Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

schedule↗

Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Interaction Between Strategic and Local Traffic Flow Controls

The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

Grabbe, Son↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Multiple-Purpose Subsonic Naval Aircraft (MPSNA) Multiple Application Propfan Study (MAPS)

A conceptual design study compared a selected propfan-powered aircraft to a turbofan-powered aircraft for multiple Navy carrier-based support missions in the 1995 timeframe. Conventional takeoff and landing (CTOL) propfan and turbofan-powered designs and short takeoff/vertical landing (STOVL) propfan-powered designs are presented. Ten support mission profiles were defined and the aircraft were sized to be able to perform all ten missions. Emphasis was placed on efficient high altitude loiter for Airborne Early Warning (AEW) and low altitude high speed capability for various offensive and tactical support missions. The results of the study show that the propfan-powered designs have lighter gross weights, lower fuel fractions, and equal or greater performance capability than the turbofan-powered designs. Various sensitives were developed in the study, including the effect of using single-rotation versus counter-rotation propfans and the effect of AEW loiter altitude on vehicle gross weight and empty weight. A propfan technology development plan was presented which illustrates that the development of key components can be achieved without accelerated schedules through the extension of current and planned government and civil propfan programs.

Winkeljohn, D. M.↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

Source record↗

DSIF station schedules

System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

Flarity, L. D.↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Platform Management System (PMS) evolution

In fiscal year 1988 a study was begun to define the platform management system (PMS) functions required for the mature platform operations era. The objectives of the task include: (1) defining how to increase the operational productivity of the platform by providing enhanced capability for responding to changing events, (2) influencing the initial PMS design by identifying required 'hooks and scars', and (3) evaluation potential automation techniques that are appropriate given predicted onboard computing resources. Initial platform operations scenarios were defined. The focus was on PMS-related functions where operations enhancements are likely to occur. Operations productivity was defined in terms of scientific productivity of the platform as well as the level of automation of the ground system. The Platform Operations Productivity Enhancement Report was completed earlier this year documenting system enhancements to increase science productivity and ground system automation. Using the baseline PMS defined in the PMS Definition Document as a starting point, the resulting PMS-specific enhancements were molded into a sequence of progressively more sophisticated operations management capabilities. This sequence of upgrades to the PMS has been documented in a PMS Evolution Plan. The plan includes enhancements in the areas of resources scheduling, resource modeling, system and payload anomaly management, and transaction sequence interpretation. A plan for migration of functions from the ground portion of the PMS to the flight portion is also included. The impacts of this plan on the platform are now being documented to ensure that the required 'hooks and scars' are included in the baseline system. Future plans include a prototype of some of the PMS enhancements to address the feasibility of and techniques for implementing these enhancements in the onboard computing environment.

Tilley, Mike↗

PLAN-IT - Knowledge-based mission sequencing

PLAN-IT (Plan-Integrated Timelines), a knowledge-based approach to assist in mission sequencing, is discussed. PLAN-IT uses a large set of scheduling techniques known as strategies to develop and maintain a mission sequence. The approach implemented by PLAN-IT and the current applications of PLAN-IT for sequencing at NASA are reported.

Biefeld, Eric W.↗

Modeling and Optimization Methods for Controlling and Sizing Grid-connected Energy Storage: A Review

Purpose of Review Energy storage is capable of providing a variety of services and solving a multitude of issues in today's rapidly evolving electric power grid. This paper reviews recent research on modeling and optimization methods for optimally controlling and sizing grid-connected battery energy storage systems (BESSs). Open issues and promising research directions are discussed. Recent Findings Recent studies on BESS dispatch, evaluation, and sizing focus on advanced modeling and optimization methods to maximize stacked value streams from multiple services. BESS models have been improved to better represent operational characteristics or capture degradation effects. Different solution methods and optimization techniques have been proposed to improve the benefits and cost-effectiveness of BESSs, using deterministic approaches prevalently but with impressive progress in capturing and addressing uncertainties. Summary Recent progress in BESS scheduling and sizing better supports planning and operational decision-making in different use cases, which is highly important to advance the deployment of BESSs. Additional research is required to properly model the trade-off between short-term benefits and service life with multiple degradation effects explicitly considered in the decision-making process. Advanced methods are to be developed for effectively determining optimal BESS sizes that maximize overall benefits within a varying lifetime considering diversified system, conditions as well as uncertainties at planning and operational stages.

