Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

A High-Throughput Computing Infrastructure to Generate Custom, Open Community Geothermal Datasets

The most significant challenge facing geothermal research, development, and deployment is a lack of comprehensive datasets describing the geological and economical properties of North America. Automated knowledge base construction, the process of designing algorithms to analyze text and images to programmatically build new datasets, is one possible solution to this problem. The xDD library of full-text scientific articles (https://xdd.wisc.edu) is one of the largest collections of open and controlled-access scientific documents available for knowledge base construction in the world, but it has been underutilized by experts in geothermal research. The xDD development team attributed the lack of engagement by software developers and geothermal researchers to two perceived shortcomings of the system. First, the workflow for obtaining data from xDD for local development and testing of data mining applications was unnecessarily abstruse and required significant manual intervention by xDD systems administrators. Second, although xDD already held articles from a broad cross-section of scientific literature with an emphasis on the geosciences, it did not have an explicit set of geothermal research documents that could serve as the nucleus of a geothermal data mining application. To address these issues, the Automated Data Extraction PlaTform (ADEPT) was proposed to extend the data distribution capabilities of the xDD system. The ADEPT extension added the following four key features to xDD: 1) integration of National Geothermal Data System (NGDS) documents into the xDD library to provide an explicitly geothermally-themed collection; 2) improved RESTful (i.e., https-protocol driven) web services for external partners to access xDD data for machine learning application development; 3) a web platform for end-users and xDD administrators to coordinate the development of data mining applications from the initial step of browsing available documents to the final stage of deploying a production-quality machine learning application on high-throughput computing infrastructure; and 4) the development of demonstration data mining applications to illustrate the new workflow to potential collaborators. A total of 21,674 geothermal documents from NGDS were fully ingested into the xDD library and the associated metadata is publicly available through the xDD web services; furthermore, the ADEPT web platform is now publicly accessible and fully live at https://xdd.wisc.edu/adept/.

15 GEOTHERMAL ENERGY↗

Low-Cost, Easy-To-Integrate and Reliable Grid Energy Storage System with 2 nd Life Lithium Batteries

Batteries retired from electric vehicles have the potential to extend their service as low-cost stationary energy storage systems. However, disperse battery state of health (SOH) and nonuniform battery characters often lead to compromised battery performance and reliability, which greatly hinder their adoption. A Heterogenous Unifying Battery (HUB) system is proposed to stage 2 nd life battery bricks for a period, and enable them to attain improved SOH uniformity, performance, and reliability before being sold for 2 nd life applications, while simultaneously providing grid services. It may offer a technically and economically advantageous solution for the broad utilization of 2 nd use batteries. The goal of this project was to develop the hardware and software that enables the key functions of the HUB system. The first achievement of the project was the development of a 1kW scale proof-of-concept (POC) system, which comprises (i) a modular plug-n-play DC-DC power converter matrix with isolated series output connections to achieve fully independent control of energy flow to each of the connected battery units at low voltage; (ii) enhanced model based control that drives each batteries’ SOH towards uniformity while collectively providing grid energy storage services; and (iii) comprehensive procedures to perform battery diagnostics and prognostics. The second achievement was the development of a 100kW scale HUB system and demonstrated its performance of re-establishing battery SOH uniformity through a period of battery cycling operation. The final HUB system incorporates six DC-DC power converter matrices paired with six battery bricks. Hot swapping of a single battery brick while maintaining consistent system power was demonstrated and system operation was validated to be capable of implementing the approved grid duty cycle and of balancing and conditioning the battery bricks. Through the course of the project, the team optimized the building-block design, form-factors, and adjusted life balancing control. An up-sized 250kW Scale was developed and deployed in October 2022 with pack-level battery form factors, see photo in Figure 1 The third achievement of the project was to perform a techno-economic analysis in order to better understand the cost and revenue potentials in this new “recondition-then-resell" value proposition. The final TEA quantified the economics of new Li-ion batteries as well as second-life batteries processed via reconditioning and traditional binning. Results showed the reconditioned second-life batteries in this project to be economically favorable and viable in grid energy storage markets. The TEA results were published in the Applied Energy journal. The fourth achievement of the project was to deliver a tech-to-market plan for the HUB system that includes funding, IP, and manufacturing strategies. The final T2M plan outlines a business strategy in which the HUB provides a B2B service to EV companies as an alternative to battery recycling that can prepare batteries for 2nd life applications. A company named Smartville Inc. was founded to carry on the commercialization, funding, and technical IP licensing activities of the OPEN project.

