Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering Directorate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

The Idyllic Workplace

How many of us have worked in organizations where the discipline was so rigid and unyielding that it would send even a Marine Corps Drill Instructor screaming into the night? How many of us have worked in organizations where sightings of senior management were sporadic and rare, and any other interactions were by appointment only? Or, how many of us have worked in organizations where your role, absent specific direction, was to be seldom seen and rarely heard? And how many of us have worked in organizations where seemingly light itself was not permitted to escape without the acquiescence and approval of the director? Sadly, there are organizations that embody some of these conditions, and the resultant adverse effects on employee productivity, creativity and morale are profound. But what if you could work in an organization in which there was little hierarchy, where rank and seniority played no part, where there were no closed meetings or doors, where everyone knows what was expected of them, and where creativity was not only tolerated but encouraged and celebrated? Was there ever such a place? There was, and it was known as NASA's Space Station Task Force. I was fortunate enough to work there for a time, and I would like to tell you how this organization with few apparent rules led to incredibly high levels of employee satisfaction and fulfillment, and yielded work products of enduring quality. On May 20, 1982, NASA Administrator James M. Beggs established the Space Station Task Force under the direction of John D. Hodge. The Task Force was charged with the responsibility for "the development of the programmatic aspects of a Space Station as they evolve, including mission analysis, requirements definition and program management," and was authorized to draw on Space Station activities at the NASA Program Offices and Field Centers. No additional conditions or directions were provided. Hodge knew that in order to accomplish the job he had been given, he was going to have to obtain the services of the "best and the brightest" and facilitate the unleashing of the full force of their creative capabilities. In order to avoid the stultifying effects of a typical hierarchical organization, he set up a loosely structured, horizontal organization with only one supervisor of record - himself. He populated this organization with detailees from Headquarters, the field Centers and the Jet Propulsion Lab, thereby assuring himself of the political and technical expertise with which to deal with Congress and the bureaucracy, and conduct the required engineering studies and analyses.

Schoenfelder, Tony E.↗

Resource Prospector (RP) - Early Prototyping and Development

The Resource Prospector (RP) is an In-Situ Resource Utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorate's (HEOMD) Advanced Exploration Systems (AES) Division. The mission, currently planned to launch in 2020, will demonstrate extraction of oxygen from lunar regolith to validate ISRU capability. The mission will address key Strategic Knowledge Gaps (SKGs) for robotic and human exploration to the Moon, Near Earth Asteroids (NEAs), and ultimately Mars, as well as meet the strategic goals of the Global Exploration Roadmap (GER), offered by the International Space Exploration Coordination Group (ISECG). In this roadmap, the use of local resources is specifically addressed relating to human exploration. RP will provide knowledge to inform the selection of future mission destinations, support the development of exploration systems, and reduce the risk associated with human exploration. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources. The moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. Lunar regolith contains useful resources such as oxygen, water, silicon, and light metals, like aluminum and titanium. Oxygen can be separated from the regolith for life support (breathable air), or used to create rocket propellant (oxidizer). Regolith can be used to protect against radiation exposure, be processed into solar cells, or used to manufacture construction materials such as bricks and glass. RP will characterize the constituents and distribution of water and other volatiles at the poles of the Moon, enabling innovative uses of local resources, in addition to validating ISRU capabilities. This capability, as well as a deeper understanding of regolith, will be valuable in the exploration of near-Earth asteroids (NEAs) and Mars. In order to reduce risk and explore system designs, the RP project is attempting two-fold approaches to development as it looks towards flight. We continue to explore flight planning, requirements, and interfaces definition by using Engineering Test Units (ETUs), looking towards lunar deployment, while also using fiscal year 2015 to develop, build and test an earth-terrestrial prototype rover and payload system. This terrestrial prototype, called "RP15", is built to both inform the system design, and to be a partnership advocacy tool for this unique mission. RP15 must be affordable within the resource and time constraints of fiscal year 2015, while working to the following Needs, Goals, and Objectives provided by HEOMD/AES: 1. Demonstrate rover mobility in a 1g environment 2. The Surface Segment (prototype rover + payload system) shall represent the flight system concept with as much fidelity as affordable (limited by cost and schedule) - Surface Segment shall be the approximate size/dimension/footprint -Surface Segment shall package all the expected devices (instruments, systems, etc.), even if some facets are mocked-up due to time/cost constraints -Overall Surface Segment fidelity negotiable to make achievable 3. Priority should be given to illustrating mission functionality over support functionality, which exists solely to support mission functionality This paper will provide an overview of RP project developments, including the design and build, capturing the development and initial integrated testing of RP15 in relevant environments.

