Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scientific Programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Year Two of Cruise to Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total (Delta)V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits.

Garner, Charles E.↗

HRP Chief Scientist's Office: Conducting Research to Enable Deep Space Exploration

The HRP Chief Scientist's Office sets the scientific agenda for the Human Research Program. As NASA plans for deep space exploration, HRP is conducting research to ensure the health of astronauts, and optimize human performance during extended duration missions. To accomplish this research, HRP solicits for proposals within the U.S., collaborates with agencies both domestically and abroad, and makes optimal use of ISS resources in support of human research. This session will expand on these topics and provide an opportunity for questions and discussion with the HRP Chief Scientist. Presentations in this session will include: NRA solicitations - process improvements and focus for future solicitations, Multilateral Human Research Panel for Exploration - future directions (MHRPE 2.0), Extramural liaisons - National Science Foundation (NSF) and Department of Defense (DOD), Standardized Measures for spaceflight, Ground-based Analogs - international collaborations, and International data sharing.

Charles, J. B.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

40 Years of Collecting Martian Meteorites

This year marks the 40th anniversary of the first Martian meteorite found in Antarctica by ANSMET, ALH 77005. Since then, an additional 14 Martian meteorites have been found by the ANSMET team making for a total of 15 Martian meteorites in the Antarctic collection at Johnson Space Center. Of the 15 meteorites, some have been paired so the 15 meteorites actually represent a total of approximately 9 separate meteorites. The first Martian meteorite found by ANSMET was ALH 77005 (482.500 g), a lherzolitic shergottite. When collected, this meteorite was split as a part of the joint expedition with the National Institute of Polar Research (NIPR) Japan. Originally classified as an "achondrite-unique", it was re-classified as a Martian lherzolitic shergottites in 1982 [1]. This meteorite has been allocated to ~125 scientists for research and there are 181.964 g remaining at Johnson Space Center (JSC). Two years later, one of the most significant Martian meteorites of the collection at JSC was found at Elephant Moraine, EET 79001 (7942.000 g), a shergottite. This meteorite is the largest in the Martian collection at JSC and was the largest stony meteorite sample collected during the 1979 season. In addition to its size, this meteorite is of particular interest because it contains a linear contact separating two different igneous lithologies, basaltic and olivine-phyric. EET 79001 has glass inclusions that contain chemical compositions that are proportionally identical to the Martian atmosphere, as measured by the Viking spacecraft [2]. This discovery helped scientists to identify where the "SNC" meteorite suite had originated, and that we actually possessed Martian samples. This meteorite has been allocated to ~195 scientists for research and there are 5304.770 g of sample is available. Five years later, ANSMET found ALH 84001 (1930.900 g), the only Martian orthopyroxenite. This meteorite was initially classified as a diogenite but was reclassified as being a Martian meteorite in 1993 [3,4]. ALH 84001 is known as the "Life on Mars" meteorite, sparked debate about whether it contained evidence of Martian life [5] and significantly influenced the field of astrobiol-ogy. This sample has been allocated to 173 scientists for research and has 1426.694 g remaining at JSC. In 1988, another lherzolitic shergottite was found, LEW 88516, (13.203 g). This meteorite wasn't recognized in the field as an achondrite until it was broken during processing 2 years later. LEW 88516 has been allocated to 43 scientists for research and 5.351 g of this meteorite remains at JSC. Six years later a basaltic shergottite was found in the Queen Alexandra Range, QUE 94201 (12.020 g). This meteorite was believed to be of terrestrial origin until maskelynite was seen in a thin section. QUE 94201 has been allocated to 57 scientists for research and there are 3.629 g of this meteorite left at JSC. In 2003, the NASA Mars Exploration Program joined the ANSMET team with the hopes of finding another Martian mete-orite. During this expedition, MIL 03346 (715.200 g) was found. This meteorite is a nakhlite. MIL 03346 has been allocated to 98 scientists for research and there are 579.046 g of this sample remaining at JSC. Six years later, 3 more meteorites that have been paired with MIL 03346 were found, MIL 090030 (452.630 g), 090032 (532.190 g ) and 090136 (170.980 g). MIL 090030 has been allocated to 21 scientists for research and has 434.420 g remaining at JSC, MIL 090032 has been allocated to 21 scientists for re-search and has 508.710 g remaining at JSC and MIL 090136 has been allocated to 14 scientists for research and has 156.790 g remaining at JSC. During the 2004 expedition, 2 identical meteorites where found together on the ice, RBT 04261 (78.763 g) and RBT 04262 (204.600 g). These paired meteorites are olivine-phyric shergottites. RBT 04261 has been allocated to 33 scientists for research and has 32.335 g remaining at JSC. RBT 04262 has been allocated to 46 scientists for research and has 171.886 g remaining. In 2006, another olivine-phyric shergottite was found, LAR 06319 (78.572 g). This meteorite has 61.414 g remaining at JSC and has been allocated to 39 scientists for research. During the 2012 season, 3 more olivine-phyric shergottites were found at Larkman Nunatak, LAR 12011 (701.170 g), LAR 12095 (133.132 g) and LAR 12240 (57.596 g). LAR 12011 is paired with LAR 06319 and LAR 12095 and LAR 12240 are paired with each other. LAR 12011 has been allocated to 43 scientists for research and there are 685.778 g of LAR 12011 remaining at JSC. LAR 12095 has been allocated to 18 scientists for research and has 119.744 g remaining at JSC. LAR 12240 has been allocated to 10 scientists for research and has 52.231 g remaining at JSC. Martian meteorites are the only samples available from Mars because no mission has returned samples from there to date. All Martian meteorites are crustal rocks with most of them being crystallized magmas, so they are an important source for under-standing Martian geological history and volcanism. The ANSMET program has greatly contributed to the scientific community by collecting these meteorites

