Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

Distributed Lunar Data Platform with Advanced Machine Learning Capabilities in Support of Lunar Science and Exploration

The United States 2020 Space Policy directive declares that NASA, in cooperation with private industry, will “extend human economic activity into deep space by establishing a permanent human presence on the Moon”. This goal will require advanced data management, as well as analysis, modeling and representation of lunar information in order to prepare for Artemis human missions, lunar science investigations and exploration. To meet this requirement, we conceptualize and present an implementation strategy for a distributed platform for lunar data retrieval, inferencing and analysis, which will be based on federated learning and the NASA Celestial Mapping System (CMS). In addition to demonstrating the imperative of enabling lunar-borne data to remain in-situ but still accessible, this presentation will also include examples of how third parties could contribute both datasets and new functionality into this platform using an AI-based data import pipeline and a plug-in architecture respectively.

Artificial Intelligence↗

Flow Forecasting on New England’s Great River Hydro (Abstract)

Great River Hydro (GRH) operates 13 generating stations and 3 storage-only reservoirs along the Upper Connecticut River, draining 6,266 square miles. Managing the reservoirs requires coordination over a couple days. So far seasonal flow-forecast and medium range probabilistic flow forecast during high flow conditions are leading to satisfactory management. Great River Hydro is seeking technical assistance to evaluate potential improvements in inflow forecasting and scheduling accuracy, particularly during short- to medium- duration periods (1-10 days). Improved accuracy is anticipated to enhance the efficiency with which GRH utilizes water, improving GRH’s ability to hit the best priced hours throughout the system and enhancing revenues as a result.

13 HYDRO ENERGY↗

Mobile Device Application for Monitoring Cyanobacteria Harmful Algal Blooms Using Sentinel-3 Satellite Ocean and Land Colour Instruments

Cyanobacterial harmful algal blooms (cyanoHAB) cause human and ecological health problems in lakes worldwide. The timely distribution of satellite-derived cyanoHAB data is necessary for adaptive water quality management and for targeted deployment of water quality monitoring resources. Software platforms that permit timely, useful, and cost-effective delivery of information from satellites are required to help managers respond to cyanoHABs. The Cyanobacteria Assessment Network (CyAN) mobile device application (app) uses data from the European Space Agency Copernicus Sentinel-3 satellite Ocean and Land Colour Instrument (OLCI) in near real-time to make initial water quality assessments and quickly alert managers to potential problems and emerging threats related to cyanobacteria. App functionality and satellite data were validated with 25 state health advisories issued in 2017. The CyAN app provides water quality managers with a user-friendly platform that reduces the complexities associated with accessing satellite data to allow fast, efficient, initial assessments across lakes.

Harmful Algal Bloom↗

Waste Management Improvement Initiatives at Atomic Energy of Canada Limited - 13091

Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories (CRL) has been in operation for over 60 years. Radioactive, mixed, hazardous and non-hazardous wastes have been and continue to be generated at CRL as a result of research and development, radioisotope production, reactor operation and facility decommissioning activities. AECL has implemented several improvement initiatives at CRL to simplify the interface between waste generators and waste receivers: - Introduction of trained Waste Officers representing their facilities or activities at CRL; - Establishment of a Waste Management Customer Support Service as a Single-Point of Contact to provide guidance to waste generators for all waste management processes; and - Implementation of a streamlined approach for waste identification with emphasis on early identification of waste types and potential disposition paths. As a result of implementing these improvement initiatives, improvements in waste management and waste transfer efficiencies have been realized at CRL. These included: 1) waste generators contacting the Customer Support Service for information or guidance instead of various waste receivers; 2) more clear and consistent guidance provided to waste generators for waste management through the Customer Support Service; 3) more consistent and correct waste information provided to waste receivers through Waste Officers, resulting in reduced time and resources required for waste management (i.e., overall cost); 4) improved waste minimization and segregation approaches, as identified by in-house Waste Officers; and 5) enhanced communication between waste generators and waste management groups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Interface Requirements Process Including Shuttle Lessons Learned

Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

Bauch, Garland T.↗

Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information system

In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.