Lunar↗

Fall 2015 NASA Internship, and Space Radiation Health Project

This fall, I was fortunate enough to have been able to participate in an internship at NASA's Lyndon B. Johnson Space Center. I was placed into the Human Health & Performance Directorate, where I was specifically tasked to work with Dr. Zarana Patel, researching the impacts of cosmic level radiation on human cells. Using different laboratory techniques, we were able to examine the cells to see if any damage had been done due to radiation exposure, and if so, how much damage was done. Cell culture samples were exposed at different doses, and fixed at different time points so that we could accumulate a large pool of quantifiable data. After examining quantifiable results relative to the impacts of space radiation on the human body at the cellular and chromosomal level, researchers can defer to different areas of the space program that have to do with astronaut safety, and research and development (extravehicular mobility unit construction, vehicle design and construction, etc.). This experience has been very eye-opening, and I was able to learn quite a bit. I learned some new laboratory techniques, and I did my best to try and learn new ways to balance such a hectic work and school schedule. I also learned some very intimate thing about working at NASA; I learned that far more people want to watch you succeed, rather than watch you fail, and I also learned that this is a place that is alive with innovators and explorers - people who have a sole purpose of exploring space for the betterment of humanity, and not for any other reason. It's truly inspiring. All of these experiences during my internship have impacted me in a really profound way, so much that my educational and career goals are completely different than when I started. I started out as a biotechnology major, and I discovered recently toward the end of the internship, that I don't want to work in a lab, nor was I as enthralled by biological life sciences as a believed myself to be. Taking that all into consideration, I've actually changed my major to mechanical engineering. I discovered that I enjoy building things, and I enjoy learning about materials and interactions between different things. And I quickly became obsessed with rocket and aerospace engineering, so I've decided that after a mechanical engineering degree, I will be pursuing an advanced degree in aerospace engineering. One final way that I was effected by this internship, is that I discovered that I don't want to have a career at NASA. I love this agency with all of my heart, but I refuse to allow my innovation to be bound by a scientifically illiterate congress. As such, I have decided to pursue commercial aerospace companies, such as Space, XCOR, Masten Space Systems, Orbital ATK, and many, many, more. Maybe one day I'll end up back here. I believe in what this agency is doing with my whole heart, and it's unfortunate to see them curtailed in some capacities as a result of budgetary constraints, brought on by people who don't fully understand the effort behind putting people in to space. All in all, this experience has been the best experience of my life - literally a childhood dream came true during this experience - and I cannot adequately explain how grateful I am to have been here for the past sixteen weeks.

Patience, Luke↗

STS-114: Discovery Crew Arrival

George Diller of NASA Public Affairs narrates the STS-114 Crew arrival at Kennedy Space Center aboard a Gulf Stream aircraft. They were greeted by Center Director Jim Kennedy. Commander Eileen Collins introduced each of her crew members and gave a brief description of their roles in the mission. Mission Specialist 3, Andrew Thomas will be the lead crew member on the inspection on flight day 2; he is the intravehicular (IV) crew member that will help and guide Mission Specialists Souichi Noguchi and Stephen Robinson during their spacewalks. Pilot James Kelly will be operating the shuttle systems in flying the Shuttle; he will be flying the space station robotic arm during the second extravehicular activity and he will be assisting Mission Specialist Wendy Lawrence during the other two extravehicular activities; he will be assisting on the rendezvous on flight day three, and landing of the shuttle. Commander Collins also mentioned Pilot Kelly's recent promotion to Colonel by the United States Air Force. Mission Specialist 1, Souichi Noguchi from JAXA (The Japanese Space Agency) will be flying on the flight deck for ascent; he will be doing three spacewalks on day 5, 7, and 9; He will be the photo/TV lead for the different types of cameras on board to document the flight and to send back the information to the ground for both technical and public affairs reasons. Mission Specialist 5, Charles Camada will be doing the inspection on flight day 2 with Mission Specialist Thomas and Pilot Kelly; he will be transferring the logistics off the shuttle and onto the space station and from the space station back to the shuttle; He will help set up eleven lap tops on board. Mission Specialist 4, Wendy Lawrence will lead the transfer of logistics to the space station; she is the space station arm operator during extravehicular activities 1 and 3; she will be carrying the 6,000 pounds of external storage platform from the shuttle payload bay over to the space station; she is also in charge of the shuttle storage. Mission Specialist 2, Stephen Robinson is the flight engineer of the shuttle; he will be doing spacewalks with Mission Specialist Noguchi; he will set up the 11 lap top computers on board. Each crew member gave a brief message to the press. Commander Eileen later gave her final message and the crew walked back to the Astronaut Corps.

