Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

MPLM On-Orbit Interface Dynamic Flexibility Modal Test

Now that the International Space Station (ISS) is being constructed, payload developers have to not only verify the Shuttle-to-payload interface, but also the interfaces their payload will have with the ISS. The Multi Purpose Logistic Module (MPLM) being designed and built by Alenia Spazio in Torino, Italy is one such payload. The MPLM is the primary carrier for the ISS Payload Racks, Re-supply Stowage Racks, and the Resupply Stowage Platforms to re-supply the ISS with food, water, experiments, maintenance equipment and etc. During the development of the MPLM there was no requirement for verification of the on-orbit interfaces with the ISS. When this oversight was discovered, all the dynamic test stands had already been disassembled. A method was needed that would not require an extensive testing stand and could be completed in a short amount of time. The residual flexibility testing technique was chosen. The residual flexibility modal testing method consists of measuring the free-free natural frequencies and mode shapes along with the interface frequency response functions (FRF's). Analytically, the residual flexibility method has been investigated in detail by, MacNeal, Martinez, Carne, and Miller, and Rubin, but has not been implemented extensively for model correlation due to difficulties in data acquisition. In recent years improvement of data acquisition equipment has made possible the implementation of the residual flexibility method as in Admire, Tinker, and Ivey, and Klosterman and Lemon. The residual flexibility modal testing technique is applicable to a structure with distinct points (DOF) of contact with its environment, such as the MPLM-to-Station interface through the Common Berthing Mechanism (CBM). The CBM is bolted to a flange on the forward cone of the MPLM. During the fixed base test (to verify Shuttle interfaces) some data was gathered on the forward cone panels. Even though there was some data on the forward cones, an additional modal test was performed to better characterize its behavior. The CBM mounting flange is the only remaining structure of the MPLM that no test data was available. This paper discusses the implementation of the residual flexibility modal testing technique on the CBM flange and the modal test of the forward cone panels.

Bookout, Paul S.↗

Development Issues for Lunar Regolith Simulants

Significant challenges and logistical issues exist for the development of standardized lunar regolith simulant (SLRS) materials for use in the development and testing of flight hardware for upcoming NASA lunar missions. A production program at Marshall Space Flight Center (MSFC) for the deployment of lunar mare basalt simulant JSC-lA is underway. Root simulants have been proposed for the development of a low-T mare basalt simulant and a high-Ca highland anorthosite simulant, as part of a framework of simulant development outlined in the 2005 Lunar Regolith Simulant Materials Workshop held at MSFC. Many of the recommendation for production and standardization of simulants have already been documented by the MSFC team. But there are a number of unanswered questions related to geology which need ta be addressed prior to the creation of the simulants.

Rickman, Doug↗

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Opportunities and Strategies for Testing and Infusion of ISRU in the Evolvable Mars Campaign

HE Evolvable Mars Campaign (EMC) is developing the plans and systems needed for a robust, evolutionary strategy to explore cis-lunar space, the Mars sphere of influence (including the moons of Mars), and the surface of Mars. Recently, the emphasis of NASA's plans has changed to focus on the prolonged pioneering of space, rather than focusing on a single crewed mission as the ultimate goal. A sustainable, pioneering vision of space would include in-situ resource utilization (ISRU) in multiple forms and at multiple destinations: atmospheric capture of Mars CO2 and/or volatiles for consumables and propellants, regolith for bulk and refined materials, and in-situ manufacturing at the Moon, Mars, and other bodies. These resources would enable a reduction in the logistical needs from Earth for future missions, thus preparing the way for a sustained presence on Mars. Although the EMC initially relies only on propellant production for the Mars ascent vehicle via ISRU, one of its primary objectives is to prospect at every EMC destination to understand the potential for ISRU; this will permit true pioneering to be enabled after the first crew arrives at Mars. Recent and ongoing analysis has considered the possible prospecting measurements that can be performed at the asteroid returned to cis-lunar space by the Asteroid Robotic Redirect Mission (ARRM), at the lunar surface, at Phobos and Deimos, and on the surface of Mars to identify available resources for future use. These opportunities will be available on missions currently in the Evolvable Mars Campaign construct, and will also facilitate the testing and demonstration of resource acquisition, processing, storage, and useage technologies that can play a role in later missions. This analysis has also led to the identification of several objectives that should be targeted during the missions building up to and including the initial crewed missions. These objectives are mapped to strategies for incorporating ISRU to support resource cycle closure and reduce mass requirements from Earth. This analysis has yielded engineering constraints, based on ISRU, that impact the evaluation of landing sites for missions to the surface of Mars. The terrain of a particular site must be sufficiently flat to permit ISRU systems, as well as ancillary systems such as power and propellant storage tanks, to be landed, moved into position, set up, and operated. Water must be accessible in a form that can be acquired via ISRU, in quantities that align with demands. The chosen method of acquiring and processing water should align with the available resources at a particular site, and that site must have sufficient quantities to meet the requirements (based on crew consumables and propellant demands). Lower altitude landing sites are preferred, as the increase in density can facilitate carbon dioxide acquisition from the atmosphere. Another preference is for sites with a greater ability to move regolith for civil engineering purposes; for example, this would be conducive to both bulk regolith uses (such as the manufacture of berms), and processed regolith uses (such as microwave sintering).