25 ENERGY STORAGE↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Igiugig Site Visit Report

The National Renewable Energy Laboratory (NREL) team conducted a site visit during January 23-25, 2019 with the Igiugig Village Council (IVC) and other stakeholders to assist the community of Igiugig in refining their long-term energy strategy. The agenda included a tour of the village, data collection, presentations, long-term visioning exercises, identification of energy scenarios, and a school presentation. Participants in the site visit activities spanned a range of local, regional, government, and industry participation. There were 24 attendees at the all-day community workshop on Thursday, January 24th, with participants from the IVC, NREL, Bristol Bay Native Association (BBNA), Bristol Bay Native Corporation (BBNC), Lake and Peninsula Borough, Alaska Energy Authority, Intergrid, ORPC, Deer Stone Consulting, the Southwest Alaska Municipal Conference, and University of Alaska Fairbanks - Alaska Center for Energy and Power. Igiugig is a well-organized rural Alaskan community, with a leadership team that appears to have broad community support. The use of consensus-based decision making is one tangible example of how the leadership team actively invokes and promotes community-focused thinking. The NREL team observed anecdotal evidence of how this approach seems to be strengthening the community: active participation in the visioning exercise, a student hosted fund-raiser dinner at the school, a clean and organized landfill, and well-maintained roads and buildings. Igiugig has wind, solar, and river hydrokinetic resources readily available within the community. Wind has shown to be a promising resource in the region, and has been integrated into microgrids around the state, but the community has had mixed success with wind technologies: some devices failed quickly and others continue to operate. The economics of solar energy are improving in Alaska, and economical solar projects are being installed around the state. Considering that economic activity in Igiugig peaks during the summer sport fishing season, solar could prove to be a valuable supplement to the electrical system. Igiugig has been a test site for two different river hydrokinetic devices, and they have began a third project to operate ORPC's RivGen device, which is delivering valuable device performance data, operations and maintenance experience, and design refinement information. Already, this device has made over 7-million revolutions, and delivered over 8 MWh of power to the community. Igiugig's river resource is fairly unique because it is available year-round and has the potential to provide reliable base-load power for months at a time. A preliminary investigation of this diverse resource mix suggests that Igiugig could achieve very high levels (70% or more) of annual renewable generation contributions. A critical step in pursuing this path is identifying the mix of energy assets (generation and storage) that best meets the community's budget, needs, and goals. The assets that a community installs early in their grid-modernization initiative can constrain the options that are economical at later stages, which may lead to sub-optimal solutions. This is where technical and economic analysis of potential scenarios (i.e., distinct mixes of energy assets) can be useful in identifying the most promising pathways so that a community can make informed and strategic decisions about the assets they install. These analyses are most accurate and informative when they are based on actual technology performance and cost data. As the RivGen project continues to operate and generate this data, we will be better prepared to evaluate the technology's long-term viability and to identify research areas that would improve it. Igiugig's energy projects are at the cutting edge of two intersecting technology areas: 1) deploying an operational river hydrokinetic turbine, and 2) integrating renewable energy sources to achieve very high percent renewables. If these projects are successful, the lessons learned and technologies developed could be valuable for other microgrids around the world. Igiugig's unique resource mix make it an ideal location for this work, and the community's organizational strength make it an ideal partner in this ground-breaking work. Ongoing support for technical assistance to manage and address technical challenges along the way will maximize the probability of project success.