Source record↗

Concept for Cyber-Physical Consequence Process

The Department of Homeland Security’s Office of Cyber and Infrastructure Analysis (DHS/OCIA) has a mission and vision that promotes innovation as central to expanding the organization’s capability to conduct consequence analysis. To pursue such innovation, OCIA is sponsoring a seedling effort with Idaho National Laboratory (INL) to leverage data from the proposed Automated Vulnerability Assessment (AVA) capability, which the DHS Science and Technology (S&T) Directorate is developing through a separate INL effort. The first phase of this effort is to develop a process by which recognized vulnerabilities can be scored relative to importance, reflected primarily in the ability to initiate high consequence and potentially cascading events. This report documents a cyber-physical metrics process (CPMP) to tie physical impact to the malicious exploitation of cyber vulnerabilities in industrial control systems (ICS) with the potential for initiating consequence in the critical infrastructure. The scale of achieving any particular physical consequence is dependent upon the ICS Component the vulnerability exists on, the Level of Access that the exploit would allow to component function and the Physical Impact (CLAPI) to the power system that the component is tied. A modified common vulnerability scoring system (CVSS) was detailed and demonstrated for the power sector with three case studies associated with a recognized vulnerability, with significant consequence detail provided to apply the process across the power sector. A detailed table that provides background on the power system components, ICS-enabled monitoring and control, potential consequence effects, and CVSS scoring is provided. To demonstrate the applicability of the CPMP, tables are provided as examples for other sectors that include chemical, water/wastewater and oil/gas.

42 ENGINEERING↗

Initiated chemical vapor deposited nanoadhesive for bonding National Ignition Facility's targets

Currently, the target fabrication scientists in National Ignition Facility Directorate at Lawrence Livermore National Laboratory (LLNL) is studying the propagation force resulted from laser impulses impacting a target. To best study this, they would like the adhesive used to glue the target substrates to be as thin as possible. The main objective of this research project is to create adhesive glue bonds for NIF’s targets that are ≤ 1 μm thick. Polyglycidylmethacrylate (PGMA) thin films were coated on various substrates using initiated chemical vapor deposition (iCVD). Film quality studies using white light interferometry reveal that the iCVD PGMA films were smooth. The coated substrates were bonded at 150 °C under vacuum, with low inflow of Nitrogen. Success in bonding most of NIF’s mock targets at thicknesses ≤ 1 μm indicates that our process is feasible in bonding the real targets. Key parameters that are required for successful bonding were concluded from the bonding results. They include inert bonding atmosphere, sufficient contact between the PGMA films, and smooth substrates. Average bond strength of 0.60 MPa was obtained from mechanical shearing tests. The bonding failure mode of the sheared interfaces was observed to be cohesive. Future work on this project will include reattempt to bond silica aerogel to iCVD PGMA coated substrates, stabilize carbon nanotube forests with iCVD PGMA coating, and kinetics study of PGMA thermal crosslinking.

36 MATERIALS SCIENCE↗

Mass and Reliability System (MaRS)

The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

Barnes, Sarah↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Material Directorate (RCMD) as a third - generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT - equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met.

