Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Groundwater Monitoring and Control Before Decommissioning of the Research Reactor VVR-S from Magurele-Bucharest

The research reactor type VVR-S (tank type, water is cooler, moderator and reflector, thermal power- 2 MW, thermal energy- 9. 52 GW d) was put into service in July 1957 and, in December 1997 was shout down. In 2002, Romanian Government decided to put the research reactor in the permanent shut-down in order to start the decommissioning. This nuclear facility was used in nuclear research and radioisotope production for 40 years, without events, incidents or accidents. Within the same site, in the immediate vicinity of the research reactor, there are many other nuclear facilities: Radioactive Waste Treatment Plant, Tandem Van der Graaf heavy ions accelerator, Cyclotron, Industrial Irradiator, Radioisotope Production Center. The objectives of this work were dedicated on the water underground analyses described in the following context: - presentation of the approaches in planning the number of drillings, vertical soil profiles (characteristics, analyses, direction of the flow of underground water, uncertainties in measurements); - presentation of the instrumentation used in analyses of water, soil and vegetation samples - analyses and final conclusions on results of the measurements; - comparison of the results of measurements on underground water from drillings with the measurements results on samples from the town and the system of drinking water - supplied from the second level of underground water. According to the analysis, in general, no values higher than the Minimum Detectable Activity were detected in water samples (MDA) for Pb{sup 212}, Bi{sup 214}, Pb{sup 214}, Ac{sup 228}, but situated under values foreseen in drinking water. Distribution of Uranium As results of the Uranium determination, values higher than 0,004 mg/l (4 ppb) were detected, values that represent the average contents in the underground water. The higher values, 2-3 times higher than background, were detected in the water from the drillings F15, F12, F5, F13, drillings located between RWTP (Radioactive Waste Treatment Plant) - the 300 m{sup 3} tanks and the Spent Filters Storage (SFS). At south of this area, on the leaking direction of the underground water layer, in the drillings F1, F2, F3, F18 and at east, in F6, F7, the natural Uranium values are within the background for the underground-water. Distribution of Radon For the Radon determination with RAD 7 equipment, water samples were taken from the same piezo-metrical drilling, 2 or 4 times during of six months period, and then, the average contents were calculated, which varied between 0,35 - 2,1 Bq/l. The values higher than 1,1 -1,2 Bq/l were detected in the water taken from the drillings located in the northern part (F10, F11) and in the eastern part (F6, F8) of the Institute fences (around of the radioactive waste storage facilities). The concentrations of 0,3 - 0,5 Bq/l are in the underground-water layer 'intercepted' by the piezo-metrical drillings (F1, F2, F3) located near the Nuclear Reactor. Concentration of heavy metals: 0.04-0.08 mg/l Pb in F5, F14, F7, F8 exceeding MCA-Maximum Admissible Concentration (0.01 mg/l) for Pb, and for Zn in F5, F7, F8, F14 are 0.2-0.5 mg/l situated under MCA , and 0.18 mg/l in F18, in accordance with tendency of decreasing of concentration of contaminants. After 50 years of deploying nuclear activities on the site the underground water quality is in very good condition. Taking into consideration the direction of the underground water flow, it results that, only in the area of underground pipe, around of the research reactor and radioactive waste treatment plant, the quality of water is influenced, and remediation actions are not necessary. Based on measurements executed in F18, the water quality is the same with any other part of the region. During the decommissioning of the Research Reactor, the samples from 18 drillings will be analysed monthly, and the contents of the heavy metals, Pb and Zn, will be monitored carefully, together with all the factors: air, soil, vegetation, subsoil, water surface and underground water. A great attention will be paid to the dismantlement of the underground structures, the 30 m{sup 3} tank, that collects all the liquid radioactive waste from the reactor, the pipes that connects this tank to the other two 300 m{sup 3} tanks, from RWTP, the ventilation ducts between the Spent Filters Storage and reactor's stack, in order to prevent contamination of surface and underground water. Engineering Absorbent Barriers will be used both for hydrophilic substances and for hydrophobic substances, tents will be used for preventing the spread of possible contaminants from the pipes and tanks, owing to the precipitation or wind, and the tanks and pipes will be drained to eliminate the spills. Since we are dealing with a multinuclear facility site, the on site and off site Monitoring Program of Institute will be properly upgraded, taking into account the values of the derived emission limit approved by Regulatory Body, before, during and after the completion of the works with impact on underground water. In another work will be presented radiological map of land associated of decommissioning project (on surface, at 0.15 m and 0.30 m in depth of soil) and estimation of migration rate in soil up to ground water level. Applying these measures, taking account of the radiological status at the beginning of the project, will mean savings and a good protection of the environment in completing the decommissioning project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A review of decommissioning considerations for new reactors

