Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

The National Solar Radiation Database Final Report: Fiscal Years 2022-2024

The National Solar Radiation Database (NSRDB) is the leading public source of high-resolution solar resource data in the United States, with more than 400,000 users annually. This database represents the state of the art in the satellite-based estimation of solar resource information and uses a unique physics-based modeling approach that enables improvements in accuracy with the deployment of the next-generation geostationary satellites. Making the highest-quality, state-of-the-art, regularly updated datasets available on a timely basis for users reduces costs of solar deployment by providing accurate information for siting studies and system output prediction and thereby reduces project financing costs and risks.

14 SOLAR ENERGY↗

DOE Zero Energy Ready Manufactured Housing: Subject Matter Expert Technical Assistance Summary

Manufactured homes offer American consumers an affordable option for decent single-family detached housing. For working-class American families in many U.S. markets, manufactured homes are the first step toward home ownership. They now make up 10% of all new homes constructed in the United States, with higher percentages in the south and in rural communities. To help encourage the production of homes that are more durable, healthy, efficient, and disaster resistant, the U.S. Department of Energy is bringing its building science research to the manufactured housing industry through DOE’s Zero Energy Ready Manufactured Home (ZER-MH) program, which provides technical assistance and voluntary guidelines to manufactured home builders. Homes built to these guidelines are better able to handle power outages and less likely to experience moisture issues, offering a better product option for American families. This higher quality is evidenced by energy modeling which shows homes manufactured to these voluntary guidelines will typically use half the energy of manufactured homes built to the current minimum requirements of the U.S. Department of Housing and Urban Development (HUD)’s Manufactured Housing and Construction Safety Standard (MHCSS). These homes can also reduce critical energy demand during the busiest hours of the day, typically late afternoon and early evening in the summer when air conditioning demand is highest and mornings in the winter when furnaces and heaters are heating up. Reducing electricity demand during these peak periods when electricity rates are at their highest reduces costs for American families while freeing up capacity on overburdened energy distribution networks. Builders participating in the DOE ZER-MH program are eligible for a tax incentive via the 45L tax credit, which helps to offset the costs of ZER-MH upgrades, enabling builders to offer these certified homes at no additional cost. Together these factors enable manufactured homes to offer home buyers a housing option that is both affordable to finance and affordable to operate, with lower monthly mortgage payments and lower monthly energy bills.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

Copula based Damage Detection for Structural Health Monitoring

This project utilizes copulas for damage detection in a Structural Health Monitoring (SHM) application. A copula-based system was chosen for the benefit of multivariate joint distribution with a goal to detect damage based on how the system as a whole reacts rather than one or two sensors by themselves. Copulas are commonly used in the field of finance for risk modeling based on two or more random inputs. A few applications in the field of SHM and Non-Destructive Evaluation (NDE) have been researched mostly on risk or reliability of the structure. The goal of this project is to determine if a copula-based approach can be used for damage detection. An unsupervised learning method was desired to reduce the dimensionality, minimal training, and be a faster evaluation method than other unsupervised methods. If a copula method can be used to detect damage what additional information on the damage can be interpreted. The remainder of this report will go over the background needed, SHM methodology, SHM applications, conclusions, and future developments.

47 OTHER INSTRUMENTATION↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO 2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs of for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

42 ENGINEERING↗

Quantum Computing Market Report

The quantum computing market is entering a rapid growth phase. Growth was originally driven by private investment interest in high value applications such as drug discovery, materials science, and finance. Currently the main market drivers include technical advances, continued private investment, and rising public funding. The quantum computing market is poised for explosive growth — with its market size estimated at $1.42 billion USD in 2024, and an expected compound annual growth rate of 20.5% from 2025 to 2030 [4]. Superconducting qubits are the largest qubit type by revenue. However, alternative approaches such as trapped ion, neutral atom, spin based, and photonic qubits are also attracting investment.