13 HYDRO ENERGY↗

Particle Size Distributions in Chondritic Meteorites: Evidence for Pre-Planetesimal Histories

Magnesium-rich silicate chondrules and calcium-, aluminum-rich refractory inclusions (CAIs) are fundamental components of primitive chondritic meteorites. It has been suggested that concentration of these early-formed particles by nebular sorting processes may lead to accretion of planetesimals, the planetary bodies that represent the building blocks of the terrestrial planets. In this case, the size distributions of the particles may constrain the accretion process. Here we present new particle size distribution data for Northwest Africa 5717, a primitive ordinary chondrite (ungrouped 3.05) and the well-known carbonaceous chondrite Allende (CV3). Instead of the relatively narrow size distributions obtained in previous studies (Ebel et al., 2016; Friedrich et al., 2015; Paque and Cuzzi, 1997, and references therein), we observed broad size distributions for all particle types in both meteorites. Detailed microscopic image analysis of Allende shows differences in the size distributions of chondrule subtypes, but collectively these subpopulations comprise a composite "chondrule" size distribution that is similar to the broad size distribution found for CAIs. Also, we find accretionary 'dust' rims on only a subset (approximately 15-20 percent) of the chondrules contained in Allende, which indicates that subpopulations of chondrules experienced distinct histories prior to planetary accretion. For the rimmed subset, we find positive correlation between rim thickness and chondrule size. The remarkable similarity between the size distributions of various subgroups of particles, both with and without fine grained rims, implies a common size sorting process. Chondrite classification schemes, astrophysical disk models that predict a narrow chondrule size population and/or a common localized formation event, and conventional particle analysis methods must all be critically reevaluated. We support the idea that distinct "lithologies" in NWA 5717 are nebular aggregates of chondrules. If greater than or equal to centimeter-sized aggregates of chondrules can form it will have implications for planet formation and suggests the sticking stage is where the preferential size physics is operating.

chondritic meteorites↗

Corridor Design and Analysis for UAM Operations

The Urban Air Mobility (UAM) concept is a part of Advanced Air Mobility (AAM), a joint initiative between the Federal Aviation Administration (FAA), NASA, and industry to develop an air transportation system that uses new electric (i.e., green) air vehicles in geographical areas previously underserved by traditional aviation. Market forecast studies predict that there will be demand for alternate modes of air transportation using electric Vertical Take-off and Landing aircraft. UAM expands transportation networks by introducing short flights to move people and goods around metropolitan areas​. UAM is expected to improve mobility for the public, decongest road traffic, reduce trip time, and decrease strain on existing public transportation networks. Various challenges exist to make the introduction of UAM operations successful in the U.S. National Airspace System (NAS). These include but are not limited to integration with existing airports and airspace, provision of air traffic services (e.g., separation), vehicle design and certification, and community acceptance. The focus of this paper is on integration of UAM operations into the NAS via introduction of new airspace structures. UAM will operate within a regulatory, operational, and technical environment that is incorporated into the NAS​. As per the UAM Concept of Operations (ConOps), the FAA retains regulatory authority and is responsible for establishing operational parameters and maintaining oversight. The FAA’s UAM ConOps describes flights at low altitudes (below 5,000 ft) with minimal disruption to established conventional aircraft traffic and limited voice interactions with the Air Traffic Control (ATC). Early stages of UAM may use existing procedures to safely integrate UAM with conventional flights. This would involve flying under Part 91 Visual Flight Rules (VFR) and using voice for communications. The initial UAM ecosystem will utilize the current infrastructure such as routes, helipads, and ATC services, where practicable. ​A NASA study explored the use of existing helicopter routes in Dallas Fort Worth (DFW) airspace for initial UAM operations with a Letter of Agreement (LOA) that included procedures to request a Class B (controlled airspace) clearance. The research showed that the chosen approach was feasible for near-term, low-demand UAM traffic, but was not scalable. The growth of operations in today’s aviation system has resulted in airspace reorganization and procedures to ensure safety and efficiency as traffic rates increase. One proposed operating innovation that can help with the scalability of UAM is establishing routes and corridors. This may look similar to the Area Navigation (RNAV) procedures used today to streamline operations into busy airports. However, instead of FAA automation systems and ATC managing the flow of traffic, some UAM concepts envision a third-party service provider performing this role as part of the Provider of Services for UAM (PSU) network. The FAA’s UAM ConOps posits that new airspace structures such as UAM corridors include the following design criteria: 1) Minimal impact on existing NAS operations, 2) no or minimal additional ATC services, 3) public interest considerations such as noise, safety, and security, and 4) customer needs. The airspace available in urban environments is limited by the height of buildings, the effect of weather including wind gusts, privacy needs, and a clearance envelope. The new airspace structure would need to be designed around large airports and urban areas where the initial market demand is likely to exist. NASA has started evaluating airspace in the Dallas Fort Worth area to design new airspace structures, keeping the first two design criteria in mind. It is assumed that there will be an on-board pilot-in-command, and the flights will operate under VFR in Visual Meteorological Conditions. Corridors will be required in controlled airspace, whereas UAM operations can fly in uncontrolled Class G and E airspace using current day rules. Keeler et. al identified factors and heuristics for development of routes for UAM operations for integration with airspace close to large airports such as Dallas Fort Worth and Dallas Love Field. This paper describes the heuristics applied to define the corridors, analyzes them with respect to legacy traffic and presents key results.