At a time of 'nuclear renaissance' when the focus is on advanced reactor designs and construction, it is easy to overlook the decommissioning considerations because such a stage in the life of the new reactors will be some sixty years down the road. Yet, one of the lessons learned from major decommissioning projects has been that decommissioning was not given much thought when these reactors were designed three or four decades ago. Hence, the time to examine what decommissioning considerations should be taken into account is right from the design stage with regular updates of the decommissioning strategy and plans throughout the life cycle of the reactor. Designing D and D into the new reactor designs is necessary to ensure that the tail end costs of the nuclear power are manageable. Such considerations during the design stage will facilitate a more cost-effective, safe and timely decommissioning of the facility when a reactor is eventually retired. This paper examines the current regulatory and industry design guidance for the new reactors with respect to the decommissioning issues and provides a review of the design considerations that can help optimize the reactor designs for the eventual decommissioning. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The IAEA international conference on fast reactors and related fuel cycles: highlights and main outcomes

The 'International Conference on Fast Reactors and Related Fuel Cycles', which is regularly held every four years, represents the main international event dealing with fast reactors technology and related fuel cycles options. Main topics of the conference were new fast reactor concepts, design and simulation capabilities, safety of fast reactors, fast reactor fuels and innovative fuel cycles, analysis of past experience, fast reactor knowledge management. Particular emphasis was put on safety aspects, considering the current need of developing and harmonizing safety standards for fast reactors at the international level, taking also into account the lessons learned from the accident occurred at the Fukushima- Daiichi nuclear power plant in March 2011. Main advances in the several key areas of technological development were presented through 208 oral presentations during 41 technical sessions which shows the importance taken by fast reactors in the future of nuclear energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Removing of Core Constructions of the MR and RFT Reactors in NRC 'Kurchatov Institute' - 16054

In frame of the FTP 'Providing nuclear and radiation safety of Russia in 2008 and for the period till 2015' works of a decommissioning of the MR and RFT research reactors are carried out in National Research Center 'Kurchatov Institute'. Within these works, the equipment of 9 loop-back facilities of the MR reactor was dismantled. In the conditions, which are most approached to natural, one researched a heat, hydrodynamic and strength characteristics of elements of cores and the capital equipment of the majority of power reactors at these facilities. In 2014-2015 dismantle of core constructions of the MR reactor was carried out and dismantle of a graphite laying of the RFT reactor is begun. The beryllium blocks, which were constructional elements of the core, and the graphite blocks playing a reactor reflector role were also taken, packed into cases or containers and removed: part on an accumulative platform, and part are placed in storage of high level radioactive waste of the Center for decay and further sending for long storage. Works were performed by remote controlled mechanisms, control of their performance was exercised by means of remote diagnostics: Gammavizor, the scanning spectrometer systems. The following methods and the organizational principles were applied to providing of radiation safety of these works: - the constant radiation control including individual control of a dose of external radiation, control of volume activity of radionuclides in air, annual control of internal radiation doses of the personnel; - dust suppression and fixing of radioactive contamination by dispersion of polymeric structures; - carrying out decontamination on a shift basis rooms with use of detergents; - use of the remote controlled mechanisms equipped with hydraulic scissors, nippers, application of the diamond are sharp that allowed to perform the majority of technological operations remotely, using 'cold' methods of fragmentation; - development on each type of works of the operation project and schedules. As a result, of works of 2011-2014 of the decommissioning of the MR and RFT research reactors more than 630 t of the equipment were dismantled. From them more than 455 t of radioactive waste was. The total activity of radwaste exceeded 300.0 GBq. From the pool of the reactor, about 160 channels of loop-back installations and near 230 beryllium and graphite are taken, fragmented and packed. The total activity on radionuclides {sup 60}Co and {sup 137}Cs of them was near 55 TBq. From the territory of the center about 2550 m{sup 3} of firm and 4600 m{sup 3} of liquid radwaste are removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantlement of the TSF-SNAP Reactor Assembly