Funk, R. C.↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

The Twin Decadal Survey Testbeds in the High Contrast Imaging Testbed facility at NASA’s Jet Propulsion Laboratory

Direct imaging of an Earth-like exoplanet will require future missions, such as the proposed HabEx or LUVOIR concepts, to achieve starlight suppression with planet/star contrast ratios on the order of 10−10 at angular separations <100 milliarcseconds in visible wavelengths. To facilitate the technology and algorithm development required to enable this ambitious scientific goal, NASA’s Exoplanet Exploration Program (ExEP) High Contrast Imaging Testbed (HCIT) facility at the Jet Propulsion Laboratory (JPL) recently commissioned the Decadal Survey Testbed (DST), a state-of-the-art, flexible, and extremely stable coronagraph testbed. This testbed integrates years of experience and lessons learned at HCIT and has now demonstrated contrast ratios as low as few times 10−10 in 10% bandwidth. Following the success of DST, the HCIT team has developed a companion testbed, the Decadal Survey Testbed 2 (DST2) that further implements lessons learned from DST, and will provide the HCIT with additional coronagraph testbed capacity and efficiency. Commissioning for DST2 is currently targeted for Fall 2021. Here we provide an update on the status of DST, and report on the design, performance modeling simulations, and status of integration and testing for DST2, highlighting updates to the design from the original DST.

Siegler, Nick↗

Investigation of solar active regions at high resolution by balloon flights of the solar optical universal polarimeter, definition phase

The definition phase of a scientific study of active regions on the sun by balloon flight of a former Spacelab instrument, the Solar Optical Universal Polarimeter (SOUP) is described. SOUP is an optical telescope with image stabilization, tunable filter and various cameras. After the flight phase of the program was cancelled due to budgetary problems, scientific and engineering studies relevant to future balloon experiments of this type were completed. High resolution observations of the sun were obtained using SOUP components at the Swedish Solar Observatory in the Canary Islands. These were analyzed and published in studies of solar magnetic fields and active regions. In addition, testing of low-voltage piezoelectric transducers was performed, which showed they were appropriate for use in image stabilization on a balloon.

Tarbell, Theodore D.↗

Program Aids Specification Of Multiple-Block Grids

3DPREP computer program aids specification of multiple-block computational grids. Highly interactive graphical preprocessing program designed for use on powerful graphical scientific computer workstation. Divided into three main parts, each corresponding to principal graphical-and-alphanumerical display. Relieves user of some burden of collecting and formatting many data needed to specify blocks and grids, and prepares input data for NASA's 3DGRAPE grid-generating computer program.

