Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk informed approach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

DOME: Directional medical embedding vectors from Electronic Health Records

Motivation: The increasing availability of Electronic Health Record (EHR) systems has created enormous potential for translational research. Recent developments in representation learning techniques have led to effective large-scale representations of EHR concepts along with knowledge graphs that empower downstream EHR studies. However, most existing methods require training with patient-level data, limiting their abilities to expand the training with multi-institutional EHR data. On the other hand, scalable approaches that only require summary-level data do not incorporate temporal dependencies between concepts. Methods: We introduce a DirectiOnal Medical Embedding (DOME) algorithm to encode temporally directional relationships between medical concepts, using summary-level EHR data. Specifically, DOME first aggregates patient-level EHR data into an asymmetric co-occurrence matrix. Then it computes two Positive Pointwise Mutual Information (PPMI) matrices to correspondingly encode the pairwise prior and posterior dependencies between medical concepts. Following that, a joint matrix factorization is performed on the two PPMI matrices, which results in three vectors for each concept: a semantic embedding and two directional context embeddings. They collectively provide a comprehensive depiction of the temporal relationship between EHR concepts. Results: We highlight the advantages and translational potential of DOME through three sets of validation studies. First, DOME consistently improves existing direction-agnostic embedding vectors for disease risk prediction in several diseases, for example achieving a relative gain of 5.5% in the area under the receiver operating characteristic (AUROC) for lung cancer. Second, DOME excels in directional drug-disease relationship inference by successfully differentiating between drug side effects and indications, correspondingly achieving relative AUROC gain over the state-of-the-art methods by 10.8% and 6.6%. Finally, DOME effectively constructs directional knowledge graphs, which distinguish disease risk factors from comorbidities, thereby revealing disease progression trajectories. The source codes are provided at https://github.com/celehs/Directional-EHRembedding.

60 APPLIED LIFE SCIENCES↗

Enhancing Risk Analysis of Accidental Release Using CFD Modeling and Machine Learning

This project report presents the results from the AU31 project that is entitled “Enhancing Risk Analysis of Accidental Release Using CFD Modeling and Machine Learning” performed between FY2021 and FY2022. The technical objective of this project is to enhance risk analysis of accidental release of radioactive materials and provide novel risk forecasting and capabilities for assessing unplanned hazardous chemical releases for the U.S. Department of Energy (DOE). The approach includes a cross-platform finite element analysis of airborne chemical release, machine learning (ML) for simulation and forecasting, and a big data approach to data management, transformation and analysis capable of handling petabyte-scale unstructured and structured data. The outcome of these findings were assembled and accessible as a final output via an intuitive web hosted geospatial-based user interface for demonstration and general dissemination. These new results also provide a mechanism of combining this knowledge in a risk analysis framework tool. The geospatial analysis and output can utilize 5 years of qualified meteorological data to illustrate projected plume footprints that are generated from computational aspects of this study. Specifically, we show the development of a geospatial risk analysis capabilities to respond to and plan for accidental release of radioactive materials and to provide a risk forecasting tool for assessing hazardous chemical releases for the DOE. The focus of this effort is germane to common practices in risk analysis; and it is highly relevant to the timely and transparent release of information related to materials at risk including hazardous materials and chemical vapors and rapid assessment of the potential impacts on the workforce at active sites across the DOE complex.

42 ENGINEERING↗

Ensemble Methodologies for Astronaut Cancer Risk Assessment in the face of Large Uncertainties