Urban Air Mobility↗

Experiences of Member States in Building a Nuclear Security Infrastructure for New Nuclear Power Programmes

A nuclear power programme has many benefits, but it is a major undertaking that requires careful planning and preparation as well as a substantial investment in time. It also necessitates the establishment of a sustainable national infrastructure with committed and sustained financial and human resources. While nuclear power is not unique in this respect, it is different from other sources of energy because of the risks associated with the use of nuclear material, as well as the need for compliance with international legal instruments, internationally accepted nuclear safety standards, nuclear security guidance, and safeguards requirements. The IAEA’s Milestones in the Development of a National Infrastructure for Nuclear Power, IAEA Nuclear Energy Series No. NG-G-3.1 (Rev. 1), defines a phased approach that identifies 19 infrastructure issues that should be addressed in each of the three phases of the development of a nuclear infrastructure for a nuclear power programme. The publication Evaluation of the Status of National Nuclear Infrastructure Development IAEA Nuclear Energy Series NG-T-3.2 (Rev. 2) provides a methodology to determine the status of the infrastructure conditions covering all 19 issues identified in the Milestones Approach. A companion IAEA Implementing Guide, Establishing the Nuclear Security Infrastructure for a Nuclear Power Programme, IAEA Nuclear Security Series No. 19, provides guidance on the recommended actions to be taken by a State to establish an effective national nuclear security infrastructure for a nuclear power programme using the Milestones Approach. This publication is intended to provide guidance based on the experiences and good practices of Member States with embarking nuclear power programmes as well as Member States that are expanding their nuclear power programmes. The guidance is in the form of case studies, which highlight challenges, issues, and solutions identified by Member States as lessons learned for new nuclear power programmes. This TECDOC is designed to present the experiences of Member States to assist other Member States in developing a nuclear security programme. It addresses the key actions necessary to establish an effective national nuclear security infrastructure for a nuclear power programme consistent with the three phases of the IAEA Milestones Approach. The Member States that provided case studies in this document are at different stages in the development of a nuclear power programme.