Sorenson, R. L.↗

NASA Microgravity Combustion Science Program

Combustion has been a subject of increasingly vigorous scientific research for over a century, not surprising considering that combustion accounts for approximately 85% of the world's energy production and is a key element of many critical technologies used by contemporary society. Although combustion technology is vital to our standard of living, it also poses great challenges to maintaining a habitable environment. A major goal of combustion research is production of fundamental (foundational) knowledge that can be used in developing accurate simulations of complex combustion processes, replacing current "cut-and-try" approaches and allowing developers to improve the efficiency of combustion devices, to reduce the production of harmful emissions, and to reduce the incidence of accidental uncontrolled combustion. With full understanding of the physics and chemistry involved in a given combustion process, including details of the unit processes and their interactions, physically accurate models which can then be used for parametric exploration of new combustion domains via computer simulation can be developed, with possible resultant definition of radically different approaches to accomplishment of various combustion goals. Effects of gravitational forces on earth impede combustion studies more than they impede most other areas of science. The effects of buoyancy are so ubiquitous that we often do not appreciate the enormous negative impact that they have had on the rational development of combustion science. Microgravity offers potential for major gains in combustion science understanding in that it offers unique capability to establish the flow environment rather than having it dominated by uncontrollable (under normal gravity) buoyancy effects and, through this control, to extend the range of test conditions that can be studied. It cannot be emphasized too strongly that our program is dedicated to taking advantage of microgravity to untangle complications caused by gravity, allowing major strides in our understanding of combustion processes and in subsequent development of improved combustion devices leading to improved quality of life on Earth. Fire and/or explosion events aboard spacecraft could be devastating to international efforts to expand the human presence in space. Testing to date has shown that ignition and flame spread on fuel surfaces (e.g., paper, wire insulation) behave quite differently under partial gravity and microgravity conditions. In addition, fire signatures-i.e., heat release, smoke production, flame visibility, and radiation-are now known to be quite different in reduced gravity environments; this research has provided data to improve the effectiveness of fire prevention practices, smoke and fire detectors, and fire extinguishment systems. The more we can apply our scientific and technological understanding to potential fire behavior in microgravity and partial gravity, the more assurance can be given to those people whose lives depend on the environment aboard spacecraft or eventually on habitats on the Moon or Mars.

King, Merrill K.↗

The NASA Life Sciences experiment program for Shuttle/Spacelab

The Life Sciences experiment program for the Shuttle/Spacelab has basically two scientific objectives. The first objective is related to an understanding and interpretation of the medical data from Skylab. The second objective is concerned with a utilization of the space environment, notably the very low g field, as an experimental variable in a broad range of fundamental studies. The program considered will use the pressurized module, almost exclusively, and will aim toward the greatest investigator participation in flight that is possible. Facilities must be provided to support such requirements as tissue biopses, blood, urine and tissue collections, and microbial and plant manipulations.

Winter, D.↗

Processing TES Level-1B Data

TES L1B Subsystem is a computer program that performs several functions for the Tropospheric Emission Spectrometer (TES). The term "L1B" (an abbreviation of "level 1B"), refers to data, specific to the TES, on radiometric calibrated spectral radiances and their corresponding noise equivalent spectral radiances (NESRs), plus ancillary geolocation, quality, and engineering data. The functions performed by TES L1B Subsystem include shear analysis, monitoring of signal levels, detection of ice build-up, and phase correction and radiometric and spectral calibration of TES target data. Also, the program computes NESRs for target spectra, writes scientific TES level-1B data to hierarchical- data-format (HDF) files for public distribution, computes brightness temperatures, and quantifies interpixel signal variability for the purpose of first-order cloud and heterogeneous land screening by the level-2 software summarized in the immediately following article. This program uses an in-house-developed algorithm, called "NUSRT," to correct instrument line-shape factors.

DeBaca, Richard C.↗

Specification, space station program (modular)

The modular concepts of a long-term manned scientific laboratory in earth orbit using the space shuttle for orbital buildup and logistics delivery are presented. The specifications defining the performance, design and verification requirements for the Modular Space Program are included.

