Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Energy Management Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

13 HYDRO ENERGY↗

CHP REGIONAL APPLICATION CENTERS: ACTIVITIES AND SELECTED RESULTS

Between 2001 and 2005, the U.S. Department of Energy (DOE) created a set of eight Regional Application Centers (RACs) to facilitate the development and deployment of Combined Heat and Power (CHP) technologies. By utilizing the thermal energy that is normally wasted when electricity is produced at central generating stations, Combined Heat and Power installations can save substantial amounts of energy compared to more traditional technologies. In addition, the location of CHP facilities at or near the point of consumption greatly reduces or eliminates electric transmission and distribution losses. The regional nature of the RACs allows each one to design and provide services that are most relevant to the specific economic and market conditions in its particular geographic area. Between them, the eight RACs provide services to all 50 states and the District of Columbia. Through the end of the federal 2009 fiscal year (FY 2009), the primary focus of the RACs was on providing CHP-related information to targeted markets, encouraging the creation and adoption of public policies and incentives favorable to CHP, and providing CHP users and prospective users with technical assistance and support on specific projects. Beginning with the 2010 fiscal year, the focus of the regional centers broadened to include district energy and waste heat recovery and these entities became formally known as Clean Energy Application Centers, as required by the Energy Independence and Security Act (EISA) of 2007. In 2007, ORNL led a cooperative effort to establish metrics to quantify the RACs accomplishments. That effort began with the development of a detailed logic model describing RAC operations and outcomes, which provided a basis for identifying important activities and accomplishments to track. A data collection spreadsheet soliciting information on those activities for FY 2008 and all previous years of RAC operations was developed and sent to the RACs in the summer of 2008. This represents the first systematic attempt at RAC program measurement in a manner consistent with approaches used for other efforts funded by DOE's Industrial Technologies Program (ITP). In addition, data on CHP installations and associated effects were collected for the same years from a state-by-state database maintained for DOE by ICF international. A report documenting the findings of that study was produced in September, 2009. The purpose of the current report is to present the findings from a new study of RAC activities and accomplishments which examined what the Centers did in FY 2009, the last year in which they concentrated exclusively on CHP technologies. This study focused on identifying and describing RAC activities and was not designed to measure how those efforts influenced CHP installations or other outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Perspectives of Future R and D on HLW Disposal in Germany

The 5. Energy Research Program of the Federal Government 'Innovation and New Technology' is the general framework for R and D activities in radioactive waste disposal. The Ministry of Economics and Technology (BMWi), the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) and the Ministry of Education and Research (BMBF) apply the Research Program concerning their respective responsibilities and competences. With regard to the Government's obligation to provide repositories for HLW (spent fuel and vitrified HAW) radioactive waste basic and applied R and D is needed in order to make adequate knowledge available to implementers, decision makers and stakeholders in general. Non-site specific R and D projects are funded by BMWi on the basis of its Research Concept. In the first stage (1998 -2001) most R and D issues were focused on R and D activities related to HLW disposal in rock salt. By that time the R and D program had to be revised and some prioritization was demanded due to changes in politics. In the current version (2001 -2006) emphasize was put on non-saline rocks. The current Research Concept of BMWi is presently subjected to a sort of revision, evaluation, and discussion, inter alia, by experts from several German research institutions. This activity is of special importance against the background of streamlining and focusing the research activities to future demands, priorities and perspectives with regard to the salt concept and the option of disposing of HLW in argillaceous media. Because the status of knowledge on disposal in rock salt is well advanced, it is necessary to take stock of the current state-of-the-art. In this framework some key projects are being currently carried out. The results may contribute to future decisions to be made in Germany with respect to HLW disposal. The first project deals with the development of an advanced safety concept for a HLW waste repository in rock salt. The second project (also carried out in the frame of the 6. Framework Program of the European Commission) aims at completing and optimizing the direct disposal concept for spent fuel by a full-scale demonstration of the technology of emplacement in vertical boreholes. The third project is devoted to the development of a reference concept to dispose of HLW in deep geological repository in clay in Germany. In the following a brief overview is given on the achievements, the projects, and ideas about the consequences for HLW disposal in Germany. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proceedings of the North Aleutian Basin information status and research planning meeting.