42 ENGINEERING↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Materiel Directorate (RCMD) as a third-generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT-equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering Design Study of Laser Power Beaming for Applications on the Moon

Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanent-ly-shadowed regions (PSR) where solar power is not available, however detailed engineering design studies of the spacecraft for such applications has not previously been undertaken. In this work, we did an engineering design study of two applications of laser power beaming for near-term lunar ap-plications. In the first application studied, an application was studied to provide power during the lunar night for a global network of small landers spread across the lunar surface, at latitudes ranging from equatorial to near polar landing sites. We analyze a proposal to power such small landers from orbit, using a laser to beam power from an orbital power station to photovoltaic arrays on the landers that are tuned to the laser wavelength. A commercially-available high-power 1.07-µ diode-pumped fiber laser was chosen as the source. To minimize beam spread of the a spot at the required distance, a 1.5 meter optical element was provided, using a design based on the Kepler telescope. To provide power to landers at any location, three orbital stations (“beamcraft) are required, each carrying a 3-kW laser. (If the surface science platforms requiring power are only in polar locations, or converse-ly, only in near equatorial locations, only one orbital platform is needed.) The approach is seen to be feasible, and a systems analysis was completed, the concept of operations for the system out-lined and a design for the beamcraft put together. The second design study looked at surface-to-surface power beaming using the VSAT as the la-ser platform, for an application to provide power to the interior of a permanently shadowed lunar crater from a surface platform. To maximize the distance of beaming, taking into account possible surface irregularities and the short distance to the horizon of the moon, it is desirable to emplace the laser at an elevation above the surface. The Vertical Solar Array Technology (VSAT) is a NASA program developing a solar array mounted vertically on a 10-m tall mast, designed for emplacement on a Commercial Lunar Payload Services (CLPS) lander to provide 10-kW (BOL) power near the south polar region of the moon, with a target readiness date of 2028. We used this design as the starting platform and the power source for a laser power beaming station. By mounting the laser beam director at the top of the solar array mast, a viewing distance to power receivers up to 10 km is possible. Requirements for the system were to be able to provide 300 W of continuous usable power to users including CLPS landers, VIPER class rovers, or the proposed Lunar Terrain Vehicle. The specified requirement was to be able to transmit power to a distance of up to 10 km, over a design lifetime of 5 years, and fitting within a total system landed mass under 625 kg. Again, a 1.07-µ fiber laser is mounted on the deck of the lander, with laser output sent to the laser beam director by a fiber-optic cable. A 7 square meter deployable radiator keeps the laser within operating temperature limits. The beam director is based on the design of a prototype unit developed by the University of California Santa Barbara. The system beams power for 57% of the time, with 44% of the time idle (accounting for the time when the VSAT array is itself in shadow). 1595 Watts of optical power are output in the beam. Accounting for receiver efficiency and beam losses, this results in an output onto the 1.5-meter receiving photovoltaic array of 542 watts. Of this, 300 watts is directly available to the user, while 242 watts is directed to the batteries for use while the beam is not available.

laser power↗

Hanford Direct Feed Low Activity Waste Real Time Monitoring Program - 18336

Effective operation of the Low-Activity Waste (LAW) Facility at Hanford will rely on information provided from monitoring and control of chemical process streams to maintain safety and environmental compliance, product quality, and operational efficiency. The LAW Facility has been designed as a contact-maintained facility and it was recognized that establishing a real time, in-line monitoring program could have substantial benefits to the U.S. Department of Energy, Office of River Protection in the long-term, which include significant time savings, increased processing efficiency and effectiveness, reducing worker exposure to radiation and chemical hazards, reducing secondary wastes, and a better understanding of the flowsheet to support direct-feed LAW (DFLAW). The Assistant Manager/Federal Project Director for the Waste Treatment and Immobilization Plant (WTP) Project chartered a multidisciplinary integrated technical team comprised of federal, contractor, and national laboratory staff to develop a phased program to support this initiative. A three-phase approach was adopted: - Phase 1: Requirements and Opportunities Analysis for Sampling Reduction; - Phase 2: Applications and Benefits Determination; - Phase 3: Qualification and Demonstration. The focus of Phase 1 is to identify the drivers behind any requirements for sampling and any opportunities to benefit from a real-time monitoring program. The effort identified 18 sample points and approximately 2,600 potential samples to be collected annually with analytical methods to be performed approximately 18,000 times annually. Based on Savannah River National Laboratory experience and discussions with WTP Analytical Laboratory personnel, these sample analyses will generate approximately 5,000 L of liquid secondary waste and approximately 1,300 m{sup 3} of solid secondary waste each year. Additional solid and liquid secondary wastes will be generated from sample collection. A preliminary evaluation indicates that employing real-time, in-line monitoring, mass balances, and periodic sampling could significantly reduce the number of samples collected, analytical methods performed, and secondary waste generated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of 2016 Occurrence Reports Involving Electrical Energy