Evolvable Mars Campaign↗

STS-102 Photo-op/Suit-up/Depart O&C/Launch Discovery On Orbit/Landing/Crew Egress

The spacecrews of STS-102 and the Expedition 1 and 2 crews of the International Space Station (ISS) are seen in this video, which presents an overview of their activities. The crew consists of Commander Jim Wetherbee, Pilot James Kelly, and Mission Specialists Andrew Thomas, and Paul Richards. The sections of the video include: Photo-op, Suit-up, Depart O&C, Ingress, Launch with Playbacks, On-orbit, Landing with Playbacks, and Crew Egress & Departs. The prelaunch activities are explained by two narrators, and the crew members are assisted in the White Room just before boarding the Space Shuttle Discovery. Isolated views of the shuttle's launch include: VAB, PAD-B, DLTR-3, UCS-23 Tracker, PATRICK IGOR, UCS-10 Tracker, Grandstand, Tower-1, OTV-160, OTV-170, OTV-171, and On-board Camera. The video shows two extravehicular activities (EVAs) to perform work on the ISS, one by astronauts Helms and Voss from Expedition 2, and another by Richards and Thomas. The attachment of the Leonardo Multipurpose Logistics Module, a temporary resupply module, is shown in a series of still images. The on-orbit footage also includes a view of the Nile River, and a crew exhange ceremony between Expedition 1 (Commander Yuri Gidzenko, Flight Engineer Sergei Krikalev) and Expedition 2 (Commander Yury Usachev, Flight Engineers James Voss, Susan Helms). Isolated views of the landing at Kennedy Space Center include: North Runway Camera, VAB, Tower-1, Mid-field, Midfield IR, Tower-2, and UCS-12 IR. The Crew Transfer Vehicle (CTV) for unloading the astronauts is shown, administrators greet the crew upon landing, and Commander Wetherbee gives a briefing.

Source record↗

Predicting thunderstorm evolution using ground-based lightning detection networks

Lightning measurements acquired principally by a ground-based network of magnetic direction finders are used to diagnose and predict the existence, temporal evolution, and decay of thunderstorms over a wide range of space and time scales extending over four orders of magnitude. The non-linear growth and decay of thunderstorms and their accompanying cloud-to-ground lightning activity is described by the three parameter logistic growth model. The growth rate is shown to be a function of the storm size and duration, and the limiting value of the total lightning activity is related to the available energy in the environment. A new technique is described for removing systematic bearing errors from direction finder data where radar echoes are used to constrain site error correction and optimization (best point estimate) algorithms. A nearest neighbor pattern recognition algorithm is employed to cluster the discrete lightning discharges into storm cells and the advantages and limitations of different clustering strategies for storm identification and tracking are examined.

Goodman, Steven J.↗

Evolutionary Development of the Simulation by Logical Modeling System (SIBYL)

Through the evolutionary development of the Simulation by Logical Modeling System (SIBYL) we have re-engineered the expensive and complex IBM mainframe based Long-term Hardware Projection Model (LHPM) to a robust cost-effective computer based mode that is easy to use. We achieved significant cost reductions and improved productivity in preparing long-term forecasts of Space Shuttle Main Engine (SSME) hardware. The LHPM for the SSME is a stochastic simulation model that projects the hardware requirements over 10 years. SIBYL is now the primary modeling tool for developing SSME logistics proposals and Program Operating Plan (POP) for NASA and divisional marketing studies.