42 ENGINEERING↗

Modelica-based system modeling for studying control-related faults in chiller plants and boiler plants serving large office buildings

System modeling is critical when studying operation faults in chiller plants and boiler plants. However, current fault models have difficulties faithfully representing the operation of chiller plants and boiler plants under the effects of those faults, especially the control-related ones. In this study, we present a systematic method to develop high-fidelity models for approximating the behaviors of chiller plants and boiler plants under faulty conditions. Compared to existing ones, the resulting fault models have two advantages: first, they better characterize the dynamic patterns in the system operation. In those models, control architecture and control logic are faithfully implemented. Thus, they can be used to study control-related faults, such as incorrect staging control due to sensor bias and mistuned feedback control. Second, they are readily extensible and can support large-scale investigations to explore different faulty conditions/scenarios. Those models are established in a hierarchical structure while modules in each layer can be redeclared and parameterized at upper layers. In such a case, modifications to the models can be realized through model modifiers and the process can be easily streamlined with scripts. We applied the proposed models in a comprehensive fault impact evaluation of the 13 control-related faults of chiller and boiler plants. In this evaluation, the proposed plant model is coupled with the EnergyPlus thermal load model to study the impact of various faulty scenarios. Based on the evaluation results, we identified the faults that have the most significant impacts on the operation of the chiller and boiler plants, respectively. We also found that the relationship between the impacts of the studied faults and the severity level of the faults are highly non-linear

Huang, Sen↗

Exploring the Moon: Training Astronauts for Artemis Missions

For the first time in over 50 years, NASA scientists are training astronauts assigned to lunar missions. The successful Artemis 1 test flight in 2022 set the stage for future human missions to the Moon. The Artemis II mission will send astronauts to fly by the Moon, providing the first opportunity since Apollo for humans to directly observe and document the lunar surface from a few thousand kilometers, including the lunar far side. Artemis III will be the first human mission to land and explore the Moon’s surface near the lunar South Pole. To prepare for Artemis exploration, geology training for the Artemis II crew and detailed training plans for Artemis III and beyond are in full swing. NASA scientists have been working for several years with the Flight Operations Directorate (FOD) at the Johnson Space Center on a progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader engineering-operations-management community in geology and field operations. In the spring of 2023, our team developed an introductory week-long class called Lunar Fundamentals and delivered this content to the Artemis II crew, as well as key NASA Flight Control Team members. The Lunar Fundamentals curriculum combines basic geographic and geologic information about the Moon; includes detailed content on major geologic processes, the lunar environment, lunar volatiles, and sample science; provides historical context of our growing knowledge about the Moon; and introduces new lunar data sets and tools for exploring the lunar surface. With the Lunar Fundamentals foundation, we continue development of the advanced planetary science classroom content for the Artemis III crew, together with field training science objectives and plans. Partnering with our FOD colleagues, we are building an integrated training plan for lunar science, exploration field methods, and operational skills to ensure that the Artemis astronauts exploring the Moon will have the necessary foundation in geology and lunar science to achieve mission success.

Astronauts training↗

Enhancing NASA Earth Science Data Discovery from Scientific Publications

Earth observations from space borne instruments have evolved explosively in the past decades. Following closely are reanalysis systems assimilating model and observational data, yielding even longer records and larger number of variables. Thanks to advances in internet technology, it is now easier than ever to visualize and analyze these data using web interfaces. On the other hand, it also becomes an increasingly daunting task to build upon the existing knowledge published in various peer reviewed sources, and navigate toward the most relevant data, analysis, and visualization. We present an analysis of a subset of publications that utilized a popular visualization web interface at the NASA Goddard Earth Science Data and Information Services Center. Known as "Giovanni", it allows researchers from wide backgrounds to work with hundreds of variables from space observations and assimilation systems. Since coming online more than a decade ago, Giovanni has been credited in more than 100 papers per year, and the total count now is estimated to be nearly 1,500. Many of these papers contain valuable information about when, where and how Giovanni has been used, and hence forge an opportunity to learn and share the knowledge of which variables were used for what research projects. The purpose of our work is to retrieve the information from the papers and organize it as a knowledge repository which links together datasets, variables, places, dates and phenomena all of which reflect the essence of the published research. Since the publications are unstructured texts, we use natural language processing along with machine learning methods in the retrieval process. One of the challenges is deciphering the dataset names, because in many cases researchers refer to variables, rather than the datasets containing them. To constrain the number of terms, we deploy Earth Science ontologies as dictionaries for the term extraction. We demonstrate that storing these terms and underlying ontologies, along with datasets, variables and papers in the knowledge graph database, enables various linkages between all these entities facilitating the data discovery. Thus, we are setting a qualitatively new stage in improvements of web data interfaces, where machine learning techniques are used to establish and optimize usage-based discovery of data.