The North Aleutian Basin Planning Area of the Minerals Management Service (MMS) is a large geographic area with significant ecological and natural resources. The Basin includes most of the southeastern part of the Bering Sea continental shelf including all of Bristol Bay. The area supports important habitat for a wide variety of species and globally significant habitat for birds and marine mammals including federally listed species. Villages and communities of the Alaska Peninsula and other areas bordering or near the Basin rely on its natural resources (especially commercial and subsistence fishing) for much of their sustenance and livelihood. The offshore area of the North Aleutian Basin is considered to have important hydrocarbon reserves, especially natural gas. In 2006, the MMS released a draft proposed program, Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012 and an accompanying draft programmatic environmental impact statement (EIS). The draft proposed program identified two lease sales proposed in the North Aleutian Basin in 2010 and 2012, subject to restrictions. The area proposed for leasing in the Basin was restricted to the Sale 92 Area in the southwestern portion. Additional EISs will be needed to evaluate the potential effects of specific lease actions, exploration activities, and development and production plans in the Basin. A full range of updated multidisciplinary scientific information will be needed to address oceanography, fate and effects of oil spills, marine ecosystems, fish, fisheries, birds, marine mammals, socioeconomics, and subsistence in the Basin. Scientific staff at Argonne National Laboratory (Argonne) were contracted to assist the MMS Alaska Outer Continental Shelf (OCS) Region in identifying and prioritizing information needs related to the North Aleutian Basin and potential future oil and gas leasing and development activities. The overall approach focused on three related but separate tasks: (1) identification and gathering of relevant literature; (2) synthesis and summary of the literature; and (3) identification and prioritization of information needs. To assist in gathering this information, MMS convened the North Aleutian Basin Information Status and Research Planning Meeting, held in Anchorage, Alaska, from November 28 through December 1, 2006; this report presents a summary of that meeting. The meeting was the primary method used to gather input from stakeholders and identify information needs and priorities for future inventory, monitoring, and research related to potential leasing and oil and gas developments in the North Aleutian Basin.

02 PETROLEUM↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An approach to evaluating and monitoring ecological resources for sustainability on DOE remediation sites: Hanford as a case study - 15524

Protecting ecological and environmental resources is a worthy aspect of the Department of Energy's site missions, for each of its sites, during and after remediation. Ecological resources are important to a range of stakeholders, including regulatory agencies, resource agencies, natural resource trustees, Tribal governments, and the public, and may be an essential component of Native American cultural resources. Because the nature and value of ecological resources can change over time as a result of remediation, succession, and global climate change, it is imperative for DOE to have instituted an acceptable method of evaluating resources before initiation of active remediation, over the ensuing century when institutional and engineering controls are considered to be in effect. Having such a methodology in place also would be key to resource sustainability. Department of Energy sites generally have environmental programs, so instituting specific unified practices for evaluating resources should not be difficult to implement. Instituting these practices would assure the public that ecological resources, as well as human and cultural resources, are being protected now, and can be protected into the future. Key ecological species and/or unique habitats have been preserved at Department of Energy sites since the mid-20. century because of federal government stewardship. Such preservation is particularly true for the sites with larger land areas, including the Hanford Reservation, the Idaho National Laboratory and the Savannah River Site. Individual sites typically have extensive studies of site biodiversity, but site resources are not routinely examined within a regional or national context (Eco-region). The evaluation of the on-site resources with those resources in the appropriate Eco-region provides a context for 'valuing' on- site resources. On-site resources should also be evaluated in terms of federal and state legislation where species may have legal protection and require legal consideration during remediation if present or adjacent to the remediation site. A method is needed in this study for evaluating ecological resources prior to remediation and during remediation, and a paradigm is proposed that will ensure sustainability. Finally, in a period of climate change and instability, developing methods of evaluating ecological resources is essential to successful protection, enhancement, and sustainability. The ecological methodology is part of a Hanford site-wide Risk Review Project, conducted by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP). Our method adapts an existing methodology that includes using established levels for evaluating ecological resources by expanding the existing methodology to include field work for validating previous resource level designations, to assess the occurrence of invasive/exotic species, and to identify landscape scale features (patch size, connectivity). Evaluations should be conducted in the remediation unit itself, and in a buffer zone surrounding the remediation site. The methodology described has been applied to several remediation areas at Hanford, and issues that emerged during its application are discussed. The methodology can be applied at the major sites. Application of the Eco-region analysis will provide regulators and the public with an understanding of the value of the ecological resources in relation to the region, as well as an appreciation for the stewardship role the Department of Energy has played in protecting these resources since the beginning of the Cold War Era and can continue to do so sustainably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.