Moynihan, Gary P.↗

Spacecraft Requirements Development and Tailoring

Spacecraft design is managed through the use of design requirements. Requirements are flowed from the highest level, the overall spacecraft, to systems, subsystems and ultimately individual components. Through the use of requirements, each part of the spacecraft will perform the functions that are required of it and will interface to the rest of the spacecraft. Functional requirements are used to make sure every component performs as expected and interface requirements ensure that each component works within the larger design environment where it operates. Writing good requirements is difficult and the verification of requirements can be expensive and time consuming. Because of this difficulty and expense, it is important that each requirement truly be “required” and critical to the overall performance of the vehicle. It is also important that requirements can be changed or eliminated as the system matures to minimize verification cost and schedule. The Capsule Parachute Assembly System (CPAS) Project is developing the parachute system for the NASA Multi-Purpose Crew Vehicle (MPCV) Orion Spacecraft. Throughout the development and qualification cycle for CPAS, requirements have been evaluated, added, eliminated, or more generically, “tailored”, to ensure that the system performs as required while minimizing the verification cost to the Program. One facet of this tailoring has been to delete requirements that do not add value to the overall spacecraft or are not needed. A second approach to minimize the cost of requirement verification has been to evaluate requirements based on the actual design as it has matured. As the design of the parachute system has become better understood, requirements that are not applicable have been eliminated. This paper will outline the evolution of CPAS requirements over time and will show how careful and considered changes to requirements can benefit the technical solution for the overall system design while allowing a Project to control costs.

Mcmichael, James H.↗

The Network Configuration of an Object Relational Database Management System

The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.

Diaz, Philip↗

Power Electronics Thermal Management

The 2017 Electrical and Electronics Technical Team Roadmap [1] proposes aggressive research and development targets aimed at improving power electronics technology to enable the mass-market penetration of electric-drive vehicles. Achieving these aggressive targets will require a decrease in cost (year 2025 cost target: $2.70/kW) and an increase in power density (year 2025 power density target: 100 kW/L) as compared with current on-road technology. Replacing traditional silicon device-based components with more efficient and higher-temperature wide-bandgap (WBG) semiconductor device-based components will enable increased power density. However, meeting the power density target will also require innovative thermal management solutions to increase the heat fluxes dissipated and allow for compact electronics packaging. This project conducts research to develop new power electronics thermal management technologies to increase power density, enable high WBG temperature operation, and decrease cost. The performance (e.g., thermal resistance, pumping power) of the power electronics cooling technologies developed in this project are compared to the performance of current, on-road technology. One of the main challenges to achieving high power densities is associated with packaging high-temperature (up to 250 degrees C) WBG devices near lower-temperature-rated components (e.g., electrical boards and capacitors).

ADVANCED PROPULSION SYSTEMS↗

Power Electronics Thermal Management

The 2017 Electrical and Electronics Technical Team Roadmap [1] proposes aggressive research and development targets aimed at improving power electronics technology to enable the mass-market penetration of electric-drive vehicles. Achieving these aggressive targets will require a decrease in cost (year 2025 cost target: $2.70/kW) and an increase in power density (year 2025 power density target: 100 kW/L) as compared with current on-road technology. Replacing traditional silicon device-based components with more efficient and higher-temperature wide-bandgap (WBG) semiconductor device-based components will enable increased power density. However, meeting the power density target will also require innovative thermal management solutions to increase the heat fluxes dissipated and allow for compact electronics packaging.

ADVANCED PROPULSION SYSTEMS↗

Power Electronics Thermal Management

The 2017 Electrical and Electronics Technical Team Roadmap [11] proposes aggressive research and development targets aimed at improving power electronics technology to enable the mass-market penetration of electric-drive vehicles. Achieving these aggressive targets will require a decrease in cost (year 2025 cost target: $2.70/kW) and an increase in power density (year 2025 power density target: 100 kW/L) as compared with current on-road technology. Replacing traditional silicon device-based components with more efficient and higher-temperature wide-bandgap (WBG) semiconductor device-based components will enable increased power density. However, meeting the power density target will also require innovative thermal management solutions to increase the heat fluxes dissipated and allow for compact electronics packaging. This project evaluates, designs, and develops thermal management strategies that use dielectric fluid (single-phase heat transfer) as coolants.

