Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Assessment of Lesser Prairie-Chicken Lek Density Relative to Landscape Characteristics in Texas

My 2.5-yr Master's project accomplished the objectives of estimating lesser prairie-chicken (LPC) lek density and abundance in the Texas occupied range and modeling anthropogenic and landscape features associated with lek density by flying helicopter lek surveys for 2 field seasons and employing a line-transect distance sampling method. This project was important for several reasons. Firstly, wildlife managers and biologists have traditionally monitored LPC populations with road-based surveys that may result in biased estimates and do not provide access to privately-owned or remote property. From my aerial surveys and distance sampling, I was able to provide accurate density and abundance estimates, as well as new leks and I detected LPCs outside the occupied range. Secondly, recent research has indicated that energy development has the potential to impact LPCs through avoidance of tall structures, increased mortality from raptors perching on transmission lines, disturbance to nesting hens, and habitat loss/fragmentation. Given the potential wind energy development in the Texas Panhandle, spatial models of current anthropogenic and vegetative features (such as transmission lines, roads, and percent native grassland) influencing lek density were needed. This information provided wildlife managers and wind energy developers in Texas with guidelines for how change in landscape features could impact LPCs. Lastly, LPC populations have faced range-wide declines over the last century and they are currently listed as a candidate species under the Endangered Species Act. I was able to provide timely information on LPC populations in Texas that will be used during the listing process.

03 NATURAL GAS↗

Potential Environmental Impacts of Hydrogen-based Transportation and Power Systems (Final Report)

Hydrogen (H 2 ) offers advantages as an energy carrier: minimal discharge of pollutants, production from multiple sources, increased thermodynamic efficiencies compared to fossil fuels, and reduced dependence on foreign oil. However, potential impacts from the H 2 generation processes, transport and distribution of H 2 , and releases of H 2 into the atmosphere have been proposed. The goal of this project was to analyze the effects of emissions of hydrogen, the six criteria pollutants and greenhouse gases on climate, human health, materials and structures. This project was part of a larger effort by DOE to assess the life-cycle costs and benefits and environmental impacts to inform decisions regarding future hydrogen research. Technical Approach: A modeling approach was developed and used to evaluate the potential environmental effects associated with the conversion of the on-road vehicle fleet from fossil-fuel vehicles to hydrogen fuel cell vehicles. GATOR-GCMOM was the primary tool used to predict atmospheric concentrations of gases and aerosols for selected scenarios. This model accounts for all feedbacks among major atmospheric processes based on first principles. The future scenarios and the emission rates selected for this analysis of hydrogen environmental effects are based on the scenarios developed by IPCC. The scenarios selected for the model simulations are a 2000 and 2050 A1B base cases, and a 2050 A1B case with hydrogen fuel cell vehicles (HFCVs). The hydrogen fuel cell scenario assumed conversion of 90% of fossil-fuel on-road vehicles (FFOV) in developed countries and 45% of FFOVs vehicles in other countries to HFCVs, with the H 2 produced by steam-reforming of natural gas (SHFCVs). Simulations were conducted to examine the effect of converting the world's FFOVs to HFCVs, where the H 2 is produced by wind-powered electrolysis (WHFCVs). In all scenarios a 3% leakage of H 2 consumed was assumed. Two new models were developed that provide the ability to evaluate a wider range of conditions and address some of the uncertainties that exist in the evaluation of hydrogen emissions. A simplified global hydrogen cycle model that simulates hydrogen dynamics in the troposphere and stratosphere was developed. A Monte Carlo framework was developed to address hydrogen uptake variability for different types of ecosystems. Findings 1. Converting vehicles worldwide in 2050 to SHFCVs at 90% penetration in developed countries and 45% penetration in other countries is expected to reduce NO x , CO, CO 2 , CH 4 , some other organic gases, ozone, PAN, black carbon, and other particle components in the troposphere, but may increase some other organic gases, depending on emissions. Conversion to SHFCVs is also expected to cool the troposphere and warm the stratosphere, but to a lesser extent than WHFCVs. Finally, SHFCVs are expected to increase UTLS ozone while decreasing upper stratospheric ozone, but to a lesser extent than WHFCVs. 2. The predicted criteria pollutant concentrations from the GATOR-GCMOM simulations indicated that near-surface annual mean concentrations in the US are likely to increase from the 2000 base case to the 2050 A1B base case for CO 2 and ozone due to the increased economic activity, but to decrease for CO, NO 2 , SO 2 , and PM 10 due to improved pollution control equipment and energy efficiencies. The shift to SHFCVs in 2050 was predicted to result in decreased concentrations for all the criteria pollutants, except for SO 2 and PM 10 . The higher predicted concentrations for SO 2 and PM 10 were attributed to increased emissions using the steam-reforming method to generate H 2 . If renewable methods such as wind-based electrolysis were used to generate H 2 , the emissions of SO 2 and PM 10 would be lower. 3. The effects on air quality, human health, ecosystem, and building structures were quantified by comparing the GATOR-GCMOM model output and accepted health and ecosystem effects levels and ambient air quality criteria. Shifting to HFCVs is expected to result in improved air quality and benefits to human health. Shifting to HFCVs is unlikely to result in damage to buildings. 4. Results are thought to be robust for larger leakage rates of H 2 and for greater penetrations of HFCVs, since the controlling factor for stratospheric ozone impacts is the reduction in fossil-fuel greenhouse gases and the resulting surface cooling, which reduces water vapor emissions and stratospheric warming, which increases tropopause stability reducing water vapor transport to the stratosphere. 5. The supplemental modeling results were generally supportive of the results from the GATOR-GCMOM simulations, and recommendations for additional analyses were made. Extending the duration of the simulation to coincide with the time required for hydrogen mixing ratios to attain a steady state condition was recommended. Further evaluation of algorithms to describe hydrogen uptake in the model was also recommended.