A new approach to NASA space radiation risk modeling has successfully extended the current NASA probabilistic cancer risk model to an ensemble framework able to consider sub-model parameter uncertainty (e.g. uncertainty in a radiation quality parameter) as well as model-form uncertainty associated with differing theoretical or empirical formalisms (e.g. combined dose-rate and radiation quality effects). Ensemble methodologies are already widely used in weather prediction, modeling of infectious disease outbreaks, and certain terrestrial radiation protection applications to better understand how uncertainty may influence risk decision-making. Applying ensemble methodologies to space radiation risk projections offers the potential to efficiently incorporate emerging research results, allow for the incorporation of future (including international) models, improve uncertainty quantification for underlying sub-models developed against sparse experimental data, and reduce the impact of subjective bias on risk projections. Moreover, risk forecasting across an ensemble of multiple predictive models can provide stakeholders additional information on risk acceptance if current health/medical standards cannot be met or the level of knowledge doesn’t permit a specific risk or exposure limit to be developed for future space exploration missions. In this work, ensemble risk projections implementing multiple sub-models of radiation quality, dose and dose-rate effectiveness factors, excess risk, and latency as ensemble members are presented. Initial consensus methods for ensemble model weights and correlations to account for individual model bias are discussed. In these analyses, the ensemble forecast compares well to results from NASA's current operational cancer risk projection model used to assess permissible exposure limits and permissible mission durations for astronauts. However, a large range of projected risk values are obtained at the upper 95th confidence level where models must extrapolate beyond available biological data sets; closer agreement is seen at the median + one sigma due to the inherent similarities in available models. Future work, including the addition of new models and methods for statistical correlation between predictive members are discussed to define alternate ways of thinking about risk and ‘acceptable’ uncertainty with respect to NASA’s current permissible exposure limits.

space radiation↗

Ensemble Cancer Risk Model for Astronaut Risk Assessment

A new approach to NASA space radiation risk modeling has successfully extended the current NASA probabilistic cancer risk model to an ensemble framework able to consider sub-model parameter uncertainty (e.g. uncertainty in a radiation quality parameter) as well as model-form uncertainty associated with differing theoretical or empirical formalisms (e.g. combined dose-rate and radiation quality effects). Ensemble methodologies are already widely used in weather prediction, modeling of infectious disease outbreaks, and certain terrestrial radiation protection applications to better understand how uncertainty may influence risk decision-making. Applying ensemble methodologies to space radiation risk projections offers the potential to efficiently incorporate emerging research results, allow for the incorporation of future (including international) models, improve uncertainty quantification for underlying sub-models developed against sparse experimental data, and reduce the impact of subjective bias on risk projections. Moreover, risk forecasting across an ensemble of multiple predictive models can provide stakeholders additional information on risk acceptance if current health/medical standards cannot be met or the level of knowledge doesn’t permit a specific risk or exposure limit to be developed for future space exploration missions. In this work, ensemble risk projections implementing multiple sub-models of radiation quality, dose and dose-rate effectiveness factors, excess risk, and latency as ensemble members are presented. Initial consensus methods for ensemble model weights and correlations to account for individual model bias are discussed. In these analyses, the ensemble forecast compares well to results from NASA's current operational cancer risk projection model used to assess permissible exposure limits and permissible mission durations for astronauts. However, a large range of projected risk values are obtained at the upper 95th confidence level where models must extrapolate beyond available biological data sets; closer agreement is seen at the median + one sigma due to the inherent similarities in available models. Future work, including the addition of new models and methods for statistical correlation between predictive members are discussed to define alternate ways of thinking about risk and ‘acceptable’ uncertainty with respect to NASA’s current permissible exposure limits.

Lisa C Simonsen↗

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

Communications↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Mars Sample Return without Landing on the Surface

Many in the science community want a Mars sample return in the near future, with the expectation that it will provide in-depth information, significantly beyond what we know from remote sensing, limited in-situ measurements, and work with Martian meteorites. Certainly, return of samples from the Moon resulted in major advances in our understanding of both the geologic history of our planetary satellite, and its relationship to Earth. Similar scientific insights would be expected from analyses of samples returned from Mars. Unfortunately, Mars-lander sample-return missions have been delayed, for the reason that NASA needs more time to review the complexities and risks associated with that type of mission. A traditional sample return entails a complex transfer-chain, including landing, collection, launch, rendezvous, and the return to Earth, as well as an evaluation of potential biological hazards involved with bringing pristine Martian organics to Earth. There are, however, means of returning scientifically-rich samples from Mars without landing on the surface. This paper discusses an approach for returning intact samples of surface dust, based on known instrument technology, without using an actual Martian lander.