Irina V Gerasimov↗

Origins of GEMS Grains

Interplanetary dust particles (IDPs) collected in the Earth s stratosphere contain high abundances of submicrometer amorphous silicates known as GEMS grains. From their birth as condensates in the outflows of oxygen-rich evolved stars, processing in interstellar space, and incorporation into disks around new stars, amorphous silicates predominate in most astrophysical environments. Amorphous silicates were a major building block of our Solar System and are prominent in infrared spectra of comets. Anhydrous interplanetary dust particles (IDPs) thought to derive from comets contain abundant amorphous silicates known as GEMS (glass with embedded metal and sulfides) grains. GEMS grains have been proposed to be isotopically and chemically homogenized interstellar amorphous silicate dust. We evaluated this hypothesis through coordinated chemical and isotopic analyses of GEMS grains in a suite of IDPs to constrain their origins. GEMS grains show order of magnitude variations in Mg, Fe, Ca, and S abundances. GEMS grains do not match the average element abundances inferred for ISM dust containing on average, too little Mg, Fe, and Ca, and too much S. GEMS grains have complementary compositions to the crystalline components in IDPs suggesting that they formed from the same reservoir. We did not observe any unequivocal microstructural or chemical evidence that GEMS grains experienced prolonged exposure to radiation. We identified four GEMS grains having O isotopic compositions that point to origins in red giant branch or asymptotic giant branch stars and supernovae. Based on their O isotopic compositions, we estimate that 1-6% of GEMS grains are surviving circumstellar grains. The remaining 94-99% of GEMS grains have O isotopic compositions that are indistinguishable from terrestrial materials and carbonaceous chondrites. These isotopically solar GEMS grains either formed in the Solar System or were completely homogenized in the interstellar medium (ISM). However, the chemical compositions of GEMS grains are extremely heterogeneous and seem to rule out this possibility. Based on their solar isotopic compositions and their non-solar elemental compositions we propose that most GEMS grains formed in the nebula as late-stage non-equilibrium condensates.

Messenger, S.↗

Accelerating Ocean-Based Renewable Energy Educational Opportunities to Achieve a Clean Energy Future