97 MATHEMATICS AND COMPUTING↗

An Intermediate-Scale Version of the Volturnus + Floating Offshore Wind Turbine Platform Concept in a Real Ocean Environment with an Operating Turbine off the Coast of Maine (Final Scientific/Technical Report)

This project was undertaken to advance the technical readiness and commercial viability of a next-generation, industrialized concrete floating foundation for offshore wind turbines called VolturnUS +. The design objective is to deliver a platform that is lower cost, faster to manufacture, simpler to deploy, and optimized for domestic supply chains and local workforce participation. To enable project financing and commercial adoption, an at-sea demonstration under representative operating conditions was required and therefore this project aimed to deploy a ¼-scale VolturnUS+ prototype offshore the Coast of Maine.

17 WIND ENERGY↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes Contributed to EDX (Work Product 2.1.c)

On September 30, 2021, a Needs Assessment Framework for Storage Complexes was completed for the SECARB-USA region by the Southern States Energy Board (SSEB) and The University of Texas at Austin Bureau of Economic Geology (UT-BEG). The Needs Assessment Framework for Storage Complexes documented a region-wide assessment to identify data needed to advance storage projects at sites of relevance to industrial, academic, and government stakeholders. The region-wide assessment addresses the needs of CO2 source, storage, and utilization stakeholders, finance and insurance institutions, state and local government agencies, local stakeholders at prospective storage complexes, environmental non-governmental organizations (NGOs), and others as identified by the Partners. This assessment was tested against various potential storage sites and modified to include site-specific issues, such as surface or pore space rights. The framework was provided to stakeholders for review and then used in other tasks, such as the ML initiative (Subtask 3.4) and storage complex readiness evaluation (Subtask 4.2). In accordance with the SOPO, this assessment satisfied completion of Work Product 2.1.b. The OSTI ID is 3015803, and the DOI link is https://doi.org/10.2172/3015803. On February 28, 2022, SSEB uploaded Work Product 2.1.b to NETL’s Energy Data eXchange (EDX). As such, Work Product 2.1.c is completed as documented below.

42 ENGINEERING↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

U.S. ESCO Industry Report: Industry Size and Recent Market Trends, 2022- 2024

The latest edition of the U.S. Energy Service Company (ESCO) Industry Report by Lawrence Berkeley National Laboratory (LBNL) finds that the U.S. ESCO industry continues to show strong growth. The report draws from ESCO industry reported revenue data for the 2022-2024 period, detailing the current size and characteristics of the U.S. ESCO industry. Following 20 years of ESCO industry reports, the 2024 report explores significant revenue trends across market segments, geographic regions, ESCO size, financing structures, and business activities. New analysis in this report outlines customer priorities and non-energy benefit drivers of Energy Savings Performance Contract projects, adjusted revenue analysis detailing the impacts of inflation on industry growth, and project challenges by market segment.