Jurewicz, A. J. G.↗

Earth Science Technology Office (ESTO) New Observing Strategies (NOS) and NOS-Testbed (NOS-T)

With the advancement of space hardware technologies such as smaller spacecraft, component and instrument miniaturization and high performance space processors, and with the advancement of software technologies in artificial intelligence, big data analysis and autonomous decision making, Earth Science is looking at novel ways to observe phenomena that previously could not have been studied or would have been too expensive to study with traditional missions. In particular, the New Observing Strategies (NOS) component of the NASA Earth Science Technology Office (ESTO) Advanced Information Systems Technology (AIST) Program aims at leveraging these novel technologies as well as low cost and easy access to space to acquire multi-temporal or simultaneous multi-angular, multi-locations, multi-resolution and multi-spectral observations that will provide better multi-source measurements and will build a more dynamic and comprehensive picture of Earth Science phenomena that need to be studied and analyzed. For applications such as water resources management, air quality monitoring, biodiversity studies or disaster management, NOS will integrate the use of small instruments, small spacecraft, constellations of spacecraft and networks of sensors to design new missions that will provide the necessary measurements to improve future forecast and science modeling systems.Measurement acquisition will therefore be approached as a system of systems rather than on a mission basis, and a system of this complexity should not be expected to work without full integration and experimental characterization. Although most of the individual technologies enabling to link and coordinate multi-source observations are more or less mature, a few technologies need to be developed and all of them need to be integrated and tested as a system. In order for this validation to occur, the AIST Program is developing the NOS Testbed that includes 3 main goals:1.Validate novel NOS technologies, independently and as a system2.Demonstrate novel distributed operations concepts3.Socialize new Distributed Spacecraft Mission (DSM) and SensorWeb (SW) technologies and concepts to the science community by significantly retiring the risk of integrating these new technologies.The NOS Testbed will consist of multiple sensing nodes, simulated or actual, representing space, air and/or ground measurements, that are interconnected by a communications fabric (infrastructure that permits nodes to transmit and receive data between one another and interact with each other). Each node will be supported by hardware capabilities required to perform nodes monitoring and command & control, as well as intelligent "onboard" computing. The nodes will work together in a collaborative manner to demonstrate optimal science capabilities. The testbed will enable to validate technologies such as inter-node communication models, techniques and protocols; inter-node coordination; real-time data fusion and understanding; planning; sensor re-targeting; etc. Additionally, the testbed will have the capability to interact with various mission design tools, OSSEs and one or several forecast models. More details about the NOS Testbed will be presented at the confererence.

Earth Science missions; Advanced information Syste↗

Evaluating Offshore Infrastructure Integrity

Drilling in the offshore environment involves a complex network of infrastructure including pipelines, platforms, rigs, subsea installations, ports, and terminals. Government and industry partners have developed this network over many decades and it remains a critical part of the United States (U.S.) energy portfolio. Many of the major components of this system have been designed with a 20- to 30-year lifespan, yet consistent and growing energy demands support the need to extend the design life of existing infrastructure or repurpose it for secondary needs (i.e. enhanced oil recovery, carbon storage, and new wells). As a result, a growing portion of the offshore infrastructure in the U.S. is approaching or has exceeded its original design life. A critical step in ensuring the continued safe and effective operation of offshore infrastructure is developing a comprehensive understanding of the state of offshore infrastructure and the factors that effect it. The purpose of this project is to assess the current state of existing infrastructure and identify the factors involved in infrastructure degradation through the development and application of big data analytics, machine learning, and advanced spatio-temporal analysis. The project leverages existing data at NETL and combines it with new information on offshore oil and gas structures and the ambient offshore environment in an effort to identify patterns associated with infrastructure integrity. Building on the identified trends and patterns, this project incorporates exploratory analytics and spatial analysis tools in conjunction with machine learning and statistical models to characterize the condition of existing platforms in the offshore environment and predict their risk of failure.