This paper describes the dismantlement of the Tower Shielding Facility (TSF)?Systems for Nuclear Auxiliary Power (SNAP) reactor, a SNAP-10A reactor used to validate radiation source terms and shield performance models at Oak Ridge National Laboratory (ORNL) from 1967 through 1973. After shutdown, it was placed in storage at the Y-12 National Security Complex (Y-12), eventually falling under the auspices of the Highly Enriched Uranium (HEU) Disposition Program. To facilitate downblending of the HEU present in the fuel elements, the TSF-SNAP was moved to ORNL on June 24, 2006. The reactor assembly was removed from its packaging, inspected, and the sodium-potassium (NaK) coolant was drained. A superheated steam process was used to chemically react the residual NaK inside the reactor assembly. The heat exchanger assembly was removed from the top of the reactor vessel, and the criticality safety sleeve was exchanged for a new safety sleeve that allowed for the removal of the vessel lid. A chain-mounted tubing cutter was used to separate the lid from the vessel, and the 36 fuel elements were removed and packaged in four U.S. Department of Transportation 2R/6M containers. The fuel elements were returned to Y-12 on July 13, 2006. The return of the fuel elements and disposal of all other reactor materials accomplished the formal objectives of the dismantlement project. In addition, a project model was established for the handling of a fully fueled liquid-metal?cooled reactor assembly. Current criticality safety codes have been benchmarked against experiments performed by Atomics International in the 1950s and 1960s. Execution of this project provides valuable experience applicable to future projects addressing space and liquid-metal-cooled reactors.

36 MATERIALS SCIENCE↗

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Thermalhydraulic calculation for boiling water reactor and its natural circulation component

Thermalhydraulic of reactor core is the thermal study on fluids within the core reactor, i.e. analysis of the thermal energy transfer process produced by fission reaction from fuel to the reactor coolant. This study include of coolant temperature and reactor power density distribution. The purposes of this analysis in the design of nuclear power plant are to calculate the coolant temperature distribution and the chimney height so natural circulation could be occurred. This study was used boiling water reactor (BWR) with cylinder type reactor core. Several reactor core properties such as linear power density, mass flow rate, coolant density and inlet temperature has been took into account to obtain distribution of coolant density, flow rate and pressure drop. The results of calculation are as follows. Thermal hydraulic calculations provide the uniform pressure drop of 1.1 bar for each channels. The optimum mass flow rate to obtain the uniform pressure drop is 217g/s. Furthermore, from the calculation it could be known that outlet temperature is 288°C which is the saturated fluid’s temperature within the system. The optimum chimney height for natural circulation within the system is 14.88 m.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conversion Preliminary Safety Analysis Report for the NIST Research Reactor

The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the NIST research reactor (aka NBSR); a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a preliminary version of the Safety Analysis Report (SAR) that would be submitted to the U.S. Nuclear Regulatory Commission (NRC) for approval prior to conversion. The report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis in any conversion SAR is to explain the differences between the LEU and HEU cores and to show the acceptability of the new design; there is no need to repeat information regarding the current reactor that will not change upon conversion. Hence, as seen in the report, the bulk of the SAR is devoted to Chapter 4, Reactor Description, and Chapter 13, Safety Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methods for quantifying uncertainty in fast reactor analyses.

Liquid-metal-cooled fast reactors in the form of sodium-cooled fast reactors have been successfully built and tested in the U.S. and throughout the world. However, no fast reactor has operated in the U.S. for nearly fourteen years. More importantly, the U.S. has not constructed a fast reactor in nearly 30 years. In addition to reestablishing the necessary industrial infrastructure, the development, testing, and licensing of a new, advanced fast reactor concept will likely require a significant base technology program that will rely more heavily on modeling and simulation than has been done in the past. The ability to quantify uncertainty in modeling and simulations will be an important part of any experimental program and can provide added confidence that established design limits and safety margins are appropriate. In addition, there is an increasing demand from the nuclear industry for best-estimate analysis methods to provide confidence bounds along with their results. The ability to quantify uncertainty will be an important component of modeling that is used to support design, testing, and experimental programs. Three avenues of UQ investigation are proposed. Two relatively new approaches are described which can be directly coupled to simulation codes currently being developed under the Advanced Simulation and Modeling program within the Reactor Campaign. A third approach, based on robust Monte Carlo methods, can be used in conjunction with existing reactor analysis codes as a means of verification and validation of the more detailed approaches.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design Studies for a Multiple Application Thermal Reactor for Irradiation Experiments (MATRIX)