The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment activities that move toward road decommissioning to reduce sediment delivery to spawning gravels and rearing habitats by reducing sedimentation from road related, man-made sources. For FY08, the project included the design and implementation of two fish barrier replacement structures mentioned above, the Salt and Profile Creek Bridges. These work elements were to be implemented on Valley County easements within the Payette National Forest. The existing culverts are full or partial barriers to most aquatic life species and all juvenile anadromous and resident fish species. Implementation will reconnect 9.34 miles of habitat, and provide natural stream channels to facilitate complete passage for all aquatic life forms. All designs were completed and a construction subcontract was awarded to construct free span, pre-cast concrete bridges. For 2008, the project statement of work also included all the necessary work elements to manage, coordinate, plan, and develop continuing strategies for restoration and protection activities.

13 HYDRO ENERGY↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron-Activated Shield Wall

Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consent Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100 centimeters squared (cm2) beta/gamma. Removable beta/gamma contamination levels seldom exceeded 1,000 dpm/100 cm2, but, in railroad trenches on the reactor pad containing soil on the concrete pad in front of the shield wall, the beta dose rates ranged up to 120 milli-roentgens per hour from radioactivity entrained in the soil. General area dose rates were less than 100 micro-roentgens per hour. Prior to demolition of the reactor shield wall, removable and fixed contaminated surfaces were decontaminated to the best extent possible, using traditional decontamination methods. Fifth, large sections of the remaining structures were demolished by mechanical and open-air controlled explosive demolition (CED). Mechanical demolition methods included the use of conventional demolition equipment for removal of three main buildings, an exhaust stack, and a mobile shed. The 5-foot (ft), 5-inch (in.) thick, neutron-activated reinforced concrete shield was demolished by CED, which had never been performed at the NTS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Columbia River Hatchery Reform System-Wide Report.

The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations for Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both conservation and harvest goals. For each Columbia River Basin Environmentally Significant Unit (ESU), Distinct Population Segment (MPG) or Major Population Group (MPG) reviewed, the HSRG presents its findings and recommendations in the form of an HSRG solution. This package of recommended changes to current hatchery and harvest program design and operation is intended to demonstrate how the programs could be managed to significantly increase the likelihood of meeting the managers goals for both harvest and conservation of the ESU/DPS/MPG. The 'HSRG solution' also highlights the biological principles that the HSRG believes must form the foundation for successful use of hatcheries and fisheries as management tools.

