Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ErIn”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Arroyo Seco Improvement Project: Annual Report 2022

The Arroyo Seco Improvement Program (ASIP) is intended to provide active channel improvements and stream zone management activities that will reduce current flood and erosion risk while providing additional and improved habitat for critical species that may use the Arroyo Seco at the Sandia National Laboratories, California (SNL/CA). SNL/CA facility is operated by the National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA). The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site.

54 ENVIRONMENTAL SCIENCES↗

Space Launch Authorities

This report identifies current best understanding of federal agencies that are responsible for the safe transportation and handling of nuclear materials during various phases of space launch activities and how they interact. It explores the following questions: (1) Which federal agencies have roles, responsibilities, and statutory authorities related to the launch, orbit, and reentry of nuclear materials and components? (2) What relevant current/recent activities are those federal agencies involved in?

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SNF Interim Storage Canister Corrosion and Surface Environment Investigations (FY22 Status Update)

High-level purpose of this work: This report summarizes work carried out by Sandia National Laboratories (SNL) in the fiscal year 2022 (FY22) to evaluate the potential occurrence of stress corrosion cracking (SCC) on spent nuclear fuel (SNF) dry storage canisters. The U.S. currently lacks a repository for permanent disposal of SNF; thus, dry storage systems will be in use for much longer time periods than originally intended. Gap analyses by the US Department of Energy (DOE), the Nuclear Regulatory Commission (NRC), the Nuclear Waste Technical Review Board (NWTRB), and the Electric Power Research Institute (EPRI) have all determined that an improved understanding of the occurrence and risk of canister SCC is critical to demonstrating the safety of long-term dry storage. Should canister penetration by SCC occur, the containment boundary represented by the canister would be breached. A loss of the inert environment (helium) within the canister could occur and intrusion of air and moisture could react with and damage the fuel within the canister. For this reason, the DOE is funding an effort to evaluate the potential occurrence and consequences of dry storage canister SCC and to develop prevention, mitigation, and repair technologies for this degradation mechanism.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Workshop on Radiographic Imaging and Applications Research and Development Recommendations for Field Radiography

The Workshop on Radiographic Imaging and Applications (WORIA) brought together subject matter experts from industry, academia, US and UK government agencies, and the national laboratories to provide a forum to liaise and share information between technology developers in government and industry, end users, and mission stakeholder to produce an “expert consensus view” regarding future research directions toward a comprehensive radiography/penetrating imaging portfolio in the Defense Nuclear Nonproliferation Research and Development Near Field Detection Portfolio. The inaugural WORIA was held at the Spallation Neutron Source at Oak Ridge National Laboratory on February 7–9, 2023. The inaugural WORIA meeting focused on field radiography applications, or situations in which a portable imaging system must be brought to an item of interest (rather than the item brought to an imaging facility). This report documents consensus views derived from the meeting and provides research and development recommendations for federal program managers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CORE-CM in The Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset (Final Report)