Wu, Di↗

Nationwide HVAC Energy-Saving Potential Quantification for Office Buildings with Occupant-Centric Controls in Various Climates

The occupant-centric control (OCC) is receiving an increasing attention due to its ability to reduce building heating ventilation and air-conditioning (HVAC) system energy consumptions while not affecting the occupant thermal comfort. This paper aims to investigate and quantify the nationwide energy-saving potential of implementing the occupant-centric HVAC controls in typical office buildings using a whole building simulation software EnergyPlus. First, the medium office and large office from the Department of Energy (DOE) Commercial Prototype Building Models (CBPM) were enhanced to have detailed layouts and dynamic occupancy schedules. Then, a comprehensive simulation plan was created by incorporating the multiple zone-level and system-level occupant-centric building HVAC controls recommended by the updated ASHRAE Standard 90.1 – 2019 and ASHRAE Guideline 36 – 2018. Three control scenarios with different occupancy sensing methods were identified in this simulation plan. A nation-wide parametric analysis which includes two building types, three occupancy sensing scenarios, two building code versions, and 16 U.S. climate zones was carried out. The simulation results of the key control variables and HVAC energy consumption suggest that generally, both the occupancy presence sensor and occupant counting sensor could achieve energy savings for the office buildings in majority of the scenarios. However, compared with the occupancy presence sensor, which could support both the temperature setpoint reset and operational breathing zone airflow rate reset for the unoccupied zones, the occupant counting sensor only brings a marginal benefit. Besides, a higher HVAC energy-saving ratio could be achieved in the heating-dominated zone, since the energy reduction brought with the minimum outdoor airflow rate reset is stronger in the heating mode.

Pang, Zhihong↗

Modeling evacuation demand during no-notice emergency events: Tour formation behavior

Disastrous events have been drastically increasing – both in frequency and destructive capacity – over the past few years. While advance-notice events have received a great deal of attention in the literature of disaster management, not much attention so far has been given to the no-notice events mainly because of the scarcity of data. As an attempt to address this critical gap, the current study proposes a disaggregate evacuation demand framework to understand evacuees’ travel behavior in case of no-notice emergency events. Here, the proposed framework comprises four main steps of evacuation decision, evacuation planning, tour formation, and activity schedule update. This article is dedicated to the introduction of the framework structure and elaboration on the tour formation step. In this step, we first estimate the total number of intermediate stops, travel time, and distance of the evacuation tours for those who decide to evacuate through a joint modeling structure and then, determine the type of each intermediate stop (if any). It is found that a broad range of factors including evacuees’ demographic profiles, built-environment attributes, and characteristics of the disastrous event plays a significant role in people’s evacuation behavior during no-notice emergency events. The findings of this study can assist responsible agencies in understanding evacuees’ complex behavior, and consequently, in devising effective strategies to alleviate economic damages and casualties resulted by such events.

99 GENERAL AND MISCELLANEOUS↗

ALTRIOS (Advanced Locomotive Technology and Rail Infrastructure Optimization System) [SWR-22-54]

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool to evaluate strategies for deploying advanced locomotive technologies and associated infrastructure for cost-effective decarbonization. ALTRIOS simulates freight-demand driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward tradeoffs of different technology rollout strategies. An open, integrated simulation tool is invaluable for identifying future research needs and making decisions on technology development, routes, and train selection. ALTRIOS was developed as part of a collaborative effort by a team comprising the National Renewable Energy Laboratory (NREL), University of Illinois Urbana-Champaign (UIUC), Southwest Research Institute (SwRI), and BNSF Railway. Python Package: https://pypi.org/project/altrios/ Rust Crate: https://crates.io/crates/altrios-core

Baker, Chad↗

Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems

For critical infrastructure restoration planning, the real-time scheduling and coordination of system restoration efforts, the key in decision-making is to prioritize those critical components that are out of service during the restoration. For this purpose, there is a need for component importance analysis. While it has been investigated extensively for individual systems, component importance considering interdependence among transmission, distribution and communication (T&D&C) systems has not been systematically analyzed and widely adopted. In this study, we propose a component importance assessment method in the context of interdependence between T&D&C networks. Analytic methods for multilayer networks and a set of metrics have been applied for assessing the component importance and interdependence between T&D&C networks based on their physical characteristics. The proposed methodology is further validated with integrated synthetic Illinois regional transmission, distribution, and communication (T&D&C) systems, the results reveal the unique characteristics of component/node importance, which are strongly affected by the network topologies and cross-domain node mapping.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Options for Subscale Maturation of Advanced Reactor Technologies Testing for Nuclear Thermal Propulsion

Several options could be implemented to establish an irradiation testing capability suitable for investigation of the performance of multiple nuclear thermal propulsion fuel elements at prototypic conditions. The prototypic conditions of interest are based on the current needs of the National Aeronautics and Space Administration’s Space Nuclear Power Program. The results of such testing are also intended to reduce the risks currently seen for any future subscale or full-scale ground testing of an engine-reactor system. The optimal solution is dependent upon several factors such as performance, cost, availability, schedule, technology readiness level, and plans for future testing in the SNP Program. Three options, based on different combinations of these factors, are considered in this report.

33 ADVANCED PROPULSION SYSTEMS↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