The United Nations has named 2021–2030 the Decade of Ocean Science for Sustainable Development with goals to 'strengthen the international cooperation needed to develop the scientific research and innovative technologies that can connect ocean science with the needs of society' (IOC 2019 The science we need for the ocean we want: the United Nations decade of ocean science for sustainable development (2021–2030) (Paris) p 24). Important actions that have been identified in support of sustainable development goals include capacity-building, training, and education. This includes educational opportunities for ocean-based renewable energy development in support of a healthy planet and ocean. Offshore wind is experiencing rapid development globally and, while the U.S. offshore wind market is still nascent, it is on the brink of exponential growth based on large cost reductions driven largely by European development and technology advances. Growth is also expected in wave and tidal energy with significant opportunities identified for various distributed markets through the Powering the Blue Economy™ initiative, with longer-term implications for expansion at the utility scale (LiVecchi et al 2019 Powering the blue economy; exploring opportunities for marine renewable energy in maritime markets p 207). In order to expedite progress and maximize benefits to the national, state, and local economies, these development actions will require a broad, diverse, and appropriately trained workforce. The ocean-based renewable energy workforce needs engineers and scientists to develop cost-effective technologies, as well as trade and maritime workers to eventually deploy the technologies at scale. In the United States, educational institutions, state governments, and private developers are taking action to understand job skills and capability requirements and to develop educational and training programs to meet offshore workforce needs; most are focused on offshore wind power, with gaining interest in marine energy. This article explores the workforce requirements of the growing ocean-based renewable energy industry and the current state of education and training programs to meet those requirements in order to identify gaps and make recommendations for further workforce development activities and initiatives. An international view needs to be adopted that incorporates the education and skill needs of early-stage marine energy technologies and evolving offshore wind technologies together with more market-ready offshore renewable energy markets. By accelerating educational development opportunities in ocean-based renewable energy, these growing blue economy markets can deliver significant economic and social benefits.

50 EE - Wind and Water Power Program - Water (EE-4↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

Enhanced Fuel-Optimal Trajectory-Generation Algorithm for Planetary Pinpoint Landing

An enhanced algorithm is developed that builds on a previous innovation of fuel-optimal powered-descent guidance (PDG) for planetary pinpoint landing. The PDG problem is to compute constrained, fuel-optimal trajectories to land a craft at a prescribed target on a planetary surface, starting from a parachute cut-off point and using a throttleable descent engine. The previous innovation showed the minimal-fuel PDG problem can be posed as a convex optimization problem, in particular, as a Second-Order Cone Program, which can be solved to global optimality with deterministic convergence properties, and hence is a candidate for onboard implementation. To increase the speed and robustness of this convex PDG algorithm for possible onboard implementation, the following enhancements are incorporated: 1) Fast detection of infeasibility (i.e., control authority is not sufficient for soft-landing) for subsequent fault response. 2) The use of a piecewise-linear control parameterization, providing smooth solution trajectories and increasing computational efficiency. 3) An enhanced line-search algorithm for optimal time-of-flight, providing quicker convergence and bounding the number of path-planning iterations needed. 4) An additional constraint that analytically guarantees inter-sample satisfaction of glide-slope and non-sub-surface flight constraints, allowing larger discretizations and, hence, faster optimization. 5) Explicit incorporation of Mars rotation rate into the trajectory computation for improved targeting accuracy. These enhancements allow faster convergence to the fuel-optimal solution and, more importantly, remove the need for a "human-in-the-loop," as constraints will be satisfied over the entire path-planning interval independent of step-size (as opposed to just at the discrete time points) and infeasible initial conditions are immediately detected. Finally, while the PDG stage is typically only a few minutes, ignoring the rotation rate of Mars can introduce 10s of meters of error. By incorporating it, the enhanced PDG algorithm becomes capable of pinpoint targeting.

Acikmese, Behcet↗

Energy characteristics of multi-chiller load distribution algorithms in a large office building

Here, this study evaluates the energy efficiency of multi-chiller systems in large office buildings, focusing on their optimization across various climate zones as defined by ASHRAE. Using EnergyPlus for simulations, the research examines five different load distribution algorithms in multi-chiller systems that range from one to ten chillers, aiming to understand their effectiveness in 15 distinct climate zones. The primary objectives of the study include identifying the energy efficiency of multi-chiller systems in each climate zone, determining the appropriate number of chillers for each zone, and evaluating the performance of the load distribution algorithms. Based on the U.S. Department of Energy’s commercial building model, the results suggest that multi-chiller systems can significantly reduce cooling energy consumption in various climates. Among the algorithms evaluated, the Sequential Uniform Part Load Ratio (SUPLR) algorithm demonstrates notable efficiency, especially in the 4A climate zone (Baltimore), where it achieves substantial energy savings. Applying the SUPLR algorithm in a multi-chiller setup with four chillers in this zone leads to an estimated 24.5 % reduction in energy usage, equivalent to 183 MW annually. The research indicates that a range of 3 to 5 chillers is typically optimal for most climate zones. In-depth analysis in the 4A climate zone highlights the importance of minimizing operation hours at low Part Load Ratios (PLR) to ensure that chillers operate at a high Coefficient of Performance (COP). This strategy underscores the potential of well-designed multi-chiller systems to reduce cooling energy demand, particularly in climates with transitional seasons. This study provides an overview of the energy-saving potential of multi-chiller systems, applicable across a variety of climatic scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Development of an Ultrahigh-bandwidth Phase Contrast Imaging System for detection of electron scale turbulence and Gigahertz Radio-Frequency Waves