The Advanced Test Reactor (ATR) is a high power density test reactor specializing in fuel and materials irradiation. For more than 45 years, the ATR has provided irradiations of materials and fuels testing along with radioisotope production. Should unforeseen circumstances lead to the decommissioning of ATR, the U.S. Government would be left without a large-scale materials irradiation capability to meet the needs of its nuclear energy and naval reactor missions. In anticipation of this possibility, work was performed under the Laboratory Directed Research and Development (LDRD) program to investigate test reactor concepts that could satisfy the current missions of the ATR along with an expanded set of secondary missions. A survey was conducted in order to catalogue the anticipated needs of potential customers. Then, concepts were evaluated to fill the role for this reactor, dubbed the Multi-Application Thermal Reactor Irradiation eXperiments (MATRIX). The baseline MATRIX design is expected to be capable of longer cycle lengths than ATR given a particular batch scheme. The volume of test space in In-Pile-Tubes (IPTs) is larger in MATRIX than in ATR with comparable magnitude of neutron flux. Furthermore, MATRIX has more locations of greater volume having high fast neutron flux than ATR. From the analyses performed in this work, it appears that the lead MATRIX design can be designed to meet the anticipated needs of the ATR replacement reactor. However, this design is quite immature, and therefore any requirements currently met must be re-evaluated as the design is developed further.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Core design of long life-cycle fast reactors operating without reactivity margin

In this paper we consider a possibility of designing a fast reactor core that operates without reactivity margin for a long time. This study is based on the physical principle of fast reactor operating in a self-adjustable neutron-nuclear regime (SANNR-1) introduced by L.P. Feoktistov (1988-1993) and improved by V. Ya. Gol'din SANNR-2 (1995). The mathematical modeling of active zones of fast reactors in SANNR modes is held by authors since 1992. The numerical simulation is based on solving the neutron transport equation coupled with quasi-diffusion equations. The calculations have been performed using standard 26 energy groups. We use a hierarchy of spatial models of 1D, 1.5D, 2D, and 3D geometries. The spatial models of higher dimensionality are used for verification of results. The calculations showed that operation of the reactor in this mode increases its efficiency, safety and simplifies management. It is possible to achieve continuous work of the reactor in SANNR-2 during 7-10 years without fuel overloads by means of further optimization of the mode. Small reactivity margin is used only for the reactor start up. After first 10-15 days the reactor in SANNR-2 operates without reactivity margin. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successes and Lessons Learned in the Design, Construction and Use of a Tool for Sampling the WR-1 Reactor Core - 1900z

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on an organically cooled, heavy water moderated nuclear reactor in the world, Whiteshell Reactor 1 (WR-1). WR-1 was safely shut down in 1985, de-fueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed In Situ Decommissioning of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, pressure tubes) was necessary to verify inventory estimates and neutron activation models produced circa 1992. The Fuel Channels of WR-1 (pressure tubes) were expected to be the most activated components of the reactor core, and to account for about 60% of the reactor core inventory. The interior surface of the fuel channel is also the most readily accessible surface within the reactor core. As such the decision was made to collect a sample of one of each of 3 Fuel Channel material types (Stainless Steel, Zr-2.5Nb, Ozhenite) for comparison to modelled estimates of neutron activation of various core materials. The expected dose rates from the samples were between 5 and 100 mSv (500-10,000 mrem) on contact based on a 200 mg sample. Sampling the Fuel Channels required verification the Fuel Channel was drained of organic coolant, removal of residual organic coolant from the Fuel Channel wall, removal of material from the interior surface of the Fuel Channel at the centerline of flux (∼25' below the operator position), and extraction of that material from the core. Several options for existing tooling and technologies, including hydraulic scrapers, and horizontal drill technologies, were looked at for their applicability to WR-1. While suitable approaches to higher radiation field sample collection, they were overly complex, costly and time consuming for the configuration at WR-1. In an effort to reduce costs, and to simplify the sampling process, a specialized and simple tool was developed to mechanically scrape a small sample of the interior wall of the Fuel Channels, collect the sample into a vial, and remove the sample from the core for analysis. The tool was designed, constructed, tested and implemented in the field entirely by Canadian Nuclear Laboratories Staff. The tool required no powered components, or electronic guidance or measurements; and was designed and constructed for a fraction of the cost of other commercially available technologies for sample collection within reactor cores. The samples were successfully collected without any injuries, contamination events or equipment failures. The tool remains operational in the event additional sampling is required. This paper provides additional details of the design, construction, testing and use of the tool and the successes and lessons learned during the various stages of design and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimization of Nuclear Waste using AHWR Reactor Technology