08 HYDROGEN↗

Transportation Vibration Data for Klystron Experimental Hardware

This memo discusses the over-the-road vibration and shock data that was captured while transporting a klystron unit from the Stanford Linear Accelerator (SLAC) facility in Menlo Park, CA to the Lawrence Livermore National Laboratory (LLNL) main site (B381). The klystron was shipped over the road in an air ride truck on May 1, 2012 in a specially designed wooden crate with an aluminum support frame for reinforcement. The klystron unit, itself, was suspended from the frame using wire cable spring isolators to help mitigate unwanted shock and vibration.

42 ENGINEERING↗

Quantifying the Effects of Idle-Stop Systems on Fuel Economy in Light-Duty Passenger Vehicles

Vehicles equipped with idle-stop (IS) systems are capable of engine shut down when the vehicle is stopped and rapid engine re-start for the vehicle launch. This capability reduces fuel consumption and emissions during periods when the engine is not being utilized to provide propulsion or to power accessories. IS systems are a low-cost and fast-growing technology in the industry-wide pursuit of increased vehicle efficiency, possibly becoming standard features in European vehicles in the near future. In contrast, currently there are only three non-hybrid vehicle models for sale in North America with IS systems and these models are distinctly low-volume models. As part of the United States Department of Energy’s Advanced Vehicle Testing Activity, ECOtality North America has tested the real-world effect of IS systems on fuel consumption in three vehicle models imported from Europe. These vehicles were chosen to represent three types of systems: (1) spark ignition with 12-V belt alternator starter; (2) compression ignition with 12-V belt alternator starter; and (3) direct-injection spark ignition, with 12-V belt alternator starter/combustion restart. The vehicles have undergone both dynamometer and on-road testing; the test results show somewhat conflicting data. The laboratory data and the portion of the on-road data in which driving is conducted on a prescribed route with trained drivers produced significant fuel economy improvement. However, the fleet data do not corroborate improvement, even though the data show significant engine-off time. It is possible that the effects of the varying driving styles and routes in the fleet testing overshadowed the fuel economy improvements. More testing with the same driver over routes that are similar with the IS system-enabled and disabled is recommended. There is anecdotal evidence that current Environmental Protection Agency fuel economy test procedures do not capture the fuel economy gains that IS systems produce in real-world driving. The program test results provide information on the veracity of these claims.