Chelminski, Kathryn↗

In Defense of the National Labs and Big-Budget Science

The purpose of this paper is to present the unofficial and unsanctioned opinions of a Visiting Scientist at Lawrence Livermore National Laboratory on the values of LLNL and the other National Labs. The basic founding value and goal of the National Labs is big-budget scientific research, along with smaller-budget scientific research that cannot easily be done elsewhere. The most important example in the latter category is classified defense-related research. The historical guiding light here is the Manhattan Project. This endeavor was unique in human history, and might remain so. The scientific expertise and wealth of an entire nation was tapped in a project that was huge beyond reckoning, with no advance guarantee of success. It was in many respects a clash of scientific titans, with a large supporting cast, collaborating toward a single well-defined goal. Never had scientists received so much respect, so much money, and so much intellectual freedom to pursue scientific progress. And never was the gap between theory and implementation so rapidly narrowed, with results that changed the world, completely. Enormous resources are spent at the national or international level on large-scale scientific projects. LLNL has the most powerful computer in the world, Blue Gene/L. (Oops, Los Alamos just seized the title with Roadrunner; such titles regularly change hands.) LLNL also has the largest laser in the world, the National Ignition Facility (NIF). Lawrence Berkeley National Lab (LBNL) has the most powerful microscope in the world. Not only is it beyond the resources of most large corporations to make such expenditures, but the risk exceeds the possible rewards for those corporations that could. Nor can most small countries afford to finance large scientific projects, and not even the richest can afford largess, especially if Congress is under major budget pressure. Some big-budget research efforts are funded by international consortiums, such as the Large Hadron Collider (LHC) at CERN, and the International Tokamak Experimental Reactor (ITER) in Cadarache, France, a magnetic-confinement fusion research project. The postWWII histories of particle and fusion physics contain remarkable examples of both international competition, with an emphasis on secrecy, and international cooperation, with an emphasis on shared knowledge and resources. Initiatives to share sometimes came from surprising directions. Most large-scale scientific projects have potential defense applications. NIF certainly does; it is primarily designed to create small-scale fusion explosions. Blue Gene/L operates in part in service to NIF, and in part to various defense projects. The most important defense projects include stewardship of the national nuclear weapons stockpile, and the proposed redesign and replacement of those weapons with fewer, safer, more reliable, longer-lived, and less apocalyptic warheads. Many well-meaning people will consider the optimal lifetime of a nuclear weapon to be zero, but most thoughtful people, when asked how much longer they think this nation will require them, will ask for some time to think. NIF is also designed to create exothermic small-scale fusion explosions. The malapropos 'exothermic' here is a convenience to cover a profusion of complexities, but the basic idea is that the explosions will create more recoverable energy than was used to create them. One can hope that the primary future benefits of success for NIF will be in cost-effective generation of electrical power through controlled small-scale fusion reactions, rather than in improved large-scale fusion explosions. Blue Gene/L also services climate research, genomic research, materials research, and a myriad of other computational problems that become more feasible, reliable, and precise the larger the number of computational nodes employed. Blue Gene/L has to be sited within a security complex for obvious reasons, but its value extends to the nation and the world. There is a duality here between large-scale scientific research machines and the supercomputers used to model them. An astounding example is illustrated in a graph released by EFDAJET, at Oxfordshire, UK, presently the largest operating magnetic-confinement fusion experiment. The graph shows plasma confinement times (an essential performance parameter) for all the major tokamaks in the international fusion program, over their existing lifetimes. The remarkable thing about the data is not so much confinement-time versus date or scale, but the fact that the data are given for both the computer model predictions and the actual experimental measurements, and the two are in phenomenal agreement over the extended range of scales. Supercomputer models, sometimes operating with the intricacy of Schroedinger's equation at quantum physical scales, have become a costly but enormously cost-saving tool.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wallowa Canyonlands Weed Partnership : Completion Report November 19, 2009

Noxious weeds threaten fish and wildlife habitat by contributing to increased sedimentation rates, diminishing riparian structure and function, and reducing forage quality and quantity. Wallowa Resources Wallowa Canyonlands Partnership (WCP) protects the unique ecological and economic values of the Hells Canyon grasslands along lower Joseph Creek, the lower Grande Ronde and Imnaha Rivers from invasion and degradation by noxious weeds using Integrated Weed Management techniques. Objectives of this grant were to inventory and map high priority weeds, coordinate treatment of those weeds, release and monitor bio-control agents, educate the public as to the dangers of noxious weeds and how to deal with them, and restore lands to productive plant communities after treatment. With collaborative help from partners, WCP inventoried {approx} 215,000 upland acres and 52.2 miles of riparian habitat, released bio-controls at 23 sites, and educated the public through posters, weed profiles, newspaper articles, and radio advertisements. Additionally, WCP used other sources of funding to finance the treatment of 1,802 acres during the course of this grant.

13 HYDRO ENERGY↗

Sandy River Delta Habitat Restoration : Annual Report, January 2008 - March 2009.