Nuclear sciences have grown from creating reactors to a greater understanding of how to dispose off the waste exhibited by the nuclear activities. Various methodologies have been proposed and are being used in order to do the same. This poster poses great attention to 'Using a fuel cycle dedicated to the production of the lower quantity of minor actinides, is one of the key targets in reducing nuclear waste in india'. A significant fraction of thorium is utilized as a fertile host in the Advanced Heavy Water Reactor (AHWR300-LEU) fuel. Being lower in the periodic table, it leads to a reduction of minor actinides. It produces only half of the minor actinides as a waste as compared to modern LWRs. As thorium oxide has inert nature, it benefits in its prolonged storage. Therefore, safe disposal of spent fuel is achieved due to the inert matrix, on completion of one fuel cycle mode. AHWR is a 300 MWe, vertical, pressure-tube type, boiling light water-cooled, and heavy water-moderated reactor. Employs natural circulation for removal of heat from the reactor core. In-situ conversion of {sup 232}Th into {sup 233}U. The reactor design permits flexible fuel cycle options. There are two types of AHWR depending upon the fuel cycle options. Uses thorium-based oxide fuels: two fuel cycle options. With the adoption of thorium fuel cycle, AHWR300-LEU produces less minor actinides. As compared to modern LWRSs, it produces almost 37% less amount of actinides for the same amount of energy production, which in turn minimizes the burden on waste disposal requirements. But, it is associated with radionuclides such as {sup 231}Pa (produced through absorption of one neutron and emission of two neutrons). Since, the reaction rate of (n,2n) reactions is very low in thermal neutron reactors, thus making the fuel cycle the favorable one. Thorium oxide (ThO{sub 2}) is chemically stable and is the highest oxidation state of thorium, therefore the inert nature of the matrix is advantageous for safe disposal of spent fuel in case of adoption of open fuel cycle mode and offers prolonged storage of spent fuel. The AHWR is thorium fueled Indian nuclear reactor that assimilates several new features with diminished environmental concern due to reduced waste generation. Since thorium fuel cycle produces less long lived nuclear waste, thus it can possibly bring the world cleaner and more sustainable nuclear energy. Currently, India being the only country with large scale research program of thorium nuclear power serves a platform for the development and demonstration of all technologies and advanced safety systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atmospheric {sup 41}Ar Plume Tracking of the UF Training Reactor Using a Large-Volume NaI Detector