13 HYDRO ENERGY↗

Niagara Falls Storage Site - Balance of plant investigation results - 15432

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U. S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper details recent investigations into the underground utilities, groundwater/soil contamination, and past storage of contaminated material on the Balance of Plant Operable Unit of the NFSS. Recent fieldwork activities have investigated areas of elevated groundwater contamination as well as an investigation to determine/eliminate any preferential pathway that historical underground utilities may have provided on-site in these areas. Additional areas of investigation included strategic placement of groundwater wells at locations of historic residue storage piles and intersections of various underground utilities (based on aerial photography and geophysical surveys). Several hundred locations across the site were investigated with a gamma walk-over survey, boring, surveying and sampling of soil-cores to aide in the delineation of soil contamination throughout the Balance of Plant Operable Unit. The series of investigations indicated multiple operational areas still have impacts above background conditions, risk-based concentrations, and promulgated maximum contaminant levels for multiple media in the Balance of Plant Operable Unit. The soil, groundwater, sediment, and utility sampling data show that 1) radionuclide impacts derived from ore-residue handling operations still exist, 2) impacts from other inorganic and organic compound exist in TNT manufacturing and support areas, and 3) contaminant transport from past source areas is minimal. The full compendium of site history and recent sampling data provides a well-defined conceptual site model that provides the necessary input data to prepare volumetric soil estimates for the Balance of Plant Operable Unit Feasibility Study. The scale of the NFSS and complexity of prior operations provide many remedial challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco x (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.

13 HYDRO ENERGY↗

Cold Crucible Induction Melter Testing at The Idaho National Laboratory for the Advanced Remediation Technologies Program

AREVA Federal Services (AFS) is performing a multi-year, multi-phase Advanced Remediation Technologies (ART) project, sponsored by the U.S. Department of Energy (DOE), to evaluate the feasibility and benefits of replacing the existing joule-heated melter (JHM) used to treat high level waste (HLW) in the Defense Waste Processing Facility (DWPF) at the Savannah River Site with a cold crucible induction melter (CCIM). The AFS ART CCIM project includes several collaborators from AREVA subsidiaries, French companies, and DOE national laboratories. The Savannah River National Laboratory and the Commissariat a l’Energie Atomique (CEA) have performed laboratory-scale studies and testing to determine a suitable, high-waste-loading glass matrix. The Idaho National Laboratory (INL) and CEA are performing CCIM demonstrations at two different pilot scales to assess CCIM design and operation for treating SRS sludge wastes that are currently being treated in the DWPF. SGN is performing engineering studies to validate the feasibility of retrofitting CCIM technology into the DWPF Melter Cell. The long-term project plan includes more lab-testing, pilot- and large-scale demonstrations, and engineering activities to be performed during subsequent project phases. This paper provides preliminary results of tests using the engineering-scale CCIM test system located at the INL. The CCIM test system was operated continuously over a time period of about 58 hours. As the DWPF simulant feed was continuously fed to the melter, the glass level gradually increased until a portion of the molten glass was drained from the melter. The glass drain was operated semi-continuously because the glass drain rate was higher than the glass feedrate. A cold cap of unmelted feed was controlled by adjusting the feedrate and melter power levels to obtain the target molten glass temperatures with varying cold cap levels. Three test conditions were performed per the test plan, during which the melter was operated with a target melt temperature of either 1,250oC or 1,300oC, and with either a partial or complete cold cap of unmelted feed on top of the molten glass. Samples of all input and output streams were collected for analysis. Laboratory analyses and mass balances will be used to determine the fate of feed constituents, especially Cs. The melter off-gas composition was measured at the melter outlet duct. Sample analyses are still in progress; but preliminary conclusions are possible using the continuous emissions monitoring system (CEMS) data. The concentrations of CO2, CO, CH4, total hydrocarbons (THC), and NOx increased with increasing feedrate of the feed containing water, nitrates, and formate. Over 90% of the formate (a reductant used in the simulant feed) was converted to CO2 and water vapor. Under 6-9% of the H in the formate converted to H2, and under 1% of the formate decomposed to gaseous hydrocarbons. This small degree of formate conversion to potentially flammable off-gas species reduces off-gas flammability concerns. About 36-61% of the NOx in the off-gas (evolved from nitrites and nitrates in the feed) was destroyed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