25 ENERGY STORAGE↗

The Remediation of Abandoned Iron Ore Mine Subsidence in Rockaway Township, New Jersey

This report represents the twenty-seventh and Final Technical Progress Report issued in connection with the subsidence remediation projects undertaken by Rockaway Township in Morris County, New Jersey. This report provides a summary of the major project work accomplished during this last reporting period ending June 30, 2010 and a summary of the work accomplished since the agreement inception in 1997. This report is issued as part of the project reporting provisions set forth in the Cooperator's Agreement between the United States Government - Department of Energy, and Rockaway Township. The purpose of the Cooperator's Agreement is for the Department of Energy to provide technical and financial assistance in a coordinated effort with Rockaway Township to develop and implement a multi-phased plan to remediate ground stability problems associated with abandoned mining activity. Primarily during the 1800's, extensive iron ore mining and prospecting was undertaken in Rockaway Township, part of the Dover District Mining region in Morris County. The abandoned mining activity has resulted in public safety hazards associated with ground collapse and surface subsidence features evolving in both developed and undeveloped areas within Rockaway Township. At the Green Pond Mine site at the Township's Jacobs Road Compost Storage Facility, surface monitoring continued after completion of construction in September 2003. Surface monitoring was conducted periodically at the Mt. Hope Road subsidence work area and adjacent areas after the January 2000 construction effort. In March 2007, a seventh collapse occurred over a portion of the White Meadow Mine in a public roadway at the intersection of Iowa and Erie Avenues in Rockaway Township. After test drilling, this portion of the mine was remediated by drilling and grouting the stopes.

42 ENGINEERING↗

Using Snow Fences to Augument Fresh Water Supplies in Shallow Arctic Lakes

This project was funded by the U.S. Department of Energy, National Energy Technology Laboratory (NETL) to address environmental research questions specifically related to Alaska's oil and gas natural resources development. The focus of this project was on the environmental issues associated with allocation of water resources for construction of ice roads and ice pads. Earlier NETL projects showed that oil and gas exploration activities in the U.S. Arctic require large amounts of water for ice road and ice pad construction. Traditionally, lakes have been the source of freshwater for this purpose. The distinctive hydrological regime of northern lakes, caused by the presence of ice cover and permafrost, exerts influence on lake water availability in winter. Lakes are covered with ice from October to June, and there is often no water recharge of lakes until snowmelt in early June. After snowmelt, water volumes in the lakes decrease throughout the summer, when water loss due to evaporation is considerably greater than water gained from rainfall. This balance switches in August, when air temperature drops, evaporation decreases, and rain (or snow) is more likely to occur. Some of the summer surface storage deficit in the active layer and surface water bodies (lakes, ponds, wetlands) is recharged during this time. However, if the surface storage deficit is not replenished (for example, precipitation in the fall is low and near-surface soils are dry), lake recharge is directly affected, and water availability for the following winter is reduced.

54 ENVIRONMENTAL SCIENCES↗

Canastota Renewable Energy Facility Project

The project was implemented at the Madison County Landfill located in the Town of Lincoln, Madison County, New York. Madison County has owned and operated the solid waste and recycling facilities at the Buyea Road site since 1974. At the onset of the project, the County owned and operated facilities there to include three separate landfills, a residential solid waste disposal and recycled material drop-off facility, a recycling facility and associated administrative, support and environmental control facilities. This putrescible waste undergoes anaerobic decomposition within the waste mass and generates landfill gas, which is approximately 50% methane. In order to recover this gas, the landfill was equipped with gas collection systems on both the east and west sides of Buyea Road which bring the gas to a central point for destruction. In order to derive a beneficial use from the collected landfill gases, the County decided to issue a Request for Proposals (RFP) for the future use of the generated gas.