The 04100 Center Director requested an analysis of 2016 occurrence reports (ORs) involving electrical energy be performed to facilitate learning through use of performance assurance methodologies. Preliminarily, 11 reportable events were identified for review; however, this population was updated to 12 during the review. Appendix 1 includes the analysis protocol and a listing of the ORs reviewed. The Team completed its review at the end of October 2016. At that time, causal analysis and associated corrective action information was available for eight events. Elements of this analysis included determining the following: common weaknesses that contributed to electrical events; the quality of causal analysis products with the goal of providing sustainable long-term corrective actions; and how learning from issues, causes, and corrective actions from prior similar events is incorporated into causal analyses for today’s events. As used in this report, the term “trends” was used as a catalyst to determine categories of events for deeper analysis. The content of ORs is important. The information in an OR for a past event can be useful in addressing today’s issues because it provides information on systemic issues that were found and past actions addressing those issues. The effectiveness of those actions as viewed from today’s vantage point is useful input to the determination of corrective actions for current problems. Additionally, as a means of communication to DOE and NNSA, ORs provide a measure of Sandia’s maturity in understanding problems and their solutions.

42 ENGINEERING↗

UAM Vision Concept of Operations (ConOps) UAM Maturity Level (UML) 4

This Vision ConOps is intended as a foundation to engage members of the UAM community and provide a consensus on the future vision of UAM operations. It provides a concept for more detailed discussion and a basis for the exploration of ideas using a common framework to inform the continued development and integration of UAM as part of the broader transportation system. Advanced Air Mobility (AAM) encompasses a range of innovative aviation technologies (small drones, electric aircraft, automated air traffic management, etc.) that are transforming aviation’s role in everyday life, including the movement of goods and people. Urban Air Mobility (UAM) represents one of the most exciting and complex AAM concepts with highly automated aircraft, providing commercial services to the public over densely populated cities. This concept has generated tremendous interest and industry investment. UAM envisages a future in which advanced technologies and new operational procedures enable practical, cost-effective air travel as an integral mode of transportation in metropolitan areas. It represents one of the most exciting and complex AAM concepts with highly automated aircraft providing commercial services to the public over densely populated cities. For this reason, the National Aeronautics and Space Administration (NASA) selected UAM as the initial goal of its AAM efforts and the focus of this Vision Concept of Operations (ConOps) document. UAM Community Vision ConOps: This Vision ConOps effort was led by experts from NASA’s Aeronautics Research Mission Directorate (ARMD) in collaboration with the Federal Aviation Administration (FAA) and Deloitte’s Ecosystem Advisory Group (a cohort of advisers with aviation, aerospace, and regulatory expertise). To develop this Vision ConOps, NASA, FAA, and Deloitte built upon the current body of aeronautical research and consulted with more than 100 stakeholder organizations. This UAM community includes entities ranging from legacy aviation leaders to innovators and new market entrants. Stakeholders consulted included the federal government, state and local government, aerospace original equipment manufacturers (OEMs), local transportation organizations, prospective UAM operators, academia, industry standards-setting bodies, airports, service suppliers, and others (as described in Appendix G). This input was captured through the following methods: • A series of more than two dozen interviews with industry experts, federal regulators, state and local governments, and industry trade groups provided insight into the challenges of UAM integration into the National Airspace System (NAS), as well as technology developments and a variety of perspectives as to how UAM systems will integrate. • A series of two-day community workshops enabling active, detailed engagement of nearly 100 industry, academic, federal, and state stakeholder individuals. These workshops, hosted by NASA and Deloitte, explored UAM concepts in detail, and stakeholders were invited to collaboratively analyze and propose solutions to some of the greatest conceptual challenges behind UAM at an intermediate state. • A review of more than 160 sources of UAM literature from across government, industry, and academia, which are listed in Appendix H. • The public sharing of workshop input and document drafts for review and input across the UAM community. Feedback in the form of more than 1,000 comments and inputs on the document was received from industry groups, individual companies, academia, and government (federal, state, and local), among others. Although effort was made to incorporate inputs from across the UAM stakeholder group, not all comments could ultimately be incorporated in this version. The team resolved conflicting comments or ideas while maintaining consistency with the known direction of regulators and ensuring the document was coherent and consistent. It is recognized that this is a rapidly evolving area and that concepts will likely change over time; as such, this Vision ConOps is a living document and is expected to evolve as concepts mature. The ConOps does, however, provide a vision of UAM concepts and solutions based on the broad insights from across the UAM stakeholder community at the time of its publication and is intended to serve as a UAM North Star for continued research and development of UAM. As a broad Vision ConOps, is not a detailed engineering document; rather, it focuses primarily on outlining a broad, high-level vision across all aspects of a UAM transportation system.