Wu, Helen↗

Lunar Navigation Architecture Design Considerations

The NASA Constellation Program is aiming to establish a long-term presence on the lunar surface. The Constellation elements (Orion, Altair, Earth Departure Stage, and Ares launch vehicles) will require a lunar navigation architecture for navigation state updates during lunar-class missions. Orion in particular has baselined earth-based ground direct tracking as the primary source for much of its absolute navigation needs. However, due to the uncertainty in the lunar navigation architecture, the Orion program has had to make certain assumptions on the capabilities of such architectures in order to adequately scale the vehicle design trade space. The following paper outlines lunar navigation requirements, the Orion program assumptions, and the impacts of these assumptions to the lunar navigation architecture design. The selection of potential sites was based upon geometric baselines, logistical feasibility, redundancy, and abort support capability. Simulated navigation covariances mapped to entry interface flightpath- angle uncertainties were used to evaluate knowledge errors. A minimum ground station architecture was identified consisting of Goldstone, Madrid, Canberra, Santiago, Hartebeeshoek, Dongora, Hawaii, Guam, and Ascension Island (or the geometric equivalent).

D'Souza, Christopher↗

Life Support and Habitation Systems: Crew Support and Protection for Human Exploration Missions Beyond Low Earth Orbit

Life Support and Habitation Systems (LSHS) is one of 10 Foundational Domains as part of the National Aeronautics and Space Administration s proposed Enabling Technology Development and Demonstration (ETDD) Program. LSHS will develop and mature technologies to sustain life on long duration human missions beyond Low Earth Orbit that are reliable, have minimal logistics supply and increase self-sufficiency. For long duration exploration missions, further closure of life support systems is paramount, including focus on key technologies for atmosphere revitalization, water recovery, waste management, thermal control and crew accommodation that recover additional consumable mass, reduce requirements for power, volume, heat rejection, crew involvement, and which have increased reliability and capability. Other areas of focus include technologies for radiation protection, environmental monitoring and fire protection. Beyond LEO, return to Earth will be constrained. The potability of recycled water and purity of regenerated air must be measured and certified aboard the spacecraft. Missions must be able to recover from fire events through early detection, use of non-toxic suppression agents, and operation of recovery systems that protect on-board Environmental Control and Life Support (ECLS) hardware. Without the protection of the Earth s geomagnetic field, missions beyond LEO must have improved radiation shielding and dosimetry, as well as warning systems to protect the crew against solar particle events. This paper will describe plans for the new LSHS Foundational Domain and mission factors that will shape its technology development portfolio.

Barta, Daniel J.↗

A Discussion of Integrated Life Support and In Situ Resource Utilization Architectures for Mars Surface Missions

Life support on the International Space Station is made possible by a combination of technologies to ensure the availability of clean water and air for the crew. Resources, including water and oxygen, are partially recovered and recycled; the balance is lost as waste either to space or incinerated during reentry into Earth's atmosphere. Frequent resupply cargo is provided to ISS to replace these lost resources. For missions beyond Low Earth Orbit, resupply becomes increasingly challenging both economically and logistically. To limit the need for these resupply missions, three options are available: increase the recovery and recycling of necessary materials, leverage in situ resources available for a given mission, or a combination of both. Here we discuss several basic life support and in situ resource utilization (ISRU) architectures, identify common technologies, propose possible integrated architectures, identify benefits of and challenges to varying levels of life support and ISRU integration, and discuss several considerations for technology commonality, dis-similar redundancy, and developmental overlap.

Abney, Morgan B.↗

Gateway Integrated Environmental Control and Life Support System Overview and Status

The Gateway will be a lunar orbiting platform that is a critical element in establishing a sustainable, long-term human presence on the lunar surface and beyond to deep space exploration. As part of this mission, the Gateway Environmental Control and Life Support Subsystem (ECLSS), employs its capabilities to: - Support two to four-person crew expeditions for at least 30 days, approximately once every one to three years with extended periods of dormancy, - Provide life support functionality during nominal and contingency scenarios, - Support crew expeditions to the Lunar surface by providing a Habitable volume, from which staging, or preparation can take place for missions to the Lunar surface or to deep space destinations, and - Facilitate a platform to demonstrate the necessary capabilities to expand a sustainable human presence into Deep Space, including the surface of the Moon and Mars. The Gateway consists of an assembly of modules provided by commercial and international partnerships with varied capability that, together, achieve these objectives. The Habitation and Logistics Outpost (HALO) and International Habitat (I-Hab) modules provide the air revitalization and conditioning capabilities for the Gateway with some ECLSS functionality provided in the other modules to support crew operations. This paper explains the architecture of the Gateway ECLSS and provides the status of its development.