02 PETROLEUM↗

Medical System Foundation Overview for Long-Duration Lunar Orbit and Surface Operations Missions

The Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has developed a Medical System Foundation for Level of Care IV, as defined by NASA’s space flight human-system standards, for long-duration lunar orbit and surface operation missions by employing a systems engineering approach using model-based systems engineering tools. This Foundation model includes a concept of operations; functional decomposition; clinical content (medical conditions, capabilities, and resources); associated functional, interface and non-functional technical requirements; and traces to the current versions of NASA standards documents and parent-level (Program- and Vehicle habitat system level) requirements. Collectively, these components constitute a foundation that serves as a starting point for a medical system that meets the Level of Care IV requirement. The Foundation was developed by a multidisciplinary team consisting of systems engineers, scientists, and clinicians across NASA, and information is presented in an easily accessible format that is understandable across disciplines. Stakeholders can use the Foundation to analyze the traces between medical capabilities, medical conditions, medical resources, and requirements and to identify medical system interfaces with other vehicle systems/subsystems. It can also be used as a basis for performing trades on risks vs. medical system mass and volume allocation. This discussion will focus on the processes through which the Medical System Foundation was developed, how the Foundation builds a bridge between the medical and engineering domains and facilitates communication between these communities, and how these processes can be applied more broadly to a crew health and performance system and other system domains. The presentation also discusses Foundation modifications based on the recently updated versions of the NASA 3001 Standards.

S. Lumpkins↗

End-To-End Uncertainty Quantification with Analytical Derivatives for Design Under Uncertainty

Uncertainty quantification (UQ) is a rapidly growing and evolving discipline, especially within the aerospace community. Performing analysis with UQ can provide decision makers with a wealth of information about a candidate design. However, the value of UQ is fully realized when the information gained during UQ analysis is leveraged in a feedback loop of a design optimization process, often referred to as design under uncertainty. Although design under uncertainty can be a powerful risk mitigation technique, there are a number of roadblocks that prevent its implementation. Two primary factors are computational costs and added complexity of the analysis. High fidelity simulations on the order tens of uncertain variables quickly become computationally infeasible. Also, implementing UQ into an existing multidisciplinary design and optimization (MDO) process often requires extensive knowledge of the UQ methods and careful treatment of the problem formulation. The objective of this work is to address these two primary roadblocks and enable practitioners to efficiently perform design under uncertainty with limited knowledge of the UQ discipline. Methods outlined in this paper demonstrate MDO incorporating UQ into the design process, leveraging an analytic derivative tool chain through the entire optimization. The proposed approach leverages machine learning techniques to generate a differentiable confidence interval output from polynomial chaos models. This technique, coupled with the incorporation of analytical derivatives through the Polynomial Chaos Expansion (PCE) process, eliminates the need to estimate derivatives which are usually obtained from finite difference, complex step, or similar methods. Developing a differentiable confidence interval allows mixed uncertainty problems (both epistemic and aleatory) to be modeled. Without such modeling, these problems cannot accurately predict objective functions containing statistical quantities such as mean and variance. The addition of analytic derivatives to a polynomial chaos-based UQ method decreases the computational costs of performing design under uncertainty by orders of magnitude in comparison with methods such as complex step. The method and codes developed are modular in nature and are a drop-in solution for design under uncertainty within existing MDO problems. A low-fidelity analytical multidisciplinary optimization under uncertainty for a wing design in OpenMDAO is detailed in this paper. This demonstration case will include both objective functions and constraints which are influenced by uncertain parameters.