Urban Air Mobility↗

Author Contribution to the Pu Handbook II: Chapter 37 LLNL Integrated Sample Preparation Glovebox (TEM) Section

The development of our Integrated Actinide Sample Preparation Laboratory (IASPL) commenced in 1998 driven by the need to perform transmission electron microscopy studies on naturally aged plutonium and its alloys looking for the microstructural effects of the radiological decay process (1). Remodeling and construction of a laboratory within the Chemistry and Materials Science Directorate facilities at LLNL was required to turn a standard radiological laboratory into a Radiological Materials Area (RMA) and Radiological Buffer Area (RBA) containing type I, II and III workplaces. Two inert atmosphere dry-train glove boxes with antechambers and entry/exit fumehoods (Figure 1), having a baseline atmosphere of 1 ppm oxygen and 1 ppm water vapor, a utility fumehood and a portable, and a third double-walled enclosure have been installed and commissioned. These capabilities, along with highly trained technical staff, facilitate the safe operation of sample preparation processes and instrumentation, and sample handling while minimizing oxidation or corrosion of the plutonium. In addition, we are currently developing the capability to safely transfer small metallographically prepared samples to a mini-SEM for microstructural imaging and chemical analysis. The gloveboxes continue to be the most crucial element of the laboratory allowing nearly oxide-free sample preparation for a wide variety of LLNL-based characterization experiments, which includes transmission electron microscopy, electron energy loss spectroscopy, optical microscopy, electrical resistivity, ion implantation, X-ray diffraction and absorption, magnetometry, metrological surface measurements, high-pressure diamond anvil cell equation-of-state, phonon dispersion measurements, X-ray absorption and emission spectroscopy, and differential scanning calorimetry. The sample preparation and materials processing capabilities in the IASPL have also facilitated experimentation at world-class facilities such as the Advanced Photon Source at Argonne National Laboratory, the European Synchrotron Radiation Facility in Grenoble, France, the Stanford Synchrotron Radiation Facility, the National Synchrotron Light Source at Brookhaven National Laboratory, the Advanced Light Source at Lawrence Berkeley National Laboratory, and the Triumph Accelerator in Canada.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Toward Right-Fidelity Rotorcraft Conceptual Design