ADVANCED PROPULSION SYSTEMS↗

Investigation of Intelligent Resource Management for Aviation Communications

The emergence of new aerial vehicles into the airspace as part of new initiatives, such as Advanced Air Mobility (AAM), will place growing demand for spectrum resources to support airspace operations. The traditional approach of using fixed channel allocations within standard service volumes will not allow for dynamic and efficient distribution of resources based on airspace demand; consequently, a new approach to aviation spectrum management will be required to meet the anticipated needs of airspace users. The National Aeronautics and Space Administration (NASA) is investigating the application of advanced concepts to implement a novel spectrum management approach that allows for the intelligent utilization of aviation spectrum throughout the airspace while maintaining the quality of service prescribed by aeronautical standards. This technical investigation evaluates the dynamic assignment of resources for both air-ground and air-air communication links applicable to both the emerging AAM initiative as well as the existing air traffic management system. The performance of the proposed spectrum management concepts will be evaluated using a custom modeling and simulation capability that is currently under development. The implementation of these approaches is anticipated to facilitate increased spectrum utilization efficiency and enhanced airspace capacity, which will better serve the needs of future applications.

Aeronautics↗

Investigation of Intelligent Resource Management for Aviation Communications

The emergence of new aerial vehicles into the airspace as part of new initiatives, such as Advanced Air Mobility (AAM), will place growing demand for spectrum resources to support airspace operations. The traditional approach of using fixed channel allocations within standard service volumes will not allow for dynamic and efficient distribution of resources based on airspace demand; consequently, a new approach to aviation spectrum management will be required to meet the anticipated needs of airspace users. The National Aeronautics and Space Administration (NASA) is investigating the application of advanced concepts to implement a novel spectrum management approach that allows for the intelligent utilization of aviation spectrum throughout the airspace while maintaining the quality of service prescribed by aeronautical standards. This technical investigation evaluates the dynamic assignment of resources for both air-ground and air-air communication links applicable to both the emerging AAM initiative as well as the existing air traffic management system. The performance of the proposed spectrum management concepts will be evaluated using a custom modeling and simulation capability that is currently under development. The implementation of these approaches is anticipated to facilitate increased spectrum utilization efficiency and enhanced airspace capacity, which will better serve the needs of future applications.

Eric Knoblock↗

Impacts of Tritium Management Approaches on Tritium Distribution and Capture Requirements for UNF Reprocessing

Four radionuclides have been identified as being sufficiently volatile in reprocessing of nuclear fuel that their gaseous release needs to be controlled to meet U.S. regulatory requirements. These radionuclides are {sup 3}H, {sup 14}C, {sup 85}Kr, and {sup 129}I. Although iodine has been the focus of a number of studies due to the high decontamination factor (DF) requirements on multiple escape pathways, it is clear from prior studies that the control of tritium will also be a significant issue for future reprocessing plants, especially if processing relatively short-cooled fuels (<10 yr post reactor discharge). Tritium contained in a used nuclear fuel (UNF) matrix will be released into the liquid and off-gas streams during fuel reprocessing. The amounts released into the process streams are a function of the type and burnup of the fuel processed, and the chemical processes employed within the reprocessing plant. Previous studies have examined the tritium capture requirements for the reprocessing facility assuming that all of the tritium is volatilized in the head-end operations; i.e., tritium pretreatment is employed and tritium is completely released from the cladding. This scenario tends to limit the release pathway to the head-end off-gas stream. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Definition, Capabilities, and Components of a Terrestrial Carbon Monitoring System

Research efforts for effectively and consistently monitoring terrestrial carbon are increasing in number. As such, there is a need to define carbon monitoring and how it relates to carbon cycle science and carbon management. There is also a need to identify intended capabilities of a carbon monitoring system and what system components are needed to develop the capabilities. This paper is intended to promote discussion on what capabilities are needed in a carbon monitoring system based on requirements for different areas of carbon-related research and, ultimately, for carbon management. While many methods exist to quantify different components of the carbon cycle, research is needed on how these methods can be coupled or integrated to obtain carbon stock and flux estimates regularly and at a resolution that enables attribution of carbon dynamics to respective sources. As society faces sustainability and climate change conerns, carbon management activities implemented to reduce carbon emissions or increase carbon stocks will become increasingly important. Carbon management requires moderate to high resolution monitoring. Therefore, if monitoring is intended to help inform management decisions, management priorities should be considered prior to development of a monitoring system.

West, Tristram O.↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Analysis of the Apollo spacecraft operational data management system. Executive summary

A study was made of Apollo, Skylab, and several other data management systems to determine those techniques which could be applied to the management of operational data for future manned spacecraft programs. The results of the study are presented and include: (1) an analysis of present data management systems, (2) a list of requirements for future operational data management systems, (3) an evaluation of automated data management techniques, and (4) a plan for data management applicable to future space programs.

Source record↗