09 BIOMASS FUELS↗

Sampling and Analysis Plan (SAP) for Assessment of LANL-Derived Residual Radionuclides in Soils within Revised Tract A-16-a for Land Transfer Decisions

Material Disposal Area (MDA) B is an inactive subsurface disposal site located south of DP Road in Technical Area 21 (TA 21). It is approximately 1600 ft east of the intersection of DP Road and Trinity Drive (Figure 1). Land proposed for for transfer is identified as tract A-16-a and constitutes approximately 30 acres with about 6 of those acres being above the trench from which waste was removed (LANL 2012a).

61 RADIATION PROTECTION AND DOSIMETRY↗

Project Startup: Evaluating the Performance of Frito Lay's Electric Delivery Trucks (Fact Sheet)

The Fleet Test and Evaluation Team at the National Renewable Energy Laboratory (NREL) is evaluating the in-service performance of 10 medium-duty Smith Newton electric vehicles (EVs) and 10 comparable conventional diesel vehicles operated by Frito Lay North America in the Seattle, Washington, area. Launched in late 2013, the on-road portion of this 12-month evaluation focuses on collecting and analyzing vehicle performance data, such as fuel economy and maintenance costs, to better understand how to optimize the use of such vehicles in a large-scale commercial operation. In addition to the on-road portion of this evaluation, NREL is analyzing charging data to support total cost of ownership estimations and investigations into smart charging opportunities. NREL is also performing a battery life degradation analysis to quantify battery pack health, track battery performance over time, and determine how various drive cycles and battery charging protocols impact battery life.

25 ENERGY STORAGE↗

Evaluation of Transportation Vibration Associated with Relocation of Work in Process As Part of KCRIMS

During relocation of the Kansas City Plant (KCP) from the site at Bannister Road to the site at Botts Road, work in process (WIP) within a production department must be transported. This report recommends packaging to mitigate vibration levels experienced by products during between-facility transportation. Measurements and analysis demonstrate that this mitigation results in vibration levels less than those experienced by the product during routine production processes within potentially damaging frequency ranges.

42 ENGINEERING↗

Assessment of Threats to Wetland Integrity at New Boston Air Force Station, New Hampshire, with Recommendations for Mitigation

Our study addressed two projects identified in the Integrated Natural Resources Management Plan (INRMP) for New Boston Air Force Station (NBAFS), New Hampshire that are related to sustaining high-quality wetland habitats on the station. These studies were intended to: (1) evaluate erosion and its impacts on NBAFS wetlands, (2) evaluate degraded wetlands for restoration potential and (3) develop designs for wetland restoration. This report includes brief descriptions of each wetland evaluated, existing and potential erosion problems at each wetland, and recommendations for restoration actions to mitigate impacting factors at high risk wetlands. In October 2011, we surveyed 15 wetlands on NBAFS for evidence of impacts from erosion. These wetlands were chosen because they were adjacent to roads, developed areas, or disturbed areas, and therefore had a higher potential for impact from erosion. Parameters evaluated at these wetlands and adjacent areas included (1) evidence of existing sedimentation and erosion into wetland areas; (2) source of sediment; (3) slope; (4) soil type; (5) surrounding land cover; (6) presence and extent of intervening non-erosive land (e.g., vegetated surface, pavement); (7) water inputs (surface runoff, groundwater); and (8) frequency and nature of erosion events. The evaluation was watershed-based and utilized existing topographic information to determine the watershed of each wetland. Erosion problems at specific locations were ranked according to risk, including probability of occurrence, magnitude of effect, and severity of effects. Our evaluations were used to determine opportunities for wetland restoration. Restoration activities were developed on a case-by-case basis with an emphasis on wetlands at highest risk of degradation. Our recommendations for restoration focused on eliminating or reducing risk using minimally intrusive procedures and engineering solutions that could be achieved at relatively low cost. We emphasize concepts such as permeable paving, stabilization of road surfaces, nonnative plant removals, and native plant buffers that eliminate the source of the disturbance or reduce the energy of runoff while increasing groundwater infiltration rates. Recommended restoration actions and solutions are intended to be sufficiently explicit to develop work plans for restoration activities.