Ben D Phillips↗

End-To-End Uncertainty Quantification with Analytical Derivatives for Design Under Uncertainty

Uncertainty quantification (UQ) is a rapidly growing and evolving discipline, especially within the aerospace community. Performing analysis with UQ can provide decision makers with a wealth of information about a candidate design. However, the value of UQ is fully realized when the information gained during UQ analysis is leveraged in a feedback loop of a design optimization process, often referred to as design under uncertainty. Although design under uncertainty can be a powerful risk mitigation technique, there are a number of roadblocks that prevent its implementation. Two primary factors are computational costs and added complexity of the analysis. High fidelity simulations on the order tens of uncertain variables quickly become computationally infeasible. Also, implementing UQ into an existing multidisciplinary design and optimization (MDO) process often requires extensive knowledge of the UQ methods and careful treatment of the problem formulation. The objective of this work is to address these two primary roadblocks and enable practitioners to efficiently perform design under uncertainty with limited knowledge of the UQ discipline. Methods outlined in this paper demonstrate MDO incorporating UQ into the design process, leveraging an analytic derivative tool chain through the entire optimization. The proposed approach leverages machine learning techniques to generate a differentiable confidence interval output from polynomial chaos models. This technique, coupled with the incorporation of analytical derivatives through the Polynomial Chaos Expansion (PCE) process, eliminates the need to estimate derivatives which are usually obtained from finite difference, complex step, or similar methods. Developing a differentiable confidence interval allows mixed uncertainty problems (both epistemic and aleatory) to be modeled. Without such modeling, these problems cannot accurately predict objective functions containing statistical quantities such as mean and variance. The addition of analytic derivatives to a polynomial chaos-based UQ method decreases the computational costs of performing design under uncertainty by orders of magnitude in comparison with methods such as complex step. The method and codes developed are modular in nature and are a drop-in solution for design under uncertainty within existing MDO problems. A low-fidelity analytical multidisciplinary optimization under uncertainty for a wing design in OpenMDAO is detailed in this paper. This demonstration case will include both objective functions and constraints which are influenced by uncertain parameters.

Ben Phillips↗

Exploration Medical Capability

Exploration Medical Capability (ExMC) is an element of NASA's Human Research Program (HRP). ExMC's goal is to address the risk of the Inability to Adequately Recognize or Treat an Ill or Injured Crewmember. This poster highlights the approach ExMC has taken to address this goal and our current areas of interest. The Space Medicine Exploration Medical Condition List (SMEMCL) was created to identify medical conditions of concern during exploration missions. The list was derived from space flight medical incidents, the shuttle medical checklist, the International Space Station medical checklist, and expert opinion. The conditions on the list were prioritized according to mission type by a panel comprised of flight surgeons, physician astronauts, engineers, and scientists. From the prioritized list, the ExMC element determined the capabilities needed to address the medical conditions of concern. Where such capabilities were not currently available, a gap was identified. The element s research plan outlines these gaps and the tasks identified to achieve the desired capabilities for exploration missions. This poster is being presented to inform the audience of the gaps and tasks being investigated by ExMC and to encourage discussions of shared interests and possible future collaborations.

Watkins, Sharmila↗

A Probabilistic Reasoner Based on Bayes Risk for Damage Detection in Structural Systems

Structural health monitoring (SHM) systems are used to inform operation of structural systems subject to loads and environments that may affect their integrity. SHM systems rely on continuous monitoring of the structure to determine its health state. These systems are often coupled with a model of the deployed structure to determine the consequences of changes in the system by forecasting the response to future states. These models, which may be thought of as digital twins, need to be updated to reflect the latest state of the structural system. This work makes use of an uncertainty-aware machine learning model that enforces distance preservation of the original input space to determine deviations from the training data input space distributions. This workflow enables domain shift detection to determine whether damage is present in the structure. The uncertainty metrics generated by this network are then used in a Bayes risk framework to design an optimal damage detector given cost and risk considerations. The approach is demonstrated on a computational example with simulated damage.