The aviation Advanced Design Office (ADO) of the US Army Aeroflightdynamics Directorate (AMRDEC) performs conceptual design of advanced Vertical Takeoff and Landing (VTOL) concepts in support of the Army's development and acquisition of new aviation systems. In particular, ADO engages in system synthesis to assess the impact of new technologies and their application to satisfy emerging warfighter needs and requirements. Fundamental to ADO being successful in accomplishing its role; is the ability to evaluate a wide array of proposed air vehicle concepts, and independently synthesize new concepts to inform Army and DoD decision makers about the tradespace in which decisions will be made (Figure 1). ADO utilizes a conceptual design (CD) process in the execution of its role. Benefiting from colocation with NASA rotorcraft researchers at the Ames Research Center, ADO and NASA have engaged in a survey of the current rotorcraft PD practices and begun the process of improving those capabilities to enable effective design and development of the next generation of VTOL systems. A unique aspect of CD in ADO is the fact that actual designs developed in-house are not intended to move forward in the development process. Rather, they are used as reference points in discussions about requirements development and technology impact. The ultimate products of ADO CD efforts are technology impact assessments and specifications which guide industry design activity. The fact that both the requirement and design are variables in the tradespace adds to the complexity of the CD process. A frequent need is ability to assess the relative "cost" of variations in requirement for a diverse set of VTOL configurations. Each of these configurations may have fundamentally different response characteristics to this requirement variation, and such insight into how different requirements drive different designs is a critical insight ADO attempts to provide decision makers. The processes and tools utilized are driven by the timeline in which questions must be answered. This can range from quick "back-of-the-envelope" assessments of a configuration made in an afternoon, to more detailed tradespace explorations that can take upwards of a year to complete. A variety of spreadsheet based tools and conceptual design codes are currently in use. The in-house developed conceptual sizing code RC (Rotorcraft) has been the preferred tool of choice for CD activity for a number of years. Figure 2 illustrates the long standing coupling between RC and solid modeling tools for layout, as well as a number of ad-hoc interfaces with external analyses. RC contains a sizing routine that is built around the use of momentum theory for rotors, classic finite wing theory, a referred parameter engine model, and semi-emperical weight estimation techniques. These methods lend themselves to rapid solutions, measured in seconds and minutes. The successful use of RC, however requires careful consideration of model input parameters and judicious comparison with existing aircraft to avoid unjustified extrapolation of results. RC is in fact a legacy of a series of codes whose development started in the early 1970s, and is best suited to the study of conventional helicopters and XV-15 style tiltrotors. Other concepts have been analyzed with RC, but typically it became necessary to modify the source code and methods for each unique configuration. Recent activity has lead to the development of a new code, NASA Design and Analysis of Rotorcraft (NDARC). NDARC uses a similar level of analytical fidelity as RC, but is built on a new framework intended to improve modularity and ability to rapidly model a wider array of concepts. Critical to achieving this capability is the decomposition of the aircraft system into a series of fundamental components which can then be assembled to form a wide-array of configurations. The paper will provide an overview of NDARC and its capabilities.

Sinsay, Jeffrey D.↗

Study of the integrity of pressurized LEH window assemblies at cryogenic temperatures for NIF targets

The National Ignition Facility (NIF) is a directorate of LLNL, a DOE Lab, and is home to the world’s largest laser. This laser shoots its 192 beams at a target about the size of a pencil eraser. Within the target are two main chambers; and depending on the type of shot, those chambers need to be pressurized to a certain point at a very low temperature (18 Kelvin). The component used for keeping the hohlraum at its designated pressure is a Laser Entrance Hole (LEH) window, made from a thin (0.5um) polyimide film and an aluminum washer attached with a miniscule amount of polymeric adhesive. One issue that has been known to happen is the chambers will leak, at very low rates (5.0E-7 mBar-liter/s and under). At higher pressures significantly larger leak rates have been observed.There are three proposed mechanisms by which the LEH windows are leaking. The first is that there is a small pinhole somewhere in the freestanding film. This is the most unlikely because before any film is shipped from Luxel, it must pass a 50-75 torr room temperature pressure test. The second is a tear in the film at the edge of the washer. This type of damage suggests that the film is under additional stress at this edge portion and/or the edge of the washer itself is what is doing the damage. Lastly, it has been hypothesized that there are small channels under the window that do not get completely filled by the glue and, if they connect to the edge of the freestanding portion of the film, then the pressure can escape through them. These channels were the mechanism being most directly tested over the course of the experiments.