Van Lonkhuyzen, Robert A.↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

Ecological Monitoring and Compliance Program 2014 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes (Crotalus mitchellii), and several species of cacti. NSTec provided to project managers a written summary report of all survey findings and mitigation recommendations, where applicable. Of the 18 projects on the NNSS, 15 occurred within the range of the threatened desert tortoise. Approximately 2.19 ha of desert tortoise habitat were disturbed. No desert tortoises were accidentally injured or killed by project activities, and no tortoises were killed by vehicles. On 13 occasions, tortoises were moved off the road and out of harm’s way. Six tortoises were found and transmitters attached as part of an approved study to assess impacts of vehicles on tortoises on the NNSS. NSTec biologists continued to monitor 37 juvenile desert tortoises as part of a collaborative effort to study survival and temperament of translocated animals. From 1978 until 2013, there has been an average of 11.2 wildland fires per year on the NNSS with an average of about 83.7 ha burned per fire. There were no wildland fires documented on the NNSS during 2014. Results from the wildland fuel surveys showed a very low risk of wildland fire due to reduced fuel loads caused by limited natural precipitation. Limited reptile trapping and reptile roadkill surveys were conducted to better define species distribution on the NNSS. Sixteen reptiles were trapped representing five species. Combined with data from 2013, 183 road kills were detected, representing 11 snake and 8 lizard species. Selected natural water sources were monitored to assess trends in physical and biological parameters, and one new water source was found. Wildlife use at five water troughs and four radiologically contaminated sumps was documented using motion-activated cameras. As part of the statewide effort to disseminate information throughout the botanical community, NSTec prepared a shape file with site-specific data for all 17 sensitive plants on the NNSS and provided it to the Nevada Natural Heritage Program for inclusion in their statewide database. No field surveys were conducted this year for sensitive plants on the NNSS due to poor growing conditions. Surveys of sensitive and protected/regulated animals during 2014 focused on winter raptors, bats, wild horses (Equus caballus), mule deer (Odocoileus hemionus), desert bighorn sheep (Ovis Canadensis nelsoni), and mountain lions (Puma concolor). Two permanent, long-term winter raptor survey routes were established and sampled in January and February. A total of 27 raptors representing 4 species were observed. The wild horse population increased from 30 to 41, with several yearlings recruiting into the population, possibly due to the death of a mountain lion known to prey on horse foals. Mule deer abundance and density measured with standardized deer surveys was similar to 2013 and appears to be stable. Desert bighorn sheep, including rams, ewes, and lambs, were detected using motion-activated cameras at four water sources. There are plans to conduct helicopter surveys to census the population during September 2015 and then capture and radio-collar up to 20 sheep during November 2015. Over 150 sheep scat samples have been collected for genetic analysis to try to determine how sheep on the NNSS are related to surrounding sheep populations. Information is presented about bird mortalities, Migratory Bird Treaty Act compliance, and a summary of nuisance animals and their control on the NNSS. A total of 93 mountain lion images (i.e., photographs or video clips) were taken during 220,379 camera hours at 16 of 32 sites sampled and another 11,946 images of at least 29 species other than mountain lions were taken as well. A mountain lion telemetry study continued in 2014. NNSS7 was tracked from January 1 to November 15 using a global positioning system satellite transmitter. He consumed 21 mule deer, 17 desert bighorn sheep, 1 juvenile bobcat, and 3 coyotes. Mule deer were primarily taken in the summer and fall. No new mountain lions were captured. A minimum of four adult lions (two males, two females), a subadult male, and three kittens were known to inhabit the NNSS during 2014. Two previously revegetated sites on the NNSS and one on the Tonopah Test Range (TTR) were monitored in 2014. The cover cap on the U-3ax/bl disposal unit, revegetated in 2000, and the 92-Acre Site at the Area 5 Radioactive Waste Management Complex, revegetated in 2011, were the restoration sites monitored on the NNSS. The Corrective Action Unit 407 Rollercoaster RADSAFE site, revegetated in 2000, was the restoration site monitored on the TTR. Plant cover and density were recorded at all sites except U-3ax/bl (qualitative monitoring), and reclamation success standards were evaluated, where applicable.