The following document summarizes project results from “CORE-CM in the Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset”. This project is part of the U.S. Department of Energy’s (“DOE”) National Energy Technology Laboratory’s (“NETL”) Carbon Ore, Rare Earth Elements, and Critical Minerals (CORE-CM) Initiative. This report concludes that the Greater Green River and Wind River Basins (GGRB-WRB) Area-of-Interest (AOI 9) is the ideal region for continued research and development in progressing the broader CORE-CM goals outlined by the DOE. Based upon the extensive analyses of technical, social, and community criteria, this report illustrates that the GGRB-WRB hosts numerous potential CORE-CM feedstocks (both coal- and non-coal based), diverse opportunities for utilizing existing industrial waste streams, ample infrastructure and industry to support new CORE-CM-focused technologies, and a highly motivated, well educated, and adaptable workforce to further develop the regional and national CORE-CM supply chain. Additionally, some potential solutions for technological gaps suggest that the GGRB-WRB's diverse resources can play a significant role in achieving the national goal of critical materials independence. With full community participation, meaningful involvement of regional Tribal Nations, and building upon the stakeholder engagement demonstrated here, the GGRB-WRB region presents a unique opportunity for advancing the CORE-CM Initiative. This project was designed to bring together coal-based communities and stakeholders from across the GGRB-WRB to advance new industries for CORE-CM resources. The University of Wyoming (UWyo) School of Energy Resources (SER) led a project team of experts from the Colorado Geological Survey (CGS), Colorado School of Mines (CSM), Los Alamos National Lab (LANL), and local community colleges. Input from basinal, regional, and national experts bolstered the coalition in order to advance the mission of DOE’s CORE-CM initiative and develop the domestic CORE-CM supply chain. Phase I of this project was designed to address the goal of developing and catalyzing economic growth, job creation, and technology innovation in the GGRB-WRB of Wyoming and Colorado, by increasing the supply of CORE-CM to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM. The GGRB-WRB CORE-CM project worked toward providing benefit through several avenues of performance and research. • Develop a coalition team to achieve project objectives • Complete detailed assessments, including State-of-the-Art (SOTA) Data acquisition of potential CORE-CM materials across the AOI, and meaningfully contributes to DOE’s CORE-CM goals nationally. • Strategic planning for regional economic growth, job creation, and associated technology innovation around coal materials, including plans to maximize the development of potential CORE-CM resources and technology by creating regional public-private partnerships. • Define regional economic growth potential around existing strengths, energy infrastructure, business and industry, including planning for the leveraging of highly trained workforces, existing and novel coal technologies, and energy infrastructure in development of CORE-CM supply chains. • Develop a preliminary strategic plan for increasing the supply of CORE-CM materials to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM, focusing on regional strengths that result in an emerging diversified CORE-CM economy. • Assemble a committed network of stakeholders and communities that learn about, accept, and grow new energy technologies within coal regions. Additionally, the project team significantly contributed to the CORE-CM Initiative’s national goals, through cross-regional scoping, collaborating with CORE-CM projects in other AOIs, and including parallel regional project experts. In addition to active inclusion and meaningful engagement and contribution to DOE-led working groups, the project team focused on engaging with regional communities including Tribal Nations, economic development groups, and regional government organizations. The project’s CORE-CM development and commercialization plan identified diverse CORECM feedstocks, potential routes towards integration with existing industries, methods for supply-chain development that leverage existing infrastructure and businesses considering the regional economy, identified entry barriers for incorporating traditional and new technologies in those supply chains, recognized opportunities for public-private partnerships to develop technology innovation centers, identified diverse workforces, and conducted stakeholder outreach and education to build a community of understanding on CORE-CM potential in the GGRB-WRB region. Detailed task descriptions can be found in each chapter.

01 COAL, LIGNITE, AND PEAT↗

Emittance Measurements with Wire Scanners in the Fermilab Side-Coupled Linac

The Fermilab Side-Coupled Linac accelerates H- beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster synchrotron ring. These wire scanners act as important diagnostic instru-ments to directly collect information on the beam s transverse distribution. The manipulation of the condi-tions of wire scanner data collection enables further characterization of the beamline, such as calculating emittance and the Twiss parameters of the beam at select regions. Here we present the results of these studies and characterization of the non-Gaussian transverse beam distribution observed.

43 PARTICLE ACCELERATORS↗

Integrated Biomass Supply Analysis and Logistics Model (IBSAL) 2.0

The Integrated Biomass Supply Analysis and Logistics (IBSAL) 2.0 models a feedstock supply shed's harvest and transport process to estimate the cost of delivered feedstock. The model sets up a supply shed of fields, harvests the fields using a series of sequential harvest operations with different crew types, and transports the harvested feedstock to a storage facility or refinery. The model reports many metrics; the most important ones include the crew resources required for harvest and transport operations, equipment utilization, fuel usage, amount of dry mass harvested, the cost for each operation, and the expected time to complete the harvest with the provided resources. IBSAL 2.0 is a complete redesign around the ExtendSim database, and it is faster and easier to reapply the model to different feedstocks.

09 BIOMASS FUELS↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Socioeconomically-inspired modeling to justify use of fine-grain mobility data

When designing measures to control infectious disease spread, it is crucial to understand the structure of the population for which interventions are being implemented. Recent work has highlighted the need for models that incorporate demographic heterogeneity not just in age structure but also by socioeconomic status (SES). Appropriately capturing additional sources of population heterogeneity requires considerable data and model development. To understand the potential disagreement between SES-explicit or SES-agnostic disease models, we adapted Sandia’s Adaptive Recovery Model (ARM) model to consider differences in contact structure and mortality by Social Vulnerability Index (SVI) on a theoretical network. We also incorporated an Average network that did not consider SVI. By exploring disparities in vaccine and PPE uptake by SES and comparing to Average networks, as well as analyzing the influence of global vs. local contact, we found that the two model constructions often predicted different outcomes. Whether these differences are truly reflective of incorporating SES, and which model most closely represents reality, merits further investigation.

99 GENERAL AND MISCELLANEOUS↗

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