42 ENGINEERING↗

Infusing Stretch Goal Requirements into the Constellation Program

In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

Operability↗

Human System Risk Management for Space Flight

This brief abstract reviews the development of the current day approach to human system risk management for space flight and the development of the critical components of this process over the past few years. The human system risk management process now provides a comprehensive assessment of each human system risk by design reference mission (DRM) and is evaluated not only for mission success but also for long‐term health impacts for the astronauts. The discipline of bioastronautics is the study of the biological and medical effects of space flight on humans. In 1997, the Space Life Sciences Directorate (SLSD) initiated the Bioastronautics Roadmap (Roadmap) as the "Critical Path Roadmap", and in 1998 participation in the roadmap was expanded to include the National Space Biomedical Research Institute (NSBRI) and the external community. A total of 55 risks and 250 questions were identified and prioritized and in 2000, the Roadmap was base-lined and put under configuration control. The Roadmap took into account several major advisory committee reviews including the Institute of Medicine (IOM) "Safe Passage: Astronaut care for Exploration Missions", 2001. Subsequently, three collaborating organizations at NASA HQ (Chief Health and Medical Officer, Office of Space Flight and Office of Biological & Physical Research), published the Bioastronautics Strategy in 2003, that identified the human as a "critical subsystem of space flight" and noted that "tolerance limits and safe operating bands must be established" to enable human space flight. These offices also requested a review by the IOM of the Roadmap and that review was published in October 2005 as "A Risk Reduction Strategy for Human Exploration of Space: A Review of NASA's Bioastronautics Roadmap", that noted several strengths and weaknesses of the Roadmap and made several recommendations. In parallel with the development of the Roadmap, the Office of the Chief Health and Medical Officer (OCHMO) began a process in 2004 of evaluating the tolerance limits and safe operating bands called for in the Bioastronautics Strategy. Over the next several years, the concept of the "operating bands" were turned into Space Flight Human System Standards (SFHSS), developed by the technical resources of the SLSD at the NASA Johnson Space Center (JSC). These standards were developed and reviewed at the SLSD and then presented to the OCHMO for acceptance. The first set of standards was published in 2007 as the NASA‐STD‐3001, Volume 1, Crew Health that elaborated standards for several physiological areas such as cardiovascular, musculoskeletal, radiation exposure and nutrition. Volume 2, Human Factors, Habitability and Human Health was published in 2011, along with development guidance in the Human Integration Design Handbook (HIDH). Taken together, the SFHSS Volumes 1 and 2, and the HIDH replaced the NASA‐STD‐3000 with new standards and revisions of the older document. Three other changes were also taking place that facilitated the development of the human system risk management approach. In 2005, the life sciences research and development portfolio underwent a comprehensive review through the Exploration Systems Architecture Study (ESAS) that resulted in the reformulation of the Bioastronautics Program into Human Research Program (HRP) that was focused on appropriate mitigation results for high priority human health risks. The baseline HRP budget was established in August 2005. In addition, the OCHMO formulated the Health and Medical Technical Authority (HMTA) in 2006 that established the position of the Chief Medical Officer (CMO) at the NASA JSC along with other key technical disciplines, and the OCHMO became the responsible office for the SFHSS as noted above. The final change was the establishment in 2008 of the Human System Risk Board (HSRB), chaired by the CMO with representation from the HRP, SLSD management and technical experts. The HSRB then began to review all human system risks, established a comprehensive risk management and configuration management plan and data sharing policy. These major developments of standards, the HRP, the HMTA and a forum for review of human system risks (HSRB) facilitated the integration of human research, medical operations, systems engineering and many other disciplines in the comprehensive review of human system risks. The HSRB began a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30 where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit 6 and 12 months, deep space sortie for 30 days and 1 year, a one year lunar mission, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary assessment representing the state of knowledge/evidence base for that risk, the available risk mitigations, traceability to the SFHSS and program requirements, and future work required. These data then can drive coordinated budgets across the HRP, the International Space Station, Crew Health and Safety and Advanced Exploration System budgets. These risk assessments were completed for 6 DRMs in December of 2014 and serve as the baseline for which subsequent research and technology development and crew health care portfolios can be assessed. The HSRB will review each risk at least annually and especially when new information is available that must be considered for effective risk mitigation. The current status of each risk can be reported to program management for operations, budget reviews and general oversight of the human system risk management program.

Davis, Jeffrey↗