Gateway↗

Accounting for Epistemic Uncertainty in Mission Supportability Assessment: A Necessary Step in Understanding Risk and Logistics Requirements

Future crewed missions to Mars present a maintenance logistics challenge that is unprecedented in human spaceflight. Mission endurance – defined as the time between resupply opportunities – will be significantly longer than previous missions, and therefore logistics planning horizons are longer and the impact of uncertainty is magnified. Maintenance logistics forecasting typically assumes that component failure rates are deterministically known and uses them to represent aleatory uncertainty, or uncertainty that is inherent to the process being examined. However, failure rates cannot be directly measured; rather, they are estimated based on similarity to other components or statistical analysis of observed failures. As a result, epistemic uncertainty – that is, uncertainty in knowledge of the process – exists in failure rate estimates that must be accounted for. Analyses that neglect epistemic uncertainty tend to significantly underestimate risk. Epistemic uncertainty can be reduced via operational experience; for example, the International Space Station (ISS) failure rate estimates are refined using a Bayesian update process. However, design changes may re-introduce epistemic uncertainty. Thus, there is a tradeoff between changing a design to reduce failure rates and operating a fixed design to reduce uncertainty. This paper examines the impact of epistemic uncertainty on maintenance logistics requirements for future Mars missions, using data from the ISS Environmental Control and Life Support System (ECLS) as a baseline for a case study. Sensitivity analyses are performed to investigate the impact of variations in failure rate estimates and epistemic uncertainty on spares mass. The results of these analyses and their implications for future system design and mission planning are discussed.

Owens, Andrew↗

Proposed Array-based Deep Space Network for NASA

The current assets of the Deep Space Network (DSN) of the National Aeronautics and Space Administration (NASA), especially the 70-m antennas, are aging and becoming less reliable. Furthermore, they are expensive to operate and difficult to upgrade for operation at Ka-band (321 GHz). Replacing them with comparable monolithic large antennas would be expensive. On the other hand, implementation of similar high-sensitivity assets can be achieved economically using an array-based architecture, where sensitivity is measured by G/T, the ratio of antenna gain to system temperature. An array-based architecture would also provide flexibility in operations and allow for easy addition of more G/T whenever required. Therefore, an array-based plan of the next-generation DSN for NASA has been proposed. The DSN array would provide more flexible downlink capability compared to the current DSN for robust telemetry, tracking and command services to the space missions of NASA and its international partners in a cost effective way. Instead of using the array as an element of the DSN and relying on the existing concept of operation, we explore a broader departure in establishing a more modern concept of operations to reduce the operations costs. This paper presents the array-based architecture for the next generation DSN. It includes system block diagram, operations philosophy, user's view of operations, operations management, and logistics like maintenance philosophy and anomaly analysis and reporting. To develop the various required technologies and understand the logistics of building the array-based lowcost system, a breadboard array of three antennas has been built. This paper briefly describes the breadboard array system and its performance.

telemetry↗

An integrated assessment of location-dependent scaling for microalgae biofuel production facilities

Successful development of a large-scale microalgae-based biofuels industry requires comprehensive analysis and understanding of the feedstock supply chain—from facility siting and design through processing and upgrading of the feedstock to a fuel product. The evolution from pilot-scale production facilities to energy-scale operations presents many multi-disciplinary challenges, including a sustainable supply of water and nutrients, operational and infrastructure logistics, and economic competitiveness with petroleum-based fuels. These challenges are partially addressed by applying the Integrated Assessment Framework (IAF) – an integrated multi-scale modeling, analysis, and data management suite – to address key issues in developing and operating an open-pond microalgae production facility. This is done by analyzing how variability and uncertainty over space and through time affect feedstock production rates, and determining the site-specific “optimum” facility scale to minimize capital and operational expenses. This approach explicitly and systematically assesses the interdependence of biofuel production potential, associated resource requirements, and production system design trade-offs. To provide a baseline analysis, the IAF was applied in this paper to a set of sites in the southeastern U.S. with the potential to cumulatively produce 5 billion gallons per year. Finally, the results indicate costs can be reduced by scaling downstream processing capabilities to fit site-specific growing conditions, available and economically viable resources, and specific microalgal strains.

09 BIOMASS FUELS↗

A Near-Term, High-Confidence Heavy Lift Launch Vehicle

The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

Rothschild, William J.↗

Choosing a reliability inspection plan for interval censored data

Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Results show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.

97 MATHEMATICS AND COMPUTING↗