54 ENVIRONMENTAL SCIENCES↗

September 2013 Storm and Flood Assessment Report

Between September 10 and 17, 2013, New Mexico and Colorado received a historically large amount of precipitation (Figure 1). This report assesses the damage caused by flooding along with estimated costs to repair the damage at Los Alamos National Laboratory (the Laboratory) on the Pajarito Plateau. Los Alamos County, New Mexico, received between 200% and 600% of the normal precipitation for this time period (Figure 2), and the Laboratory received approximately 450% percent of its average precipitation for September (Figure 3). As a result, the Laboratory was inundated with rain, including the extremely large, greater-than-1000-yr return period event that occurred between September 12 and 13 (Table 1). With saturated antecedent soil conditions from the September 10 storm, when the September 12 to September 13 storm hit, the flooding was disastrous to the Laboratory’s environmental infrastructure, including access roads, gage stations, watershed controls, control measures installed under the National Pollutant Discharge Elimination System Permit (hereafter, the Individual Permit), and groundwater monitoring wells (Figures 4 through 21). From September 16 to October 1, 2013, the Laboratory completed field assessments of environmental infrastructure and generated descriptions and estimates of the damage, which are presented in spreadsheets in Attachments 1 to 4 of this report. Section 2 of this report contains damage assessments by watershed, including access roads, gage stations, watershed controls, and control measures installed under the Individual Permit. Section 3 contains damage assessments of monitoring wells by the groundwater monitoring groups as established in the Interim Facility-Wide Groundwater Monitoring Plan for Monitoring Year 2014. Section 4 addresses damage and loss of automated samplers. Section 5 addresses sediment sampling needs, and Section 6 is the summary of estimated recovery costs from the significant rain and flooding during September 2013.

58 GEOSCIENCES↗

Vehicle Technologies and Fuel Cell Technologies Program: Prospective Benefits Assessment Report for Fiscal Year 2016

Under a diverse set of programs, the Vehicle Technologies and Fuel Cell Technologies offices of DOE’s Office of Energy Efficiency and Renewable Energy invest in research, development, demonstration, and deployment of advanced vehicle, hydrogen production, delivery and storage, and fuel cell technologies. This report estimates the benefits of successfully developing and deploying these technologies (a “Program Success” case) relative to a base case (the “No Program” case). The Program Success case represents the future with completely successful deployment of Vehicle Technologies Office (VTO) and Fuel Cell Technologies Office (FCTO) technologies. The No Program case represents a future in which there is no contribution after FY 2016 by the VTO or FCTO to these technologies. The benefits of advanced vehicle, hydrogen production, delivery and storage, and fuel cell technologies were estimated on the basis of differences in fuel use, primary energy use, and greenhouse gas (GHG) emissions from light-, medium- and heavy-duty vehicles, including energy and emissions from fuel production, between the base case and the Program Success case. Improvements in fuel economy of various vehicle types, growth in the stock of fuel cell vehicles and other advanced technology vehicles, and decreased GHG intensity of hydrogen production and delivery in the Program Success case over the No Program case were projected to result in savings in petroleum use and GHG emissions. Benefits were disaggregated by individual program technology areas, which included the FCTO program and the VTO subprograms of batteries and electric drives; advanced combustion engines; fuels and lubricants; materials (for reduction in vehicle mass, or “lightweighting”); and, for medium- and heavy-duty vehicles, reduction in rolling and aerodynamic resistance. Projections for the Program Success case indicate that by 2035, the average fuel economy of on-road, light-duty vehicle stock could be 47% to 76% higher than in the No Program case. On-road medium- and heavy-duty vehicle stock could be as much as 39% higher. The resulting petroleum savings in 2035 were estimated to be as high as 3.1 million barrels per day, and reductions in GHG emissions were estimated to be as high as 500 million metric tons of CO2 equivalent per year. The benefits of continuing to invest government resources in advanced vehicle and fuel cell technologies would have significant economic value in the U.S. transportation sector and reduce its dependency on oil and its vulnerability to oil price shocks.

33 ADVANCED PROPULSION SYSTEMS↗