The study of waves and turbulence is vital to the development of future reactor-grade plasma devices developed in the quest for fusion energy. These fluctuations are responsible for moving heat and particles across the magnetic field, and a predictive understanding of them is needed to achieve the density and temperature required to sustain a plasma fusion reaction. While many techniques have been developed for measuring waves and fluctuations, every measurement method has limitations. There are relatively few techniques for measuring very high frequency fluctuations, such as radio frequency waves injected to heat the plasma, unstable waves driven by suprathermal particles, or short wavelength electrostatic waves driven by electron temperature or density gradients. The present project builds upon the proven phase contrast imaging (PCI) technique to extend the response of the diagnostic by orders of magnitude in frequency and almost a factor of ten in spatial resolution. PCI provides a measurement of electron density based on small angle scattering of a CO-2 laser beam by using optical techniques to render a phase shift as an intensity change on a detector. Due to the telecommunications revolution, technological development by manufacturers has focused on components in the near -infrared, so that high- quality lasers and detectors at 1.55 µm are readily available. Shifting PCI design to a new, shorter wavelength has numerous advantages and challenges. Similar detector performance is available with room-temperature arrays with GHz bandwidth, while the detector arrays for 10.6 µm required liquid nitrogen cooling and were therefore limited to a bandwidth of about 1 MHz. Shifting to a shorter wavelength reduces the angle at which the laser beam scatters off of plasma waves, allowing more such scattered components to pass through the aperture of the vacuum vessel port and be collected by the PCI, which increases the spatial resolution. Concomitant with these benefits, various questions of performance arise. At shorter laser wave- length, the sensitivity to mirror and lens quality is increased, the contribution of the laser to the overall system noise is increased, and the sensitivity to vibrations is increased. The custom optical components at the heart of the PCI technique were required to be properly scaled for the shorter wavelength, so fabrication technologies needed to be explored. This project was designed to show that a low noise, high response PCI system at 1.55 µm could be constructed and operated, and then to quantify potential issues to allow extrapolation to a full-size production system providing physics measurements on a large plasma device. The first stage, producing the custom optical component called a Phase Plate, was successfully achieved using two methods. First, an easily reproduced masking and coating technique was able to produce good phase plates with the required parameters. Second, a nanofabrication technique was found to produce extremely high quality phase plates at a competitive price. The PCI constructed with the new phase plates and 1.55 µm laser was found to provide excellent wavelength measurements with the theoretically expected response. The sensitivity to optical surface quality was found to be in line with previous measurements at 10.6 µm. The observed signal-to-noise ratio was similar to the theoretically expected value. The effect of vibrations on PCI was studied with the first measurement of the effect of beam motion on PCI response and comparison to theory, allowing for a quantitative prediction of the effect of vibrations on a production PCI system and the requirements for improved beam stabilization. PCI is an extremely cost-effective method to provide a low noise, absolutely calibrated measurement of plasma fluctuations across a wide spatial scale. This project has shown that a 1.55 µm PCI using modern techniques and components is less expensive than the 10.6 µm PCI of a few years ago, with the largest savings in phase plate fabrication and the infrared detector array.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