Source record↗

NASA-ESA Mars Sample Return Program

NASA's Perseverance mission arrived at Jezero Crater on Mars in February 2021 and began scientific studies and acquisition of Martian samples for return to Earth by future missions, consistent with the recommendations of the U.S. science community in the previous Planetary Science Decadal Survey. NASA and ESA have established a joint Mars Sample Return (MSR) program to safely deliver these samples back to Earth, allowing researchers to use advanced scientific instrumentation that cannot be transported on robotic spacecraft and enable future studies of carefully curated samples using capabilities that have not yet been developed. The MSR architecture consists of two flight elements to follow Perseverance, the NASA-led Sample Retrieval Lander (SRL) and the ESA-led Earth Return Orbiter (ERO). The ERO is designed to orbit Mars and provide relay services for the SRL, including its ESA Sample Fetch Rover (SFR) and the NASA Mars Ascent Vehicle (MAV). The SRL deploys the SFR to retrieve Martian samples cached by the Perseverance rover and then returns the samples to the Orbiting Sample container (OS) on board the MAV using the ESA Sample Transfer Arm (STA). Independently, Perseverance could also deliver samples retained onboard to the OS. The MAV would launch and release the OS into low Mars orbit for rendezvous with the ERO. Upon successful capture of the OS in the ERO’s primary payload, the NASA Capture/Containment Return System (CCRS), the OS would be safely contained and loaded into the Earth Entry System (EES). The ERO will leave Mars orbit and release the EES on Earth approach on a ballistic reentry trajectory through the Earth's atmosphere for landing in the United States. Following return of the samples to Earth, the samples would be protected, preserved, assessed, curated, and made available to the international science community for scientific research and analysis. The NASA SRL and ESA ERO missions are expected to launch as early as 2026, with the return of Martian samples to Earth as early as 2031. MSR’s primary objective is the return of scientifically selected Mars samples for detailed investigation in terrestrial laboratories. The mission would also further inform the design of future human missions. The Mars Sample Return campaign is underway with the successful collection of several scientifically selected samples in Jezero Crater. The MSR Program is working towards a confirmation review in 2023 for the remaining flight elements.

Mars↗

Astronomy Aid

As a Jet Propulsion Laboratory astronomer, John D. Callahan developed a computer program called Multimission Interactive Planner (MIP) to help astronomers analyze scientific and optical data collected on the Voyager's Grand Tour. The commercial version of the program called XonVu is published by XonTech, Inc. Callahan has since developed two more advanced programs based on MIP technology, Grand Tour and Jovian Traveler, which simulate Voyager and Giotto missions. The software allows astronomers and space novices to view the objects seen by the spacecraft, manipulating perspective, distance and field of vision.

Source record↗

Ocean-Atmosphere Interaction in Climate Changes

The diagram, which attests the El Nino teleconnection observed by the NASA Scatterometer (NSCAT) in 1997, is an example of the results of our research in air-sea interaction - the core component of our three-part contribution to the Climate Variability Program. We have established an interplay among scientific research, which turns spacebased data into knowledge, a push in instrument technology, which improves observations of climate variability, and an information system, which produces and disseminates new data to support our scientific research. Timothy Liu led the proposal for advanced technology, in response to the NASA Post-2002 Request for Information. The sensor was identified as a possible mission for continuous ocean surface wind measurement at higher spatial resolution, and with the unique capability to measure ocean surface salinity. He is participating in the Instrument Incubator Program to improve the antenna technology, and is initiating a study to integrate the concept on Japanese missions. He and his collaborators have set up a system to produce and disseminate high level (gridded) ocean surface wind/stress data from NSCAT and European missions. The data system is being expanded to produce real-time gridded ocean surface winds from Quikscat, and precipitation and evaporation from the Tropical Rain Measuring Mission. It will form the basis for a spacebased data analysis system which will include momentum, heat and water fluxes. The study on 1997 El Nino teleconnection illustrates our interdisciplinary and multisensor approach to study climate variability. The diagram shows that the collapse of trade wind and the westerly wind anomalies in the central equatorial Pacific led to the equatorial ocean warming. The equatorial wind anomalies are connected to the anomalous cyclonic wind pattern in the northeast Pacific. The anomalous warming along the west coast of the United States is the result of the movement of the pre-existing warm sea surface temperature anomalies with the cyclonic wind anomalies toward the coast. The results led to a new study which identifies decadal ocean variations in the Northeast Pacific. Three studies of oceanic responses to wind forcing caused by the seasonal change of monsoons, the passage of a typhoon, and the 1997 El Nino, were successfully conducted. Besides wind forcing, we continue to examine new techniques for estimating thermal and hydrologic fluxes, through the inverse ocean mixed-layer model, through divergence of atmospheric water transport, and by direct retrieval from radiances observed by microwave radiometers. Greenhouse warming has been linked to water vapor measured by two spaceborne sensors in two studies. In the first study, strong baroclinicity and deep convection were found to transport water vapor to the upper atmosphere and increase greenhouse trapping over the storm tracks of the North Pacific and Atlantic. In another study, the annual cycle of greenhouse warming were related to sea surface temperature (SST) and integrated water vapor, and the latitudinal dependence of the magnitudes and phases of the annual cycles were compared.

Liu, W. Timothy↗