The ability to track and monitor gaseous radioactive materials is important in the event of a radioactive release such as from a nuclear power plant accident, weapons testing, or other unintended release scenarios. The International Monitoring System (IMS) is currently in place to monitor for weapons testing and has been used to monitor nuclear power plant accidents. However, only 80 radionuclide stations for the IMS exist in the world and are stationary, limiting the resolution of any radioactive plumes detected. Furthermore, the IMS radionuclide stations are designed to be sensitive specifically to atmospheric radio-xenon and no other radionuclides. Historically, monitoring radioactive releases has been limited to the detection of radio-xenon and radio-krypton, both arising as fission products from nuclear fuel. After the accident at Three Mile Island Unit 2, scientists were interested in finding the dose the public received from released radioactive material. This was achieved by analyzing radiation monitors in the exhaust stack and filters within the reactor building. furthermore, a series of 20 thermoluminescent dosimeters (TLD's), 8 air sampling station positioned around Three Mile Island, and a helicopter survey which used a NaI(Tl) detector array provided data on radionuclides, specifically {sup 137}Cs, that escaped the confines of the reactor building. The TLD's and air sampling stations were stationary, and therefore limited the resolution of the radioactive release plume. The helicopter survey using the NaI detectors was limited by the technology available at the time. The NaI detector array output was compressed from 1024 channels to 256 channels, limiting the energy resolution of the spectral data. The helicopter used a microwave ranging system to establish position. Since this survey was taken in October of 1982, advancements in technology allow spectral data to be saved in its full 1024 channel format and the advent of GPS can give a more accurate account of the detector position. An updated mobile system for tracking a radioactive release would help to alleviate these issues as well as gain the ability to track a radioactive release in real-time. We investigate the feasibility of mobile tracking through study and measurement of the {sup 41}Ar plume released from the University of Florida Training Reactor (UFTR) research reactor. We use a large-volume NaI(Tl) detector placed on the roof near the reactor. This detector may also be placed and moved on a cart to survey the area surrounding the reactor. We compare the spectral data taken when the reactor is running at full power to the background to analyze the effectiveness of the detector at identifying atmospheric {sup 41}Ar. Finally we discuss the implications of these measurements with regards to validation of plume models and the capability to track releases over a localized area from the source. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HFIR Core Modeling and Analysis for the PROSPECT Reactor Antineutrino Experiment

Nuclear reactors have been employed as a copious source of antineutrinos for over six decades. Research initially directed at the study of antineutrino physics has led to applications of these highly penetrating particles to reactor safeguards because the antineutrino flux and spectrum can be related to the state of the reactor core, including burnup evolution. One of the main challenges of antineutrino-based safeguards is operation of the detectors near surface (within the reactor containment or in the close proximity). Lack of overburden results in increased contribution to the detector noise from cosmic radiation. Similarly to safeguards, experiments to definitively confirm or exclude the existence of sterile neutrino oscillations require detector technologies capable of operating at short baselines (tens of meters) at the surface. The Precision Reactor Oscillation and Spectrum Experiment (PROSPECT) at the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is an experiment with a main objective to make a precision measurement of the flux and energy spectrum of antineutrinos emitted from nuclear reactors in order to search for the oscillation signature of sterile neutrinos. Fissions of highly-enriched uranium of HFIR will serve as a source of antineutrinos. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparing Sensitivity/Uncertainty Analysis Results for LR-0 Salt Experiments with Salt Reactor Models

Recent reactor physics measurements conducted at Research Centre Rez (RC Rez) used the LR-0 low power nuclear reactor to investigate neutronic impacts and uncertainties of FLiNa (60 mol% LiF and 40 mol% NaF) and FLiBe (2 LiF + BeF{sub 2}) salt targets. This included using FLiBe originally from the Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory (ORNL), which contained enriched lithium (99.994 mol% {sup 7}Li). In collaboration with RC Rez, ORNL performed sensitivity/uncertainty (S/U) analyses of these LR-0 experiments with salt targets. Molten salt reactor technologies can be categorized into two general types: solid-fueled or liquid-fueled. Solid-fueled molten salt technologies are perhaps best represented by fluoride-salt-cooled high-temperature reactors (FHRs), which are solid-fueled and salt-cooled. They are potentially promising because they offer high-temperature outlet heat using a low-pressure, high-power-density system (relative to high temperature gas-cooled reactors). However, FHRs have never been built; therefore, no direct neutronic benchmarks exist for code or cross section validation work. Liquid-fueled molten salt reactors (MSRs) use a liquid salt as both fuel and coolant. MSRs can be designed to use a variety of fertile or fissile species as nuclear fuel, different neutron energy spectra, and a multitude of approaches for adding or removing material from the salt. The MSRE generated some operational data for fluoride salt MSRs, but no formal benchmarks currently exist based on the MSRE data, and the data available do not cover all operational conditions. Given these data limitations, ORNL performed S/U analyses using application models for FHR and MSR concepts to (1) identify potential sources of bias in FHR and MSR simulations resulting from cross section uncertainties and to (2) compare the sensitivity of neutron multiplication in FHR and MSR concepts to cross section data on an energy-dependent basis for specific nuclides against similar sensitivity results from LR-0 with a FLiBe salt target. In the future, these S/U analyses could inform the design of additional salt experiments or provide part of the basis for follow-up work to refine nuclear data. Please see the final project report for additional details beyond this paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