During the period 2008-2009, there were 2 contracts with BPA. One (38539) was dealing with the restoration work for 2007 and the other (26198) was an extension on the 2006 contract including the NEPA for Dam removal on the old channel of the Sandy River. For contract 38539, the Sandy River Delta Habitat Restoration project continued its focus on riparian hardwood reforestation with less emphasis on wetlands restoration. Emphasis was placed on Sundial Island again due to the potential removal of the dike and the loss of access in the near future. AshCreek Forest Management was able to leverage additional funding from grants to help finance the restoration effort; this required a mid year revision of work funded by BPA. The revised work not only continued the maintenance of restored hardwood forests, but was aimed to commence the restoration of the Columbia River Banks, an area all along the Columbia River. This would be the final restoration for Sundial Island. The grant funding would help achieve this. Thus by 2011, all major work will have been completed on Sundial Island and the need for access with vehicles would no longer be required. The restored forests continued to show excellent growth and development towards true riparian gallery forests. Final inter-planting was commenced, and will continue through 2010 before the area is considered fully restored. No new wetland work was completed. The wetlands were filled by pumping in early summer to augment the water levels but due to better rainfall, no new fuel was required to augment existing. Monitoring results continued to show very good growth of the trees and the restoration at large was performing beyond expectations. Weed problems continue to be the most difficult issue. The $100,000 from BPA planned for forest restoration in 2008, was augmented by $25,000 from USFS, $120,000 from OR150 grant, $18,000 from LCREP, and the COE continued to add $250,000 for their portion. Summary of the use of these funds are displayed in Table 1 (page 5). Work on the restoration of the original Sandy River channel (dam removal, contract 26198) continued slowly. The draft EA was completed and sent out for review. The COE has decided to finish the NEPA with the intent to complete the project.

13 HYDRO ENERGY↗

Eliminating Electricity Deficit through Energy Efficiency in India: An Evaluation of Aggregate Economic and Carbon Benefits

Electricity demand has consistently exceeded available supply in India. While the electricity deficit varies across states, nationally it was estimated to be of the order of 12percent on peak and 11percent for electricity during 2008-09. This paper explores a demand-side focused potential for energy efficiency improvement to eliminate the electricity deficit compared to a business as usual (BAU) supply-side focused scenario. The limited availability of finance and other legal and administrative barriers have constrained the construction of new power plant capacity in India. As a result, under the BAU scenario, India continues to face an electricity deficit beyond the end of the Twelfth Five Year Plan. The demand-side cost-effective potential achieved through replacement of new electricity-using products, however, is large enough to eliminate the deficit as early as 2013 and subsequently reduce the future construction of power plants and thus reduce air pollutant emissions. Moreover, energy efficiency improvements cost a fraction of the cost for new supply and can lead to a substantial increase in India's economic output or gross domestic product (GDP). Eliminating the deficit permits businesses that have experienced electricity cutbacks to restore production. We estimate the size of the cumulative production increase in terms of the contribution to GDP at a $505 billion between 2009 and 2017, the end of India's Twelfth Five Year Plan, which may be compared with India's 2007-08 GDP of $911 billion. The economic output is influenced by the size of the electricity savings and rate of penetration of energy efficient technologies, and that of self-generation equipment and inverters used by businesses faced with electricity cuts. Generation and inverters are estimated to service 23percent of these customers in 2009, which increase to 48percent by 2020. The reduction in the construction and operation of new power plants reduces the cumulative CO2 emissions by 65 Mt, and those of sulfur dioxide and nitrogen oxides by 0.4 Mt each, while also reducing India's imports of coal and natural gas. By 2020, the cumulative GDP benefit increases to $608 billion, the CO2 savings expand to 333 Mt and SO2 and NOx to 2.1 Mt.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In fall 2010, Greenbelt Homes, Inc. (GHI) a 1,566-home cooperative of circa 1930-1940 homes in Greenbelt, Maryland, undertook a multiyear pilot energy efficiency retrofit project. GHI established this pilot project as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy-efficiency improvements to the building envelopes and mechanical equipment. The community upgrade is fully funded by the cooperative through its membership with no outside subsidies. This project thus presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, tradeoffs, construction methods, project management implications, realistic upfront costs, financing, and other considerations provides a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner.

Array↗

Gas-Turbines and the Competitiveness of Aviation Plants

The challenge for Russian gas-turbine manufacturers is to create an optimal product line—optimal in the sense that gas-turbine engines may be supplied not only to the aviation industry but to other prospective customers with limited finances. That approach will not only ensure the efficient use of available resources but also quickly bring up-to-date marine and stationary gas-turbine engines to the market. For gas-turbine manufacturers, expansion of the markets for their products will result in significant increase in competitiveness.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