Najera-Flores, David [ATA Engineering, Inc.]↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Composite chronicles: A study of the lessons learned in the development, production, and service of composite structures

A study of past composite aircraft structures programs was conducted to determine the lessons learned during the programs. The study focused on finding major underlying principles and practices that experience showed have significant effects on the development process and should be recognized and understood by those responsible for using of composites. Published information on programs was reviewed and interviews were conducted with personnel associated with current and past major development programs. In all, interviews were conducted with about 56 people representing 32 organizations. Most of the people interviewed have been involved in the engineering and manufacturing development of composites for the past 20 to 25 years. Although composites technology has made great advances over the past 30 years, the effective application of composites to aircraft is still a complex problem that requires experienced personnel with special knowledge. All disciplines involved in the development process must work together in real time to minimize risk and assure total product quality and performance at acceptable costs. The most successful programs have made effective use of integrated, collocated, concurrent engineering teams, and most often used well-planned, systematic development efforts wherein the design and manufacturing processes are validated in a step-by-step or 'building block' approach. Such approaches reduce program risk and are cost effective.

Vosteen, Louis F.↗

Identification of Safety Metrics for Airport Surface Operations

A large fraction of safety incidents occurs on the ground during airport surface operations. Although these incidents are mostly non-fatal with a few exceptions, they are high profile incidents that remain a source of concern for the National Transportation Safety Board (NTSB), the Federal Aviation Administration (FAA), major airlines, and other stakeholders of the National Airspace System (NAS). These incidents have historically been mitigated by implementing changes to regulations, policies, and procedures over time. This approach has minimized but not eliminated the risk of occurrence of safety incidents. It is thus important to develop integrated techniques to assess, model, and prevent these incidents by analyzing the risk and likelihood of occurrence and communicating results of the analysis to decision-making personnel who can mitigate and prevent incidents in real time. The work presented in this paper builds on a previously developed architecture for safety, Real-Time Safety Monitoring (RTSM), to enable monitoring and prediction of the safety of the NAS. In the RTSM framework, hazards to flight are translated to safety metrics such as wake vortex encounters or loss of separation, that can be modeled and analyzed offline and also predicted and monitored in real time (online). The intent of this paper is to integrate predictable incidents that occur during surface and ground operations into the safety portfolio of the RTSM project by (i) identifying suitable information sources from which ground incidents can be studied, (ii) developing safety metrics correlated with surface operations, and (iii) recommending suitable data sources that can be quantified and used for the computation of pertinent safety metrics.

safety↗

Uncertainty quantification of a physics-informed model based on sparse identification of a Thermal Energy Distribution System

Integrated energy systems (IES)s are crucial for enhancing the economy and efficiency of power generation sources (e.g., nuclear energy) necessary to unleash American energy dominance. These systems can be integrated with thermal energy storage (TES) and intermittent renewable energies to optimize overall energy use, peak-load regulation, and demand-side responses. However, the stabilization of energy generation, transport, and utilization introduces operational complexities that exceed the challenges of managing each sub-component individually. Currently, though IESs rely on human operators for efficiency and stability, reducing human error risk and enhancing performance through automation is highly desirable. Recent advances at Idaho National Laboratory have demonstrated successful control of the Thermal Energy Distributed System (TEDS). However, the automatic control system depends on a deterministic Sparse Identification of Nonlinear Dynamics with Control (SINDyC) model, which are trained based on simulation data from physics-based simulations. Because of uncertainties in physics-based simulation, SINDyC model results in large discrepancies against experimental data and cannot be reliably used in automatic control. In this paper, we present an innovative approach to address these discrepancies by quantifying uncertainties and developing a more robust model. We first generated trajectories by using first-principles physics codes to encapsulate the experiment. Next, we trained thousands of models by randomly sampling these trajectories. We then collapsed all those models into one probabilistic SINDyC by fitting a multivariate Gaussian distribution onto the resulting coefficient’s distribution. Despite its simplicity, our approach successfully produced 95% confidence intervals that captured the experimental trajectories. It even did so with a higher probability and better U-pooling score across six of the seven relevant quantities of interest (QoIs), as compared to other classical approaches. In conclusion, ongoing research is focusing on generating new experimental trajectories to validate this approach, and on employing Bayesian calibration to refine parametric uncertainties and guide future model development efforts.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