networks of queues. Parameters include queueing network topology and routing probabilities, number of processors, and assignment of network nodes to processors. These experiments show that Chandy-Misra distributed simulation is a questionable alternative to sequential simulation of most queueing network models.

Reed, Daniel A.↗

A Novel Application of Parallel Betweenness Centrality to Power Grid Contingency Analysis

In Energy Management Systems, contingency analysis is commonly performed for identifying and mitigating potentially harmful power grid component failures. The exponentially increasing combinatorial number of failure modes imposes a significant computational burden for massive contingency analysis. It is critical to select a limited set of high-impact contingency cases within the constraint of computing power and time requirements to make it possible for real-time power system vulnerability assessment. In this paper, we present a novel application of parallel betweenness centrality to power grid contingency selection. We cross-validate the proposed method using the model and data of the western US power grid, and implement it on a Cray XMT system - a massively multithreaded architecture - leveraging its advantages for parallel execution of irregular algorithms, such as graph analysis. We achieve a speedup of 55 times (on 64 processors) compared against the single-processor version of the same code running on the Cray XMT. We also compare an OpenMP-based version of the same code running on an HP Superdome shared-memory machine. The performance of the Cray XMT code shows better scalability and resource utilization, and shorter execution time for large-scale power grids. This proposed approach has been evaluated in PNNL’s Electricity Infrastructure Operations Center (EIOC). It is expected to provide a quick and efficient solution to massive contingency selection problems to help power grid operators to identify and mitigate potential widespread cascading power grid failures in real time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SWS Project Relevant Research

Project Overview Tech Challenge 2 - In-Time Safety Management for Emerging Operations - (2018-19) Initial Architecture and Information Req'ts - UTM-like ecosystem; ASIAS/SWIM-like info sharing - Ref: NASA TM-2020-220440 - (2020-2021) Phase 1 - Architecture and SFCs tailored to domain risks - Build collaborations on key topics - (2021-2022) Phase 2 - Services with infrastructure for urban ops - Broader in-time risk assessment span - (2023-2024) Phase 3 - With and by partners - Urban sUAS and AAM/UAM domains

Wind modeling↗

Optimal processor assignment for pipeline computations

The availability of large scale multitasked parallel architectures introduces the following processor assignment problem for pipelined computations. Given a set of tasks and their precedence constraints, along with their experimentally determined individual responses times for different processor sizes, find an assignment of processor to tasks. Two objectives are of interest: minimal response given a throughput requirement, and maximal throughput given a response time requirement. These assignment problems differ considerably from the classical mapping problem in which several tasks share a processor; instead, it is assumed that a large number of processors are to be assigned to a relatively small number of tasks. Efficient assignment algorithms were developed for different classes of task structures. For a p processor system and a series parallel precedence graph with n constituent tasks, an O(np2) algorithm is provided that finds the optimal assignment for the response time optimization problem; it was found that the assignment optimizing the constrained throughput in O(np2log p) time. Special cases of linear, independent, and tree graphs are also considered.

Nicol, David M.↗

Some Aeronautical Communications Experiments

Classically there has existed an asymmetry between the computing and communicating sides of aerospace systems. Over the past few decades, this asymmetry has shifted to favoring communication link technologies, meaning that advancements in available central processing units (CPUs), storage devices, and internal data buses have stagnated. Indeed, the increased emphasis placed on refining subsystem performance such as with antenna bandwidth in phased arrays, amplifier power efficiency, software defined radio (SDR) flexibility and encoding for data compression and error correction has given rise to successful debuts of multi-gigabit-per-second data return from long space-link distances. These accomplishments are easily quantifiable through link budgets and illustrate what is possible, but also reveal the deficiencies in overall communications capabilities. In particular, the ever-accelerating presence of aerospace vehicles gives rise to newer and larger classes of challenges to address the needs of 21st century systems. Furthermore remote sensing and imaging capabilities have far outpaced our ability to transmit their products to the ground, so we are increasingly dependent on pre-processing and downselection to contend with the communications bottleneck. No longer may we depend upon the constrained logistics in delivering end-to-end data delivery through manual reconfigurations, static event scheduling and execution on a per-vehicle basis, for these methods do not scale and therefore must give way to dynamic, networked approaches with an overall systems view in mind. Emerging mission requirements exhibit a trend toward multiple smaller-scale vehicles working together to perform dissimilar observations. Such operations necessitate sensor fusion across a constellation, and where data processing may be distributed throughout a fairly disconnected network whose topology changes over time in non-deterministic manners. Individual communications link performance is still very relevant to deploying an effective communications system, but now must be embedded within a greater architecture of capability to optimally utilize the bandwidth available from each link to generate an ultimate end-to-end quality of service. The deleterious effects of timing uncertainty across the arrangement presents a challenge to measurement synchronization and delivery, so a successful deployed system needs to be tolerant to the delays inherent in time-of-light between elements and digital processing latencies existing at each node. In this presentation we share the flight test results from a high performance Gbps laser communications terminal evaluated with a suite of store and forward capabilities called High-rate Delay Tolerant Networking (HDTN). The communications payload is operated over Lake Erie across a range of configurations including several convergence layers, and is evaluated to determine recovery time after link disruptions, information loss, efficiency and speed. The effectiveness of utilizing a flying laboratory to increase the Technology Readiness Level (TRL) of an integrated system in relevant environments is discussed, as well as the value of conducting aeronautics experiments to retire risk for technology infusion into space missions. Upcoming flight campaigns will be presented, including opportunities to demonstrate secure command and control, data intensive hyperspectral imaging, quantum link characterization, 4k High Definition (HD) video streaming and internetworked space-ground-aero relay operations. These experiments will pave the way for future missions which will depend upon interoperability across disparate government and privately owned networks, involve contention with uncertain and dynamic timing, and require agility to autonomously configure optimal parameters across networks of ever-increasing size and complexity to ensure data delivery. https://www1.grc.nasa.gov/space/scan/acs/tech-studies/dtn/

Daniel Raible↗